bts - bq zss • bts - vm zss - citipower and powercor · and miller street before returning to...

2
ISSUE 33 SEPTEMBER 2016 Welcome to the Metro and CBD Security of Supply newsletter. In this edition we look at the installation of five new 66kV underground XLPE (Cross Linked Polyethylene) circuits between Bouverie Queensberry (BQ), Victoria Market (VM), Waratah Place (WP) Zone Substations (ZSS) and Brunswick Terminal Station (BTS): • BQ ZSS - VM ZSS • BQ ZSS - WP ZSS • BTS - BQ ZSS • BTS - WP ZSS • BTS - VM ZSS WHERE ARE WE NOW? Our jointing works are now complete with all cables having been hauled from the Glenlyon Road and Miller Street joint bays to Brunswick Terminal Station (BTS). WHERE TO NEXT? We will undertake final reinstatement of the road surface in Glenlyon Road and Miller Street before returning to site later this year to connect the cables to the BTS switchboard. PROJECT MILESTONES • BQ ZSS - VM ZSS 66kV cable commissioned 11/9/13. • BTS - BQ ZSS and BTS – WP ZSS civil works complete 17/09/15. • BQ ZSS - WP ZSS cable works completed 29/06/14. • BTS - BQ ZSS, BTS - WP ZSS and BTS - VM ZSS cable works commenced 4/07/2016. WHY ARE THE WORKS TAKING PLACE? These cables are a part of a major project to ensure the security of power supply to the CBD and inner suburbs. We thank customers and the community for your understanding while these important works are carried out. For more information please call 1300 301 101 or visit our website at https://www.citipower.com.au/about-us/electricity-networks/metro-and- cbd-security-of-supply. Our cables hauled and secured within Brunswick Terminal Station. We will return to site shortly to undertake final reinstatement of the road surface.

Upload: tranphuc

Post on 13-May-2018

215 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: BTS - BQ ZSS • BTS - VM ZSS - CitiPower and Powercor · and Miller Street before returning to site later this year to connect the ... • BTS - BQ ZSS and BTS ... For more information

ISSUE 33 SEPTEMBER 2016

Welcome to the Metro and CBD Security of Supply newsletter. In this edition we look at the installation of five new 66kV underground XLPE (Cross Linked Polyethylene) circuits between Bouverie Queensberry (BQ), Victoria Market (VM), Waratah Place (WP) Zone Substations (ZSS) and Brunswick Terminal Station (BTS):

• BQ ZSS - VM ZSS

• BQ ZSS - WP ZSS

• BTS - BQ ZSS

• BTS - WP ZSS

• BTS - VM ZSS

WHERE ARE WE NOW?

Our jointing works are now complete with all cables having been hauled from the Glenlyon Road and Miller Street joint bays to Brunswick Terminal Station (BTS).

WHERE TO NEXT?

We will undertake final reinstatement of the road surface in Glenlyon Road and Miller Street before returning to site later this year to connect the cables to the BTS switchboard.

PROJECT MILESTONES

• BQ ZSS - VM ZSS 66kV cable commissioned 11/9/13.

• BTS - BQ ZSS and BTS – WP ZSS civil works complete 17/09/15.

• BQ ZSS - WP ZSS cable works completed 29/06/14.

• BTS - BQ ZSS, BTS - WP ZSS and BTS - VM ZSS cable works commenced 4/07/2016.

WHY ARE THE WORKS TAKING PLACE?

These cables are a part of a major project to ensure the security of power supply to the CBD and inner suburbs. We thank customers and the community for your understanding while these important works are carried out.

For more information please call 1300 301 101 or visit our website at https://www.citipower.com.au/about-us/electricity-networks/metro-and-cbd-security-of-supply.

Our cables hauled and secured within Brunswick Terminal Station.

We will return to site shortly to undertake final reinstatement of the road surface.

Page 2: BTS - BQ ZSS • BTS - VM ZSS - CitiPower and Powercor · and Miller Street before returning to site later this year to connect the ... • BTS - BQ ZSS and BTS ... For more information

WHERE ARE WE UP TO AND WHAT’S NEXT?

CABLE DETAILS AT A GLANCE:

• 29kg per meter

• 1600mm2 copper conductor

• Capable of 1200 amps per phase