Page 1: BTS3900 LTE Installation Guide(V100R002C00_02)

BTS3900 LTEV100R002C00

Installation Guide

Issue 02

Date 2010-07-30

HUAWEI TECHNOLOGIES CO., LTD.

Page 2: BTS3900 LTE Installation Guide(V100R002C00_02)
Page 3: BTS3900 LTE Installation Guide(V100R002C00_02)

Copyright © Huawei Technologies Co., Ltd. 2010. All rights reserved.No part of this document may be reproduced or transmitted in any form or by any means without prior writtenconsent of Huawei Technologies Co., Ltd. Trademarks and Permissions

and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.All other trademarks and trade names mentioned in this document are the property of their respective holders. NoticeThe purchased products, services and features are stipulated by the contract made between Huawei and thecustomer. All or part of the products, services and features described in this document may not be within thepurchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information,and recommendations in this document are provided "AS IS" without warranties, guarantees or representationsof any kind, either express or implied.

The information in this document is subject to change without notice. Every effort has been made in thepreparation of this document to ensure accuracy of the contents, but all statements, information, andrecommendations in this document do not constitute the warranty of any kind, express or implied.

Huawei Technologies Co., Ltd.Address: Huawei Industrial Base

Bantian, LonggangShenzhen 518129People's Republic of China

Website: http://www.huawei.com

Email: [email protected]

Issue 02 (2010-07-30) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

i

Page 4: BTS3900 LTE Installation Guide(V100R002C00_02)
Page 5: BTS3900 LTE Installation Guide(V100R002C00_02)

About This Document

PurposeThis document describes installation of the BTS3900 cabinet, boards, modules, and cables. Italso provides checklists for hardware installation.

Product VersionThe following table lists the product version related to this document.

Product Name Product Version

BTS3900 LTE V100R002C00

Intended Audiencel Base station installation engineers

Organization1 Changes in BTS3900 LTE Installation Guide

This describes the changes in BTS3900 LTE Installation Guide.

2 Preparing for Installation

This topic describes the tools and meters that need to be available before the installation. It alsodescribes the skills that the installation engineers must possess, and the requirements that theinstallation engineers must meet.

3 Information About the Installation

BTS3900 cabinets can be classified into -48 V cabinet, +24 V cabinet, and +220 V cabinet. Youneed to familiarize yourself with the related information and clearance requirements before thecabinet installation.

4 Installation Procedure

BTS3900 LTEInstallation Guide About This Document

Issue 02 (2010-07-30) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

iii

Page 6: BTS3900 LTE Installation Guide(V100R002C00_02)

The BTS3900 cabinets are delivered with boards are installed. The installation procedureinvolves installing the base, cabinets, and cables on site. In addition, some optional componentscan be installed on site as required.

5 Unpacking the Equipment

You need to unpack and check the delivered equipment and ensure that all the materials areincluded and intact.

6 Checking the Installed Modules and Cables

The internal modules and cables are installed in the cabinet before delivery. You need to checkthat the modules and cables are securely connected.

7 Installing the Base

The BTS3900 cabinet must be installed on the base. The base can be installed on the concretefloor or ESD floor according to the equipment room conditions and customer requirements.

8 Installing a Cabinet

This section describes the procedure and precautions for installing a single cabinet on a base.

9 Installing the PGND Cable

The equipotential PGND cable is used to connect the PGND bolts on the cabinets to the PGNDgrounding bars on site, ensuring that the cabinets are properly grounded. The equipotential cableis used to connect the PGND bolts on the cabinets, ensuring the equipotential connectionsbetween the cabinets.

10 (Optional) Installing the Modules

The mandatory modules in the cabinet are already installed. The optional modules can beinstalled on site according to different field requirements.

11 Installing the Cables

The BTS3900 cabinet is delivered with boards installed, and the internal cables are alreadyinstalled. Therefore, only the external cables and cables for the optional modules need to beinstalled on site.

12 Installation Checklist

After the cabinets and devices are all installed, you need to check the installation items,installation environment, and cable-related items.

13 Performing the Power-On Check

Before the cabinets are put into use, you need to check the power-on status of the cabinets.

14 Obtaining the ESN

The Electronic Serial Number (ESN) is unique to a Network Element (NE) for identification.The ESN is used during the commissioning of the base station.

ConventionsSymbol Conventions

The symbols that may be found in this document are defined as follows.

About This DocumentBTS3900 LTE

Installation Guide

iv Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

Issue 02 (2010-07-30)

Page 7: BTS3900 LTE Installation Guide(V100R002C00_02)

Symbol Description

Indicates a hazard with a high level of risk, which if notavoided,will result in death or serious injury.

Indicates a hazard with a medium or low level of risk, whichif not avoided, could result in minor or moderate injury.

Indicates a potentially hazardous situation, which if notavoided,could result in equipment damage, data loss,performance degradation, or unexpected results.

Indicates a tip that may help you solve a problem or savetime.

Provides additional information to emphasize or supplementimportant points of the main text.

General Conventions

The general conventions that may be found in this document are defined as follows.

Convention Description

Times New Roman Normal paragraphs are in Times New Roman.

Boldface Names of files, directories, folders, and users are inboldface. For example, log in as user root.

Italic Book titles are in italics.

Courier New Examples of information displayed on the screen are inCourier New.

Command Conventions

The command conventions that may be found in this document are defined as follows.

Convention Description

Boldface The keywords of a command line are in boldface.

Italic Command arguments are in italics.

[ ] Items (keywords or arguments) in brackets [ ] are optional.

{ x | y | ... } Optional items are grouped in braces and separated byvertical bars. One item is selected.

[ x | y | ... ] Optional items are grouped in brackets and separated byvertical bars. One item is selected or no item is selected.

BTS3900 LTEInstallation Guide About This Document

Issue 02 (2010-07-30) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

v

Page 8: BTS3900 LTE Installation Guide(V100R002C00_02)

Convention Description

{ x | y | ... }* Optional items are grouped in braces and separated byvertical bars. A minimum of one item or a maximum of allitems can be selected.

[ x | y | ... ]* Optional items are grouped in brackets and separated byvertical bars. Several items or no item can be selected.

GUI Conventions

The GUI conventions that may be found in this document are defined as follows.

Convention Description

Boldface Buttons, menus, parameters, tabs, window, and dialog titlesare in boldface. For example, click OK.

> Multi-level menus are in boldface and separated by the ">"signs. For example, choose File > Create > Folder.

Keyboard Operations

The keyboard operations that may be found in this document are defined as follows.

Format Description

Key Press the key. For example, press Enter and press Tab.

Key 1+Key 2 Press the keys concurrently. For example, pressing Ctrl+Alt+A means the three keys should be pressed concurrently.

Key 1, Key 2 Press the keys in turn. For example, pressing Alt, A meansthe two keys should be pressed in turn.

Mouse Operations

The mouse operations that may be found in this document are defined as follows.

Action Description

Click Select and release the primary mouse button without movingthe pointer.

Double-click Press the primary mouse button twice continuously andquickly without moving the pointer.

Drag Press and hold the primary mouse button and move thepointer to a certain position.

About This DocumentBTS3900 LTE

Installation Guide

vi Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

Issue 02 (2010-07-30)

Page 9: BTS3900 LTE Installation Guide(V100R002C00_02)

Contents

About This Document...................................................................................................................iii

1 Changes in BTS3900 LTE Installation Guide.......................................................................1-1

2 Preparing for Installation.........................................................................................................2-12.1 Preparing Tools and Meters............................................................................................................................2-22.2 Qualification of Installation Engineers...........................................................................................................2-2

3 Information About the Installation........................................................................................3-13.1 Hardware Structure of the BTS3900 Cabinet (-48 V).....................................................................................3-23.2 Hardware Structure of the BTS3900 Cabinet (+24 V)....................................................................................3-33.3 Hardware Structure of the BTS3900 Cabinet (220 V)....................................................................................3-43.4 Installation Clearance and Position Requirements..........................................................................................3-5

4 Installation Procedure...............................................................................................................4-1

5 Unpacking the Equipment.......................................................................................................5-1

6 Checking the Installed Modules and Cables........................................................................6-1

7 Installing the Base......................................................................................................................7-17.1 Installing the Base on the Concrete Floor.......................................................................................................7-27.2 Installing the Base on the ESD Floor..............................................................................................................7-5

8 Installing a Cabinet....................................................................................................................8-1

9 Installing the PGND Cable......................................................................................................9-1

10 (Optional) Installing the Modules......................................................................................10-110.1 Installing the GPS Surge Protector..............................................................................................................10-2

11 Installing the Cables..............................................................................................................11-111.1 Cabling Requirements.................................................................................................................................11-211.2 Cable Routing Principles.............................................................................................................................11-311.3 Installing the Power Cables.........................................................................................................................11-4

11.3.1 Installing the Input Power Cable for the -48 V Cabinet.....................................................................11-411.3.2 Installing the Input Power Cable for the +24 V Cabinet....................................................................11-511.3.3 Installing the Input Power Cable for the 220 V Cabinet....................................................................11-6

11.4 Installing the Transmission Cables.............................................................................................................11-811.4.1 Installing the E1/T1 Cable..................................................................................................................11-9

BTS3900 LTEInstallation Guide Contents

Issue 02 (2010-07-30) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

vii

Page 10: BTS3900 LTE Installation Guide(V100R002C00_02)

11.4.2 Installing the FE/GE Cable..............................................................................................................11-1011.4.3 Installing the FE/GE Optical Cable .................................................................................................11-11

11.5 Installing the Monitoring Signal Cable for the EMU................................................................................11-1211.6 Installing the RF Jumper...........................................................................................................................11-13

12 Installation Checklist............................................................................................................12-1

13 Performing the Power-On Check........................................................................................13-1

14 Obtaining the ESN.................................................................................................................14-1

ContentsBTS3900 LTE

Installation Guide

viii Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

Issue 02 (2010-07-30)

Page 11: BTS3900 LTE Installation Guide(V100R002C00_02)

Figures

Figure 3-1 BTS3900 cabinet (-48 V) in typical configuration.............................................................................3-2Figure 3-2 BTS3900 cabinet (-48 V) in full configuration..................................................................................3-2Figure 3-3 BTS3900 cabinet (+24 V) in typical configuration............................................................................3-3Figure 3-4 BTS3900 cabinet (+24 V) in full configuration................................................................................. 3-3Figure 3-5 BTS3900 cabinet (220 V) in typical configuration............................................................................ 3-4Figure 3-6 BTS3900 cabinet (220 V) in full configuration..................................................................................3-4Figure 3-7 Cabinet installation clearance requirements.......................................................................................3-5Figure 3-8 Cabinet layout requirements...............................................................................................................3-6Figure 4-1 Installation procedure.........................................................................................................................4-2Figure 6-1 Internal power cables..........................................................................................................................6-2Figure 6-2 Internal signal cables..........................................................................................................................6-4Figure 7-1 Positioning the cabinet........................................................................................................................7-2Figure 7-2 Drilling a hole and installing an expansion bolt assembly.................................................................7-2Figure 7-3 Fixing the base....................................................................................................................................7-3Figure 7-4 Checking the base level......................................................................................................................7-4Figure 7-5 Measuring the resistance between the adjusting bolt and the expansion bolt.................................... 7-4Figure 7-6 Support for installing the ESD floor ..................................................................................................7-5Figure 7-7 Drilling a hole on the ESD floor.........................................................................................................7-6Figure 7-8 Positions of the access holes in the support and holes in the ESD floor............................................7-7Figure 7-9 Marking the positions of the mounting holes.....................................................................................7-7Figure 7-10 Securing the supports for installing the ESD floor...........................................................................7-8Figure 8-1 Removing the cabinet door.................................................................................................................8-1Figure 8-2 Installing the cabinet door.................................................................................................................. 8-2Figure 8-3 Installing the cabinet...........................................................................................................................8-2Figure 9-1 Installing the OT terminal in a correct way........................................................................................9-2Figure 9-2 Installing the PGND cable for the BTS3900 cabinet (-48 V DC)......................................................9-2Figure 9-3 Installing the PGND cable for the BTS3900 cabinet (+24 V DC).....................................................9-3Figure 10-1 Installing the support for the GPS surge protector.........................................................................10-2Figure 10-2 Installing the GPS signal cable.......................................................................................................10-2Figure 10-3 Installing the GPS surge protector..................................................................................................10-3Figure 11-1 Cable routing in a single cabinet....................................................................................................11-4Figure 11-2 Installing the -48 V input power cable...........................................................................................11-5Figure 11-3 Installing the +24 V input power cable..........................................................................................11-6

BTS3900 LTEInstallation Guide Figures

Issue 02 (2010-07-30) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

ix

Page 12: BTS3900 LTE Installation Guide(V100R002C00_02)

Figure 11-4 Adding an OT terminals to the power cable...................................................................................11-7Figure 11-5 220 V AC single-phase power cable..............................................................................................11-7Figure 11-6 220 V AC three-phase power cable................................................................................................11-8Figure 11-7 110 V AC dual-live-wire power cable............................................................................................11-8Figure 11-8 Installing the E1/T1 cable...............................................................................................................11-9Figure 11-9 Installing the FE/GE cable............................................................................................................11-10Figure 11-10 Installing the optical module......................................................................................................11-11Figure 11-11 Installing the FE/GE optical cable..............................................................................................11-12Figure 11-12 Installing RF jumpers.................................................................................................................11-13Figure 13-1 Power-on check procedure.............................................................................................................13-2Figure 14-1 Obtaining the ESN..........................................................................................................................14-1

FiguresBTS3900 LTE

Installation Guide

x Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

Issue 02 (2010-07-30)

Page 13: BTS3900 LTE Installation Guide(V100R002C00_02)

Tables

Table 6-1 Internal power cable.............................................................................................................................6-2Table 6-2 Internal signal cables............................................................................................................................6-4Table 7-1 Height of the support for installing the ESD floor...............................................................................7-5Table 9-1 Specifications of the PGND cable........................................................................................................9-1Table 12-1 Cabinet installation checklist...........................................................................................................12-1Table 12-2 Installation environment checklist...................................................................................................12-1Table 12-3 Electric connection checklist of the cabinet.....................................................................................12-2

BTS3900 LTEInstallation Guide Tables

Issue 02 (2010-07-30) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

xi

Page 14: BTS3900 LTE Installation Guide(V100R002C00_02)
Page 15: BTS3900 LTE Installation Guide(V100R002C00_02)

1 Changes in BTS3900 LTE Installation Guide

This describes the changes in BTS3900 LTE Installation Guide.

02 (2010-07-30)This is the commercial release.

Compared with issue 01 (2010-05-20), this issue is added with the following topic:l 9 Installing the PGND Cable

Compared with issue 01 (2010-05-20), the issue incorporates the following change:

Content Change Description

4 Installation Procedure The installation procedure is optimized.

01 (2010-05-20)This is the draft release.

Compared with the issue V100R001C01 04 (2010-03-31), no information is added.

Compared with the issue V100R001C01 04 (2010-03-31), no information is changed.

Compared with the issue V100R001C01 04 (2010-03-31), no information is deleted.

BTS3900 LTEInstallation Guide 1 Changes in BTS3900 LTE Installation Guide

Issue 02 (2010-07-30) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

1-1

Page 16: BTS3900 LTE Installation Guide(V100R002C00_02)
Page 17: BTS3900 LTE Installation Guide(V100R002C00_02)

2 Preparing for Installation

About This Chapter

This topic describes the tools and meters that need to be available before the installation. It alsodescribes the skills that the installation engineers must possess, and the requirements that theinstallation engineers must meet.

2.1 Preparing Tools and MetersYou need to prepare the following tools and meters before installation:

2.2 Qualification of Installation EngineersInstallation engineers must possess the basic knowledge of safe operation. They should receivethe related training, should understand how to operate correctly, and acquire correspondingoperation qualification.

BTS3900 LTEInstallation Guide 2 Preparing for Installation

Issue 02 (2010-07-30) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

2-1

Page 18: BTS3900 LTE Installation Guide(V100R002C00_02)

2.1 Preparing Tools and MetersYou need to prepare the following tools and meters before installation:

Marking pen Phillips screwdriver (M3 toM6)

Flat-head screwdriver (M3 toM6)

Diagonal pliers

Combination wrench(capacity 32 mm)

Socket wrench Torque wrench

Power cable crimping tool RJ11 crimping tool Cable cutter

Rubber mallet Soldering iron Wire stripper

Hammer drill (Ø16) Heat gun Level

Multimeter Measuring tape Vacuum cleaner

2.2 Qualification of Installation EngineersInstallation engineers must possess the basic knowledge of safe operation. They should receivethe related training, should understand how to operate correctly, and acquire correspondingoperation qualification.

2 Preparing for InstallationBTS3900 LTE

Installation Guide

2-2 Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

Issue 02 (2010-07-30)

Page 19: BTS3900 LTE Installation Guide(V100R002C00_02)

When arranging the installation engineers to perform this activity, the customer needs to payattention to the following points:

l The technical engineer of the customer must have received the basic training conducted byHuawei Technologies Co., Ltd., and must understand the related methods of installationand construction.

l The number of installation engineers should be based on the specific engineering scheduleand the installation environment. In general, arrange for three to five installation engineers.

BTS3900 LTEInstallation Guide 2 Preparing for Installation

Issue 02 (2010-07-30) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

2-3

Page 20: BTS3900 LTE Installation Guide(V100R002C00_02)
Page 21: BTS3900 LTE Installation Guide(V100R002C00_02)

3 Information About the Installation

About This Chapter

BTS3900 cabinets can be classified into -48 V cabinet, +24 V cabinet, and +220 V cabinet. Youneed to familiarize yourself with the related information and clearance requirements before thecabinet installation.

3.1 Hardware Structure of the BTS3900 Cabinet (-48 V)The BTS3900 cabinet (-48 V) houses the RFUs, fan box, BBU, and DCDU-01. In addition, sparespace in the cabinet is available for customer equipment.

3.2 Hardware Structure of the BTS3900 Cabinet (+24 V)The BTS3900 cabinet (+24 V) houses the RFUs, fan box, BBU, DCDU-01, and PSUs (DC/DC).

3.3 Hardware Structure of the BTS3900 Cabinet (220 V)The BTS3900 cabinet (220 V) houses the RFUs, fan box, BBU, DCDU-01, PSUs (AC/DC), andPMU.

3.4 Installation Clearance and Position RequirementsSpace for cabling and maintenance should be reserved during the installation of the cabinet.

BTS3900 LTEInstallation Guide 3 Information About the Installation

Issue 02 (2010-07-30) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

3-1

Page 22: BTS3900 LTE Installation Guide(V100R002C00_02)

3.1 Hardware Structure of the BTS3900 Cabinet (-48 V)The BTS3900 cabinet (-48 V) houses the RFUs, fan box, BBU, and DCDU-01. In addition, sparespace in the cabinet is available for customer equipment.

The BTS3900 cabinet (-48 V) can house three RFUs in typical configuration or six RFUs in fullconfiguration. Figure 3-1 and Figure 3-2 show the BTS3900 cabinet (-48 V) in typicalconfiguration and in full configuration respectively.

Figure 3-1 BTS3900 cabinet (-48 V) in typical configuration

Figure 3-2 BTS3900 cabinet (-48 V) in full configuration

3 Information About the InstallationBTS3900 LTE

Installation Guide

3-2 Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

Issue 02 (2010-07-30)

Page 23: BTS3900 LTE Installation Guide(V100R002C00_02)

3.2 Hardware Structure of the BTS3900 Cabinet (+24 V)The BTS3900 cabinet (+24 V) houses the RFUs, fan box, BBU, DCDU-01, and PSUs (DC/DC).

The BTS3900 cabinet (+24 V) supports the 3RFU typical configuration and the 6RFU fullconfiguration. Figure 3-3 and Figure 3-4 show the BTS3900 cabinet (+24 V) in typicalconfiguration and in full configuration respectively.

Figure 3-3 BTS3900 cabinet (+24 V) in typical configuration

Figure 3-4 BTS3900 cabinet (+24 V) in full configuration

BTS3900 LTEInstallation Guide 3 Information About the Installation

Issue 02 (2010-07-30) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

3-3

Page 24: BTS3900 LTE Installation Guide(V100R002C00_02)

3.3 Hardware Structure of the BTS3900 Cabinet (220 V)The BTS3900 cabinet (220 V) houses the RFUs, fan box, BBU, DCDU-01, PSUs (AC/DC), andPMU.

The BTS3900 cabinet (220 V) supports the 3RFU typical configuration and the 6RFU fullconfiguration. Figure 3-5 and Figure 3-6 show the BTS3900 cabinet (220 V) in typicalconfiguration and in full configuration respectively.

Figure 3-5 BTS3900 cabinet (220 V) in typical configuration

Figure 3-6 BTS3900 cabinet (220 V) in full configuration

3 Information About the InstallationBTS3900 LTE

Installation Guide

3-4 Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

Issue 02 (2010-07-30)

Page 25: BTS3900 LTE Installation Guide(V100R002C00_02)

3.4 Installation Clearance and Position RequirementsSpace for cabling and maintenance should be reserved during the installation of the cabinet.

Installation Clearance Requirements

The clearance requirements of the BTS3900 cabinets are as follows:

l The cabinet can be installed with its back against the wall.

l The cabinet can be installed with one side against the wall.

l At least 800 mm in front of the cabinet should be reserved for maintenance.

l At least 200 mm on top of the cabinet should be reserved for cabling.

Figure 3-7 shows the installation clearance requirements when a single cabinet is installed, twocabinets are installed side-by-side, and two cabinets are stacked.

Figure 3-7 Cabinet installation clearance requirements

Cabinet Layout Requirements

The layout requirements of the BTS3900 cabinets are as follows:

l The cabinets are as close to the feeder window as possible so that the feeders can be asshort as possible.

l The cabinets are installed in a row in the same equipment room for easy cabling.

BTS3900 LTEInstallation Guide 3 Information About the Installation

Issue 02 (2010-07-30) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

3-5

Page 26: BTS3900 LTE Installation Guide(V100R002C00_02)

l No space is reserved between the cabinets and the customer equipment if they are installedside-by-side.

Figure 3-8 shows the layout requirements (unit: mm) for the installation of the BTS3900cabinets.

Figure 3-8 Cabinet layout requirements

3 Information About the InstallationBTS3900 LTE

Installation Guide

3-6 Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

Issue 02 (2010-07-30)

Page 27: BTS3900 LTE Installation Guide(V100R002C00_02)

4 Installation Procedure

The BTS3900 cabinets are delivered with boards are installed. The installation procedureinvolves installing the base, cabinets, and cables on site. In addition, some optional componentscan be installed on site as required.

Figure 4-1 shows the installation procedure.

BTS3900 LTEInstallation Guide 4 Installation Procedure

Issue 02 (2010-07-30) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

4-1

Page 28: BTS3900 LTE Installation Guide(V100R002C00_02)

Figure 4-1 Installation procedure

4 Installation ProcedureBTS3900 LTE

Installation Guide

4-2 Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

Issue 02 (2010-07-30)

Page 29: BTS3900 LTE Installation Guide(V100R002C00_02)

5 Unpacking the Equipment

You need to unpack and check the delivered equipment and ensure that all the materials areincluded and intact.

ContextNOTE

When transporting, moving, or installing the equipment, components, or parts, you must:

l Prevent them from colliding with doors, walls, shelves, or other objects.

l Wear clean gloves, and avoid touching the equipment, components, or parts with your bare hand,sweat-soaked gloves, or dirty gloves.

Procedure

Step 1 Check whether the total number of goods in each case matches that in the packing list.

If... Then...

The total number matches that in thepacking list

Go to Step 2.

The total number does not match that in thepacking list

Find out the cause and report it to the localHuawei office.

Step 2 Check whether the packing case is in good condition.

If... Then...

The outer packing is in good condition Go to Step 3.

The outer packing is severely damaged orsoaked

Find out the cause and report it to the localHuawei office.

Step 3 Check the type and quantity of the equipment in the cases according to the packing list.

BTS3900 LTEInstallation Guide 5 Unpacking the Equipment

Issue 02 (2010-07-30) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

5-1

Page 30: BTS3900 LTE Installation Guide(V100R002C00_02)

If... Then...

Types and quantity of the goods are inconformity with those on the packing list

Sign the packing list with the customer.

There is wrong delivery or shortage ofgoods

Fill in the Cargo Shortage and MiscarriageReport and submit it.

There is goods damaged Fill in the Goods Replacement Report andsubmit it.

WARNINGTo protect the equipment and find out the cause in the future, you need to keep the unpackedequipment and packing materials in indoor environment, take photos of the stockingenvironment, rusted or eroded equipment, packing case or carton, and packing materials, andthen file the photos.

----End

5 Unpacking the EquipmentBTS3900 LTE

Installation Guide

5-2 Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

Issue 02 (2010-07-30)

Page 31: BTS3900 LTE Installation Guide(V100R002C00_02)

6 Checking the Installed Modules and Cables

The internal modules and cables are installed in the cabinet before delivery. You need to checkthat the modules and cables are securely connected.

Module ChecklistThe modules are securely connected to the cabinet, and the screws are tightened.

Cable ChecklistCheck whether the power cables and screws are properly and securely fixed in the cabinet byreferring to Figure 6-1 and Table 6-1.

BTS3900 LTEInstallation Guide 6 Checking the Installed Modules and Cables

Issue 02 (2010-07-30) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

6-1

Page 32: BTS3900 LTE Installation Guide(V100R002C00_02)

Figure 6-1 Internal power cables

(1) -48 V cabinet (2) +24 V cabinet (3) AC cabinet

Table 6-1 Internal power cable

SN Cable One end The other end

Connector InstallationPosition

Connector InstallationPosition

P1 toP6

RFU PowerCable

3V3 powerconnector

PWR port onthe RFU

Parallelterminal

Ports RFU0 toRFU5 on theDCDU-01

P7 Fan BoxPower Cable

3V3 powerconnector

-48 V port ofthe fan box

Parallelterminal

FAN port onthe DCDU-01

P8 BBU PowerCable

3V3 powerconnector

PWR port onthe UPEU

Parallelterminal

BBU port onthe DCDU-01

P9 DCDU-01Power Cable

OT terminal RTN(+) porton theDCDU-01

OT terminal RTN(+)wiringterminal forpower outputof the powersubrack (DC/DC)

6 Checking the Installed Modules and CablesBTS3900 LTE

Installation Guide

6-2 Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

Issue 02 (2010-07-30)

Page 33: BTS3900 LTE Installation Guide(V100R002C00_02)

SN Cable One end The other end

Connector InstallationPosition

Connector InstallationPosition

P10 DCDU-01Power Cable

OT terminal NEG(-) porton theDCDU-01

OT terminal LOAD(-)wiringterminal forpower outputof the powersubrack (DC/DC)

P11 DCDU-01Power Cable

OT terminal RTN(+) porton theDCDU-01

OT terminal RTN(+)wiringterminal forpower outputof the powersubrack (AC/DC)

P12 DCDU-01Power Cable

OT terminal NEG(-) porton theDCDU-01

OT terminal LOAD1(-) orLOAD2(-)wiringterminal forpower outputof the powersubrack (AC/DC)

Check whether the signal cables and screws are properly and securely fixed in the cabinet byreferring to Figure 6-2 and Table 6-2.

BTS3900 LTEInstallation Guide 6 Checking the Installed Modules and Cables

Issue 02 (2010-07-30) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

6-3

Page 34: BTS3900 LTE Installation Guide(V100R002C00_02)

Figure 6-2 Internal signal cables

(1) -48 V cabinet (2) +24 V cabinet (3) AC cabinet

Table 6-2 Internal signal cables

SN Cable One end The other end

Connector InstallationPosition

Connector InstallationPosition

S1 Monitoringsignal cablefor the fanbox

RJ-45 COM IN portof the fan box

RJ-45 MON0 porton the UPEU

S2 ELU signalcable

RJ-45 SENSOR portof the fan box

RJ-45 ELU

S3 Monitoringsignal cablefor the PSU(DC/DC)

Cord endterminal

ALM port ofthe powersubrack (DC/DC)

RJ-45 EXT-ALM0port on theUPEU

S4 In-positionsignal cablefor the PSU(DC/DC)

RJ-45 PRESENTport of thepower subrack(DC/DC)

RJ-45 EXT-ALM1port on theUPEU

6 Checking the Installed Modules and CablesBTS3900 LTE

Installation Guide

6-4 Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

Issue 02 (2010-07-30)

Page 35: BTS3900 LTE Installation Guide(V100R002C00_02)

SN Cable One end The other end

Connector InstallationPosition

Connector InstallationPosition

S5 Monitoringsignal cablefor the PMU

RJ-45 RS232/RS422 port onthe PMU

RJ-45 MON1 porton the UPEU

Check and ensure the secure connections of the CPRI cables, which are installed inside thecabinets based on different configurations of the cabinets before delivery. For details about howto remove and insert the CPRI cable, see Inserting and Removing CPRI Cables.

BTS3900 LTEInstallation Guide 6 Checking the Installed Modules and Cables

Issue 02 (2010-07-30) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

6-5

Page 36: BTS3900 LTE Installation Guide(V100R002C00_02)
Page 37: BTS3900 LTE Installation Guide(V100R002C00_02)

7 Installing the Base

About This Chapter

The BTS3900 cabinet must be installed on the base. The base can be installed on the concretefloor or ESD floor according to the equipment room conditions and customer requirements.

7.1 Installing the Base on the Concrete FloorThis section describes the procedure and precautions for installing the base on the concrete floor.

7.2 Installing the Base on the ESD FloorThis section describes the procedure and precautions for installing the base on the ESD floor.

BTS3900 LTEInstallation Guide 7 Installing the Base

Issue 02 (2010-07-30) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

7-1

Page 38: BTS3900 LTE Installation Guide(V100R002C00_02)

7.1 Installing the Base on the Concrete FloorThis section describes the procedure and precautions for installing the base on the concrete floor.

ProcedureStep 1 Determine the position of the cabinet by referring to the marking template, as shown in Figure

7-1.

Figure 7-1 Positioning the cabinet

(1) Anchor hole (2) Concrete floor (3) Marking template

Step 2 Drill a hole at each anchor point, and then install the expansion bolt assembly, as shown inFigure 7-2.

Figure 7-2 Drilling a hole and installing an expansion bolt assembly

(1) M12x60 bolt (2) Spring washer (3) Flat washer (4) Expansion tube

1. Use the percussion drill with bit 16 to drill holes at the anchor points, and ensure that the

depth of each hole ranges from 52 mm to 60 mm.

7 Installing the BaseBTS3900 LTE

Installation Guide

7-2 Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

Issue 02 (2010-07-30)

Page 39: BTS3900 LTE Installation Guide(V100R002C00_02)

WARNINGTake proper safety measures to protect your eyes and respiratory tract against the dustbefore drilling holes.

2. Use a vacuum cleaner to clear the dust inside and around the holes. If the inter-hole spacingis too wide or too narrow, locate and drill holes again.

3. Slightly tighten the expansion bolt, and then put the expansion bolt assembly into the holevertically.

4. Use a rubber mallet to hammer the expansion bolt until the expansion tube is buried intothe hole.

5. Remove the M12x60 bolt, spring washer, and flat washer from each expansion boltassembly in sequence.

WARNINGAfter disassembling the expansion bolt assembly, ensure that the top of the expansion tubeis on the same level as the floor.

Step 3 Install the base and adjust the base level.1. Place the insulating spacer and the base on the floor, align the mounting holes in the base

and in the insulating spacers with the holes of the expansion bolts in the floor, and then usefour M12x60 bolts to secure the base, as shown in Figure 7-3.

Figure 7-3 Fixing the base

(1) M12x60 bolt (2) Spring washer (3) Flat washer

(4) Insulating washer (5) Insulating spacers -

BTS3900 LTEInstallation Guide 7 Installing the Base

Issue 02 (2010-07-30) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

7-3

Page 40: BTS3900 LTE Installation Guide(V100R002C00_02)

2. Check and adjust the base level.

Place the level on the top plane of the base to check the base level, as shown in Figure7-4. If the bubble is not in the middle of the level, adjust the base level through the adjustingbolts.

Figure 7-4 Checking the base level

(1) Adjusting bolt (2) Level

Step 4 Test the insulation between the base and the expansion bolt.1. Set the multimeter to the megohm position (MΩ).2. Measure the resistance between the adjusting bolt and the expansion bolt, as shown in

Figure 7-5.

Figure 7-5 Measuring the resistance between the adjusting bolt and the expansion bolt

l If the resistance is less than five megohms, you can infer that the base is not insulated

from the floor. Go to Step 4.3.l If the resistance is greater than or equal to five megohms, you can infer that the base is

insulated from the floor. End the test.

7 Installing the BaseBTS3900 LTE

Installation Guide

7-4 Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

Issue 02 (2010-07-30)

Page 41: BTS3900 LTE Installation Guide(V100R002C00_02)

3. Dissemble the expansion bolt assembly, and check whether insulating washers are missedor damaged.l If insulating washers are missed or damaged, reinstall them, and then adjust the base

level.l If no insulating washers are missed or damaged, check whether the multimeter is faulty

or whether the setting is correct.

----End

7.2 Installing the Base on the ESD FloorThis section describes the procedure and precautions for installing the base on the ESD floor.

ContextFigure 7-6 shows the support for installing the ESD floor.

Figure 7-6 Support for installing the ESD floor

(1) Mounting holes for the ESD floor (2) Frames (3) Mounting hole for the concretefloor

The support for installing the ESD floor on which the cabinet is installed is classified into twotypes: support with fixed height and support with adjustable height. Table 7-1 lists the relationsbetween the two types of supports and the height of the ESD floor.

Table 7-1 Height of the support for installing the ESD floor

Type of the Support Height of the ESD Floor (Unit: mm)

Support with fixed height 296 to 495

Support with adjustableheight

120 at least; adjustable according to the height of the floor

BTS3900 LTEInstallation Guide 7 Installing the Base

Issue 02 (2010-07-30) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

7-5

Page 42: BTS3900 LTE Installation Guide(V100R002C00_02)

NOTE

Height of the ESD floor refers to the spacing between the concrete floor and the upper surface of the ESDfloor.

Procedure

Step 1 Determine the installation position of the cabinet on the ESD floor by referring to Installing theCabinet on the Concrete Floor Step 1.

Step 2 Drill holes on the ESD floor.1. Use a percussion drill with bit 16 to drill holes at the anchor points. The holes should

penetrate the ESD floor, as shown in Figure 7-7.

Figure 7-7 Drilling a hole on the ESD floor

WARNINGTake proper safety measures to protect your eyes and respiratory tract against the dustbefore drilling holes.

2. Use a vacuum cleaner to clear the dust inside and around the holes. If the inter-hole spacingis too wide or too narrow, locate and drill holes again.

Step 3 Position the support.1. Place the support under the ESD floor, and then use bolts to secure the ESD floor on the

support temporarily, as shown in Figure 7-8.

7 Installing the BaseBTS3900 LTE

Installation Guide

7-6 Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

Issue 02 (2010-07-30)

Page 43: BTS3900 LTE Installation Guide(V100R002C00_02)

Figure 7-8 Positions of the access holes in the support and holes in the ESD floor

(1) Mounting holes for the ESD floor (2) ESD floor (3) Mounting hole for the concrete floor

2. Mark the positions of the mounting holes on the concrete floor, as shown in Figure 7-9.

Figure 7-9 Marking the positions of the mounting holes

(1) Mounting hole for theconcrete floor

(2) Frames (3) Concrete floor (4) ESD floor

3. Use a measuring tape to measure the inter-hole spacing, and ensure that the four holes serve

as the vertices of a rectangle.

Step 4 Drill holes at the anchor points on the concrete floor, and then install expansion bolt assemblies.For details, see Installing the Cabinet on the Concrete Floor Step 2.

Step 5 Secure the support for installing the ESD floor.

Use M12x60 bolts, spring washers, and flat washers to secure the support for installing the ESDfloor on the concrete floor. Tighten the bolts until the fastening torque reaches 45 N·m. Figure7-10 shows how to secure the support for installing the ESD floor.

BTS3900 LTEInstallation Guide 7 Installing the Base

Issue 02 (2010-07-30) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

7-7

Page 44: BTS3900 LTE Installation Guide(V100R002C00_02)

Figure 7-10 Securing the supports for installing the ESD floor

(1) M12x60 bolt (2) Spring washer (3) Flat washer

Step 6 Remove the bolts that are used to temporarily secure the ESD floor on the support in Step 3.1.

Step 7 Refer to Installing the Cabinet on the Concrete Floor Step 3, Step 4.

----End

7 Installing the BaseBTS3900 LTE

Installation Guide

7-8 Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

Issue 02 (2010-07-30)

Page 45: BTS3900 LTE Installation Guide(V100R002C00_02)

8 Installing a Cabinet

This section describes the procedure and precautions for installing a single cabinet on a base.

ContextThe cabinet door can be removed before the cabinet is installed for easy operations. Whenremoving the cabinet door, disconnect the equipotential cable from the lower part of the door,and then rotate the spring pin 90° to the left and press the pin. Thus, the cabinet door can beremoved, as shown in Figure 8-1.

Figure 8-1 Removing the cabinet door

When installing the cabinet door, align the spring pin with the hole, rotate the pin to the rightuntil it is tightly pressed by the door, and then install the equipotential cable on the door, asshown in Figure 8-2.

BTS3900 LTEInstallation Guide 8 Installing a Cabinet

Issue 02 (2010-07-30) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

8-1

Page 46: BTS3900 LTE Installation Guide(V100R002C00_02)

Figure 8-2 Installing the cabinet door

Procedure

Step 1 Lift the cabinet onto the base.

Step 2 Slide the cabinet along the base to ensure that the back of the cabinet is aligned with the backof the base. Use a torque wrench to tighten the two M12x50 bolts in the front of the cabinet untilthe fastening torque reaches 45 N·m, as shown in Figure 8-3.

Figure 8-3 Installing the cabinet

----End

8 Installing a CabinetBTS3900 LTE

Installation Guide

8-2 Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

Issue 02 (2010-07-30)

Page 47: BTS3900 LTE Installation Guide(V100R002C00_02)

9 Installing the PGND Cable

The equipotential PGND cable is used to connect the PGND bolts on the cabinets to the PGNDgrounding bars on site, ensuring that the cabinets are properly grounded. The equipotential cableis used to connect the PGND bolts on the cabinets, ensuring the equipotential connectionsbetween the cabinets.

ContextTable 9-1 describes the specifications of the PGND cable and equipotential cable.

Table 9-1 Specifications of the PGND cable

Cable Name One End The Other End Remarks

PGND cable OT terminal (M8) OT terminal (M8) Yellow and greencable, 25 mm2

Procedure

Step 1 Prepare the PGND cable and equipotential cable.1. Prepare the cable of proper length based on the actual cable route.2. Add OT terminals to both ends of the cable. For details, see Assembling the OT Terminal

and the Power Cable.

Step 2 Install the PGND cable for a single cabinet.

CAUTIONInstall the OT terminals in a correct way, as shown in Figure 9-1.

BTS3900 LTEInstallation Guide 9 Installing the PGND Cable

Issue 02 (2010-07-30) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

9-1

Page 48: BTS3900 LTE Installation Guide(V100R002C00_02)

Figure 9-1 Installing the OT terminal in a correct way

l Use a PGND cable with a cross-sectional area of 25 mm2 to connect the ground point on the-48 V cabinet to an external ground bar, as shown in Figure 9-2.

NOTE

The procedure for grounding the BTS3900 cabinet (AC) is the same as the procedure for groundingthe BTS3900 cabinet (-48 V DC).

Figure 9-2 Installing the PGND cable for the BTS3900 cabinet (-48 V DC)

(1) OT terminal (M8) (2) External ground bar

l Use two PGND cables with a cross-sectional area of 25 mm2 to connect the ground point onthe +24 V cabinet to the external ground bar, as shown in Figure 9-3.

9 Installing the PGND CableBTS3900 LTE

Installation Guide

9-2 Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

Issue 02 (2010-07-30)

Page 49: BTS3900 LTE Installation Guide(V100R002C00_02)

Figure 9-3 Installing the PGND cable for the BTS3900 cabinet (+24 V DC)

(1) External ground bar (2) OT terminal (M8) (3) OT terminal (M8)

Step 3 Route the cable by referring to 11.1 Cabling Requirements.

Step 4 Label the installed cables by referring to Attaching the Cable-Tying Label.

----End

BTS3900 LTEInstallation Guide 9 Installing the PGND Cable

Issue 02 (2010-07-30) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

9-3

Page 50: BTS3900 LTE Installation Guide(V100R002C00_02)
Page 51: BTS3900 LTE Installation Guide(V100R002C00_02)

10 (Optional) Installing the Modules

About This Chapter

The mandatory modules in the cabinet are already installed. The optional modules can beinstalled on site according to different field requirements.

10.1 Installing the GPS Surge ProtectorThis section describes the procedure and precautions for installing the GPS surge protector.

BTS3900 LTEInstallation Guide 10 (Optional) Installing the Modules

Issue 02 (2010-07-30) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

10-1

Page 52: BTS3900 LTE Installation Guide(V100R002C00_02)

10.1 Installing the GPS Surge ProtectorThis section describes the procedure and precautions for installing the GPS surge protector.

Procedure

Step 1 Remove the connecting piece from the cabinet top, and then install the support for the GPS surgeprotector in the original position of the connecting piece, as shown in Figure 10-1.

Figure 10-1 Installing the support for the GPS surge protector

Step 2 Link the SMA male connector of the GPS signal cable to the GPS surge protector on the USCUand the N-type connector to the support for the GPS surge protector, as shown in Figure 10-2.

NOTE

If the USCU is not configured, the GPS signal cable is connected to the GPS port on the LMPT.

Figure 10-2 Installing the GPS signal cable

Step 3 Install the GPS surge protector to the support, and then connect cables, as shown in Figure10-3.

10 (Optional) Installing the ModulesBTS3900 LTE

Installation Guide

10-2 Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

Issue 02 (2010-07-30)

Page 53: BTS3900 LTE Installation Guide(V100R002C00_02)

Figure 10-3 Installing the GPS surge protector

Step 4 Route the cable by referring to 11.1 Cabling Requirements and 11.2 Cable RoutingPrinciples.

Step 5 Attach labels to the installed cables. For details, see Labeling Signal Cables.

----End

BTS3900 LTEInstallation Guide 10 (Optional) Installing the Modules

Issue 02 (2010-07-30) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

10-3

Page 54: BTS3900 LTE Installation Guide(V100R002C00_02)
Page 55: BTS3900 LTE Installation Guide(V100R002C00_02)

11 Installing the Cables

About This Chapter

The BTS3900 cabinet is delivered with boards installed, and the internal cables are alreadyinstalled. Therefore, only the external cables and cables for the optional modules need to beinstalled on site.

11.1 Cabling RequirementsYou must route cables according to the specified cabling requirements to prevent signalinterference.

11.2 Cable Routing PrinciplesThe cables in the BTS3900 cabinet must be routed according to the cabling requirements andmust be bound by using cable ties.

11.3 Installing the Power CablesThis describes the procedure and precautions for installing the external input power cable.

11.4 Installing the Transmission CablesThe E1/T1 cable or FE/GE cable can be used for data transmission according to the transmissionmode of the eNodeB.

11.5 Installing the Monitoring Signal Cable for the EMUThe monitoring signal cable for the EMU transmits monitoring signals from the EMU to theBBU3900.

11.6 Installing the RF JumperThe RF jumper connects the RFU to the antenna system for signal exchange between the basestation and the antenna system.

BTS3900 LTEInstallation Guide 11 Installing the Cables

Issue 02 (2010-07-30) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

11-1

Page 56: BTS3900 LTE Installation Guide(V100R002C00_02)

11.1 Cabling RequirementsYou must route cables according to the specified cabling requirements to prevent signalinterference.

General Cabling RequirementsThe bending radius of the cables must meet the following specifications:

l The bending radius of the 7/8'' feeder must be more than 250 mm, and the bending radiusof the 5/4'' feeder must be more than 380 mm.

l The bending radius of the 1/4'' jumper must be more than 35 mm. The bending radius ofthe super-flexible 1/2'' jumper must be more than 50 mm, and the bending radius of theordinary 1/2'' jumper must be more than 127 mm.

l The bending radius of the power cable or PGND cable must be at least five times thediameter of the cable.

l The bending radius of the optical cable must be at least 20 times the diameter of the opticalcable.

l The bending radius of the E1/T1 cable must be at least five times the diameter of the cable.

l The bending radius of the signal cable must be at least five times the diameter of the cable.

The cables must be bound as follows:

l Different types of cables must be separately routed at least 30 mm and cannot be entangled.

l The cables must be bound tightly and neatly. The jackets of the cables are not damaged.

l The cable ties must face the same direction, and those at the same horizontal line must bein a straight line. Extra length of cable ties must be cut off.

l Labels or nameplates must be attached to the cables after they are installed.

The cables must be routed in category as follows:

l Different types of cables must be separately routed.

l Different types of cables cannot be crossed.

l Different types of cables must be routed in parallel or separated by special objects.

Special Cabling RequirementsCabling requirements for power cables are as follows:

l The -48 V power cables should be bound together.

l The +24 V power cables should be bound together.

l The power cable must be separately bound from transmission cables and signal cables.

l Multiple power cables must be bound when routed.

l Positions for routing the power cables must meet requirements of the engineering design.

l If the length of the power cable is insufficient, replace the cable rather than addingconnectors or soldering joints to lengthen the cable.

Cabling requirements for PGND cables are as follows:

11 Installing the CablesBTS3900 LTE

Installation Guide

11-2 Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

Issue 02 (2010-07-30)

Page 57: BTS3900 LTE Installation Guide(V100R002C00_02)

l The PGND cables for the base station must be connected to the same ground bar.

l The PGND cables must be buried in the ground or routed indoors. They should not berouted overhead before they are led into the equipment room.

l The exterior of the coaxial wire and shielding layer of the shielded cable must have properelectrical contact with the metal surface of the connected equipment.

l The PGND cable and signal cable cannot be bound or entangled. A certain distance mustbe reserved between them to prevent interference from each other.

l Fuses or switches cannot be installed on the PGND cables.

l Other devices cannot be used for the electrical connection of the PGND cables.

l All the metal parts in the housing of the equipment must be reliably connected to the groundterminal.

Cabling requirements for E1 cables are as follows:

l The E1 cable cannot cross the power cable, PGND cable, or RF cable when routed. If thetransmission cable is routed with the power cable, PGND cable, and RF cable in parallel,the spacing between them must be greater than 30 mm.

l The E1 cables must be neatly and elegantly routed and securely bound with cable ties.

l Extra length of E1 cables must be reserved when they are curved.

Cabling requirements for the optical cables are as follows:

l Do not stretch the optical cables, step on the cables, or place heavy objects on the cables.Keep the cables away from sharp objects to prevent damage to the fibers.

l When the optical cables are routed, the extra length of the cables must be coiled aroundspecial devices, such as a fiber coiler.

l When coiling the optical cables, apply the strength evenly. Do not bend the cables withforce, thus preventing any damage to the fibers.

l Cover the optical connectors that are not in use with dustproof caps.

11.2 Cable Routing PrinciplesThe cables in the BTS3900 cabinet must be routed according to the cabling requirements andmust be bound by using cable ties.

Procedure

Step 1 Route the PGND cable along the left interior of the cabinet.

Step 2 Route the six jumpers on the left along the left interior of the cabinet.

Step 3 Route the external input power cable along the left interior of the cabinet.

Step 4 Route the six jumpers on the right along the right interior of the cabinet.

Step 5 Route the transmission cables along the right interior of the cabinet.

Step 6 Route the monitoring signal cables close to the CPRI cables.

Figure 11-1 shows the cable routing in a single cabinet.

BTS3900 LTEInstallation Guide 11 Installing the Cables

Issue 02 (2010-07-30) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

11-3

Page 58: BTS3900 LTE Installation Guide(V100R002C00_02)

Figure 11-1 Cable routing in a single cabinet

(1) PGND cable (2) Jumper on the left (3) Input power cable

(4) Jumper on the right (5) Transmission cable -

----End

11.3 Installing the Power CablesThis describes the procedure and precautions for installing the external input power cable.

11.3.1 Installing the Input Power Cable for the -48 V CabinetThe input power cable for the -48 V cabinet connects the wiring terminals for the input powercable on the DCDU-01 to the external power equipment. The cable feeds -48 V DC power intothe BTS3900 cabinet.

11.3.2 Installing the Input Power Cable for the +24 V CabinetThe input power cable for the +24 V cabinet connects the power system (DC/DC) to the externalpower equipment. The cable feeds +24 V DC power into the BTS3900 cabinet.

11.3.3 Installing the Input Power Cable for the 220 V CabinetThe input power cable for the 220 V cabinet feeds external AC power into the BTS3900 cabinet.

11.3.1 Installing the Input Power Cable for the -48 V CabinetThe input power cable for the -48 V cabinet connects the wiring terminals for the input powercable on the DCDU-01 to the external power equipment. The cable feeds -48 V DC power intothe BTS3900 cabinet.

ContextThe cross-section area of the -48 V power cable is 16 mm2.

Procedure

Step 1 Measure the distance between the DCDU-01 and the external power equipment according to theactual cable route, and then prepare power cables of a proper length.

11 Installing the CablesBTS3900 LTE

Installation Guide

11-4 Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

Issue 02 (2010-07-30)

Page 59: BTS3900 LTE Installation Guide(V100R002C00_02)

NOTE

Reserve an extra length of 300 mm when preparing the input power cables. Thus, the power cables can beled out from the upper cabinet if two cabinets are stacked in the case of capacity expansion.

Step 2 Make an M6 OT terminal at each end of the power cable. For details, see Assembling the OTTerminal and the Power Cable.

Step 3 Remove the protecting hood from the terminal block of the DCDU-01.

Step 4 Connect the blue cable to the wiring terminal labeled NEG(-) and black cable to the wiringterminal labeled RTN(+).

NOTE

When two -48 V cabinets are stacked, the external power equipment supplies power to the upper and lowercabinets.

Step 5 Use a screwdriver to tighten the screws on the wiring terminals.

Step 6 Install the protecting hood, and then use a screwdriver to tighten the screws. Figure 11-2 showsthe installation procedure.

Figure 11-2 Installing the -48 V input power cable

Step 7 Route the cable by referring to 11.1 Cabling Requirements and Cable Routing Principles.

Step 8 Attach labels to the installed cables. For details, see Attaching the Cable-Tying Label.

----End

11.3.2 Installing the Input Power Cable for the +24 V CabinetThe input power cable for the +24 V cabinet connects the power system (DC/DC) to the externalpower equipment. The cable feeds +24 V DC power into the BTS3900 cabinet.

ContextThe cross-section area of the +24 V power cable is 25 mm2.

BTS3900 LTEInstallation Guide 11 Installing the Cables

Issue 02 (2010-07-30) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

11-5

Page 60: BTS3900 LTE Installation Guide(V100R002C00_02)

Procedure

Step 1 Measure the distance between the wiring terminal of the power subrack (DC/DC) and theexternal power equipment according to the actual cable route, and then prepare power cables ofa proper length.

NOTE

Reserve an extra length of 300 mm when preparing the input power cables. Thus, the power cables can beled out from the upper cabinet if two cabinets are stacked in the case of capacity expansion.

Step 2 Make an M6 OT terminal at each end of the power cable. For details, see Assembling the OTTerminal and the Power Cable.

Step 3 Use a Phillips screwdriver to remove the screws from the protecting hood for the wiring terminalsof the power subrack (DC/DC), and then remove the protecting hood.

Step 4 Connect the two red cables to the wiring terminals labeled + and two black cables to the wiringterminals labeled -.

Step 5 Use a screwdriver to tighten the screws on the wiring terminals.

Step 6 Install the protecting hood, and then use a screwdriver to tighten the screws. Figure 11-3 showsthe installation procedure.

Figure 11-3 Installing the +24 V input power cable

Step 7 Route the cable by referring to 11.1 Cabling Requirements and Cable Routing Principles.

Step 8 Attach labels to the installed cables. For details, see Attaching the Cable-Tying Label.

----End

11.3.3 Installing the Input Power Cable for the 220 V CabinetThe input power cable for the 220 V cabinet feeds external AC power into the BTS3900 cabinet.

11 Installing the CablesBTS3900 LTE

Installation Guide

11-6 Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

Issue 02 (2010-07-30)

Page 61: BTS3900 LTE Installation Guide(V100R002C00_02)

Contextl The 220 V cabinet supports three types of AC power input: 220 V AC single-phase, 220

V AC three-phase, and 110 V AC dual-live-wire.

l The cross-section area of the 220 V AC single-phase power cable is 6 mm2. The cross-section area of the 220 V AC three-phase power cable is 2.5 mm2. The cross-section areaof the 110 V dual-live-wire power cable is 6 mm2.

ProcedureStep 1 Measure the distance between the wiring terminal of the power subrack (AC/DC) and the

external power equipment according to the actual cable route, and then prepare power cables ofa proper length.

NOTE

Reserve an extra length of 300 mm when preparing the input power cables. Thus, the power cables can beled out from the upper cabinet if two cabinets are stacked in the case of capacity expansion.

Step 2 Make an M6 OT terminal at each end of the power cable. For details, see Assembling the OTTerminal and the Power Cable.

DANGERWhen adding OT terminals to the power cable, do not expose the metal wires, as shown inFigure 11-4.

Figure 11-4 Adding an OT terminals to the power cable

Step 3 Connect the corresponding input powers according to field requirements.1. Install the 220 V AC single-phase input power cable. That is, connect the live wire to the

wiring terminal labeled L1 in the power subrack (AC/DC) and neutral wire to the wiringterminal labeled N1, as shown in Figure 11-5.

Figure 11-5 220 V AC single-phase power cable

BTS3900 LTEInstallation Guide 11 Installing the Cables

Issue 02 (2010-07-30) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

11-7

Page 62: BTS3900 LTE Installation Guide(V100R002C00_02)

2. Install the 220 V AC three-phase input power cable. That is, remove the short-circuiting

cable from the wiring terminals of the power subrack (AC/DC), connect the three live wiresto the wiring terminals labeled L1, L2, and L3, and then connect the neutral wire to thewiring terminal labeled N1, as shown in Figure 11-6.

Figure 11-6 220 V AC three-phase power cable

3. Install the 110 V AC input power cable. That is, connect the live wire to the wiring terminal

labeled L1 in the power subrack (AC/DC) and neutral wire to the wiring terminal labeledN1, as shown in Figure 11-7.

Figure 11-7 110 V AC dual-live-wire power cable

Step 4 Connect the other end of the power cable to the external power equipment.

Step 5 Use a screwdriver to tighten the screws on the wiring terminals.

Step 6 Route the cable by referring to 11.1 Cabling Requirements and Cable Routing Principles.

Step 7 Attach labels to the installed cables. For details, see Attaching the Cable-Tying Label.

----End

11.4 Installing the Transmission CablesThe E1/T1 cable or FE/GE cable can be used for data transmission according to the transmissionmode of the eNodeB.

11 Installing the CablesBTS3900 LTE

Installation Guide

11-8 Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

Issue 02 (2010-07-30)

Page 63: BTS3900 LTE Installation Guide(V100R002C00_02)

11.4.1 Installing the E1/T1 CableIf the BTS3900 needs to communicate with transmission equipment through the E1/T1 cable,the E1/T1 cable needs to be installed.

11.4.2 Installing the FE/GE CableIf the BTS3900 needs to communicate with transmission equipment through the FE/GE cable,the FE/GE cable need to be installed.

11.4.3 Installing the FE/GE Optical CableIf the BTS3900 needs to communicate with transmission equipment through the FE/GE opticalcable , the FE/GE optical cable needs to be installed.

11.4.1 Installing the E1/T1 CableIf the BTS3900 needs to communicate with transmission equipment through the E1/T1 cable,the E1/T1 cable needs to be installed.

PrerequisiteEnsure that both ends of the E1 cable are disconnected. Then, weld connectors to the bare wiresat one end of the E1 cable all at once.

ProcedureStep 1 Install the UTRP for the communication between the BTS3900 and the transmission equipment

through the E1/T1 cable. Then, link the DB26 male connector of the E1/T1 cable to the portlabeled E1/T1 on the UTRP, and then tighten the screws, as shown in Figure 11-8.

Figure 11-8 Installing the E1/T1 cable

BTS3900 LTEInstallation Guide 11 Installing the Cables

Issue 02 (2010-07-30) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

11-9

Page 64: BTS3900 LTE Installation Guide(V100R002C00_02)

Step 2 Route the E1/T1 cable along the cable through on the right of the cabinet, and then use cableties to bind the cable.

Step 3 Route the cable by referring to 11.1 Cabling Requirements and 11.2 Cable RoutingPrinciples.

Step 4 Attach labels to the installed cables by referring to Attaching the L-Shaped Label.

----End

11.4.2 Installing the FE/GE CableIf the BTS3900 needs to communicate with transmission equipment through the FE/GE cable,the FE/GE cable need to be installed.

ContextNOTE

The ports labeled SFP0 and FE/GE0 on the LMPT is GE transmission line, and the two ports cannot beused at the same time.The ports labeled SFP1 and FE/GE1 on the LMPT is another GE transmission line, and the two ports cannotbe used at the same time.

ProcedureStep 1 Connect the FE/GE cable to the port labeled FE/GE0 or the port labeled FE/GE1 on the LMPT,

as shown in Figure 11-9.

Figure 11-9 Installing the FE/GE cable

11 Installing the CablesBTS3900 LTE

Installation Guide

11-10 Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

Issue 02 (2010-07-30)

Page 65: BTS3900 LTE Installation Guide(V100R002C00_02)

Step 2 Route the cable along the cable through on the right of the cabinet, and then use cable ties tobind the cable.

Step 3 Route the cable by referring to 11.1 Cabling Requirements and 11.2 Cable RoutingPrinciples.

Step 4 Attach labels to the installed cables by referring to Attaching the L-Shaped Label.

----End

11.4.3 Installing the FE/GE Optical CableIf the BTS3900 needs to communicate with transmission equipment through the FE/GE opticalcable , the FE/GE optical cable needs to be installed.

Context

l The single-mode optical module is labeled "SM" and multi-mode optical module is labeled"MM".

l If there are no labels on the optical module, it is the multi-mode optical module.

l If the optical module is labeled with 1.25 G, 1310nm, or other information, it is the single-mode optical module.

NOTE

The ports labeled SFP0 and FE/GE0 on the LMPT is GE transmission line, and the two ports cannot beused at the same time.

The ports labeled SFP1 and FE/GE1 on the LMPT is another GE transmission line, and the two ports cannotbe used at the same time.

Procedure

Step 1 Turn the puller downwards and insert into the ports labeled SFP0 or FE/GE0 on the LMPT, asshown in Figure 11-10.

Figure 11-10 Installing the optical module

Step 2 Connect the FE/GE optical cable to the optical module, as shown in Figure 11-11.

BTS3900 LTEInstallation Guide 11 Installing the Cables

Issue 02 (2010-07-30) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

11-11

Page 66: BTS3900 LTE Installation Guide(V100R002C00_02)

Figure 11-11 Installing the FE/GE optical cable

Step 3 Route the cable along the cable trough on the right of the cabinet, and then use cable ties to bindthe cable.

Step 4 Route the cable by referring to 11.1 Cabling Requirements and 11.2 Cable RoutingPrinciples.

Step 5 Attach labels to the installed cables by referring to Attaching the L-Shaped Label.

----End

11.5 Installing the Monitoring Signal Cable for the EMUThe monitoring signal cable for the EMU transmits monitoring signals from the EMU to theBBU3900.

Procedure

Step 1 Insert the RJ-45 connector at one end of the monitoring signal cable for the EMU into the portlabeled MON1 on the UPEU in the BBU3900.

Step 2 Link the DB9 male connector at the other end of the monitoring signal cable for the EMU to theport labeled RS485 on the EMU, and then tighten the screws.

Step 3 Route the cable by referring to 11.1 Cabling Requirements and Cable Routing Principles.

11 Installing the CablesBTS3900 LTE

Installation Guide

11-12 Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

Issue 02 (2010-07-30)

Page 67: BTS3900 LTE Installation Guide(V100R002C00_02)

Step 4 Attach labels to the installed cables by referring to Attaching the L-Shaped Label.

----End

11.6 Installing the RF JumperThe RF jumper connects the RFU to the antenna system for signal exchange between the basestation and the antenna system.

Procedure

Step 1 Lead the RF jumpers into the cabinet through the cable holes, and the route the jumpers byreferring to Cable Routing Principles.

NOTE

Reserve an extra length of 300 mm when preparing the RF jumper according to the actual cable route. Thus, thejumper can be led out from the upper cabinet if two cabinets are stacked during capacity expansion.

Step 2 Link the DIN connectors of the RF jumpers to the ports labeled ANT on the panels of the RFUs,as shown in Figure 11-12.

Figure 11-12 Installing RF jumpers

Step 3 Use a torque wrench to tighten the DIN connector until the fastening torque reaches 25 N·m to35 N·m.

Step 4 Attach color rings by referring to Color Ring for the Antenna System and Attaching the ColorRing.

NOTE

Check and ensure the secure connections of the Inter-RFU RF signal cables, which are installed inside thecabinets based on different configurations of the cabinets before delivery.

----End

BTS3900 LTEInstallation Guide 11 Installing the Cables

Issue 02 (2010-07-30) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

11-13

Page 68: BTS3900 LTE Installation Guide(V100R002C00_02)
Page 69: BTS3900 LTE Installation Guide(V100R002C00_02)

12 Installation Checklist

After the cabinets and devices are all installed, you need to check the installation items,installation environment, and cable-related items.

Checking the Cabinet Installation

Table 12-1 describes the cabinet installation checklist.

Table 12-1 Cabinet installation checklist

1 The base is securely installed.

2 All the bolts, especially those for electrical connections, are tightened. Both thespring washer and the flat washer are installed in a correct sequence.

3 The surface of the cabinet is neat and clean.

4 The cabinet meets the dustfree requirement.

5 The paint on the surface is satisfactory. The damaged paint is repaired.

6 All labels, tags, and nameplates are correct, legible, and complete.

Installation Environment Checklist

Table 12-2 describes the installation environment checklist.

Table 12-2 Installation environment checklist

1 No redundant tapes or cable ties are left on the cables.

2 No tapes, tails of cable ties, paper, or packing bags are left inside or outside thecabinet.

3 All the items around the cabinet are neat, clean, and intact.

BTS3900 LTEInstallation Guide 12 Installation Checklist

Issue 02 (2010-07-30) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

12-1

Page 70: BTS3900 LTE Installation Guide(V100R002C00_02)

Electric Connection ChecklistTable 12-3 describes the electric connection checklist of the cabinet.

Table 12-3 Electric connection checklist of the cabinet

1 All self-made PGND cables are copper-based with the proper wire diameters. Nobreaking device such as switch and fuse is allowed for the electric connection ofthe grounding system. No short circuit is allowed. Each terminal on the groundingbar can be connected with only one wiring terminal of the PGND cable.

2 The redundant part of the power cable or PGND cable is stripped off rather thancoiled.

3 The lugs at both ends of the power cable or PGND cable are securely soldered orcrimped.

4 The bare wires and the terminal handles at the wiring terminals are coated withheat-shrinkable tubes.

5 The flat washer and the spring washer are well mounted on all OT terminals.

6 All cables are connected securely and reliably. Pay special attention to thecommunication cable connections and cable connections at the bottom of thecabinet.

7 The cables are neatly and tightly bound. The cable ties are evenly spaced and facethe same direction.

8 The power cable, PGND cable, feeder, optical cable and the E1/T1/FE signal cableare bound separately with a spacing of larger than 30 mm.

9 The cable layout facilitates maintenance and future capacity expansion. And thebending radius of the cables meet the requirements.

10 All the labels at both ends of the cables are legible.

11 The extra length of each indoor cable tie is cut, and the cut surface is smoothwithout sharp edges. An extra length of 3 mm to 5 mm is resereved for eachoutdoor cable tie.

12 The idle connectors of the cables are properly protected.

13 The connectors of the RF cables are fixed in position to avoid false connectionthat may cause an abnormal voltage standing wave ratio (VSWR).

12 Installation ChecklistBTS3900 LTE

Installation Guide

12-2 Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

Issue 02 (2010-07-30)

Page 71: BTS3900 LTE Installation Guide(V100R002C00_02)

13 Performing the Power-On Check

Before the cabinets are put into use, you need to check the power-on status of the cabinets.

Figure 13-1 shows the power-on check procedure.

BTS3900 LTEInstallation Guide 13 Performing the Power-On Check

Issue 02 (2010-07-30) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

13-1

Page 72: BTS3900 LTE Installation Guide(V100R002C00_02)

Figure 13-1 Power-on check procedure

NOTE

For details about how to check the LEDs on the boards, see the BTS3900 LTE Hardware Description.

13 Performing the Power-On CheckBTS3900 LTE

Installation Guide

13-2 Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

Issue 02 (2010-07-30)

Page 73: BTS3900 LTE Installation Guide(V100R002C00_02)

14 Obtaining the ESN

The Electronic Serial Number (ESN) is unique to a Network Element (NE) for identification.The ESN is used during the commissioning of the base station.

Procedure

Step 1 Record the ESN shown on the label attached to the mounting ear of the BBU. Figure 14-1 showsthe position of the ESN.

Figure 14-1 Obtaining the ESN

Step 2 Report the ESN to the engineer for the commissioning of the base station.

Step 3 Close the cabinet door, and lock it.

----End

BTS3900 LTEInstallation Guide 14 Obtaining the ESN

Issue 02 (2010-07-30) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

14-1