brownsville revitalization project

6
Brownsville Revitilization Project Spring 2014 - Third Year 2 Person Group Site and Hotel Design Model Photos

Upload: scott-axel

Post on 24-Mar-2016

226 views

Category:

Documents


0 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Brownsville Revitalization Project

Brownsville Revitilization ProjectSpring 2014 - Third Year2 Person GroupSite and Hotel DesignModel Photos

Page 2: Brownsville Revitalization Project

Brownsville Taking a Look at the Past in Order to Create a New Beginning Regional Map

West Brownsville

California

Brownsville

Brownsville Surrounding Area and Site Proposed Rails to Trails: Establish an Attraction for Outdoors Enthusiast

West Brownsville

California

Brownsville

West Brownsville

California

Brownsville

Railroad Travel: Major Roads: Proposed Rails to Trails: Railroad Travel: Major Roads: Railroad Travel: Major Roads:

West Brownsville

California

Brownsville

Dunlap Creak: Monongahela River: Target Riverfront: Dunlap Creak: Monongahela River: Target Riverfront

Dunlap Creak Bridge Section

California

BrownsvilleFredericktown

West Brownsville

Labelle

Site

Existing Industries: Coke ProductionCoal MiningFerry Boat Production

Current Industries:Barge ProductionPopulation Loss Since 2000: -16.87%

Future Attractions: - Outdoor Sports, Kayaking, Paddle Boarding, Mountain Biking, Rock Climbing- Hotel: Provides rooms for California College, Outdoor Sports Enthusiast- Restaurant: Services Hotel and Revitalized Downtown Area - Office Downtown: Branch Offices of Pittsburgh- Retail Shopping: Outdoor Sports Shops- Mine Tours

Questions To Ask: How do you acknowledge the historic nature of Brownsville without copying it?

Which Elements of the ow do you acknowledge the historic nature of Brownsville without copying it?

Brownsville Railroad Erecting Shop

Wythe Hotel, Heinz Center, 408 Greenwich, Clyfford Still Museum

Page 3: Brownsville Revitalization Project

Scale 1/32” = 1’-0” Site Section [restaurant]

0’ 6’ 10’ 20’ Scale 1/32” = 1’-0” Site Section [hotel] 0’ 6’ 10’ 20’

Site Plan Scale: 1/32” : 1’

Existing Site Plan

Restaurant

Hotel

Hotel Ballroom

Park

Building Open To Street

Boat Dock and Recreational Pier

Page 4: Brownsville Revitalization Project

UP UP UP UP UP

Fire Egress (Occupancy Group R)2 �re stairs per �oor1 area of refuge per stairFully sprinkled rooms and halls

70ft

80ft

30ft

50ft

70ft

UP

ADA Diagram1 area of refuge per �re stair2 full service elevatorsADA accessible bathrooms in all rooms

HVAC HVAC HVACHot WaterCold

Water

HVAC/Water Diagram

1' overhang1' overhang

1' overhang

1' overhang

2' overhang

6" overhang

Sun Studies [sectional/plan]

West Walls

Winter SunWinter

Winter

WinterWinter

Spring/Fall

Spring/ Fall

Spring/ Fall

Spring/ Fall

Spring/ Fall

SummerSummer

Summer

Summer

Summer

East Walls

Win

ter

Spr

ing/

Fall

Sum

mer

Room Ventilation

Joint Detail

Pin Connection

Steel Beam W8-10

Steel Column W12

Steel Girder W16-20

Lateral Bracing System

Structural Diagram

Scal

e1/

8”=

1’-0

”Gro

und

Floo

rPla

n

0’3’

5’10

Scal

e1/

8”=

1’-0

”Sec

ond

Floo

rPla

n

0’3’

5’10

Scal

e1/

8”=

1’-0

”Th

irdFl

oorP

lan

0’3’

5’10

Scal

e 1/

8” =

1’-0

” Fo

urth

Flo

or P

lan

0’

3’

5

10

Scal

e1/

8”=

1’-0

”Fi

fth

Floo

rPla

n

0’3’

5’10

Scal

e1/

8”=

1’-0

”Si

xth

Floo

rPla

n

0’3’

5’10

UP

DE

NO

ND

EN

ON

Page 5: Brownsville Revitalization Project

EPOXY GROUT

BLUE STONE SLATE

RADIANT HEATING SYSTEM

CONCRETE SLAB

RIGID BOARD INSULATION

GRAVEL

EARTH

Interior Perspectives

Exterior Perspective B Wall Section 3/8” : 1’ Scale Insulated Wall Panel DetailExterior Perspective A Site Photos

Page 6: Brownsville Revitalization Project

Skylight

Steel Hinge BracketLouvre Blade

Alum. “SF” FrameBuilt-up Roofing

5/8” GWB Roof Finish

Window Condition

Concrete Panel - Board Formed (6”)

Concrete Panel - Board Formed (6”)

Custom Bracket on Beam for Concrete

Floor Finish - Acoustic, Weather, Flooring

Steel Decking w/Concrete (4”)

Steel Beam W8 Shape

5/8” GWB on 1” Air Gap

Steel Girder W20 Shape

Concrete Foundation Wall (1’)

Pavement

Gravel Support/Absorption

Steel Column W12 Shape

Balcony Door System

Balcony Roof Insulation

Balcony Drainage

Vertical Fin/Overhang

Scale 1/8” = 1’-0” West Elevation 0’ 3’ 5’ 10’

Scale 1/16” = 1’-0” North Elevation 0’ 3’ 5’ 10’ Scale 1/16” = 1’-0” East Elevation 0’ 3’ 5’ 10’ Scale 1/16” = 1’-0” North Elevation 0’ 3’ 5’ 10’

0’ 3’ 5’ 10’ Scale 1/8” = 1’-0” Longitudinal Section 0’ 3’ 5’ 10’ Scale 1/8” = 1’-0” Transverse Section 0’ 1.5’ 2.5’ 5’

Wall Section

Scale 1/4” = 1’-0”

UP

UP