brookhaven science associates u.s. department of energy aerosol life cycle iop, 2011 stephen r....
TRANSCRIPT
Brookhaven Science AssociatesU.S. Department of Energy
Aerosol Life Cycle IOP, 2011
Stephen R. Springston
6/27/2011
BNL
Purpose: Weekly informational meeting on the Aerosol IOP. This includes:• Logistical Information • Instrument and Measurement Status Reports• Safety Observations• Noteworthy Field Observations• New Business• Presentations
Where/When: Monday mornings (10-11 am) in 815E conference room.
Purpose of Weekly Meeting
Goal is to keep meeting < 1 hr with offline follow ups
Agenda for 6/27 meeting
SafetyLogistics UpdateWikiMusical InstrumentsCalendarData FlowStudent 1-Liners
Safety
Who’s responsible for safety?Emergency phone number?Long pants, bug spray, closed toe shoesQuestions/Observations
Weekly Update/Calendar
Today – Railing up on AMFII AOSWednesday (?) – Power at graveled siteFriday (?) – Move 4 structures to gravel site Friday (???) – Erect towers, commence samplingMonday, July 4th meeting moved to July 6th
DOE Visit week of 7/25
Keys/AccessSue Oatis ([email protected])
Wiki
Log in/passwordCalendar up and runningPictures
MAOS A/CMAOS A
CCN-200PSAPAethalometerPASS-3SP2Dual Nephelometer HygrometerCPC (>10 nm)CPC (>2.5 nm)UHSASSMPSHTDMAACSMLocal Meteorology
MAOS CPILSPTRMSCarbon MonoxideOzoneSulfur DioxideNOx (NO, NO2, NOy)
• 4 Instrument Racks• Aerosol Inlet
• 1 Instrument Rack• 2 Custom Mounts• 1 Expansion Rack• Trace Gas Inlet• Aerosol Inlet
Also
• 3 Instrument Racks• Aerosol Inlet
AMFII AOSCCN-100PSAPDual Nephelometer HygrometerCPC (>10 nm)HTDMAOzoneLocal MeteorologyCAPSn-SMPSUV-APSSP2 ??
BNL Mobile LaboratoryDMA/CCN1DMA/CCN2HR-TOF-AMSCIMSPSM
OtherRadar Wind ProfilerSODARMTPCimel SunphotometerLASMFRSR
• 3 Instrument Racks
Data Route
Brick
Instrument
Brick
Instrument
Brick
Instrument
KVM
Site Server ARM DMF Archive
Mentors
ANL VPN
Users
New Business?