bts b9 additional test
TRANSCRIPT
-
7/30/2019 BTS B9 Additional Test
1/50
-
7/30/2019 BTS B9 Additional Test
2/50
2 / 50 3BK 17240 0001 RJZZA 09A L EC T L
Status Released
Change Note UPDATE
Shor t Title ADD-BTS
All rights reserved. Passing on and copying of this
document, use and communication of its contents not
permitted without written authorization from Alcatel.
-
7/30/2019 BTS B9 Additional Test
3/50
Preface
3BK 17240 0001 RJZZA 09 3 / 50A L EC T L
Contents
Preface ..................................................................................... 5
1 General descrip tion.......................................................... 9
1 .1 Hardware descr ip ti on . . .. .. . .. . .. .. . .. .. . .. . .. .. . .. . .. .. . .. . .. .. . .. . .101 .1 .1 Ra ck co n fig ur atio n fo r A9 1 0 0 BTS D C In d oo r . 1 11 .1 .2 Rack con figu ra tion fo r A9100 BTS FV AA
O utdoor . . . . . . . . . .. . . . . . . . . .. . . . . . . . . .. . . . . . . . .. . . . . . . . . .. . . .121 .1 .3 Rack con figu ra tion fo r A9100 BTS FV BA
O utdoor . . . . . . . . . .. . . . . . . . . .. . . . . . . . . .. . . . . . . . .. . . . . . . . . .. . . .131 .1 .4 Rack con figu ra tion fo r A9100 BTS AC Indoor ..141 .1 .5 Ra ck co nfig ura tio n fo r A9 1 0 0 BTS
Evolution DC Indoor . . . . . . . . .. . . . . . . . . .. . . . . . . . .. . . . . .15
1 .1 .6 Rack con figu ra tion fo r A9100 BTS Evo lu ti on ACIndoor . . . . . . . . .. . . . . . . . . .. . . . . . . . .. . . . . . . . . .. . . . . . . . . .. . . . . . .16
1 .1 .7 Rack con figu ra tion for A9100 BTS Evo lu ti on
O utdoor . . . . . . . . . .. . . . . . . . . .. . . . . . . . . .. . . . . . . . .. . . . . . . . . .. . . .17
1 .1 .8 Rack con figu ra tion for A9100 BTS Evo lu ti on
Com pact O utdoor . . . . . . . . . .. . . . . . . . .. . . . . . . . . .. . . . . . . . .171 .1 .9 Rack con figu ra tion for A9100 BTS Mu lti standard
Base station O utdoor .... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
1.2 Restr ictions. . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . .. . .19
1.3 Prerequ isi tes. . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . ..19
1.4 Time Schedu le . . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . .. .19
1 .5 In fo rma tion requ ired . . .. . .. . .. . .. .. . .. .. . .. . .. .. . .. . .. .. . .. . .. .. . .. . .19
2 Preliminary checks.......................................................... 21
2.1 Before leaving fo r the si te . . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . .. .22
2.2 Before star ting (on ar riva l a t the si te ) . .. . . .. . . .. . . .. . . .. . . .. . . ..23
3 Frequency measurement ................................................ 25
4 Checki ng output power .................................................. 294 .1 Case 1 : The BTS i s i n comm issioning mode . . .. . .. . .. .. . .. . .30
4.2 Case 2 : The BTS is connected to BSC .. . .. . . .. . . .. . . .. . . .. . . .. . .34
5 Cal l tests......................................................................... 37
5 .1 Case 1 : Ca ll tests i n standalone mode . . .. . .. .. . .. . .. .. . .. . .38
5.2 Case 2 : Ca l l tests connected to the BSC .. . .. . . .. . . .. . . .. . . ..41
6 Test ing operation of a BTS wi th bat tery backup ........... 43
-
7/30/2019 BTS B9 Additional Test
4/50
Preface
4 / 50 3BK 17240 0001 RJZZA 09A L EC T L
Abbr eviat ions .........................................................................47
App end ix A List of documents, tools an d softwar e ...............49
1 List of documents required .... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49
2 List of tools required .... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49
3 List of software required .... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50
-
7/30/2019 BTS B9 Additional Test
5/50
Preface
3BK 17240 0001 RJZZA 09 5 / 50A L EC T L
Preface
Purpose n The document describes the procedures to be carried outwhen perform ing the ad ditional tests for the A91 00 BTSEvo lution , release B6.2 .
H i s t o r yDate Edition Comments
000221 01 Creation
000426 02 Update
000816 03 Update000918 04 Update fo r Com pact O utdoor BTS
010118 05 Update
010208 06 Upda te fo r new com m issioningsoftware BSSC.X_X.06B
010710 07 Update fo r M ultistandard Basestation O utdoor
010723 08 Update fo r ba ttery backup dura tion
010802 09 Update
A u d i e n c e n Site ad m inistratorsn Supervisors
n Project m ana gers
n Field service technicians
n O ccasional users
A ssu m e d K n o w l e d g e The personn el involved m ust be fam iliar with:n ALCATEL O perations & M aintenance (O &M ) concepts for
the Base Station Subsystem (BSS)n Commissioning toolsn Person al C om puters (PCs) using the Win do ws 3.1 x and
Windows N T environments
-
7/30/2019 BTS B9 Additional Test
6/50
Preface
6 / 50 3BK 17240 0001 RJZZA 09A L EC T L
Documen t s t r uc tu re This section provides a summary of the contents of eachchapter.
Chapter 1 Genera l descr ip tionThis chap ter provides general info rm ationconcerning the operating principle andrequirem ents of the pro cedure:
n Hardware descriptionn Restrictionsn Prerequisitesn Time schedulen Informa tion required
Chapter 2 Prel iminary checks
This chapter describes the preparation of theop eration in two steps:
n at basen on arrival at the site.
Chapter 3 Frequency measurement
This chapter d escribes how to check thefrequency of 2 .16 M Hz clock generators.
Chapter 4 Check ing output power
This chapter describes how to measure theou tput po wer for TREs.
Ch ap ter 5 Ca ll t est s
This chapter describes how to perform call testsin two cases:
n in standalone mode, when connection toBSC is no t availa ble.
n connected to the BSC.
Chapter 6 Test ing operat ion of a BTS with batterybackup
This chapter d escribes how to test the op erationof the BTS in the case of an A9100 BTS withbattery backup.
-
7/30/2019 BTS B9 Additional Test
7/50
Preface
3BK 17240 0001 RJZZA 09 7 / 50A L EC T L
C o n v e n t i o n s n Press < Enter > m eans pr ess the Enter keyn Click < OK > m eans click the O K button with the mo use
n O perator input is indicated after a right-poin ting arrow inCou rier font : operator input
n To d escribe a m enu pa th, the menu entries are linked a sfol lows:Tools Options Printer ...
P i c t o g r a m s & Refer to the document indicated
2 Refer to an ap pendix in the docum entindicated
Refer to a section in the docum ent
-
7/30/2019 BTS B9 Additional Test
8/50
Preface
8 / 50 3BK 17240 0001 RJZZA 09A L EC T L
Pag e intentionally left blan k
-
7/30/2019 BTS B9 Additional Test
9/50
G eneral description
3BK 17240 0001 RJZZA 09 9 / 50A L EC T L
1 Genera l descr ip tion
This chapter provides general info rm ation concerning theoperating principle of and requirements for the procedure:
n Hardware descriptionn Restrictionsn Prerequisitesn O perating pr inciplen Time schedulen Informa tion required
-
7/30/2019 BTS B9 Additional Test
10/50
G eneral d escription
10 / 50 3BK 17240 0001 RJZZA 09A L EC T L
1.1 Hardwar e descr ip tion
For the correct identification of the BTS, consider and identify the
following elements to help choose the right BTS box (shaded): indoor or outdoor?
SUM P or SUMA bo ard installed in the rack?
Power m odules (PM 08 , PM 11 or PM 12 ) for the AC p oweredBTS?
Con nection a rea (CO AR or O UTC boa rd) for outdoor BTS?
Busba r (BO BU o r BO M U) for outdo or BTS?
Start
SUMP/SUMA
AC/DC
power type
AC/DC
power type
SUM P/ SUM Aboard
SUM P/ SUM Aboard
Battery equipped
COAR/OUTC
PM08/PM11/PM12power modules
A9100 BTSIndoor
A9100 BTSAC Indoor
A91 00 BTS EvolutionAC Indoor
without ba ttery
A91 00 BTS Evolution
AC Indoorwith ba ttery
SUMA
SUMP
SUMA
N o
ACDC
AC
DC
Yes
A9100 BTS EvolutionDC Indoor
A910 0 BTSFV AA O utdoor
A9100 BTS Evolution
in FV AA O utdoor
rack
BOBU/BOMUbusbar
A910 0 BTSFV BA Outdo or
A91 00 BTS Evolution
in FV BA O utdoorrack
SUMA
SUMP
COAR
OUTC A91 00 BTS EvolutionO utdoor
BOBU
BOMU
A91 00 BTS EvolutionCompa ct O utdoor
A910 0 BTS Multistandard
Base stat ion O utdoor
Outdoo r
PM08 PM12
PM11
SUMP
Indoor/Outdoor
-
7/30/2019 BTS B9 Additional Test
11/50
G eneral description
3BK 17240 0001 RJZZA 09 11 / 50A L EC T L
1.1.1 Rack configurat ion for A9100 BTS DC Indoor
BTS-CA
FANU FANU FANU
FANU FANU FANU
TRE TRE TRE TRE
ANxANy
ANy
ANy
FANU FANU FANU
TRE TRE TRE TRE
ANxANy
ANy
ANy
SUMP
FANU FANU FANU
TRE TRE TRE TRE
FANU FANU FANU
BTS-CA
ANxSUMP
ANx
FANU FANU FANU
TRE TRE TRE TRE
Figure 1-1 A9100 BTS Medi and Min i layouts
(example: 2x6 (Medi) and 2x2 (Mini) configurations)
-
7/30/2019 BTS B9 Additional Test
12/50
G eneral d escription
12 / 50 3BK 17240 0001 RJZZA 09A L EC T L
1.1.2 Rack configuration for A9100 BTS FV AA Outdoor
SBS40
FAN U FAN U FAN U
PM
08
PM
08
PM
08
PM
08
PM
08
BC
U1
BACO ACINACRI
D C D P
SUM
P
ANy
AN x
AIR
TRE TRE TRE TRE
FAN U FAN U FAN U
AIR
OPTIONS
SERVICE+LIGHT HEAT
F1 F2 F3 F4 F5
POWER PANEL
BATTERY UNITS
(BACO)
POWER SUPPLY
SUBRACK
DC
DISTRIBUTION
PANEL
BT SL1 L2 L3
Figure 1-2 A9100 BTS Min i O utdoor rack layout
(example: 1x4 configuration )
-
7/30/2019 BTS B9 Additional Test
13/50
G eneral description
3BK 17240 0001 RJZZA 09 13 / 50A L EC T L
1.1.3 Rack configuration for A9100 BTS FV BA Outdoor
SBS40
SUMP ANy ANx
AIR
TRE TRE TRE TRE
FANU FANU FANU
AIR
AIR
TRE TRE TRE TRE
TRE TRE TRE TRE
FANU FANU FANU
AIR
FANU FANU FANU
ANx ANxANyANy
AIR
AIR
OPTIONS
2
BTS1 BTS2
3
4
Side compartment
1
Subrack 1 Subrack 2
Subrack 4
Subrack 5
Subrack 6
Subrack 3
BOBU barBOSU bar
BAC2
PM 11
Figure 1-3 A9100 BTS FV BA Medi layout
(example : 3x4 configuration)
1 Plinth cover
2 Co nnection area (CO AR) between the racks
3 Electricity m eter or o ption s location
4 AC switch pa nel (ACSP)
-
7/30/2019 BTS B9 Additional Test
14/50
G eneral d escription
14 / 50 3BK 17240 0001 RJZZA 09A L EC T L
1.1.4 Rack conf iguration for A9100 BTS AC Indoor
BTS-CA AFIP
ABAC APODACRI
BCU1
PM08
PM08
PM08
PM08
PM08
FANU FANU FANU
FANU FANU FANU
FANU FANU FANU
FANU FANU FANU
TRE TRE TRE TRE
TRE TRE TRE TRE
ANx
A
Ny
A
Ny
A
Ny
S
UMP
BBU (BBU41)
Figure 1 -4 A9100 BTS AC Indoor layout
(example : 1x8 configuration)
-
7/30/2019 BTS B9 Additional Test
15/50
G eneral description
3BK 17240 0001 RJZZA 09 15 / 50A L EC T L
1.1.5 Rack configurat ion for A9100 BTS Evolution DC
Indoor
Figure 1-5 A9100 BTS Evo lu tionMedi and Mini layouts
(example: 2x6 (Medi) and 2x2 (Mini) configurations)
-
7/30/2019 BTS B9 Additional Test
16/50
G eneral d escription
16 / 50 3BK 17240 0001 RJZZA 09A L EC T L
1.1.6 Rack configurat ion for A9100 BTS Evolution ACIndoor
Figu re 1 -6 A9100 BTS Evo lu ti on AC Indoor (without and with battery backup)
-
7/30/2019 BTS B9 Additional Test
17/50
G eneral description
3BK 17240 0001 RJZZA 09 17 / 50A L EC T L
1.1.7 Rack configurat ion for A9100 BTS Evolution
Outdoor
STASR
STASR
STASR
PM 12
LPFU
B B U
B
O
S
U
ACSU
B
O
B
U
ADAM
S. LIGHTS. LIGHT
I D U
STASR
STASR
STASR
S. LIGHT
OPTIONS
OPTIONS
Figure 1-7 A9100 BTS Evo lu tion Outdoor
1.1.8 Rack configurat ion for A9100 BTS Evolution
Compact Outdoor
STASR
STASR
STASR
STASR
STASR
PM 12
LPFU
STASR
STASRPM 12
LPFU
CPT1 CPT2
B B U B B U
BO
B
U
B
O
S
U
B
O
S
U
ACSU ACSU
Figu re 1 -8 A9100 BTS Evo lu tion Co m pa ct O utdoor (CPT1 an d CPT2)
-
7/30/2019 BTS B9 Additional Test
18/50
G eneral d escription
18 / 50 3BK 17240 0001 RJZZA 09A L EC T L
1.1.9 Rack conf igurat ion for A9100 BTS Mul tistanda rdBase sta tion Outdoor
TRE
TRE
TRE
TRE
TRE
TRE
AN
C
ANC
AN
C
PM1
2
PM1
2
Figure 1-9 Mul tistandard Base sta tion O utdoor MBO 1(example: 3 X 2 configuration)
TRE
TRE
TRE
TRE
TRE
TRE
TRE
TRE
TRE
TRE
TRE
TRE
ANC
ANC
ANC
SUM
A
PM1
2
PM1
2
PM1
2
Figure 1-10 Mult istandard Base station O utdoor M BO 2
(example: 3 X 4 configuration)
-
7/30/2019 BTS B9 Additional Test
19/50
G eneral description
3BK 17240 0001 RJZZA 09 19 / 50A L EC T L
1.2 Restrictions
Check ing outpu t power is restricted when the BTS isconnected to the BSC and operational.
1.3 Prerequisites
The site must comply with the Safety rules (see BSS MethodsHandbook) .
1.4 Time Schedule
Task time (mn)
1st
person
time (mn)
2nd
person
Prelim inar y checks
Preparation before going to the site 1 0 1 0
Before you start (on arriva l a t the site) 1 0 1 0
Frequency measurement 1 0(1)
1 0(1)
Checki ng ou tput p ower 5 - 6 0(2)
5 - 6 0(2)
Call tests 5 - 6 0(2)
5 - 6 0(2)
Testing operati on of BTS equipp ed wi th b attery ba ckup 7 5 7 5
Tota l t ime 1h55 - 3h35 1h55 - 3h35(1)
this time depends also on the measuring instruments warm-up time(2)
5min/TRE
The times given are based on technical constraints, not taking intoaccount safety considerations.
1.5 Informa tion required
1. Equipment configuration
Con figuration of sectors, br idg es and num ber ofTREs/ secto r
2. Other
Call test frequencies
-
7/30/2019 BTS B9 Additional Test
20/50
G eneral d escription
20 / 50 3BK 17240 0001 RJZZA 09A L EC T L
Pag e intentionally left blan k
-
7/30/2019 BTS B9 Additional Test
21/50
Preliminary checks
3BK 17240 0001 RJZZA 09 21 / 50A L EC T L
2 Preliminar y checks
This chapter describes prepa ration fo r the operation in twosteps:
n at basen on arrival at the site.
-
7/30/2019 BTS B9 Additional Test
22/50
Preliminary checks
22 / 50 3BK 17240 0001 RJZZA 09A L EC T L
2.1 Before leaving for the site
Check t h ep r e r e q u i s i t e s h a v e
b e e n s a t i s f i e d Cn See prereq uisites in chap ter 1
C h e c k a v a i l a b i l i t yo f I n f o r m a t i o n
r e q u i r e d
?
n See information required in chapter 1
C h e c k a v a i l a b i l i t yo f d o cu m e n t a t i o n
n 2 See docum entation list in a pp endix
C h e c k a v a i l a b i l i t yo f t o o l s
n 2 See tool kit list in appendix; refer to the Tools catalogue for checking the
contentn 2 Verify the calibration label when
indicated in tools kit list (appendix)
C h e c k a v a i l a b i l i t ya n d v e r s i o n o f
s o f t w a r e > (icon) Windows 3.1 x)
C. At BTS Terminal:
User/ G roup name : UPGRAD
Password: SUMSUP
Click < Log-on> .
D. If not already done, set the baud rate of the connectionand the path to the Inventar software:
Settings Terminal
Click < Baudrate> .
Select 11 52 00 and the po rt in the Serial
Interfacetab of theBTS Terminal part of
the window a nd click < OK> .
E. Set up the connection:File Connect/Disconnect
2. Set the BTS to free run mod e
A. At the BTS TE choose:
Settings Transmission OCXOAdjustment
The following window opens:
-
7/30/2019 BTS B9 Additional Test
27/50
Frequency m easurem ent
3BK 17240 0001 RJZZA 09 27 / 50A L EC T L
B. Verify that the BTS is in free run m od e, notsynchron ized on the Ab is (use < Get Config > ). If not, seti t to free run m ode using < Tran smit> .
C. After saving the change, click < Close> .
3. Power up the frequency counter
4. Conn ect the test tool
see Figure 3-1 A. Connect the frequency counter's port to the XCLK1 OUT
connector in the connection a rea (CO AR or O UTC).
O n an indo or BTS, the CO AR is located at the top fron t ofthe rack. O n an o utdoo r BTS, the CO AR (O UTC for thecompact and multistandard outdoor) is located right sideon compa rtm ent 1.
Connector used forfrequency measurement
Figu re 3 -1 C lock connecto rs i n the connection a rea : Indoor BTS
-
7/30/2019 BTS B9 Additional Test
28/50
Frequency m easurem ent
28 / 50 3BK 17240 0001 RJZZA 09A L EC T L
5. Before testin g, mak e the follow ing check s:
A. The tests must not be run before the frequency counter
has been powered up for a few minutes (for example, fora Fluke PM 6685R the warm-up time is less then 6minutes).
B. The tests m ust not b e run until the BTS ha s been p ow eredup for two h ours.
C. O n the frequen cy counter choo se the highest po ssibleimpedance for measuring.
6. Check the frequency
A. O n the frequency coun ter, press "MEAS TIM E". Use the
DATA EN TRY ( and ) keys to select 10 s then press"EN TER".
B. Check that:
(2 .166666559 x 10 Hz - l Pf l ) < measured value Ready for
next test.B. Click the button in the Call Mobile
Testwindow.
-
7/30/2019 BTS B9 Additional Test
41/50
Ca ll tests
3BK 17240 0001 RJZZA 09 41 / 50A L EC T L
5.2 Case 2 : Cal l tests connected to the BSC
Purpose To check the handling of radio calls on each TRE in the BTS.
N O T I C EFor th is test, th e BSS must be connected to the MSC.
Procedu re
1. Identify the signall ing using the BTS Terminal
A. Show Logical Configurations Radiochannel configuration
B. In the CCL, note the radio channels (B and S) assigned assign allin g links (identify B, S in the repo rt wind ow ).
B = ( FCCH + SCH + BCCH + CCCH + SDCCH/4 + SACCH/4 ) S = ( SDCCH/ 8 + SACCH/8 )
C. Check that the other time slots are assigned to trafficchannels (TCH).
2. Call th e OMC-R to get the LAC and CI values
3. Unlock the cel l (s) under test
A. At the BTS_TE, unlock the cell(s) :
Init BTS_TEL of each sector.4. Set up the trace mob i le
A. Insert the SIM card in the Alcatel mobile.
B. Power up the mo bile.
5. Start the mobi le trace funct ion
6. Act ivate the trace funct ion (Refer to the relevant MDTdocument)
7. Check the handling of radio calls on the time slots ofeach TRE
A. M ake ra dio calls on a Timeslot (TCH ) of each FU.
B. M ake one incom ing call on each BTS from a fixed station(have someone call you).
C. Ch eck speech q ua lity in b oth dir ection s (sub jectively).
D. M ake one outgoing call on each FU to a fixed station.
E. Ch eck speech q ua lity in b oth dir ection s (sub jectively).
F. Make calls to the voice mailbox for all the remainingtimeslots.
-
7/30/2019 BTS B9 Additional Test
42/50
Call tests
42 / 50 3BK 17240 0001 RJZZA 09A L EC T L
8. For each ca ll ,
A. Check on the trace mobile if the call is handled by the BTS.
B. Ch eck the cell num ber (hexad ecim al).
C. Ch eck the BCCH frequency used.
D. Ch eck the rad io resource used: rad io chan nel (ARFCN ).
E. Check the Timeslot (TN).
9. Note the resul t o f the ca l l .
-
7/30/2019 BTS B9 Additional Test
43/50
Testing operation of a BTS with battery backup
3BK 17240 0001 RJZZA 09 43 / 50A L EC T L
6 Testing operat ion of a BTS wi th battery
backup
This chap ter describes ho w to test the o pera tion of the BTS inthe case of an A9100 BTS with battery backup.
-
7/30/2019 BTS B9 Additional Test
44/50
Testing operation of a BTS with battery backup
44 / 50 3BK 17240 0001 RJZZA 09A L EC T L
Purpose
To check tha t op eration of BTS is not affected by switching the23 0 V AC power or battery backup O FF and O N .
Procedu re
ATTENTIONThese tests ap ply o nly in the case of a n A91 00 AC BTS with
battery backup.
1. Note down the state of the BTS mod ulesA. At the BTS Terminal, display the states of the BTS SBLs.
B. Check that all the modules in the BTS are IT.
2. Check BTS oper at ion when swi tching the ba tter yba ck up OFF an d ON
Action Resul ts
A. M ake a radio call Call ongoing
B. Switch O FF battery break ers F1 a nd
F2 on the left side of BBUs (for
A91 00 Evolution BTSs) or on the
power supply subrack (for A910 0
outdoor).
The batteries are disconnected.
The radio call is ma intained.
C. At the BTS Terminal, display the states
of the modules.
State unchanged.
D. Switch O N the battery breakers F1
and F2.
The batteries are connected.
The radio call is ma intained.
E. At the BTS Terminal, display the states
of the modules.
State unchanged.
-
7/30/2019 BTS B9 Additional Test
45/50
Testing operation of a BTS with battery backup
3BK 17240 0001 RJZZA 09 45 / 50A L EC T L
3. Check BTS oper ati on when swit ching the 230 V ACpower supp ly OFF an d O N
Action Results
A. M ake a radio call Call ongoing
B. Switch O FF the electrical supply fo r
the BTS at the site po wer pa nel.
The BTS is powered by batteries.
LEDs on power modules are off.
The radio call is maintained.
C. At the BTS Terminal, display the
states of the modules and active
alarms.
States of modules remain unchanged
except BTS go es to FIT .
The power supply alarms appear on the
BTS Terminal as active alarms.
D. Restore the electrical power at the
site po wer pan el.
23 0V AC p ower is restored.
LEDs on power modules come on.The radio call is maintained.
E. At the BTS Terminal, display the
states of the modules and active
alarms.
All mod ules are IT .
The power supply alarms disappear.
-
7/30/2019 BTS B9 Additional Test
46/50
Testing operation of a BTS with battery backup
46 / 50 3BK 17240 0001 RJZZA 09A L EC T L
Pag e intentionally left blan k
-
7/30/2019 BTS B9 Additional Test
47/50
Abbreviations
3BK 17240 0001 RJZZA 09 47 / 50A L EC T L
Abbreviations
ADAM Adapter M odule
Abis Abis Interface: Interface between BSC and BTS
AC Alternating Current
AN Antenna Network
AN C Antenna N etwork Com bined
AN X Antenna N etwork X
AN Y Antenna Network Y
ARFCN Absolute Radio Frequency ChaN nel
BBU Battery Backup Unit
BCB BTS Co ntro l Bus
BCCH Broadcast Control ChannelBSC Base Station Co ntroller
BSS Base Station Subsystem
BTS Base Tra nsceiver Statio n
BTS-CA BTS Con nection A rea
BTSRIMA BTS Remote Inventory Board Maxi
BTSRIMI BTS Remote Inventory Board Mini
BU100 Battery Unit 10 0 (10 0 Ah)
CIDE Cab inet Indoor M edi
CIDI Cab inet Indoor M ini
CIMA Cab inet Indoor M axi
CIMI Cab inet Indoor M Ini
CLK Clock
COAR Connection Area
DC Direct Current
DCS Digital Cellular System (1800 MHz)
E-GSM Extended b and G SM
FROPA Front C over Con nection Area
GPS G lob al Position ing System
GSM Global System for Mobiles (900 MHz)HW Hardware
IDU InDoor Unit (of microwave entity)
MMI M an M achine Interface
MSC M ob ile Switching Centre
MW Microwave
O& M O peration and M aintenance
ODU O utDoo r Unit (of m icowave entity)
-
7/30/2019 BTS B9 Additional Test
48/50
Abbreviations
48 / 50 3BK 17240 0001 RJZZA 09A L EC T L
OMC-R O peration and M aintenance Centre - Rad io (O M C o f BSS)
OML O peration and M aintenance Link
OMU O peration and M aintenance Unit
PCM Pulse Cod e M odulation (PCM l ink = 2.0 48 Mb it/ s terrestriall ink)
PM12 Power Module 1200 W AC/ DC
RF Rad io Frequen cy
RI Rem ote Inventory
RIBAT Remote Inventory Battery
RIT Repla ceable Item
RSL Radio Signalling Link
Rx Reception
SBL Security BLock
STASR SUM / TRE/ Antenna subra ckSUM Station U nit Mo dule
SUMA Station Unit Module (G4)
SUMP Station Unit Module (G3)
SW Software
TCH Traffic Channel
TRE TRansceiver Equipment
Tx Transmission
VSWR Voltage Stan ding Wa ve Ratio
XBCB External BTS Control Bus
XGPS Externa l G PS
XIN External Inpu t
XIOB External Input/ O utput Bus
-
7/30/2019 BTS B9 Additional Test
49/50
Appendix A List of documents, tools and software
3BK 17240 0001 RJZZA 09 49 / 50A L EC T L
Appendix A List of documents, tools and software
1 List of documents required
The fol lo wing table is used to check, at ba se, the availab il i ty of thenecessary d ocum ents.
Document ti t tle Reference
A9100 BTS additona l tests CCL 3 BK 1 7 2 4 0 0 0 0 1 Q ZZZA
Tools catalogue for field activity 3 BK 2 0 4 5 8 0 0 0 1 RJZZA
BSS software list Depend ing on version asked by the custom er
Applicable notification list (ITL-PRO ) 3 D F 0 0 4 6 2 00 0 5 AAAG A
Applicable operation instructions (IO ) 3 D F 0 0 3 0 0 00 0 5 U AZZA
BSS M ethods Handbook 3 BK 1 7 2 5 3 0 0 0 1 PC ZZA
2 List of tools required
The following table is used to check, at base, the availability of thenecessary tools.
& see Too ls catalo gue for checking the content
Kit name Reference Cal ibration
Basic kit O UT 0 0 1 N O
Test cab les and p lugs (A9 100 BTS) O UT 0 1 3 N O
Radio connection kit O UT 0 1 4 N O
Utility PC (BTS LM T) D ES 0 0 2 N O
Power m eter/ Reflectom eter D ES 0 0 3 YES
Trace m obile D ES 0 0 4 N O
Frequency counter D ES 0 0 6 YES
Test SIM card with M CC = 0 01 , M N C= 01 N O
-
7/30/2019 BTS B9 Additional Test
50/50
Appendix A List of documents, tools and software
3 List of software required
The following table is used to check, at base, the availability andversion of the n ecessary softwa re.
& refer to the corresponding document for checking the SWversion
Name Version check ing
O perating system Windows N T
1) A91 00 BTS add itional tests in standa lone m ode:
n BTS Term ina l BSSC X_X.0 6 B / BTS-TEn BTS Software BSSC X_X.0 6 B / BTS-SW
2) A9100 BTS additional tests connected to BSC in
operational m ode:
n BTS Term ina l specified in BSS software list