Page 1: BSB JOP Project  BSBEEP Black Sea Buildings Energy Efficiency Plan Yerevan Me eting

BSB JOP Project BSBEEPBlack Sea Buildings Energy Efficiency Plan

Yerevan Meeting9th-10th of December, 2013

Yerevan - Armenia

HAKAN SEZGINHAKAN SEZGINSamsun Metroplitan MSamsun Metroplitan Municipality unicipality

SamsunSamsun, , TurkeyTurkey

1

Page 2: BSB JOP Project  BSBEEP Black Sea Buildings Energy Efficiency Plan Yerevan Me eting

Synopsis of the Samsun Metropolitan Municipality BSBEEP Project

It is determined that all bodies involved in the project partnership should have their own budgets for visibility activities; since each project partner body has different and varied number of target groups as it can be seen in detail in BSBEEP Communication Plan, they should focus on different priorities as a matter of course.

Thusly, it has been highlighted that in order to get the maximum possible efficiency from the activities of project visibility operations, all the project partner bodies should plan the project visibility operations according to their own target groups and priorities and compose them in their native languages.

It has been underlined that project partners’ asking the opinion of the project managing authorities and getting their approval in advance of each visibility operation in the framework of the project are essential for regarding the expenses paid by the visibility budget as eligible costs.

2

Page 3: BSB JOP Project  BSBEEP Black Sea Buildings Energy Efficiency Plan Yerevan Me eting

Communication and visibility activities might be summurized within

just one word

ELIGIBLE OR

NOT3

Page 4: BSB JOP Project  BSBEEP Black Sea Buildings Energy Efficiency Plan Yerevan Me eting

JUST THINK ABOUT

WHY COMMUNICATION…

AND

WHY VISIBILTY…

4

Page 5: BSB JOP Project  BSBEEP Black Sea Buildings Energy Efficiency Plan Yerevan Me eting

A GOOD

COMMUNICATION CHANGES

BEHAVIOUR & ATTITUDES… 5

Because,

Page 6: BSB JOP Project  BSBEEP Black Sea Buildings Energy Efficiency Plan Yerevan Me eting

6

Our Basic Framework is…

Our Daily work: Black Sea Buildings Energy Efficiency Plan

Our tactical objectives: Local development policies

Creation of administrative capacity

Our strategic objective: Creation of regional partnerships and cooperation

Page 7: BSB JOP Project  BSBEEP Black Sea Buildings Energy Efficiency Plan Yerevan Me eting

7

THE BLACK SEA BASINTHE BLACK SEA BASIN 2007 2007 – 2013 – 2013 JOINT OPERATIONAL JOINT OPERATIONAL

PROGRAMMEPROGRAMME

BLACK SEA BASINBLACK SEA BASINBUILDINS ENERGY BUILDINS ENERGY

EFFICIENCY PLAN PROJECTEFFICIENCY PLAN PROJECT

GA4 GA4 VISIBILITY OFVISIBILITY OF THE ACTION THE ACTION

Page 8: BSB JOP Project  BSBEEP Black Sea Buildings Energy Efficiency Plan Yerevan Me eting

Structure or presentationStructure or presentation

1. Visual Identity Manual of the Programme2. Institutions involved in communication &

information activities3. Communication instruments4. GA’s internal structure 5. General description of the GA6. From GAF to implementation - What to do7. BSBEEP Partner Perception and Added

Value 8. Presentation of GA’s activities9. Outputs, results, target groups and

stakeholders10.Contact details 8

Page 9: BSB JOP Project  BSBEEP Black Sea Buildings Energy Efficiency Plan Yerevan Me eting

SSources for the Communication Activitiesources for the Communication Activities

9

Following sources might be resorted when preparing communication activities:

• The EU Communication and Visibility Manual,

• The Visual Identity Manual of the Programme,

• Communication Guide,

•EUwebsite:http://ec.europa.eu/europeaid/work/visibility/index_en.htm,

• Programme website: http://www.blacksea-cbc.net/index.php/eng/Documents/Communication-materials.

Page 10: BSB JOP Project  BSBEEP Black Sea Buildings Energy Efficiency Plan Yerevan Me eting

EU Communication and Visibility ManualEU Communication and Visibility Manual

10

The Communication

Manual is designed to ensure that

actions, wholly or partially

funded by the EU, incorporate communication

activities to raise awareness

of the EU support, its

results and its impact.

Page 11: BSB JOP Project  BSBEEP Black Sea Buildings Energy Efficiency Plan Yerevan Me eting

The EU ManualThe EU Manual

11

• Sets out requirements and guidelines for all relevant communication activities and tools.

• Goes beyond static visibility promoting dynamic communication strategies .

• Provides guidance on budgeting.

• Supports draft and implementation of communication plans and reports.

• Covers partnership with international organisations.

Page 12: BSB JOP Project  BSBEEP Black Sea Buildings Energy Efficiency Plan Yerevan Me eting

The Visual Identity and TemplatesThe Visual Identity and Templates

12

A full set of elements to make the EU visible http://ec.europa.eu/europeaid/work/visibility/index_en.htm

Page 13: BSB JOP Project  BSBEEP Black Sea Buildings Energy Efficiency Plan Yerevan Me eting

The Visual Identity Manual of the Programme revised 2011The Visual Identity Manual of the Programme revised 2011

13

• A revised version of the Communication and Visibility Manual for European Union External Actions published by the European Commission –new VIM of the Programme.

• VIM is part of the Grant contract - compulsory rules.

Page 14: BSB JOP Project  BSBEEP Black Sea Buildings Energy Efficiency Plan Yerevan Me eting

The Issues Covered by the Visual Identity ManualThe Issues Covered by the Visual Identity Manual

14

Visual Identity ElementsUse of the European Union Logo, The title, the slogan and the logo of the Programme, Colors, Backgrounds, Spacing, Fonts, Page layout.Compulsory InformationCommunication ToolsPress releases, Press releases, Press visits, Press ads, Leaflets, Brochures, Posters, Newsletters, Web pages, Public events, visits, information campaigns, Banner-ups, Internet Banners, CD Covers, Stickers, Business cards, Power Point Presentations, Promotional Items, Envelopes, T-shirts, Caps, Photos, Audio-visual Productions.

Page 15: BSB JOP Project  BSBEEP Black Sea Buildings Energy Efficiency Plan Yerevan Me eting

Changes within the revised Visual Identity ManualChanges within the revised Visual Identity Manual

15

• Better underlined the difference between Project/Programme communication tools;• Compulsory information according the EC Manual (disclaimer, definition of EU in case of publications);•Recommendation for the Beneficiaries/partners to consult the communication officers from the JMA/JTS and NIPs when producing communication/promotional materials;• Example of new communication instruments have been introduced such as: press visits, public events and information campaigns• Compulsory bilingual stickers for all the equipment purchased

Page 16: BSB JOP Project  BSBEEP Black Sea Buildings Energy Efficiency Plan Yerevan Me eting

Changes within the revised Visual Identity ManualChanges within the revised Visual Identity Manual

16

• Better underlined the difference between Project and Programme communication tools;• Compulsory information according the EC Manual (disclaimer, definition of EU in case of publications);•Recommendation for the Beneficiaries/partners to consult the communication officers from the CFCU and NIPs when producing communication/promotional materials;• Example of new communication instruments have been introduced such as: press visits, public events and information campaigns• Compulsory bilingual stickers for all the equipment purchased

Page 17: BSB JOP Project  BSBEEP Black Sea Buildings Energy Efficiency Plan Yerevan Me eting

Basic Communication RulesBasic Communication Rules

17

Flag of the EU, logo of the Project, logo of the Programme“Project funded by the European Union”, below the EU flagIn case of publications:Technical box which will contain: the title of the project, the editor of the material, the date of publishing and the disclaimer “This publication has been produced with the assistance of the European Union. The contents of this publication are the sole responsibility of ……. and can in no way reflect the views of the European Union”.

Definition of EU- several texts available, at the choice of the Beneficiary/partner

Compulsory information at Project level (I)

Page 18: BSB JOP Project  BSBEEP Black Sea Buildings Energy Efficiency Plan Yerevan Me eting

Basic Communication RulesBasic Communication Rules

18

• The flag of the EU must appear on all the communication and promotional materials with the following text “Project funded by the European Union”. Instructions in the Communication and Visibility Manual for EU External Actions must be followed for the proper use of the EU flag.• Any supplies or equipment delivered and brochures, booklets all types of promotional materials (posters, display panels, etc.) produced under Programme must visibly carry the Programme logo, placed in accordance with the instructions included in the VIM.

• The project’s logo must appear on all communication and promotional materials.

Compulsory information at Project level (II)

Page 19: BSB JOP Project  BSBEEP Black Sea Buildings Energy Efficiency Plan Yerevan Me eting

Basic Communication RulesBasic Communication Rules

19

• The EU logo must be in the same height with the Programme logo.

• In case of any suspicions arising from the interpretation of the EU Visibility Guidelines or Visual Identity Manual of the Programme, the Grant Beneficiaries must consult with the CFCU.

• Consult VIM for the proper use of Programme title

• Pay attention to page layout rules in VIM (cover page design, where and how the EU flag, the Programme logo and project logo shall be placed)

• Various publications shall mentioned that the funding was provided by the European Union. (Consult VIM)

• There are specific rules for setting up websites.

• Cost of incorrectly designed printed materials may be determined as ineligible costs at the end of project implementation.

Compulsory information at Project level (III)

Page 20: BSB JOP Project  BSBEEP Black Sea Buildings Energy Efficiency Plan Yerevan Me eting

Basic Communication RulesBasic Communication Rules

20

• Photographs showing the progress of all actions should be taken where appropriate to document the progress of actions and events related to these (their launch, visits by EU officials, and so on) so that they can be used in communication material. (Consult VIM for Photography rules)

• Audiovisual products must also be compatible with the visibility rules

• The promotional items produced must be clearly identified with the programme logo, the project logo and EU logo carring the words Project funded By the EUROPEAN UNION, followed by key messages or key phrases.

• In case of small promotional items it is accepted that under the flag of EU to appear only the words EUROPEAN UNION

Compulsory information at Project level (IV)

Page 21: BSB JOP Project  BSBEEP Black Sea Buildings Energy Efficiency Plan Yerevan Me eting

The Programme LogoThe Programme Logo

21

• The logo must be used in accordance with the rules (spacing, color codes, fonts and background) in the VIM

• The logo shall not be copied from another document but downloaded from the Programme website, “Communication Materials” section.

• Various forbidden uses are present in VIM

Page 22: BSB JOP Project  BSBEEP Black Sea Buildings Energy Efficiency Plan Yerevan Me eting

Useful Information about Good Communication PracticesUseful Information about Good Communication Practices

22

In order to maximise the impact of communication efforts

•Activities need to be timely•Information used must be accurate•Activities should be coordinated closely with the CFCU•The right audience(s) should be targeted•Appropriate communication tools for particular audiences should be used•Messages should interest the target audience(s)•Activities should be appropriate in terms of resources spent and expected impact

Page 23: BSB JOP Project  BSBEEP Black Sea Buildings Energy Efficiency Plan Yerevan Me eting

Communication Plan TemplateCommunication Plan Template

23

Templates for the communication plan help staff to plan, manage and evaluate communication of their projects

Objectives• Overall communication objectives• Target groups• Spesific objectives for the target group, related with the action’s objectives and the phases of the project cycleCommunication Activities• Main activities that will tale place during the period covered by the communication plan• Communication tools chosenIndicators of achievements• Completion of the communication objectives• Provisions for the feedback ResourcesHuman and financial resources

Page 24: BSB JOP Project  BSBEEP Black Sea Buildings Energy Efficiency Plan Yerevan Me eting

Communication PlanCommunication Plan

24

Ideally, Grant Beneficiaries will have included some kind of Communication & Visibility Plan within their overall Project work plan, given as a compulsory Group of Activity within the Grant Application form. At the beginning of the implementation of the project it is recommended to develop a ‘full-blown’ Communication Plan in collaboration with the project partners and associates. For instructions and more information on how to develop communication plans, please consult the Communication Guide on the Programme website: http://www.blacksea-cbc.net/index.php/eng/Documents/Communication-materials

Page 25: BSB JOP Project  BSBEEP Black Sea Buildings Energy Efficiency Plan Yerevan Me eting

Main Instruments for the CommunicationMain Instruments for the Communication

25

Non-exaustive Good Communication Plan covers:

• Website

• Publications (flyers, brochures, maps of the eligible area)

• Events (project workshops, partnership forums, conference, trainings)

• Promotion materials

• Helpdesk

Page 26: BSB JOP Project  BSBEEP Black Sea Buildings Energy Efficiency Plan Yerevan Me eting

Practical Information about Good Communication PlanPractical Information about Good Communication Plan

26

The EU Communication and Visibility Manual, The Visual Identity Manual of the Programme and the Communication Guide can be found on the Programme website: www.blacksea-cbc.net in the “Communication Materials” section.On this section, editable templates for various communication tools are also uploaded.It is recommended that you consult the JTS during preparation of communication activities, in order to avoid inconveniences.The JTS shall be informed prior to major events such as kick off meetings, conferences, seminars etc. in order to promote the activity/project via various mechanisms

Page 27: BSB JOP Project  BSBEEP Black Sea Buildings Energy Efficiency Plan Yerevan Me eting

27

4- INTERNAL STRUCTURE OF GROUP ACTIVITIES 4- INTERNAL STRUCTURE OF GROUP ACTIVITIES

Name Visibility of the Action Responsible

partnerMunicipality of Samsun-TR

Involved Partners         

1. Applicant- Municipality of Kavala-GR 2. Democritus University-GR 3. Municipality of Galati-RO 4. University “DUNĂREA" Galaţi-RO 5. American University of Armenia-AM 6. R2E2 Fund-AM 7. Municipality of Cahul-MD 8. Municipality of Mykolayiv-UA 9. Municipality of Tekirdag-TR

Page 28: BSB JOP Project  BSBEEP Black Sea Buildings Energy Efficiency Plan Yerevan Me eting

28

55- - GENERAL DESCRIPTION OF THE GA4 IN TERMS OF AIM AND PURPOSE GENERAL DESCRIPTION OF THE GA4 IN TERMS OF AIM AND PURPOSE

The aims of GA4 is (1) to produce the promotion and communication material of BSBEEP project (brochures, web-page, final report etc) in English as also in all languages of the participating countries and (2) to implement media activities.

The purpose of GA4 is to promote the purposes, activities and results of Joint Action, to disseminate outputs, to communicate with final beneficiaries and wide audience, to raise awareness about the project and about energy efficiency for buildings.

Page 29: BSB JOP Project  BSBEEP Black Sea Buildings Energy Efficiency Plan Yerevan Me eting

29

66- From GAF to implementation – What to do- From GAF to implementation – What to do

Visibility of the Action Subcontracted services Budget Line Budget 1. Applicant- Municipality of Kavala-GR

One Communication Plan 581 € 8.000,00

1. Applicant- Municipality of Kavala-GR

Various other Promotional Activities

583 € 6.000,00

2. Democritus University-GR NOTHING ELSE MATTERS    

3. Municipality of Galati-RO Various other Promotional

Activities584 € 6.000,00

4. University “DUNĂREA" Galaţi-RO NOTHING ELSE MATTERS     5. American University of Armenia-AM

Various other Promotional Activities

585 € 6.000,00

6. R2E2 Fund-AMOne web page with intranet

section582 € 7.000,00

7. Municipality of Cahul-MD Various other Promotional

Activities586 € 6.000,00

8. Municipality of Mykolayiv-UA NOTHING ELSE MATTERS    

9. Municipality of Samsun-TR Various other Promotional

Activities581 € 6.000,00

10. Municipality of Tekirdag-TR Various other Promotional

Activities582 € 6.000,00

Total € 51.000,00

Page 30: BSB JOP Project  BSBEEP Black Sea Buildings Energy Efficiency Plan Yerevan Me eting

30

77- BSBEEP Partner Perception and Added Value- BSBEEP Partner Perception and Added Value

• Expectations from the implementation:• Enhance the knowledge of local authorities regarding

energy efficiency in buildings related issues.

• Help decision makers (local, regional, level) in relative issues.

• Support further actions (capitalization of the results).

• Added value for GA4:• Development of a cooperation network regarding

various aspects of our research interests (e.g. Carbon footprinting, Life cycle assessment, sustainability performance, sustainability metrics, industrial ecology, etc.).

• Gain experiece from the cooperation with neighboring Black Sea region countries.

Page 31: BSB JOP Project  BSBEEP Black Sea Buildings Energy Efficiency Plan Yerevan Me eting

31

Activity 1

Elaboration of a common communication plan which will define precisely activities, specific target groups, beneficiaries, wide audience (typology and numbers), timetable and location of activities and appropriate means

Applicant- Municipality of Kavala- GR

88- Presentation of GA’s Activities- Presentation of GA’s Activities

Page 32: BSB JOP Project  BSBEEP Black Sea Buildings Energy Efficiency Plan Yerevan Me eting

32

Activity 2:

Implementation of communicationplan (project newsletter, press releases, media)

All ten (10) partners

Activity 3:

Elaboration of web page for the project with intranet section and a section for “BSBEEP AGORA” activity

All ten (10) partners

88- Presentation of GA’s Activities- Presentation of GA’s Activities

Page 33: BSB JOP Project  BSBEEP Black Sea Buildings Energy Efficiency Plan Yerevan Me eting

33

Activity 4:

Capitalization of project activities,including looking for networking, fund raising, continuation of project

All ten (10) partners

Activity 5:

Publish

Municipality of Samsun-TR

88- Presentation of GA’s Activities- Presentation of GA’s Activities

Page 34: BSB JOP Project  BSBEEP Black Sea Buildings Energy Efficiency Plan Yerevan Me eting

34

Activity 4:

Capitalization of project activities,including looking for networking, fund raising, continuation of project

All ten (10) partners

Activity 5:

Publish

Municipality of Samsun-TR

88- Presentation of GA’s Activities- Presentation of GA’s Activities

Page 35: BSB JOP Project  BSBEEP Black Sea Buildings Energy Efficiency Plan Yerevan Me eting

35

GA 4- Visibility actions

YEAR I YEAR II

1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12

Activity GA4.1- Elaboration of a common communication plan

                                               

Preparation Activity GA4.1                                                

Execution Activity GA4.1                                                

Activity GA4.2- Implementation of communication plan (web page for the project, brochures, project‟s newsletter, publishing of final report, press releases, media)

                                               

Preparation Activity GA4.2                                                

Execution Activity GA4.2                                                

Activity GA4.3- Capitalisation of project activities

                                               

Preparation Activity GA4.3                                                

Execution Activity GA4.3                                                

Page 36: BSB JOP Project  BSBEEP Black Sea Buildings Energy Efficiency Plan Yerevan Me eting

36

Expected outputs (quantified)

Months 1-4 Until 1st Progress Report

· One communication Plan · One BSBEEP web page with intranet section and a section

· First (1st) newsletter disseminated

· First (1st) press release disseminated

· First (1st) press conference

Months 5-8 Until 2nd Progress Report

· Second (2nd) newsletter disseminated

· Second (2nd) press release disseminated

· Presentation to Open Days (potential), Brussels Oct 2012

Months 9-12 Until Interim Report

· Third (3rd) newsletter disseminated

· Third (3rd) press release disseminated

· Second (2nd) press conference

Months 13-16 Until 3rd Progress Report · Fourth (4th) newsletter disseminated

· Fourth (4th) press release disseminated

Months 17-20 Until 4rd Progress Report

· Fifth (5th) newsletter disseminated

· Fifth (5th) press release disseminated

· Third (3rd) press conference · Presentation to local Fairs and events (potential), (e.g. “POLIS” Greek LA’s exhibition, Thessaloniki, Q3- 2013)

Months 21-24 Until Final Report

· Sixth (6th) newsletter disseminated

· Sixth (6th) press release disseminated

· One published final report · Fourth (4th) press conference · Capitalisation activities report

Page 37: BSB JOP Project  BSBEEP Black Sea Buildings Energy Efficiency Plan Yerevan Me eting

37

Expected results (listed; if possible, quantified)

· Efficient dissemination of joint action's knowledge base, process and results.

· To concretize partnership and strengthen project's sustainability

· Efficient capitalization of the activities of joint action

· Raised awareness to wider local audience about energy efficiency for buildings

Page 38: BSB JOP Project  BSBEEP Black Sea Buildings Energy Efficiency Plan Yerevan Me eting

38

Target groups

• Political personnel (Mayors and Vice-mayors, counselors), • Municipal servants (Technical and Financial Departments), • Scientific and technical personnel at municipalities,•Universities (relevant schools and laboratories),•Decision makers (Mayor and Vice-mayors, local counsellors),• Work force related with construction and technical services from the free market, •Journalists at local, regional and national media.

Stakeholders• National authorities and bodies (ministries, independent authorities, etc.), • Collective bodies (e.g. chambers of commerce, associations of engineers, working unions, financial institutions),• Public administration and NGOs, • Scientific and academic community concerning energy, renewable energy resources,•General audience (both as potential investors and as sensitive and active energy consumers).

Page 39: BSB JOP Project  BSBEEP Black Sea Buildings Energy Efficiency Plan Yerevan Me eting

39

BSBEEP Project Logo Alternatives

Alternative I

Alternative II

Alternative III

Page 40: BSB JOP Project  BSBEEP Black Sea Buildings Energy Efficiency Plan Yerevan Me eting

40

BSBEEP Project Logo selected unanimously

by project partners

BSBEEP Logo

colorful

BSBEEP Logo

black&white

Page 41: BSB JOP Project  BSBEEP Black Sea Buildings Energy Efficiency Plan Yerevan Me eting

Thank you for your attentionThank you for your attentionSAMSUN METROPLITAN MUNICIPALITY

Hakan SEZGİ[email protected]

+90 544 523 7849

www.samsun.bel.trPhone: +90 362 431 6090 Fax: +90 362 435 9137

41