b__tom_01-10-2015_gh1_sol

Upload: vikash-avtar

Post on 28-Feb-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/25/2019 B__TOM_01-10-2015_GH1_Sol

    1/6

    8 Theory of Machine www.madeeasy.in | Copyright :

    1.1.1.1.1. (d)

    2.2.2.2.2. (b)

    3.3.3.3.3. (d)

    4.4.4.4.4. (a)

    5.5.5.5.5. (c)

    6.6.6.6.6. (b)

    13.13.13.13.13. (c)

    14.14.14.14.14. (c)

    15.15.15.15.15. (c)

    16.16.16.16.16. (a)

    17.17.17.17.17. (c)

    18.18.18.18.18. (d)

    19.19.19.19.19. (b)

    20.20.20.20.20. (a)

    21.21.21.21.21. (a)

    22.22.22.22.22. (b)

    23.23.23.23.23. (c)

    24.24.24.24.24. (b)

    25.25.25.25.25. (c)

    26.26.26.26.26. (a)

    27.27.27.27.27. (a)

    28.28.28.28.28. (d)

    29.29.29.29.29. (b)

    30.30.30.30.30. (c)

    7.7.7.7.7. (b)

    8.8.8.8.8. (b)

    9.9.9.9.9. (d)

    10.10.10.10.10. (c)

    11.11.11.11.11. (c)

    12.12.12.12.12. (b)

    Theory of MachineDate : 01/10/2015

    Mechanical Engineering

    CLASS TEST - 2015

    Serial No. : B__ TOM_01102015_GH1

    ME

    ANSWERS

  • 7/25/2019 B__TOM_01-10-2015_GH1_Sol

    2/6

    9 Theory of Machine www.madeeasy.in | Copyright :

    CTME15 Delhi Noida Bhopal Hyderabad Jaipur

    Lucknow Indore Pune Bhubaneswar Kolkata

    EXPLANAEXPLANAEXPLANAEXPLANAEXPLANATIONSTIONSTIONSTIONSTIONS

    11.11.11.11.11. (c)(c)(c)(c)(c)

    = ( )( )

    l

    Area will be maximum when

    A = 90i.e. PQR is a right angle triangle

    l= tan 75 = 3.732

    l = 3.732 r

    12.12.12.12.12. (b)(b)(b)(b)(b)

    =

    =

    16.16.16.16.16. (a)(a)(a)(a)(a)

    =

    +

    =

    +

    fn

    = ( )

    = 5367 rpm

    17.17.17.17.17. (c)(c)(c)(c)(c)

    The logarithmic decrement represents the natural logarithm of the ratio of any two successiveamplitude on the same side of the mean position

    =

    +l

    e = ( )

    += =

  • 7/25/2019 B__TOM_01-10-2015_GH1_Sol

    3/6

    10 Theory of Machine www.madeeasy.in | Copyright :

    CTME15 Delhi Noida Bhopal Hyderabad Jaipur

    Lucknow Indore Pune Bhubaneswar Kolkata

    19.19.19.19.19. (b)(b)(b)(b)(b)

    =

    Centre distance =

    +

    = ( )

    +

    = ( )

    +

    = 250 mm

    20.20.20.20.20. (a)(a)(a)(a)(a) w = 10 rad/secV

    C= 10 10 = 100 cm/sec= 1 m/sec

    21.21.21.21.21. (a)(a)(a)(a)(a)

    22.22.22.22.22. (b)(b)(b)(b)(b)

    A spring is equivalent to 2 binary links connected by a turning pair.A cam pair is equivalent to 1 binary link with turning pairs at each end hence equivalent chain

    23.23.23.23.23. (c)(c)(c)(c)(c)T

    A= 80 T

    B= 200

    TB

    =

    +

    TC = 60

    +

    y + x = 100y = 100 x

  • 7/25/2019 B__TOM_01-10-2015_GH1_Sol

    4/6

    11 Theory of Machine www.madeeasy.in | Copyright :

    CTME15 Delhi Noida Bhopal Hyderabad Jaipur

    Lucknow Indore Pune Bhubaneswar Kolkata

    and

    = 50 or

    =

    x = 107.1 and y = 7.1

    Thus speed of arm a = 7.1 (CCW)

    24.24.24.24.24. (b)(b)(b)(b)(b)

    Force in upper spring =

    (W = mg)

    Force in lower spring = W

    Deflection of mass = deflection of upper spring + deflection of lower spring

    = +

    =

    =

    n =

    =

    25.25.25.25.25. (c)(c)(c)(c)(c)

    =

    6 106 = 7000 V2

    V = 29.28 m/sec

    29.28 =

    d = 1.393 m

    K.E at a = E

    at b = E 28at c = E + 352

    at d = E + 92

    at e = E + 402

    at f = E + 102

    at g = E + 344

    at h = E 36

    at j = E + 229

    at k = E

    maximum energy = E + 402 (at e)

    minimum energy = E 36 (at h)

  • 7/25/2019 B__TOM_01-10-2015_GH1_Sol

    5/6

    12 Theory of Machine www.madeeasy.in | Copyright :

    CTME15 Delhi Noida Bhopal Hyderabad Jaipur

    Lucknow Indore Pune Bhubaneswar Kolkata

    Max. fluctuation of energy

    emax

    =

    = 22360 N-m

    or 22.360 KJ

    26. (a)26. (a)26. (a)26. (a)26. (a)

    Work done per cycle = 300 103

    = 200 103N.m

    E = W CE =200 103 0.1= 20 103N.m

    Cs

    =

    = = =

    Cs = 0.01, I = mk2 = 4 m kg.m2

    =

    =

    = 3

    E = I 2 Cs

    I =

    =

    =

    = 22222.22 (210)

    m =

    = 5.5 103kgor 5.5 T

    27.27.27.27.27. (a)(a)(a)(a)(a)

    n

    =

    =

    =

    50 = e0.22 14.14 NTd

    NTd = 126

    Td =

    = 0.455 sec

    28. (d)28. (d)28. (d)28. (d)28. (d)

    k =

    =

    =

    = 555 n/cm or 55.5 kN/m

    29.29.29.29.29. (b)(b)(b)(b)(b)

    Let S = dist covered by the bicycle before it comes to rest

    work done against friction = k.E. of the bicycle and the rider

  • 7/25/2019 B__TOM_01-10-2015_GH1_Sol

    6/6

    13 Theory of Machine www.madeeasy.in | Copyright :

    CTME15 Delhi Noida Bhopal Hyderabad Jaipur

    Lucknow Indore Pune Bhubaneswar Kolkata

    RnS =

    0.06 80 S = ( )

    S = 121.5 m

    30.30.30.30.30. (c)(c)(c)(c)(c)

    1

    23

    4

    Number of links = 4

    Number of lower pairs,j = 3

    Number of higher pair, h = 1

    dof = 3(n 1) 2j h

    = 3(4 1) 2 3 1 = 3 3 6 1 = 2