Page 1: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

Build As OneSM

WelcomeWelcome

An on-line introduction to

Page 2: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

AgendaAgenda

• Why BIM?• BIM is what?• Measuring the benefits.

• Who is doing BIM?

• Examples of BIM in practice.

• Highlighted technologies for BIM

…and 1 minute about Bentley.

Page 3: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

Outline Agenda• Why BIM?• BIM is…?• Measuring the payoffs.

• Who is doing BIM?

• Examples of BIM in practice.

• Highlighted technologies for BIM• …and 1 minute about Bentley.

Page 4: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

Build As OneBuild As OneBenefits of integrated processes, teams, and toolsBenefits of integrated processes, teams, and tools

Page 5: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

Build As One…Integrate the work, processes and information of:

– Multiple Disciplines• Architects, Engineers, Specialists

– Multiple Companies• Peers, Subs, Partners, Clients• A “one-time enterprise”

– Multiple Project Phases• Design• Construct• Operate

Page 6: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

Build As One - TimeTeams that build as one,waste less time.

– Design • Increase opportunity for design iterations• Exchange information between disciplines quickly

– Documentation• Spend less time on grunt work• Spend less time documenting, avoid redundant efforts

– Construction • Fast-tracking• Managed schedules• Design/Build

Page 7: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

Build As One - QualityTeams that build as one, improve the quality of work.

– Improve coordination• between documents• between disciplines• between teams

– Reduce errors & omissions• Coordinated documents• Well captured design intent

– Enhance the design process• Informed design environment

Page 8: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

Build As One - MoneyTeams that build as one,enhance profitability & competitiveness.

– Effectively applied man-hours– Efficient deliverables– Lower error and omission remediation costs– Lower contingencies– Lower insurance premiums

– Faster delivery of service– More competitive quality of work– Tighter bidding for design and construction

Page 9: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

What is BIM? What is BIM? And how does it help us build as one?And how does it help us build as one?

Page 10: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.Image courtesy NBBJ BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

A working definition of BIM

Image courtesy NBBJ

Building– The entire lifecycle of the building

(Not just design…)

Information– All information about the building and it’s lifecycle

(Not just Architectural Drawings…)

Modeling– Defining & Simulating the building, its delivery, operation

(Not just the physical characteristics…)

Image courtesy NBBJ

Page 11: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

20 Enabling Technologies for BIM

5. Facility/Asset Mapping4. Interactive Visualization/Analysis3. Feature-based Solids Modeling2. Parametric Design1. Discipline-specific applications

20. IP Management19. Scalable, Open System18. Enterprise System Integration

17. Project Standards Management16. Multi-Disciplinary Model15. Context-sensitive Representation

14. Change Management13. Coordinated Documentation 12. Construction/Schedule Simulation11. Rapid Prototyping

10. Anywhere Publishing9. Project Querying8. Document Management7. Federated Data Architecture 6. Native DWG/DGN

Create / Access / AnalyzeCreate / Access / Analyze

Shared InformationShared Information

Synchronized InformationSynchronized Information

Information ContextInformation Context

Secure InformationSecure Information

Page 12: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

BIM Business Benefits… BIM Business Benefits…

As told by our usersAs told by our users

Page 13: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

Evolution

BuildingBuilding InformationInformation

ModelingModeling

’00s

ComputerComputerModelingModeling

( 3D )( 3D )

’90s

ComputerComputerDraftingDrafting

( 2D )( 2D )

’80s

T-SquareT-SquareAidedAided

DraftingDrafting

’70s

Ben

efit

Page 14: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

BuildingBuilding InformationInformation

ModelingModeling

’00s

ComputerComputerModelingModeling

( 3D )( 3D )

’90s

ComputerComputerDraftingDrafting

( 2D )( 2D )

’80s

T-SquareT-SquareAidedAided

DraftingDrafting

’70s

Ben

efit

Evolution

Page 15: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

BuildingBuilding InformationInformation

ModelingModeling

’00s

ComputerComputerModelingModeling

( 3D )( 3D )

’90s

ComputerComputerDraftingDrafting

( 2D )( 2D )

’80s

T-SquareT-SquareAidedAided

DraftingDrafting

’70s

Ben

efit

Evolution

Page 16: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

Right information, at the right time

Time

Impact of decisionsIn traditional methodologies high impact decisions are often made when minimal relevant information is available…

Amount of in

formatio

n

Amount of in

formatio

n

Page 17: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

Right information, at the right time

Time

Impact

BIM enables high impact decisions to be better informed

by increasing the availability and timeliness of relevant information.

Info

rmatio

n

Info

rmatio

n

Page 18: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

design documentation constructiondesign documentation construction

rem

edia

tion

cost

rem

edia

tion

costThe Cost of Design Errors

Cost and time to rectify a design error or omissionincrease dramatically the later it is discovered

Page 19: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

Measuring the value in practice

– 15.8 Billion cost/yr. in the US due to fragmentation

– $1.2 Billion to AEs

– 10% Schedule Reduction potential

Page 20: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

“Reductions in delivery time, on the order of 20 to 50 percent, are possible…”

“Our industry’s inability to communicate effectively has created tremendous waste and inefficiency, estimated at up to 30 percent of the total cost of each building project.”

Page 21: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

BIM is being Demanded

Page 22: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

Where Does the NIST Money Go?

Planning, Design & Engineering

Construction

Operations & Maintenance

$2.7b$2.7b

$4.1b$4.1b

$9.1b$9.1b

Source: NIST

Page 23: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

Where Does the NIST Money Go?

Planning, Design & Engineering

Construction

Operations & Maintenance

$2.7b$2.7b

$4.1b$4.1b

$9.1b$9.1b

You should care about this…

Page 24: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

Where Does the NIST Money Go?

Planning, Design & Engineering

Construction

Operations & Maintenance

$2.7b$2.7b

$4.1b$4.1b

$9.1b$9.1b

You should care about this…

Page 25: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

Where Does the NIST Money Go?

Planning, Design & Engineering

Construction

Operations & Maintenance

$2.7b$2.7b

$4.1b$4.1b

$9.1b$9.1b

You should REALLY care about this…

Page 26: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

So, where is BIM first and strongest?Where risks and rewards are shared

– Between design disciplines– Between Phases of work/responsibility

Where the building is strategic to the owner’s business– Integrated into the business, not just containing it

Where ‘extra’ is desired– Delivery Process– Performance– Form

Page 27: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

So what does that mean to you?So what does that mean to you?How are BIM practitioners capturing those NIST dollars?How are BIM practitioners capturing those NIST dollars?

Page 28: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

Measuring the value in practice

Page 29: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

Measuring the value in practice

Page 30: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

Measuring the value in practice

Page 31: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

Measuring the value in practice

Page 32: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

Architects - EngineersArchitects - EngineersSSOESSOE

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

Page 33: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

BE Award Nominee

Founded in 1948Founded in 1948560 employees560 employees11 offices in US,11 offices in US,Puerto Rico & ShanghaiPuerto Rico & Shanghai

Key MarketsAutomotiveChemicalCivil/InfrastructureCommercialEducationEnergyFood & BeverageGlassHealthManufacturingPersonal/Household CarePharmaceuticalRetail

Page 34: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

½ the Time at ½ the Cost½ the Time at ½ the Cost

What if that was the goal you client was setting for themselves?What if that was the goal you client was setting for themselves?

Page 35: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

The Old Way – 2d AbstractionBIM removes abstraction, connects processes

Page 36: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

Building Information Modeling

A multidisciplinary 3d model that integrates– Multiple disciplines– Design and documentation– Plans, Sections, Details, Elevations– Graphics and data

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

Page 37: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

Coordinated Documentation3D Details

One 3D = Three+ 2d

One recent project: 16 3D Details Replaced 50 2d Saved 200 hours Saved $20K fees

Page 38: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

Coordinated Documentation

Page 39: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

Measuring the value in practice

BIM beats the budget by 14%

With BIM

14% Savings

Page 40: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

Time to Market

A typical auto project = 36 months12,000 Pickup Trucks per month1 month = $40 million

A typical auto project = 36 months12,000 Pickup Trucks per month1 month = $40 million

Structural steel reduced by 1 month

BIM reduces design by 5 months

Structural steel reduced by 1 month

BIM reduces design by 5 months

= $40 Mil. More Revenue for the owner

= $200 Mil. More Revenue for the owner

Page 41: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

Time to Market

A typical auto project = 36 months12,000 Pickup Trucks per month1 month = $40 million

A typical auto project = 36 months12,000 Pickup Trucks per month1 month = $40 million

Structural steel reduced by 1 month

BIM reduces design by 5 months

Structural steel reduced by 1 month

BIM reduces design by 5 months

= $40 Mil. More Revenue for the owner

= $200 Mil. More Revenue for the owner

Page 42: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

What you need to BUILD AS ONEWhat you need to BUILD AS ONE

Page 43: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

Discipline Specific Applications

ArchitectureStructural EngineeringM/E/P Engineering

– HVAC– Plumbing– Fire Protection– Electrical– Communications/Data

Civil/Site Engineering– Site– Infrastructure

Etc.• Optimized per discipline • To Design, Refine, Analyze• In your domain, language, libraries

Page 44: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

Working TogetherA Shared, Common Technology Platform

– Ensure data compatibility– Avoid data re-entry – Integrated functionality– Coordinated user environments

Open and Customizable– APIs, VBA, COM, ODBC, Scripts and Macros, Interface, etc...

Supporting Industry Standards– IFC, CIS/2, SDNF, STEP, IGES, STL, VRML, DXF, CGM, PDF, DGN, DWG, PDF...

Managed Environment– Integrate distributed teams, tools and processes– Manage and publish building information

Page 45: BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE

BENTLEY.COM/BIM(c) 2005 Bentley Systems, Inc.

[email protected]@bentley.comfor more informationfor more information