PROJECT MANAGEMENT INFORMATION SYSTEM
(BSBCCL)
HELP DESK
1
INDEX
S.NO CONTENT PAGE
1 Public view 4
1.1 About us 5
1.2 Work in progress 6
1.3 Contractors 7
1.4 Search employee 8
1.6 Contacts 9
1.7 Login menu 10
1.8 Registered as contractors 11
1.9 Request for proposal 12
2 Dashboard 14
3 Basic detail 15
3.1 Office 17
3.2 Designation 19
3.3 Post 20
3.4 Employee 21
3.5 Sanctioned 22
3.6 Assigned chair 22
3.7 Department 23
3.8 Scheme
24
3.9 Transfer employee
25
3.10 Relieve employee
26
3.11 Join employee
26
2
3.12 Add consultant 27
3.13 Delegate authority 27
4 Contractor 28
4.1 Add/Edit contractor 29
4.2 Contractors to be approved 29
4.3 Debar/suspended contractors 31
4.4 Lower class contractor 32
4.5 Add blacklisted contractors 33
4.6 Revoke contractors 33
5 Proposal 34
5.1 Architectural Drawing 40
5.2 Preliminary Estimate 43
5.3 Administrative approval
49
5.4 Detailed Drawing 50
5.5 Detailed Project Report 53
5.6 Technical Sanction 54
5.7 Call of Tender 55
5.8 Agreement 56
5.9 Sub-Work 57
5.10 Work in Progress
58
5.11 Work Completed
62
6 Quality Assurance 63
6.1 In house inspection 63
6.2 Material test 65
6.3 Electrical test 67
3
7 Reports 70
7.1 Customize report 71
7.2 Chair report 72
8 Funds 73
4
Public view:
Simply search “pmisbh.com” in any browser. It shows PMIS home page.
In above home page there are seven menus:-
Home
About us
Works of department
Contractors
Reports
search employee
contacts
5
About us:
In this menu statement of honourable minister and managing director has been shown:
6
Work in progress:
In this section work of department has to be shown by select PIU , department, scheme, district and
block whatever you want, and click on submit button:
If we search any PIU such as Saran PIU & click on submit button it shows work pie chart of that
particular PIU. Where the pie chart shows over view detail such as total work, expenditure till March
2017, expenditure in 2017-18, cumulative expenditure till date.
In above picture click on view detail then its shows detail physical & financial progress report
7
Contractors:
In this menu we can search contractors as per blocking type and contractor’s type.
8
Search employee:
In this menu we can search any employee by name, by DOB, by mobile no., and by email.
9
Contacts:
In this menu office address & contact numbers has to be shown:
10
Login menu:
In login menu first fill userId, password and click on login button it opens bsbccl page.
In that page when anyone forget login password then by forget password option they
recognizes there password.
Here instruction for employees, sign up options are present.
11
Register as contractor:
In this PMIS any contractor who wants to registered in bsbccl so here option of sign up in public
domain. When click on signup option a dialog box is to be shown.
Contractors who are not registered can request by clicking on sign up and choose As
Contractor. On submission of filled details an OTP is provided by email and sms and if it will
match, request will go to Admin.
12
Request for proposal:
Going down there is a link as request for proposal under BSBCCL tab.
Those who are not authorized to login can request by filling details for request of proposal
about construction and maintenance of building, their maintenance, administer townships, low
cost housing facilities to the weaker section, estates, building yards, water reservoirs, pipe
lines, storage sheds and such other constructions which state government may assign.
13
14
15
Admin can login there login panel by putting valid user id & password. After that dashboard is
open:
Dashboard:
No of module in dashboard:
• Basic detail
• Contractors
• Reports
In the top on the dashboard some colorful boxes has to be shown where blue box denotes no. of
requisition received, preliminary estimate to be send, red box denotes no. of administrative
approval & expenditure sanctioned to be send, green box denotes no. of work sanctioned, yet to
be awarded, and orange box denotes no. of work in progress.
16
Basic details:
No of sub module:
• Office
• Designation
• Post
• Employee
• Sanctioned
• Assign chair
• Department
• Scheme
• transfer employee
• Relieve employee
• Join employee
• Add consultant
• Block/unblock works
• Delegate authority
17
18
Office:
In this menu we can Add office & edit office through zone, PIU, Division, & Sub division by filling
some basic information.
19
Edit office:
We can also edit detail of any office simply click on edit button.
20
Designation:
In this menu we can Add & edit designation.
21
Post: In this menu we can Add & edit post.
22
Employee: In this menu we can Add employee detail filling basic details
Here we can edit employee detail by simply clicking on edit button.
23
Sanctioned:
In this menu we can sanction employee of any office by selecting office.
Assign chair:
In this menu we can assign employee to their chair by simply selecting office, whether any employ is in
regular, current and additional duty.
24
Department: In this menu we can add & edit department information.
25
Scheme:
In this menu we can add Scheme as per there department. Here we simply fill some basic detail
regarding scheme and click on preview -> submit button.
Here we can also edit scheme by simply click on edit button.
26
Transfer employee: In this menu we can transfer any employ by filling his/her details & click on
search button it shows details of the employ in grid view. After that click on transfer employ.
After that fill transfer date, order no, transfer office, remark & click on promoted check box.
After that click on preview>> submit button.
27
Relieve employee: in this we can relieve employee by choosing office.
Join employee: In this menu We can join employee by filling details & click on preview>>submit
button.
28
Add consultant: Here we can add consultant by filling details of any consultant.
Delegate authority:
In this menu admin can right to delegate any authority work.
29
Contractors:
No of sub modules:
• Add/edit contractor
• Contractors to be approved
• Debar/suspended contractor
• Lower contractor class
• Add blacklisted contractor
• Revoke contractor
30
Add/Edit contractors: In this menu we can add/edit contractors simply filling simple details.
Contractor to be approved: In this menu Admin has rite to accept or reject the contractor’s
request. If admin needs more documents before accepting contractor’s request, he/she can request
documents. To perform this action admin has to login through his id. Under dashboard=>contractors
=> contractors to be approved.
On this page admin get list of contractors who has requested. The details of particular
contractor can be viewed by clicking on view details. If admin wants to reject contractor’s
31
request, it can be done directly by clicking on Reject and in case of accepting click on Accept.
More documents can be requested by clicking on Request Documents.
Once request has made respective contractor will get email and sms notification carrying his
login id. Contractor then has to request for a new password by providing his registered contact
details including this login id on http://pmisbh.com/. After log in contractor gets notification
panel on his home page, where he can view all the requested documents. Contractor then
directly response for respective request. After his response admin will get notification and can
view the response on the same page where the request has made. Admin can request again
and again till he gets satisfied with all documents. When accepting contractor, respective
contractor will get notification via sms and email with login id. With same process contractor
can request for new password and login. Admin can directly enlist contractor by following
dashboard=>contractors => Add/Edit Contractor.
32
Debar/suspend contractor:
Through this menu admin has right to debar/suspend contractor selecting class wise.
Select class>>edit>>debar/suspend.
33
Lower class contractor:
Admin have right to change class of any contractor.
Lower class contractor>>select class>>edit>>select class>>submit
34
Add Blacklist/suspend contractor:
Admin has rights to blacklist/suspend contractors by filling contractors detail.
Contractor>>blacklist/suspend contractor>>preview>>submit
Revoke contractor:
Admin can revoke blacklisted/suspended contractor by choosing blocking type & contractor type.
Contractors>>revoke contractor>>select blocking type & contractor type>>search contractor>> revoke
contractor.
35
Proposal
No of module:
• Proposal approval
Going down there is a link as proposal under BSBCCL tab. Those who are not authorized to
login can request by filling details for request of proposal about construction and maintenance
of building, their maintenance, administer townships, low cost housing facilities to the weaker
section, estates, building yards, water reservoirs, pipe lines, storage sheds and such other
constructions which state government may assign.
36
Proposal Approval:
Requests that are made are pending for approval and needs to be approved by CGM. CGM can view list
of pending requisition on
Dashboard=>Proposal => Proposal Approval
After that CGM click on view & accept. After that CGM have right to fill detail . And click on
preview>>submit>>OTP update.
37
Similarly, GM(N/S) will give remarks on the submitted proposal and send it to PIU for site plan after
approval of CGM.
38
PIU person will login and access Site Plan page to fill the details of site plan.
Dashboard=>Workflow => Site Plan
Once PIU concern person fill site plan it will go back to Gm(N/S) for acceptance by accessing the same
page.
Dashboard=>Workflow => Site Plan
39
After approval of Site Plan, GM(Consultancy) will give remarks on Requisition.
Dashboard=>Proposal => Proposal Approval
Go to View & Accept, fill the details, verify the OTP and submit.
Senior Architect will login and access the same page.
Dashboard=>Proposal => Proposal Approval
40
Senior Architect will decide either to send proposal to consultant or in-house for architectural drawing
and forward it.
If Senior Architect select consultant than consultant will login and access architectural drawing page.
41
Architectural Drawing
If Senior Architect decides to send proposal in-house for architectural drawing, then Assistant Architect
or Interior designer will be selected. Then selected person will login and fill the details of drawing.
42
Once architectural drawing filled, it will go to Sr. Arch, GM(Consultancy), CGM, Dept for approval
respectively.
In case of Sr. Arch, GM(Consultancy), CGM:
Dashboard=>Workflow => Approve Drawings
43
In case of Department:
Dashboard=>Proposal => Approval Of Drawings by Dept.
After approve architectural drawing department send it for PE to CGM(HQ) panel.
Dashboard=>Work Flow => Approval Of Submitted Drawings
44
Preliminary Estimate
CGM(HQ) send it to GM(N/S) for further process.
After that GM(N/S) send it to DGM(Estimate N/S).
45
DGM(Estimate N/S) send it to AGM(HQ) or PIU for Preliminary Estimate
Selected AGM or concern Person from selected PIU will fill the details of Preliminary Estimate.
Dashboard=>Work Flow => Preliminary Estimate
46
Now process is return after approving PE . Such as AGM(HQ)>>DGM(Estimate N/S)>>
GM(N/S)>>CGM(HQ) & CGM(HQ) send it for TA to department. Process will be done by accessing
the same menu.
Dashboard=>Work Flow => Preliminary Estimate
47
Department will access the following menu:
Dashboard=>Proposal => Remarks after PE approval by Dept.
After getting TA, department send it for AA to CGM(HQ) Panel.
Dashboard=>Proposal => Remarks after PE approval
48
Now CGM(HQ) forward it to GM(consultancy) for further process by accessing same menu
Dashboard=>Proposal => Remarks after PE approval
After that GM(Consultancy) forward it to senior architect for doing soil test & detail architectural
drawing. And senior architect send it to consultant for making soil test.
Consultant will fill take the necessary action.
Dashboard=>Soil Test after PE
49
After soil test consultant send proposal for approval to senior architect then >> GM(Consultancy)
>> CGM(HQ)
Dashboard=> Work flow =>Approve Soil Test
In case of Department:
Dashboard=> Approve Soil Test
50
Administrative Approval :
After getting TA, department send it for AA to CGM(HQ) Panel.
51
Detailed Drawing :
Now CGM(HQ) forward it to GM(consultancy) for further process & GM(N/S) . After approving soil test
GM(N/S) send it for structural drawing design to DGM(Design N/S) (In-house). And GM(Consultancy)
(consultant).
Dashboard=>Work flow => Approve AA
52
Concern person will fill Structural Electrical Drawing
After making Design DGM(Design) send it to GM(N/S) and after that to CGM(HQ) for approval.
Dashboard=>Work flow => Approve Structural Drawing
Dashboard=>Work flow => Approve Electrical Drawing
53
Now PIUs send DE & for DPR to PIU or GM(Consultancy).
Dashboard=>Work flow =>After Approval of Struct and Elec Drawing
54
Detailed Project Report :
Concern Person will fill Detailed Project Report
Dashboard=>Work flow =>Add DPR
Submitted DPR need approval From GM(N/S) and DGM(Estimate)
Dashboard=>Work flow =>Approve DPR
55
Technical Sanction :
Now CGM(HQ) for provide details for TS .
Dashboard=>Work flow =>Insert Technical Sanction
56
Call of Tender :
Lastly CGM(HQ) send it to GM(N/S) for Tender.
Dashboard=>Work flow =>Call of Tender
57
Agreement :
After successful tender, an agreement need to be done by concern person of PIU
Dashboard=>Work flow =>Add Agreement
58
Sub Work :
After agreement, sub work needs to be added by concern person of PIU
Dashboard=>Work flow =>Add Sub Work
59
Work In Progress:
Dashboard=>Work flow => Work in Progress
60
Physical Progress :
Expenditure :
61
Comments :
Hindrance :
62
Upload Documents :
63
Work Completed:
Dashboard=>Work flow => Work Completed
64
Quality Assurance:
No of modules:
• In house inspection
• Material test
• Electrical test
In house inspection:
• GM quality and DGM quality visit each site and inspect about quality .
Here quality person add in house inspection report. After filling all details & Attach all relevant
photos click on preview, submit, OTP updating.
65
66
Material test:
Person related to PIU test the material used and upload the material report file.
Brick test, coarse aggregate test, fine aggregate test, cube test, steel test.
67
68
Electrical test:
Person related to PIU visit the site and add the electrical test inspection reports.
Dashboard>>Quality assurance>>Electrical test>>Add electrical test inspection
report>>preview>>submit>>OTP Update.
69
70
Now electrical test report are shows below.
71
Reports:
In this menu we can see any work reports.
No of module:
• Customize report
• Chair report
72
Customize Reports:
we can see report by two way, 1- by work particulars,2- by department particulars. Just choose criteria
& click on search record.
After click on view button in any work it show all detail report. And also we can print the whole
report.
73
Chair report: in this menu we can see chair wise report by selecting office & chair.
74
Fund:
Firstly fund requisition sends by PIU to GM (Quality).
75
After that GM (Quality) has right to accept/reject requisition, further requisition is forwarded
to GM (Zone).
After that GM (Zone) send it to GM (finance).
Then GM (finance) forward requisition to CGM.
And now CGM sends this requisition to Managing director.
Now finally MD approves/rejects requisition and sends back to CGM & CGM forward this to GM
(Fin).
Lastly GM (finance) release fund to PIU through RTGS, cheque etc.
Once fund request sent by PIU it shows in GM(Quality) panel.
After that GM(Quality) can right to accept and return the requisition.
After that GM(Zone) send it to GM(finance).
After that GM(finance) forward requisition to CGM.
And now CGM send this requisition to Managing director.
Now MD send requisition once again to CGM & CGM forward this to GM(finance).
Lastly GM(finance) release fund to PIU through RTGS, cheque etc.