BSC6900 (UO) OMU software installation guide
Set the IP address of the PC to be on the same network segment with the ETH2 . The initial IP
address of the ETH2 of active OM is !"2.!#$.#.%& and standb' OM is !"2.!#$.#.#& ( the
s)bnet mask is 2%%.2%%.2%%.&. Then go thro)gh the following ste*s.
Ste* !. +ogging In to the OM
+ogging in to the OM thro)gh PuTTY software. P)TT, is a Telnet client software that
s)**orts m)lti*le network *rotocols( incl)ding SSH and Telnet. P)TT, can be )sed for
remotel' logging in to the -o*ra +in) o*erating s'stem.
Procedure
!. +og in to htt*/00s)**ort.h)awei.com0s)**ort0. Choose Software Center 1 Minitool
software 1 Core 3etwork Prod)ct +ine 1 4ene C3 3astar TOO+ 1 Tools for remotelogin lin)( to download the P)TT, files.
2. -o)bleclick PuTTY.ee. Putty.exe 5 dialog bo PuTTY Configurationis dis*la'ed.
-
5/21/2018 BSC6900 (UO) OMU Commissioning Guide (2)
2/9
6. In the S!ecif" "our connection #" $ost na%e or &P address area( s*ecif' the 'ost
a%e (or &P address)with the IP address of the OMa board( and set Protocolto SSH.
&f... T$en...
The PC is connected to ETH2 on the OMa
board *anel thro)gh an Ethernet cable(
The IP address is the deb)gging IP address of
the OMa board.
The PC is connected to ETH& or ETH! on the
OMa board *anel thro)gh a network device(
The IP address is the eternal fied IP address
or eternal virt)al IP address of the OM.
7. Click O!en. 5 window is dis*la'ed( as shown below
%. +og in to the OM as )ser rootand the defa)lt *assword is $uawei.
Ste* 2. *loading the OM 5**lication Installation Package to the OM
*load the OM 5**lication Installation Package to the OM thro)gh !sft! software.The
*sft* software can be )sed to )*load files to the OM hard disk.The *sft* software can also
be )sed to download files from the OM hard disk to a local com*)ter.
Procedure to login in !sft! software
!. +og in to htt*/00s)**ort.h)awei.com0s)**ort0. Choose Software Center 1 Minitool
software 1 Core 3etwork Prod)ct +ine 1 4ene C3 3astar TOO+ 1 Tools for
remote login lin)( to download the *sft* files.
-
5/21/2018 BSC6900 (UO) OMU Commissioning Guide (2)
3/9
2. -o)bleclick !sft!.ee. Psftp.exe 5 window is dis*la'ed( as shown below.
6. T'*e the o!enIP addresscommand 8!"2.!#$.#.%&( for eam*le9 and *ress nter.
The s'stem *rom*ts 'o) to enter the )ser *assword( as shown below
*sft*/ no hostname s*ecified: )se ;o*en host.name; to connect
*sft*1 o*en !"2.!#$.#.%&
login as/ root
*assword/ h)awei
7. Enter the )ser name rootand the )ser *assword $uaweito connect the *sft*
software to the OM.
Procedure to u!load BSC6900 *ersion s+w !ac,age in OMU
!. -ecom*ress the
-
5/21/2018 BSC6900 (UO) OMU Commissioning Guide (2)
4/9
O!tion -escri!tion
&f t$e +%#sc+u!grade director" does not eist 4o to %.
&f t$e +%#sc+u!grade director" eists 4o to #.
%. =)n the %,dir +%#sc+u!gradecommand to create installation director' on the
OM.
#. =)n the cd +%#sc+u!gradecommand to go to the OM installation director'.
?. =)n the !ut 1r 29003044C008
-
5/21/2018 BSC6900 (UO) OMU Commissioning Guide (2)
5/9
@ The *assword m)st range from # to 62 characters and consist of onl' letters and
fig)res.
@ -o not forget the *assword.
@ ,o) can change the *assword later( b)t this *assword sho)ld be *rovided first.
Please in*)t a valid adminA*assword /ad%in478
?. T'*e the admin *assword and *ress nter.
@ The ft* )serBs *assword of OM service
@ The *assword m)st range from # to 62 8characters9 and consist of onl' letters and
fig)res.
@ -o not forget the *assword.
@ ,o) can change it later( b)t this *assword sho)ld be *rovided first.
Please in*)t a valid ft*A*assword /t!Usr
$. T'*e the TP *assword and *ress nter.
@ The virt)al etranet i*.Please in*)t a valid virt)alAetranetAi* /40.470.74.7:0
". T'*e the eternal virt)al IP address and *ress nter.
@ The OM s'stem t'*e. eg/ Single0-)al
@ Single/Install standalone s'stem
@ -)al/Install d)alOM s'stem.
The d)alOM s'stem can effecientl' increase the reliabilit' of the OM s'stem.
Please in*)t a valid installAt'*e /-ual
!&. T'*e the OM s'stem t'*e according to the act)al conditions and *ress nter.
!!. The s'stem asks 'o) whether to contin)e with the installation.
Please affirm in*)t information. in*)t , to contin)e: in*)t E to eit. 1Y
!2. Enter Yto install the OM a**lications. Dhen the message ;&nstall OMU succeed
-
5/21/2018 BSC6900 (UO) OMU Commissioning Guide (2)
6/9
Ste* # / 5ctivating and erif'ing the +icense
Procedure
!. =)n the MM+ command -=- =&CSto download the +icense to the OM
active works*ace director'+ft!+license( that is( +%#sc+#a%+*ersiona+ft!+license.
2. =)n the MM+ command =ST =&CSand then set ile a%eto the name of the
license file to be activated to >)er' the detailed config)ration information of the
license file.
6. =)n the MM+ command >CT =&CSto activate the license file.
Ste* ? / *dating the OM -atabase
*date the )eried thro)gh the MM+ command=STOMU>3>.The following *roced)re ass)mes that the active works*ace is *ersiona.
Procedure
=)n the MM+ command scri*t thro)gh MM+ commands
!. =e*eat the MM+ command ST C?->T>&CT&2to set all the s)bracks
to the ineffective mode.
2. =)n the MM+ command 3ST ->T>. 5 dialog bo is dis*la'ed. Click Yesto
initialiFe the
-
5/21/2018 BSC6900 (UO) OMU Commissioning Guide (2)
7/9
ile Manager
The file manager is a com*onent of the +MT software s)ite. It enables file )*loading and
downloading between the +MT and the OM. The f)nctions of the file manager are similar tothose of the TP client. or eam*le( 'o) can obtain logs and )*load data config)ration files.
Click ile Managerin the tool bar on the +MT main interface.
To )*load files from the +MT PC to the OM( 'o) can click U!loadon the file manger
*anel. 5lternativel'( 'o) can rightclick files in the file manager *anel( and then choose
U!loadfrom the shortc)t men).
To download files from the OM to the +MT PC( 'o) can click -ownloadon the filemanger *anel. 5lternativel'( 'o) can rightclick files in the file manager *anel( and then
choose -ownloadfrom the shortc)t men).
T$roug$ co%%and lines.
a. On the local PC( choose Start1 3un. T'*e c%d( and then click O@.
b. In*)t d( and then *ress nterto switch to disk -.
c. In*)t ft!IP addressto tr' to be connected to the OM. Here(IP address is the
IP address of the OM.
-
5/21/2018 BSC6900 (UO) OMU Commissioning Guide (2)
8/9
d. In*)t the TP )ser name and *assword. The connection between the OM and
the local TP is set )* after the a)thentication s)cceeds.
e. In*)t cd +%#sc+#a%+*ersiona+ft!to switch to the OM active works*ace.
f. In*)t !ut B>TC'&=.ttto )*load the file.
g. 5fter the file is )*loaded s)ccessf)ll'( in*)t Auitto disconnect the TP.
%. =)n the MM+ command 3U B>TC'&=to r)n the MM+ command scri*t.
=)n the MM+ command scri*t thro)gh 4I
!. =e*eat the MM+ command ST C?->T>&CT&2to set all the
s)bracks to the ineffective mode.
2. =)n the MM+ command 3ST ->T>.5 dialog bo is dis*la'ed. Click Yesto
initialiFe the
-
5/21/2018 BSC6900 (UO) OMU Commissioning Guide (2)
9/9
$. In the Batc$tab *age( set ecution T"!eto >ll.
". Click ?o. The s'stem r)ns the MM+ commands one b' one.
!&. Click O@when the message dialog bo is dis*la'ed( indicating that the r)nning of
all the MM+ commands is com*lete.
3efer BSC6900 UMTS co%%issioning guide