budowa parowo żaglowego
TRANSCRIPT
Construction of side wheel aviso XIX century
Esplanade
Tadeusz Probulski December 2011
Hull constructionBulkheads equalisation
Keel laying
Structure assembling
Drilling holes for masts Planking
Filling and sanding
Coopering
Side wheels housings
Equippment makingSide wheels
Pumps Boats
Equipment setup
Techniques and materials usedHull Planks on bulkheads (single planking)
Deck Birch veneer with drawn planks
Coppering Self adhesive cooper tape
Side wheels Photoetched parts glued with cyanoacrylate glue
Sails Cloths lines – machnie sewing (courtesy of my wife)Leeches and leech rope –glued with textile glue
Boats GRP laminate covered with veneer strips
Steering wheel, ventilatingand skylights gratings,bow and stern decorations Photoetched
Caronades, binnacle Brass machined
Ventilators GRP laminate
Anchors Cut from aluminum bar
Bow figure Commercial figurine
Flags Computer printing on rice paper
Rigging Commercial cordage and blocks
Flagging ceremony
And champagne