February 27, 2017 #58 We Build Futures ~ Communities ~ Confidence ~ We Build Your Business The Genuine. The Original. “We’re Not The Best Because We’re the Oldest... We’re The Oldest Because We’re the Best!” Overhead Door Company of Salinas 733 Sanborn Place • Salinas, CA 93901 Salinas (831) 422-3667 • Monterey (831) 375-3667 Fax (831) 422-1061 • Santa Cruz (831) 662-3122 Lic. #529655 Overhead Door Company of Santa Clara Valley 1266 Lawrence Expressway • Sunnyvale, CA 94089 Tel (408) 734-8010 • Fax (408) 734-3728 Lic. #215098 Bidding This Week... Builders Bulletin 2/27/17 Marina Pump Station No. 13 Valve Replacement And Upgrades 2:00 PM 2/27/17 Carmel-By-The-Sea Fourth Ave Irrigation Meter 2:00 PM 2/28/17 Castroville North Monterey County Hs Freezer & Refrigerator Replacement 3:30 PM 2/28/17 Mountain View Crittenden Middle School Track And Field And Permanente Creek Trail Extension & Track & Field Lighting (Online) 2:00 PM 2/28/17 Santa Clara Main Building Replacement Phase Ii - 10c - Front Entry Signs Mission College - Wvc 1:00 PM 2/28/17 * Morgan Hill Paradise Valley E.S. Modular Classrooms And Site Work - Morgan Hill Unified School District (Online) 3:00 PM 2/28/17 Palo Alto Rinconada Pool Reroof Project 3:00 PM 2/28/17 Arroyo Grande Strother Park Rain Garden 2:00 PM 2/28/17 * Cupertino City Hall Turf Reduction 2:00 PM 2/28/17 Cupertino Memorial Park Courts Resurfacing Project 2:00 PM 2/28/17 * San Luis Obispo County Highway 1 Gateway Monuments Project 2:00 PM 2/28/17 Palo Alto Upgrade Chiller Units E & F Wings, Building 100 - Va Palo Alto (Online) 2:00 PM 2/28/17 Salinas Rfp - Professional Design Services 2:00 PM 2/28/17 Mountain View Residence Inn By Marriott Gatehouse Addition (Online) 2:00 PM 2/28/17 Hollister Community Food Bank Of San Benito County - Tenant Improvement 2:00 PM 2/28/17 Atascadero Atascadero State Hospital Main Building Roof And Air Handler Replacement 5:00 PM 3/1/17 Cupertino Hyde Middle School Casework Replacement Administration Work Space & Library - Cusd 2:00 PM 3/1/17 San Jose Oak Grove Renovate Building H1/H2 Restrooms - Esuhsd (Online) 2:00 PM 3/1/17 San Jose Oak Grove High School New Student Center & Quad Reno (Student Center Only) - Esuhsd (Online) 2:00 PM 3/1/17 San Jose Oak Grove New Student Center & Quad Reno & Og Site Infrastructure (Quad Reno Only) - Esuhsd (Online) 2:00 PM 3/1/17 Felton Henry Cowell Redwoods State Park Nature Store Hvac Duct 2:00 PM 3/1/17 Atascadero Centennial Bridge & Plaza Project 2:00 PM 3/1/17 * Sunnyvale Primary Treatment Facility Package 2 3:00 PM 3/1/17 Aptos Seacliff State Beach - Accessibility Upgrades 2:00 PM 3/1/17 San Luis Obispo Rfp For Collaborative Design-Build Services For I Field Artificial Turf Project 3:00 PM 3/2/17 San Jose De Vargas Elementary School Modernization - Cusd Rebid (Online) 1:30 PM 3/2/17 San Jose Gunderson High School Ems Replacement Project 2:00 PM 3/2/17 San Jose Lynhaven Elementary School Staff Lounge - Campbell Union School District 2:00 PM 3/2/17 San Jose Andrew Hill High School And Piedmont Hills High School Dw Roof Replacement (Package B) - Esuhsd (Online) 2:00 PM 3/2/17 San Jose Mount Pleasant High School And W. C. Overfelt High School Dw Roof Replacement (Package C) - Esuhsd (Online) 2:30 PM 3/2/17 San Jose Evergreen High School. Foothill High School, James Lick High School, Santa Teresa High School & Yerba Buena High School Roof Replacement (Package D) - Esuhsd (Online) 3:00 PM 3/2/17 Morgan Hill Fourth Street & Monterey Road Signalization Project 2:00 PM 3/2/17 Mountain View Stevens Creek Trail Landscaping Improvements, South El Camino Real 2:00 PM 3/2/17 Santa Clara County Job Order Contracts (4) Joc-Faf-2017-01, Joc-Faf-2017-02, Joc-Faf-2017-03 And Joc-Faf-2017-04 (Online) 2:00 PM 3/2/17 San Jose 8354-Cast Iron Sewer Replacement Fy 16-17 Packge Ii 3:00 PM 3/2/17 Monterey Construction Management For The Advanced Water Purification Facility And Product Water Pump Station 3:30 PM

Upload: others

Post on 19-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

February 27, 2017 #58

We Build Futures ~ Communities ~ Confidence ~ We Build Your Business

The Genuine. The Original.

“We’re Not The Best Because We’re the Oldest...We’re The Oldest Because We’re the Best!”

Overhead Door Company of Salinas733 Sanborn Place • Salinas, CA 93901

Salinas (831) 422-3667 • Monterey (831) 375-3667Fax (831) 422-1061 • Santa Cruz (831) 662-3122

Lic. #529655

Overhead Door Company of Santa Clara Valley1266 Lawrence Expressway • Sunnyvale, CA 94089

Tel (408) 734-8010 • Fax (408) 734-3728Lic. #215098

Bidding This Week...

Builders Bulletin

Bid Time Project NameLocationBid Date

2/27/17 Marina Pump Station No. 13 Valve Replacement And Upgrades2:00 PM

2/27/17 Carmel-By-The-Sea Fourth Ave Irrigation Meter2:00 PM

2/28/17 Castroville North Monterey County Hs Freezer & Refrigerator Replacement3:30 PM

2/28/17 Mountain View Crittenden Middle School Track And Field And Permanente Creek Trail Extension & Track & Field Lighting (Online)

2:00 PM

2/28/17 Santa Clara Main Building Replacement Phase Ii - 10c - Front Entry Signs Mission College - Wvc

1:00 PM

2/28/17* Morgan Hill Paradise Valley E.S. Modular Classrooms And Site Work - Morgan Hill Unified School District (Online)

3:00 PM

2/28/17 Palo Alto Rinconada Pool Reroof Project3:00 PM

2/28/17 Arroyo Grande Strother Park Rain Garden2:00 PM

2/28/17* Cupertino City Hall Turf Reduction2:00 PM

2/28/17 Cupertino Memorial Park Courts Resurfacing Project2:00 PM

2/28/17* San Luis Obispo County

Highway 1 Gateway Monuments Project2:00 PM

2/28/17 Palo Alto Upgrade Chiller Units E & F Wings, Building 100 - Va Palo Alto (Online)2:00 PM

2/28/17 Salinas Rfp - Professional Design Services2:00 PM

2/28/17 Mountain View Residence Inn By Marriott Gatehouse Addition (Online)2:00 PM

2/28/17 Hollister Community Food Bank Of San Benito County - Tenant Improvement2:00 PM

2/28/17 Atascadero Atascadero State Hospital Main Building Roof And Air Handler Replacement

5:00 PM

3/1/17 Cupertino Hyde Middle School Casework Replacement Administration Work Space & Library - Cusd

2:00 PM

3/1/17 San Jose Oak Grove Renovate Building H1/H2 Restrooms - Esuhsd (Online)2:00 PM

3/1/17 San Jose Oak Grove High School New Student Center & Quad Reno (Student Center Only) - Esuhsd (Online)

2:00 PM

3/1/17 San Jose Oak Grove New Student Center & Quad Reno & Og Site Infrastructure (Quad Reno Only) - Esuhsd (Online)

2:00 PM

3/1/17 Felton Henry Cowell Redwoods State Park Nature Store Hvac Duct2:00 PM

3/1/17 Atascadero Centennial Bridge & Plaza Project2:00 PM

3/1/17* Sunnyvale Primary Treatment Facility Package 23:00 PM

3/1/17 Aptos Seacliff State Beach - Accessibility Upgrades2:00 PM

3/1/17 San Luis Obispo Rfp For Collaborative Design-Build Services For I Field Artificial Turf Project

3:00 PM

3/2/17 San Jose De Vargas Elementary School Modernization - Cusd Rebid (Online)1:30 PM

3/2/17 San Jose Gunderson High School Ems Replacement Project2:00 PM

3/2/17 San Jose Lynhaven Elementary School Staff Lounge - Campbell Union School District

2:00 PM

3/2/17 San Jose Andrew Hill High School And Piedmont Hills High School Dw Roof Replacement (Package B) - Esuhsd (Online)

2:00 PM

3/2/17 San Jose Mount Pleasant High School And W. C. Overfelt High School Dw Roof Replacement (Package C) - Esuhsd (Online)

2:30 PM

3/2/17 San Jose Evergreen High School. Foothill High School, James Lick High School, Santa Teresa High School & Yerba Buena High School Roof Replacement (Package D) - Esuhsd (Online)

3:00 PM

3/2/17 Morgan Hill Fourth Street & Monterey Road Signalization Project2:00 PM

3/2/17 Mountain View Stevens Creek Trail Landscaping Improvements, South El Camino Real2:00 PM

3/2/17 Santa Clara County Job Order Contracts (4) Joc-Faf-2017-01, Joc-Faf-2017-02, Joc-Faf-2017-03 And Joc-Faf-2017-04 (Online)

2:00 PM

3/2/17 San Jose 8354-Cast Iron Sewer Replacement Fy 16-17 Packge Ii3:00 PM

3/2/17 Monterey Construction Management For The Advanced Water Purification Facility And Product Water Pump Station

3:30 PM

Page 2: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

Central Coast Builders Association

242 East Romie Lane (831) 758-1624 Salinas Salinas, CA 93901 423-5900 Santa Cruz Mon-Thurs 8-5 Fri 8-3 883-3933 Monterey

758-6203 Fax

[email protected]

Board of Directors

President: Clifford Fasnacht, Dougherty Pump & Drill Oscar Grijalva, OCG Plumbing, Inc

Vice President: Ken Steen, Steen Ass. Consulting Serv. Anka Hepper, Saleh WM B CO.

Secretary/Treasurer: Kevin McIntosh, Blach Constuction Kate Rueter, AON Risk Services

Past President: Kristine O’Dell, Absolute HR Edwin Sargenti, PSC

Gabriel Torres, CCRB/CHISPA

John Vorwerck, Otto Construction

CCBA STAFFChristie Cromeenes

Executive Director

Office Manager/AP Ingrid Vierra Planroom Coordinator

Shelly Verba Safety Coordinator Rikki Montejano Public Relations Coordinator

DisclaimerAll information provided by CCBA is obtained from sources deemed to be reliable. It is the user’s responsibility to confirm the accuracy of

all facts. We assume no responsibility for errors and/or omissions.All information included is for the intended recipient only, we ask that

you do not share this information

Page 3: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

Its a Fiesta Join us

March 15, 2017From 11:00am-2:00pm

CCBA OPEN HOUSE Come by and check

out our new location Plenty of tacos & tortas on US!!!!

242 E. Romie LaneSalinas, CA. 93901

Additional Parking in lot next door

Ribbon Cuttiing at 11:30am

Page 4: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

WEDNESDAY MARCH 29th

9:00am-2:00pm

242 E. ROMIE LANESalinas, CA 93901

Members $75Non-Members $95

Walk away from this class with a better understanding of prevailing wages and how to remain in compliance.

Please Call our O�ceto reserve your spot today,

First 16 People Only!!!Salinas: 831.758.1624

Prevailing Wage Contract Administration

•Contract Review to determine applicable prevailing wage: Funding source (i.e. local, state, federal, other)

Owner/agency contact Advertisement date Duration of Project Contract Amount

Prevailing wage determination & classi�cations

∞ •Understand the required documents:

Statement of Compliance (Certi�ed Payroll Certi�cate)

Fringe Bene�t Statement (PW 26) Public Works Contract Award Information

(DAS 140) Request for Dispatch of registered

Apprentice (DAS 142) Training Fund Contributions (CAC 2)

Veri�cation of Apprentice/Journeyman Hours Progress Billing & Waivers

(Conditional & Unconditional)

∞ •How to properly bid a prevailing wage project

Page 5: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

Mon

day,

Apr

il 3,

201

7 8:

00 A

M—

12:0

0 PM

Employers have a legal obligation to establish an effective injury and illness prevention program to promote health and safety in the workplace. Complying with safe and healthful work practices, includes first aid kits easily accessible to each work area, and training of at least one employee on each shift currently qualified to render first aid. Contractors are required, by law, to have an employee certified in CPR/First Aid on each job site. Sessions have limited space so register early. This course is designed to provide skills in CPR, First Aid & Automated External Defibrillation (AED). Students will learn adult CPR, rescue breathing and choke saving. Upon successful completion, students will receive the American Red Cross CPR & First Aid Certificate. Both CPR & First Aid Certificates are valid for 2 Years.

CPR & First Aid Training American Red Cross Certified

Cost: $70 members $85 non-members

Bi-Lingual Instructor: PEDRO ALFARO Mr. Alfaro has a Bachelor of Science degree in Nutrition and has been a Health Educator for over 20 years. He volunteered for the Los Angeles American Red Cross Chapter for CPR/First Aid for over 3 years. He was with the Monterey County Health Department for 12 years.

Attendees:_______________________________________________________________________________________________ Company:___________________________________________________Contact:_____________________________________ Email_______________________________________________________Phone:______________________________________

Paying by: □ □ Check: □ Total:__________________________ Card Card #_________________________________________________________Expiration Date________________________

Class will be held at 242 E. ROMIE LANE, SALINAS

PLEASE MAIL, FAX OR EMAIL FORM TO: Central Coast Builders Association

242 E. Romie Lane Salinas, Ca 93901

Phone 831-758-1624 Fax 831-758-6203 Email: [email protected]

***fee will be applied for a “no show” ONLY 10 SPOTS AVAILABLE! RESERVE YOUR SPOT NOW!

Certified CPR/First Aid Training Sponsored by the Central Coast Builders Association

Page 6: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

SEXUAL HARASSMENT PREVENTION

DATE: MAY 17TH 2017

ENGLISH: 3:00PM – 5:00PM

SPANISH: 1:00PM – 3:00PM

LOCATION: CCBA

242 E. ROMIE LN, SALINAS CA 93901

COST: $25.00

Description: The state of California requires sexual harassment training for all supervisory employees. Studies estimate one in four women will experience sexual harassment on the job. The U.S. Supreme Court has ruled that even if an employer is unaware of sexual harassment taking place the employer’s liability remains. All companies that don’t train their managers on sexual harassment are subject to lawsuits and other liabilities. You will learn how to define, recognize and prevent sexual harassment in the workplace. While it may be impossible to completely prevent harassment and discrimination claims and lawsuits, this course can help minimize potential workplace conflicts and complaints before they arise which will help reduce your companies liability exposure.

FIRST 16 PEOPLE

CALL 831-758-1624 OR EMAIL [email protected] TO RESERVE YOU’RE SPOT TODAY!

Page 7: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

Projects Out To Bid

Deadline for submission of materials for our Bulletin is end of day Wednesday each week.

Weekly Projects Bidding 2/23/2017

Reasonable care is given in gathering, compiling and furnishing the information contained herein which is obtained from sources believed to bereliable, but the Planroom is not responsible or liable for errors, omissions or inaccuracies.

Name Bid Date Time Contract # EstimateLocationOPR#

Monterey County

Carmel-by-the-Sea

Install a new water meter and associated piping and valves, connecting the existing fourth street irrigation system to the Pebble BeachRecycled Water System.

2/3 @ 9am- site

17-00149

0

2:00 PM2/27/17

Addenda:FOURTH AVE IRRIGATION METER

Prebid Conf:

Bidders:

Plan Issuer:

Castroville

Removal of existing walk-in freezer and refrigerator boxes, associated equipment, concrete, roofing, flooring and ceiling.

PREVAILING WAGE

MAND 2/2 @ 3:30pm- site

17-00155

1

3:30 PM2/28/17

Addenda:NORTH MONTEREY COUNTY HS FREEZER & REFRIGERATOR REPLACEMENT

Prebid Conf:

Teter, LLP 559-437-0887

General Contractor Fax: 831-761-5513Office: 831-761-5511Coastwide Environmental Tech.

General Contractor Fax: 831-722-3084Office: 831-722-1730Knowlton Construction

General Contractor Fax: 831-641-0586Office: 831-915-6823Pueblo Construction , Inc.

Plan Issuer:

Salinas

For this specific RFP, the MRWPCA in collaboration with their partner, the City of Salinas (City), are seeking proposals from qualifiedfirms to provide professional engineering design services for the design of the Salinas Industrial Wastewater and Storm Water Storageand Recovery Project.

MAND 2/6 @ 1pm- 14811 Del Monte Blvd. Marina

17-00249

1

2:00 PM2/28/17

Addenda:RFP - PROFESSIONAL DESIGN SERVICES

Prebid Conf:

Monterey Regional Water Pollution Control [email protected]

831-883-6178 831-883-0516

Bidders:

Plan Issuer:

Marina

Project consists of: Site Work; Concrete; Hot Dip Galvanizing, Misc. Metalwork, Structural Steel Framing; Polywrap; Thermal andMoisture Protection; Protective Coatings; Equipment; Mechanical; Electrical; Instrumentation.

PREVAILING WAGE

MAND 2/2 @ 10am- site

17-00196

2

2:00 PM3/1/17

Addenda:PUMP STATION NO. 13 VALVE REPLACEMENT AND UPGRADES

CP297

Prebid Conf:

Monterey Regional Water Pollution Control Agency [email protected] 831-883-6179 831-883-0516

General Contractor Fax: 408-970-9975Office: 408-970-9900Anderson Pacific Engineering, Inc.

General Contractor Fax: 510-657-3688Office: 510-657-3686Blocka Construction Inc.

General Contractor Fax: 831-384-5078Office: 831-384-4081Monterey Peninsula Engineering

General Contractor Fax: 925-373-0940Office: 925-373-8370Mountain Cascade Inc.

General Contractor Fax: 925-249-0009Office: 925-249-0011Pacific Infrastructure Corp.

General Contractor Fax: 805-226-4021Office: 805-226-4020Whitaker Construction Group, Inc.

Plan Issuer:

Monterey

MRWPCA is seeking proposals from qualified firms to provide Construction Management Services for the Advanced Water PurificationFacility and Product Water Pump Station Project.

MAND 2/14 @ 10am- 14811 Del Monte Blvd, Marina

17-00353

0

3:30 PM3/2/17

Addenda:CONSTRUCTION MANAGEMENT FOR THE ADVANCED WATER PURIFICATION FACILITY ANDPRODUCT WATER PUMP STATION

Prebid Conf:

Monterey Regional Water Pollution Control [email protected]

831-645-4605 831-656-0637

Page 8: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

Projects Out To Bid

Name Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Salinas $400,000

Tenant Improvements in portion of County Offices, approximately 5,600 SF; selective demolition; modernization of office space andBoard Room with full finishes and new suspended ceilings; related electrical and mechanical systems.

PREVAILING WAGE

***Plans and specs will be available February 17th.

MAND 2/16 @ 10am- site

17-00322

0

11:00 AM3/7/17

Addenda:BOARD ROOM AND SUPERINTENDENTS MODERNIZATION

Prebid Conf:

ARC (Monterey) 831-646-1170

General Contractor Fax: 831-717-4315Office: 831-375-4777Property Restoration Services

General Contractor Fax: 831-717-4315Office: 831-375-4777Property Restoration Services

Bidders:

Plan Issuer:

Big Sur $480,000 $507,000

Work includes reinstallation or salvage of the existing timber bridge structures, excavation of backfill behind the existing concretefoundations, construction of new bridge foundation reinforcement and anchorage, construction of timber bridge structures on retrofitfoundations using re-used or new timber, installation of bridge rails, replacement of water valves and water line, installation of electricaland communication service to existing USGS river gauge station, road paving, and erosion control.

PREVAILING WAGE

MAND 2/21 @ 10am- Pfeiffer State Park, Parking Lot #4

17-00328

0

2:00 PM3/7/17

Addenda:WEYLAND BRIDGE RE-INSTALLATION @ PFEIFFER BIG SUR STATE PARK

C1664016 to

Prebid Conf:

Department of Parks & Recreation [email protected] 831-647-6245

General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company

General Contractor Fax: 619-233-3706Office: 619-233-0178R.E. Staite Engineering, Inc.

General Contractor Fax: 805-549-0702Office: 805-549-0667Sansone Company, Inc.

Gonzales $345,000

The work will consist of: Removing of existing asphalt pavement, curb and gutter to construct a curb bulb-out. Excavation to installbioretention basins to capture stormwater runoff. Removal and replacement of existing curb ramps at the intersections, compliant withcurrent ADA standards.

PREVAILING WAGE

2/23 @ 10am- 147 Fourth St, Gonzales

17-00375

0

2:00 PM3/7/17

Addenda:GONZALES OLD TOWN LOW IMPACT DEVELOPMENT REBID

Prebid Conf:

Big Sur $60,000 $70,000

Replace the roofs on six separate structures in Pfeiffer Big Sur State Park. Include: 1) Employee Residences #1 and #12, bothreceiving composition shingle roofs and underlayments over new or existing plywood sheathing that is set over existing 1x4 roofdecking, repair or replace in-kind 1x4 decking, provide new flashing and pre-finished galvanized iron gutters and downspouts; 2) TwoDetached Garages, associated with Employee Residences #1 and #12, respectively, which will receive composition shingle roofs andunderlayments, with new pre-finished galvanized iron flashings and downspouts; 3) Combination Restroom Buildings #8 and #9,receiving a new composition shingle roof and underlayment over new plywood sheathing, set over existing repaired 2x6 roof decking,repair or replacement of in-kind roof decking with new galvanized iron flashing.

PREVAILING WAGE

MAND 2/13 @ 10am- site

17-00274

0

3:00 PM3/8/17

Addenda:PFEIFFER BIG SUR STATE PARK ROOF REPLACEMENTS

to

Prebid Conf:

Page 9: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

Projects Out To Bid

Name Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Marina

Work involves construction of, but not limited to, (1) approximately 72,000 SF of impervious surfacing with associated grading anddrainage, new detention pond, expansion of existing detention pond, exterior improvements to employee parking areas toaccommodate accessibility compliance. The work also includes subgrade preparation and placement of engineered fill as required bygeotechnical engineer/consultant report.

PREVAILING WAGE

MAND 2/23 @ 1:30 pm

17-00324

1

3:00 PM3/14/17

Addenda:MATERIALS RECOVERY FACILITY (MRF) IMPROVEMENT - SITE IMPROVEMENTS

Prebid Conf:

General Contractor Fax: 831-633-3389Office: 831-633-3371Ausonio Incorporated

General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company

Bidders:

Marina

Work involves construction of interior improvements in existing Office Building including 1st level interior improvements to restrooms toaccommodate accessibility compliance, interior improvement to 2nd level offices, and an approximate 1,200 SF expansion of theexisting 2nd level office area to accommodate a multi-purpose room. The work also includes subgrade preparation and placement ofengineered fill for foundations as required by geotechnical engineer/consultant report.

PREVAILING WAGE

MAND 2/23 @ 10:30am

17-00326

0

3:00 PM3/14/17

Addenda:MATERIALS RECOVERY FACILITY (MRF) IMPROVEMENT - OFFICE IMPROVEMENTS

Prebid Conf:

General Contractor Fax: 831-641-0586Office: 831-915-6823Pueblo Construction , Inc.

Bidders:

Plan Issuer:

Monterey $1,200,000

In general, the work consists of, but is not limited to, the demolition and construction of concrete curbs, gutters, sidewalks, sidewalkcrossings (driveway approach) and curb ramps, storm drainage, signage and striping, isolated street and driveway surface repairs,pavement grinding, street reconstruction and Hot Mix Asphalt pavement.

2/28 @ 10am- 601 Wave St, Ste 100, Monterey

17-00356

0

2:00 PM3/14/17

Addenda:CITYWIDE ADA RAMPS AND STREET RECONSTRUCTION, PHASE 4

Prebid Conf:

City of Monterey 831-646-3997 831-646-5686

General Contractor Fax: 831-761-1042Office: 831-763-6100Granite Construction

Plan Issuer:

Monterey $2,350,000

In general, the work consists of, but is not limited to, pavement spot repair of approximately 200,000 SF, crack sealing, placing ofapproximately 900,000 SF of slurry/cape seal, associated striping removal and replacement, refreshing of existing painted streetmarkings, traffic control and installation of necessary environmental pollution prevention requirements on various streets in the City ofMonterey.

2/28 @ 2pm- 601 Wave St, Suite 100, Monterey

17-00376

0

2:00 PM3/14/17

Addenda:CITYWIDE STREET RESURFACING (SLURRY), PHASE 4

Prebid Conf:

City of Monterey 831-646-3997 831-646-5686

Page 10: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

NEW

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Marina

Renasci Homes is requesting sub-bids. 63 Single Family detached Homes located on the old Fort Ord. Bid is based on Scope of workprovided by Renasci Homes.

Trades Needed For Market Rate Models and Phase 1. All Finish Trades including: cabinets, paint, flooring, counters, splashes,mirrors, shower enclosures, landscape, garage doors, waterproof decking, decorative iron.

Trades NOT needed for Market Rate Models and Phase 1: rough trades such as concrete, plumbing, sprinklers, electrical, framing,mechanical, sheet metal, gutter, finish carpentry, stucco, windows, insulation

CONTACT JEANIE GERRARD FOR TRADE SCOPE OF [email protected] 818.879.7400 X206 orM 805.390.5717

17-00123

2

5:00 PM3/15/17

Addenda:SEA HAVEN COTTAGES

General Contractor Office: 805-390-5717Renasci Homes

Supplier Fax: 831-754-2096Office: 831-754-2020Hydro Turf

Supplier Fax: 408-294-2331Office: 408-391-0508River City Building Supply

Bidders:

Pebble Beach

Requesting sub-bids. We are looking for all trades from grading to finish. Submit your proposals to: Mike Chernus - E-Mail:[email protected], Cell (619) 708-1565

17-00403

0

5:00 PM3/15/17

Addenda:25 POPPY LANENEW

General Contractor Fax: 530-577-7751Office: 530-577-7750Chernus Construction Co.

Plan Issuer:

Marina $41,500,000

The Project will be funded in whole or in part by the following funding sources in addition to District funds: Clean Water State RevolvingFund (SRF) and Proposition 1 Recycled Water (Prop 1)

PREVAILING WAGE

***Please contact the builders exchange for the Appendix A-D

MAND 3/2 @ 10am- 14811 Del Monte Blvd, Marina

17-00399

0

3:00 PM3/21/17

Addenda:ADVANCED WATER PURIFICATION FACILITY AND PRODUCT WATER PUMP STATION

Prebid Conf:

Monterey Regional Water Pollution Control [email protected]

831-645-4605 831-656-0637

NEW

San Benito County

Bidders:

Plan Issuer:

Visit

Hollister $850,000 $900,000

The project consist of a remodel of the existing office space and second floor area into office space. New cold storage rooms, remodelthe market place area of the existing warehouse with new storefront. The scope includes, plumbing, mechanical, electrical and newfinishes, some site work (concrete, A.C. Paving and landscaping).

PREVAILING WAGE

2/14 1 pm @ site

17-00279

1

2:00 PM2/28/17

Addenda:COMMUNITY FOOD BANK OF SAN BENITO COUNTY - TENANT IMPROVEMENT

1634.1 to

Prebid Conf:

Non-Mandatory

Community Food Bank of San Benito [email protected]

831-637-0340 831-637-0840

Asbestos Abatement /Hazardous Materials Contract

Fax: 831-384-0696Office: 831-384-6505Parc Environmental

Electrical Contractor Fax: 831-758-9638Office: 831-422-7819JM Electric

Page 11: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

NEW

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Equipment Fax: 209-724-0755Office: 209-986-3712Central Valley Rentals

General Contractor Fax: 831-372-5584Office: 831-372-5580Avila Construction

General Contractor Fax: 510-657-1810Office: 510-657-1800Calstate Construction

General Contractor Fax: 408-846-5660Office: 408-846-5550Kent Construction

General Contractor Fax: 831-422-0566Office: 831-422-9696Tombleson Inc

Bidders:

Plan Issuer:

Hollister

This RFQ is for on-call engineering and engineering support services as may be necessary for public works projects in the County.These services include general civil and transportation engineering, structural engineering, geotechnical engineering and materialstesting, water resources engineering, construction engineering/management, and surveying.It is the intent of the County to engage one or more consultants to provide professional services as described herein. However, theCounty reserves the right, at its sole discretion, to terminate this RFQ process or negotiations with a selected consultant and eitherperform the work with its staff or begin a new RFQ process. Nothing herein, or in this process, shall be construed as having obligatedthe County to pay for any expenses incurred by respondents to this RFQ, or to the selected consultant(s).

RFP/RFQ Contact: Miguel Sanchez (831) 636-4402

17-00066

3

4:00 PM3/3/17

Addenda:RFQ - ON-CALL ENGINEERING CONSULTANT SERVICES FOR VARIOUS PUBLIC WORKS PROJECTS

County of San Benito 831-636-4170 831-636-4176

Construction Manager Fax: 831-372-2679Office: 831-521-9360Eagle Project Managament

Plan Issuer:

Hollister $160,000

This project involves installation of two fiberglass reinforced plastic (FRP) manholes (one primary diversion structure and onesecondary containment structure) supplied by the City of Hollister, on West Street at the location of one existing concrete manholewhich will be removed as shown on the plans and within these specifications. The work to be done consists, in general, of furnishing allmaterials, labor, equipment, tools, transportation and services for the West Street Diversion Project, excluding the two FRP manholes,FRP manholes to be City purchased and contractor installed.

2/28 @ 1pm- 420 Hill St, Bldg. D Hollister

17-00417

0

2:00 PM3/14/17

Addenda:WEST STREET DIVERSION PROJECT

C1617

Prebid Conf:

City of Hollister 831-636-4340 831-636-4349

NEW

Bidders:

Plan Issuer:

Hollister

This scope of work of the project consists of the general construction of an additional 2,000 square feet of space, including fouradditional exam rooms. Tenant improvements to include:• Selective demolition of interior finishes and structural elements.• New framing• New doors• New drywall• Minor electrical• Minor plumbing• New casework and countertops• New flooring• New paint• New glazing and window treatments

PREVAILING WAGE

MAND 3/2 @ 9am- Hazel Hawkins Memorial Hospital main lobby

17-00263

0

3:00 PM3/16/17

Addenda:RURAL HEALTH CLINIC - EXPANSION & TENANT IMPROVEMENTS

Prebid Conf:

Hazel Hawkins Hospital Administration 831-636-2673 831-636-2697

General Contractor Fax: 831-422-0566Office: 831-422-9696Tombleson Inc

Page 12: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

San Luis Obispo County

Plan Issuer:

Arroyo Grande $25,000

1. Temporary sediment and erosion control measures.2. Excavation, grading, and backfill to final rain garden elevations.3. Filling of existing catch basin.4. Installation of cast-in-place concrete overflow structure.5. Planting6. Permanent soil stabilization

PREVAILING WAGE

17-00239

0

2:00 PM2/28/17

Addenda:STROTHER PARK RAIN GARDEN

PW 2017-02

City of Arroyo Grande 805-473-5460 805-473-5462

Bidders:

Plan Issuer:

San Luis ObispoCounty

The work includes the construction of three community gateway monument signs along or adjacent to State Route 1 (SR 1), one eachnear the southbound entry to San Luis Obispo, the southbound entry to Cambria, and the northbound entry to San Simeon.

At each location, the sign itself is the majority of the project. However, the following may be considered ancillary components:• San Luis Obispo: landscaping, low-water-use drip irrigation, lighting, and a sidewalk on the Ferrini Rd., and (subject to Bid Alternate)Chorro St., frontages• Cambria (subject to Bid Alternate): no additional features; immediate area around sign will be re-seeded with Caltrans-approvedhydroseed mix as necessary.• San Simeon: landscaping

PREVAILING WAGE

17-00273

3

2:00 PM2/28/17

Addenda:HIGHWAY 1 GATEWAY MONUMENTS PROJECT

CASB06-6096(038)

ASAP Reprographics 805-772-6921

Sub-Contractor/SpecialtyContractor

Fax: 805-543-3429Office: 805-543-3311KCI Environmental, Inc.

Plan Issuer:

Atascadero $33,000,000

Provide professional architectural and engineering design services as required for a roof replacement of approximately 455,000 squarefeet of roof area. The project includes, but Is not limited to, hazardous materials, correction of the existing roof pitch and drainage, roofreplacement, replacement of existing heating, ventilating, and air conditioning mechanical equipment, and the addition of fallprotection. The responsible party shall be an architect or engineer licensed to practice in the State of California (CA) and all work shallbe performed under and approved by a licensed design professional.

17-00298

0

5:00 PM2/28/17

Addenda:ATASCADERO STATE HOSPITAL MAIN BUILDING ROOF AND AIR HANDLER REPLACEMENT

RESD-PMDB 2017-03

CA State Dept of General Services 916-376-1778 916-376-1766

Bidders:

Plan Issuer:

Atascadero

Construct abutments and install 150’ pedestrian bridge, concrete pathway and plaza areas, and reconstruct existing parking area.

MAND 2/21 @ 10am- 6500 Palma Ave, SLO

17-00212

1

2:00 PM3/1/17

Addenda:CENTENNIAL BRIDGE & PLAZA PROJECT

C2015B01

Prebid Conf:

City of Atascadero [email protected] 805-470-3180 805-470-3181

Electrical Contractor Fax: 805-238-0996Office: 805-238-3502Rossi & Carr Electrical Inc

General Contractor Fax: 805-473-2479Office: 805-489-7779Brough Construction, Inc.

General Contractor Fax: 805-345-3538Office: 805-345-3466CalPortland Construction

General Contractor Fax: 805-461-0071Office: 805-461-5765Kirk Construction

General Contractor Fax: 805-466-0594Office: 805-466-5060Michael Frederick Paving Corp.

General Contractor Fax: 805-543-2521Office: 805-543-8568R. Burke Construction

General Contractor Fax: 805-543-9341Office: 805-543-9340S. Chaves Construction Inc.

General Contractor Fax: 805-549-0702Office: 805-549-0667Sansone Company, Inc.

General Contractor Fax: 805-546-8287Office: 805-546-8288Souza Construction Inc.

General Contractor Fax: 805-543-1722Office: 805-543-1706Specialty Construction

General Contractor Fax: 530-226-6401Office: 530-226-6400Steelhead Constructors Inc.

Page 13: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

General Contractor Fax: 805-226-4028Office: 805-226-4020Whitaker Construction Group Inc.

General Contractor Fax: 805-466-5176Office: 805-466-1038Wysong Construction

Bidders:

San Luis Obispo

The State of California, acting through the Board of Trustees of The California State University, hereinafter called Trustees, on behalfof California Polytechnic State University, hereinafter called University, is requesting Technical Proposals from interested and qualifiedDesign-Builders (Respondents) to provide design, pre-construction and design-build construction services for the project referencedabove (Project).

The Project approximately consists of an approximately 104,000 square foot artificial turf field at Cal Poly I Field to serve as a practicelocation for Cal Poly football, men’s and women’s soccer, intramural sports, and other student activities and tournaments.

Bid Contact: Cody VanDorn - Strategic Business Services(805) 756-1299 [email protected]

2/14 @ 11am- Cal Poly Building 70, Room 110

17-00284

0

3:00 PM3/1/17

Addenda:RFP FOR COLLABORATIVE DESIGN-BUILD SERVICES FOR I FIELD ARTIFICIAL TURF PROJECT

MAJ 16-MJ0069.C

Prebid Conf:

General Contractor Fax: 805-543-1722Office: 805-543-1706Specialty Construction

San Luis Obispo

The Oppenheimer Upper Equestrian Pavilion Project is a Construction Manager at Risk (CMAR) Project with Specialty ConstructionInc. serving as the CM and Populous Design serving as the Designer. The project is currently in the 100% Preliminary Design Phaseand proposals are being requested for a Design-Build Subcontractor to enter in to a design and preconstruction contract with SCI forthe design of two Pre-Engineered Metal Buildings as well as, two pre-engineered roof structures for both the Stallion and Foaling Barn.

All proposers are required to complete the Prequalification Questionnaire document and return it the Trustees' Representative no laterthan 3:00 PM on February 24, 2017.

Bid Contact: Cody VanDorn(805) 756-1299 [email protected]

17-00343

0

3:00 PM3/7/17

Addenda:OPPENHEIMER UPPER EQUESTRIAN PAVILION PRE-ENGINEERED METAL BUILDING

Plan Issuer:

Arroyo Grande

The work consists of furnishing all labor, materials, tools, equipment, transportation, and services to remove, and recycle existing toiletand replace with a new 1.28 gpm flush toilet; install 1.5 gpm faucet aerators; install 1.5 gpm shower heads; check water pressureservicing the residence; adjust and or install water pressure regulating valve; and all other incidental work required to complete theimprovements in accordance with the Contract Documents and the Uniform Plumbing Code.

Contact Person: Shane Taylor, Utilities Manager 805-473-5464

17-00345

0

2:00 PM3/7/17

Addenda:RFP - PLUMBING RETROFIT PROGRAM 2017

City of Arroyo Grande 805-473-5460 805-473-5462

Plan Issuer:

Arroyo Grande

The Cities of Arroyo Grande, Grover Beach, and Pismo Beach (Agencies) are requesting proposals for Traffic Signal Maintenance andOperation Services. Individual Contractor Services Agreements will be entered into between the successful contractor and the threeseparate agencies. The City of Arroyo Grande Public Works Department is serving as the lead agency for this cooperativeprocurement partnership.

Contact Person: Geoff English, Public Works Director, City of Arroyo Grande (805) 473-5466 or [email protected]

17-00373

0

4:00 PM3/7/17

Addenda:RFP - TRAFFIC SIGNAL MAINTENANCE AND OPERATION SERVICES

City of Arroyo Grande 805-473-5460 805-473-5462

Page 14: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

San Luis Obispo $22,000,000

Project consists of: Demolition; Selective Demo; Cast-in-Place Concrete; Penetrating reactive concrete stain; Concrete unit masonry;Adhered brick masonry; Metals; Plastic-laminate-faced architectural casework; Thermal and Moisture Protection; Openings; Finishes;Specialties; Loading dock bumpers; Food service equipment; Plastic-laminate-clad countertops; Simulated stone countertops; Electrictraction elevators; Fire Suppression; Plumbing; HVAC; Integrated Automation; Electrical; Communications; Electronic safety andsecurity; Earthwork; Exterior improvements; Utilities.

MAND 2/7 @ 10am- Bldg 70, room 110 on the campus

17-00193

0

3:00 PM3/8/17

Addenda:VISTA GRANDE FACILITY REPLACEMENT

MAJ 15-MJ0061

Prebid Conf:

Cal Poly Facilities Planning & Capital Projects 805-756-2581 805-756-7566

Demolition Contractor Office: 661-204-9942PSC

Electrical Contractor Fax: 805-238-0996Office: 805-238-3502Rossi & Carr Electrical Inc

Sub-Contractor/SpecialtyContractor

Fax: 661-322-6816Office: 661-410-1333RLH Fire Protection

Supplier Fax: 661-588-2157Office: 661-342-9959Golden Empire Equipment, Inc

Plan Issuer:

Visit

Morro Bay

The City of Morro Bay is requesting sealed proposals for professional engineering services for the City of Morro Bay WaterReclamation Facility Project Lift Station and Offsite Pipelines. Professional engineering services are needed to review and verify thepreliminary design criteria for the lift station and offsite pipelines presented in the Draft FMP; develop a preliminary design; prepareconstruction documents including plans, specifications, and cost opinion for public bid; and provide engineering services duringconstruction.

2/9 10 am @ the Veteran’s Memorial Building, 209 Surf St.

17-00266

0

2:00 PM3/8/17

Addenda:ENGINEERING SERVICES WRF LIFT STATION & OFFSITE PIPELINES

Prebid Conf:

non-mandatory

City of Morro Bay [email protected] 805-772-6205 805-772-7329

Paso Robles $250,000

Install rumble strip and place traffic striping In San Luis Obispo County Near Paso Robles From Perry Creek Bridge To Theatre DriveThe Contractor must have either a Class A license or one of the following Class C licenses: C-32.

17-00070

0

2:00 PM3/8/17

Addenda:DOT 05-1H2804 INSTALL RUMBLE STRIP AND PLACE TRAFFIC STRIPING

05-SLO-46-R0.2/R21.7

Plan Issuer:

Visit

Paso Robles

Tree trimming for 11 large oak trees in the City right-of-way.

PREVAILING WAGE

2/16 10 am, meet in the City Hall parking Lot @ 1000 Spring St.

17-00236

0

2:00 PM3/9/17

Addenda:OAK TREE TRIMMING

17-02

Prebid Conf:

NON-MANDATORY

City of Paso Robles 805-237-3861 805-237-3904

Plan Issuer:

San Luis Obispo $1,140,000

In general, the work consists of providing a complete wet automatic fire sprinkler system for all living and common areas in thebuildings 6, 7, 8 and 9, in the Yosemite Dormitory complex, on the California Polytechnic State University campus in San Luis Obispo.

PREVAILING WAGE

MAND 2/9 @ 10am- Bldg. 70, room 110 on the campus

17-00240

0

3:00 PM3/9/17

Addenda:YOSEMITE FIRE PROTECTION PHASE II

MAJ 15-MJ0062.1

Prebid Conf:

Cal Poly Facilities Planning & Capital Projects 805-756-2581 805-756-7566

Plan Issuer:

Paso Robles $735,000

The work shall include but is not limited to, grinding existing pavement and replacing, lower and or raise utility covers, remove andreplace pavement striping, all as shown on the plans and/or as specified herein.

PREVAILING WAGE

17-00282

0

2:00 PM3/9/17

Addenda:HOT SPOT REPAIRS CRESTON ROAD AND VARIOUS STREETS

16-10

City of Paso Robles 805-237-3861 805-237-3904

Page 15: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Arroyo Grande $315,384

The scope of work includes: offsite filter back-flush pipeline, site grading, masonry retaining wall/building, treatment plant equipment,pump and equipment, water line tie-in and testing of a Municipal Water Well.

PREVAILING WAGE

2/23 @ 2pm

17-00288

0

2:00 PM3/9/17

Addenda:MUNICIPAL WATER WELL NO.11 TREATMENT PLANT CONSTRUCTION, WELL EQUIPMENT ANDPIPELINE INSTALLATION

PW 2010-07

Prebid Conf:

City of Arroyo Grande [email protected] 805-473-5444

Electrical Contractor Fax: 805-238-0996Office: 805-238-3502Rossi & Carr Electrical Inc

General Contractor Fax: 805-549-0702Office: 805-549-0667Sansone Company, Inc.

Supplier Fax: 661-393-0439Office: 661-393-2288HD Supply Waterworks

Atascadero

Provide the DSH with HVAC cleaning, sanitizing and repair, with current C20 – Specialty Contractor – Warm Air Heating, Ventilatingand Air-Conditioning license issued by the Contractors State License Board and maintained in good standing. Joint Venture biddersmust possess a Joint Venture License. Bidders for this project must also possess a current National Air Duct Cleaners Association(NADCA) certification.

MAND 2/24 @ 10am- 10333 El Camino Real, Atascadero

17-00348

0

2:00 PM3/9/17

Addenda:HVAC DUCT REPAIR AND CLEANING

16-10050-000

Prebid Conf:

Plan Issuer:

Visit

San Luis Obispo

The Contractor shall provide all equipment, materials, tools, labor, supervision, transportation, licenses, permits, travel, per diem,insurance, and every other item of expense necessary to install Overhead Coiling Doors for the California Department of Correctionsand Rehabilitation (CDCR), Inmate/Ward Labor Program.

PREVAILING WAGE

MAND 2/14 9:30 am @ site

17-00201

0

5:00 PM3/14/17

Addenda:OVERHEAD COILING DOORS INSTALLATION AT CMC

C5606828-D

Prebid Conf:

Notification of Intent to Participate 1/31

CA Dept of Corrections & Rehabilitation 916-229-0891 916-255-6187

Plan Issuer:

Visit

San Luis Obispo $200,000

The Contractor shall provide all labor, equipment, parts, materials, tools, licenses, permits, bonds, insurance, supervision, installation,inspection, including travel and per diem, necessary to perform Jacking and Casing Pipe Installation for the Central Services KitchenReplacement project, located at the California Department of Corrections and Rehabilitation (CDCR), Inmate/Ward Labor Program(IWL), at the California Men’s Colony.

PREVAILING WAGE

MAND 2/23 11 am @ site

17-00200

0

1:30 PM3/16/17

Addenda:JACKING AND CASING PIPE INSTALLATION

C5606821-D

Prebid Conf:

Notification of Intent to Participate 2/3 by 5 pm

CA Dept of Corrections & Rehabilitation 916-229-0891 916-255-6187

Plan Issuer:

San Luis Obispo $100,000

The Contractor shall furnish all submittals, materials, permits, insurance, licenses, installation, tools, training, travel, per diem, laborand any other costs necessary to provide Spray-on Fire Resistive Material (SFRM) to three (3) buildings for the Central ServicesKitchen Replacement Project, for the California Department of Corrections and Rehabilitation (CDCR), Inmate/Ward Labor Program(IWL), located at California Men’s Colony.

PREVAILING WAGE

17-00202

0

11:00 AM3/16/17

Addenda:SPRAY ON FIRE RESISTIVE MATERIAL

C5606851-D

CA State Dept of Corrections & Rehabilitation 916-255-6163 000-000-0000

Page 16: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Paso Robles

Annual inspection and maintenance of citywide storm drainage appurtenances, such as drain inlets, bubble ups, pipes, and vaults.

PREVAILING WAGE

2/17 @ 9am- Paso Robles City Hall Parking Lot

17-00258

1

2:00 PM3/16/17

Addenda:CITY-WIDE STORM DRAINAGE MAINTENANCE

16-25

Prebid Conf:

City of Paso Robles 805-227-7200 805-237-3904

Plan Issuer:

Pismo Beach

Cleaning and Resealing of the decorative concrete in the downtown area.

PREVAILING WAGE

17-00410

0

2:00 PM3/16/17

Addenda:DOWNTOWN DECORATIVE SIDEWALK CLEANING AND RESEALING REBID

City of Pismo Beach . 805-773-4656 805-773-4684

NEW

Plan Issuer:

Paso Robles

The work is generally described as open space weed abatement located throughout the City of Paso Robles.

PREVAILING WAGE

3/3 @ 10am- 1000 Spring St (City Hall Parking Lot)

17-00306

0

2:00 PM3/23/17

Addenda:OPEN SPACE DISKING & TRIMMING

17-04

Prebid Conf:

City of Paso Robles 805-237-3861 805-237-3904

Plan Issuer:

Visit

Paso Robles

Furnishing all labor, materials, equipment, and performing all work necessary and incidental to Median/Parkway Maintenance. Thework is generally described as median, parkway and planter landscape maintenance.

PREVAILING WAGE

3/1 10 am @ City Hall Parking Lot, 1000 Spring St.

17-00281

0

2:00 PM3/30/17

Addenda:MEDIAN/PARKWAY LANDSCAPE MAINTENANCE

17-01

Prebid Conf:

NON-MANDATORY

City of Paso Robles 805-237-3861 805-237-3904

Bidders:

Plan Issuer:

Paso Robles $13,630,000

Furnishing all labor, materials, equipment, services, testing, permits, temporary controls and construction facilities, and all generalconditions, general requirements and incidentals required to complete the Work for the Paso Robles Tertiary Treatment FacilitiesProject in its entirety as described in the Contract Documents, which includes, but is not necessarily limited to, the following: site work,building construction, facility demolition including minor lead and asbestos abatement, installation of major process equipment such ascloth media filtration and ultraviolet light disinfection, SCADA, and related systems and facilities, as more fully described in the biddingand contract documents.

PREVAILING WAGE

MAND 3/8 9 am @ 3200 Sulphur Springs Rd.

17-00406

0

2:00 PM4/5/17

Addenda:TERTIARY TREATMENT FACILITIES

16-22

Prebid Conf:

City of Paso Robles 805-237-3865 805-237-3904

NEW

Demolition Contractor Office: 661-204-9942PSC

Equipment Fax: 661-588-2157Office: 661-342-9959Golden Empire Equipment, Inc

General Contractor Fax: 408-213-0532Office: 408-970-9900Anderson Pacific EngineeringConstruction, Inc.

Plan Issuer:

Paso Robles

The work is generally described as a sports field barrier netting system on one (1) softball field at Barney Schwartz Park, 2970 UnionRoad, Paso Robles.

PREVAILING WAGE

3/14 @ 10am- site

17-00428

0

2:00 PM4/6/17

Addenda:BARNEY SCHWARTZ PARK SPORTS FIELD NETTING

17-03

Prebid Conf:

City of Paso Robles 805-237-3861 805-237-3904

NEW

Page 17: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Santa Clara County

Bidders:

Plan Issuer:

Mountain View

Demolition of existing classroom wing, portable classroom buildings and surrounding site demolition. Site grading and construction ofbuilding pads for new work.

Project Contact: Courtney JacksonEmail: [email protected]

Available ONLINE ONLY

MAND 1/31 at 2PM

17-00180

3

2:00 PM2/28/17

Addenda:CRITTENDEN MIDDLE SCHOOL TRACK AND FIELD AND PERMANENTE CREEK TRAIL EXTENSION &TRACK & FIELD LIGHTING (ONLINE)

Prebid Conf:

Greystone West Company 707-933-0624 707-996-8390

Electrical Contractor Fax: 209-464-2615Office: 209-464-4878Bockmon & Woody Electric Company, Inc.

General Contractor Fax: 707-643-4581Office: 707-643-4580BHM Construction

General Contractor Fax: 408-253-4753Office: 408-253-4747Galeb Paving, Inc.

General Contractor Fax: 650-952-6851Office: 650-952-7333Interstate Grading & Paving

General Contractor Fax: 510-526-0990Office: 510-526-3424O.C. Jones & Sons Inc

General Contractor Fax: 408-279-2286Office: 408-279-2277Robert A. Bothman., Inc.

Sub-Contractor/SpecialtyContractor

Fax: 408-727-7051Office: 408-727-6999Mission City Rebar, Inc

Bidders:

Plan Issuer:

Santa Clara $400,000

Furnish and install Front Entry Signs from start to finish. Including, but not limited, to all shop drawings, coordination, labor, materials,equipment and supervision required to complete all entry monument & digital sign work.

Project Contact Email: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

MAND 2/7 at 10AM

17-00205

2

1:00 PM2/28/17

Addenda:MAIN BUILDING REPLACEMENT PHASE II - 10C - FRONT ENTRY SIGNS MISSION COLLEGE - WVC

Bid #21-1617

Prebid Conf:

West Valley Mission College, Facilities 408-741-2187

Electrical Contractor Fax: 408-708-7611Office: 408-506-4143Lakeshore Electric and Engineering

Plan Issuer:

Cupertino

Installation of irrigation and plantings and DG paving. The work will includes excavation of trenches, laying of pipe and installation andmaintenance of plantings, backfill of trenches.

Project Contact Email: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

2/13 at 10AM (10300 Torre Ave- Corner of Torre Ave & Rodrigues Ave)

17-00290

3

2:00 PM2/28/17

Addenda:CITY HALL TURF REDUCTION

2017-03

Prebid Conf:

City of Cupertino DPW 408-777-3354

Bidders:

Plan Issuer:

Cupertino

Slip sheet resurfacing six (6) tennis courts including all general conditions, general requirements and incidentals.

Project Contact Email: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

17-00308

0

2:00 PM2/28/17

Addenda:MEMORIAL PARK COURTS RESURFACING PROJECT

2017-13

City of Cupertino DPW 408-777-3354

Sub-Contractor/SpecialtyContractor

Fax: 661-587-4603Office: 661-587-4602Courts & Greens

Page 18: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Palo Alto

Remove existing roofs and install a new roofs at the Rinconada Pool buildings, and it includes the following: 1) Remove existing baseassemblies of all roof-mounted HVAC equipment & Skylights and install crickets/drainage swales towards the roof drains. 2) Removeand replace all existing roof drains, downspouts, and leaders. 3) Remove all existing galv edge metal perimeter flashing with new andpaint to match trim color. 4) Remove existing mineral cap roof system and replace with modified bituminous membrane roof overfiberboard over R19 tapered rigid insulation and finished with Acrylic title 24 and CRRC Approved white or light coating through outthree roof areas.

Project Contact: Jimmy ChenEmail: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

MAND 2/15 at 11AM (Front of Pool Lobby Area)

17-00331

0

3:00 PM2/28/17

Addenda:RINCONADA POOL REROOF PROJECT

166799

Prebid Conf:

City of Palo Alto - DPW 650-329-2271

Bidders:

Plan Issuer:

Mountain View

PLEASE NOTE DIVISION 22 is NOT AVAILABLE. PLEASE CONTACT GENERAL CONTRACTOR FOR QUESTIONS.

Construction of a new Gatehouse located at the Residence Inn .

This is non-prevailing wage project and there are no union or non-union requirements.

Available ONLINE ONLY

17-00342

0

2:00 PM2/28/17

Addenda:RESIDENCE INN BY MARRIOTT GATEHOUSE ADDITION (ONLINE)

Stoer Construction 408-593-5276 408-600-0818

General Contractor Office: 209-321-7280Lowery-Pena Construction Company, Inc.

General Contractor Fax: 408-600-0818Office: 408-593-5276Stoer Construction

Bidders:

Plan Issuer:

Morgan Hill

Construction of new outdoor courtyard and landscape improvements. Also includes the work as shown associated with the installationof the new American Modular Classroom Buildings. This includes but is not limited to: site utilities, site accessories, structural concretefoundations, concrete building vents, site concrete, pavers, landscaping, irrigation, SWPP, electrical, plumbing, mechanical, EnergyManagement Systems, fire alarm, low voltage, polished concrete flooring, minor abatement, installation of Owner Furnished ContractorInstalled items, coordination of installation with Owner Furnished Owner Installed Items, coordination with American Modular Systemsto install their modulars etc.

Project Contact: Casino Fajardo 408-201-6086Email: [email protected]

Available ONLINE ONLY

MAND 2/9 t 12PM (Administration Building)

17-00364

2

3:00 PM2/28/17

Addenda:PARADISE VALLEY E.S. MODULAR CLASSROOMS AND SITE WORK - MORGAN HILL UNIFIEDSCHOOL DISTRICT (ONLINE)

G1701

Prebid Conf:

Morgan Hill Unified School District -Anessa Espinosa 408-201-6087

Electrical Contractor Fax: 408-708-7611Office: 408-506-4143Lakeshore Electric and Engineering

General Contractor Fax: 408-683-4224Office: 408-683-4221DRP Builders

General Contractor Fax: 408-846-5660Office: 408-846-5550Kent Construction

General Contractor Fax: 530-899-2683Office: 530-899-1104Seward L Schreder Construction

General Contractor Fax: 530-229-0070Office: 530-229-0001Seward L. Schreder Construction Inc.

Sub-Contractor/SpecialtyContractor

Fax: 408-727-7051Office: 408-727-6999Mission City Rebar, Inc

Supplier Fax: 661-588-2157Office: 661-342-9959Golden Empire Equipment, Inc

Page 19: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Sunnyvale $93,869,000

Construction under this Contract involves expansion and/or modification of facilities at the existing operating treatment facilities, pumpstations, reservoirs, and/or pipelines which must continue to meet requirements of State and Federal regulating agencies.

Work includes site work, new building construction, existing facility modification/demolition, installation of major process equipment,electrical/instrumentation/control system improvements.

Project Contact: Pete Gonda 408-730-7418Email: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange & San Francisco Builders Exchange

MAND 1/19 at 10AM

16-03092

5

3:00 PM3/1/17

Addenda:PRIMARY TREATMENT FACILITY PACKAGE 2

UY-16-01-20

Prebid Conf:

City of Sunnyvale DPW 408-730-7403

Demolition Contractor Fax: 209-942-2579Office: 209-942-1129W.C. Maloney, Inc.

Fire Alarm/Security Contractor Fax: 925-667-2951Office: 925-667-2950Point 1 Electrical Systems, Inc.

General Contractor Fax: 707-427-8901Office: 707-427-8900Balfour Beatty Infrastructure

General Contractor Fax: 510-657-3688Office: 510-657-3686Blocka Construction Inc.

General Contractor Fax: 510-237-2435Office: 510-234-0926C. Overaa & Co.

General Contractor Fax: 707-746-0849Office: 707-742-6000Flatiron West, Inc.

General Contractor Fax: 925-447-0962Office: 925-447-0292GSE Construction Co. Inc.

General Contractor Fax: 707-439-7301Office: 707-439-7300Kiewit Infrastructure West Co

General Contractor Fax: 925-961-1925Office: 925-606-2400RGW Construction

General Contractor Fax: 805-934-4432Office: 805-937-5859Spiess Construction Co. Inc.

General Contractor Fax: 925-944-9860Office: 925-627-1714Walsh Construction

Invited General Contractor Fax: 650-365-5817Office: 650-365-8828A & D Automatic Gate

Sub-Contractor/SpecialtyContractor

Fax: 408-727-7051Office: 408-727-6999Mission City Rebar, Inc

Sub-Contractor/SpecialtyContractor

Fax: 408-413-4130Office: 408-848-4088R Titus Waterproofing

Supplier Fax: 661-588-2157Office: 661-342-9959Golden Empire Equipment, Inc

Bidders:

Plan Issuer:

Cupertino

Casework is to be replaced in three areas including the Administration area reception desk, the work room immediately adjacent to theAdministration area the Library circulation desk and the Library work room counter tops in the room behind the Library CirculationDesk.

2/7 at 3:30PM (Voluntary)

17-00169

1

2:00 PM3/1/17

Addenda:HYDE MIDDLE SCHOOL CASEWORK REPLACEMENT ADMINISTRATION WORK SPACE & LIBRARY -CUSD

170IB05-24

Prebid Conf:

Cupertino Union School District 408-252-3000 408-343-2802

General Contractor Fax: 650-557-1239Office: 650-557-1238Cal Pacific Construction

Bidders:

Plan Issuer:

San Jose $750,000

Complete renovation of the student restrooms in Buildings H1 and H2. The work consists of removal and replacement of interiorfinishes, plumbing fixtures, toilet partitions, and toilet accessories, electrical, lighting and mechanical upgrades. The project alsoconsists of a minor renovation to the staff restrooms in each building along with a “deep” cleaning of each, All restrooms at onebuilding will remain functional at all times. Only one building can be renovated at a time.

Project Contact: Steve Corchado, Kitchell CEM 408-280-7889Email: [email protected]

Available ONLINE ONLY

MAND 1/31 & 2/8 at 2PM

17-00243

1

2:00 PM3/1/17

Addenda:OAK GROVE RENOVATE BUILDING H1/H2 RESTROOMS - ESUHSD (ONLINE)

B-07-16-17

Prebid Conf:

East Side Union High School District (ESUHSD) 408-347-5100

Electrical Contractor Fax: 831-313-1137Office: 408-991-3740RCH Enterprises

Page 20: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

San Jose $2,000,000

Complete renovation of the second floor of the Administration Building or Bldg “A”. Includes removal and replacement of interiorfinishes, casework, ceilings, painting, roofing, mechanical, plumbing, electrical, and low voltage wiring. Additionally there will be 2 newexterior stairs and site work included in this construction package.

Project Contact: Steve Corchado, Kitchell 408-280-7889Email: [email protected]

Available ONLINE ONLY

MAND 1/31 & 2/8 at 2PM

17-00247

1

2:00 PM3/1/17

Addenda:OAK GROVE HIGH SCHOOL NEW STUDENT CENTER & QUAD RENO (STUDENT CENTER ONLY) -ESUHSD (ONLINE)

B-06-16-17

Prebid Conf:

East Side Union High School District (ESUHSD) 408-347-5100

Electrical Contractor Fax: 831-313-1137Office: 408-991-3740RCH Enterprises

General Contractor Fax: 650-802-2970Office: 650-802-2960Gonsalves & Stronck Construction

Glass & Glazing Contractor Fax: 408-922-0554Office: 408-922-0555Lincoln Glass & Mirror

Plumbing & Piping Contractor Fax: 408-842-4005Office: 408-842-4004Michael Venosta Plumbing

Sub-Contractor/SpecialtyContractor

Fax: 408-970-8680Office: 408-727-5465AAA Fence Company

Sub-Contractor/SpecialtyContractor

Fax: 408-727-7051Office: 408-727-6999Mission City Rebar, Inc

Sub-Contractor/SpecialtyContractor

Fax: 408-413-4130Office: 408-848-4088R Titus Waterproofing

Bidders:

Plan Issuer:

San Jose $2,000,000

Complete renovation of the Central Campus Quad. Includes removal and replacement of site concrete, asphalt paving, landscaping,irrigation, site lighting, and fencing. Additionally there the renovation of an existing shade structure included in this constructionpackage.

Project Contact: Steve Corchado, Kitchell CEM 408-280-7889Email: [email protected]

Available ONLINE ONLY

MAND 1/31 & 2/8 at 2PM

17-00248

1

2:00 PM3/1/17

Addenda:OAK GROVE NEW STUDENT CENTER & QUAD RENO & OG SITE INFRASTRUCTURE (QUAD RENOONLY) - ESUHSD (ONLINE)

B-08-16-17

Prebid Conf:

East Side Union High School District (ESUHSD) 408-347-5100

Electrical Contractor Fax: 408-708-7611Office: 408-506-4143Lakeshore Electric and Engineering

Sub-Contractor/SpecialtyContractor

Fax: 408-727-7051Office: 408-727-6999Mission City Rebar, Inc

Bidders:

Plan Issuer:

San Jose

Modernization of classroom interior finishes such as flooring, paint, vinyl wrapped tack panels, sinks, counter tops, fire alarm system,and ceiling tile replacement; full restroom, casework, mechanical, electrical, and plumbing renovation to the kindergarten classrooms,administration offices, and warming kitchen. Project also includes upgrades to path of travel to bring to within ADA compliancethroughout the campus.

Available ONLINE ONLY

MAND 2/1 & 2/8 at 3:30PM

17-00260

1

1:30 PM3/2/17

Addenda:DE VARGAS ELEMENTARY SCHOOL MODERNIZATION - CUSD REBID (ONLINE)

17-B07-24

Prebid Conf:

Cupertino Union School District 408-252-3000 408-343-2802

Demolition Contractor Fax: 831-761-5513Office: 831-761-5511Coastwide Environmental Tech, Inc.

Electrical Contractor Fax: 831-313-1137Office: 408-991-3740RCH Enterprises

General Contractor Fax: 650-557-1239Office: 415-824-8871Cal Pacific Construction

General Contractor Fax: 510-657-1810Office: 510-657-1800Calstate Construction

General Contractor Fax: 831-466-9597Office: 831-426-0743CRW Industries, Inc

General Contractor Fax: 925-398-8245Office: 925-398-8290Integra Construction Services, Inc.

General Contractor Fax: 650-508-1705Office: 650-508-1700Rodan Builders Inc.

Page 21: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

General Contractor Fax: 510-632-9769Office: 510-568-6600Sausal Corporation

General Contractor Fax: 916-344-0307Office: 916-344-2098SW Allen Construction

General Contractor Fax: 510-236-4979Office: 510-236-9111Vila Construction

Sub-Contractor/SpecialtyContractor

Fax: 408-413-4130Office: 408-848-4088R Titus Waterproofing

Plan Issuer:

Mountain View $70,000 $80,000

Installing irrigation and landscaping improvements between Stevens Creek Trail and Highway 85, from South of El Camino Real to theStevens Creek Trail neighborhood access point at Sleeper Avenue Open Space in Mountain View.

Project Contact: AnneMarie StarrEmail: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

2/14 at 10:30AM (Sleeper Ave Open Space at intersection of Sleeper Ave and Franklin Ave, Mtn View )

17-00291

1

2:00 PM3/2/17

Addenda:STEVENS CREEK TRAIL LANDSCAPING IMPROVEMENTS, SOUTH EL CAMINO REAL

11-34 to

Prebid Conf:

City Of Mountain View, DPW 650-903-6311

Plan Issuer:

Santa Clara County

The scope of this JOC Contract is for general construction, repair, remodel and other repetitive related work to be performed for theCounty of Santa Clara Facilities and Fleet Department.

Project Contact: Susan Martin 408-593-8576Email: [email protected]

Available ONLINE ONLY

MAND 2/14 at 9AM (1500 Berger Dr, Bldg #3, FAF Dept, San Jose)

17-00310

1

2:00 PM3/2/17

Addenda:JOB ORDER CONTRACTS (4) JOC-FAF-2017-01, JOC-FAF-2017-02, JOC-FAF-2017-03 AND JOC-FAF-2017-04 (ONLINE)

Prebid Conf:

County of Santa Clara Facilities & Fleet 408-993-4600

Plan Issuer:

San Jose

The demolition of an existing EMS system (controls, communication cable, panels, sensors, devices etc.), and install new EMS systemto control HVAC and Exterior Lighting.

Project Contact: Jack JehaEmail: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

MAND 2/22 at 10AM (Administration Building)

17-00317

0

2:00 PM3/2/17

Addenda:GUNDERSON HIGH SCHOOL EMS REPLACEMENT PROJECT

80027/3001C

Prebid Conf:

Van Pelt Construction 707-438-3790

Plan Issuer:

San Jose

All demo, clearing and preparation work to allow the modernization of the buildings

Plans and specs also available for review at Santa Clara Builders Exchange

2/9 (time not given)

17-00332

0

2:00 PM3/2/17

Addenda:LYNHAVEN ELEMENTARY SCHOOL STAFF LOUNGE - CAMPBELL UNION SCHOOL DISTRICT

2016032

Prebid Conf:

Aedis Architects 408-300-5160

Plan Issuer:

Morgan Hill

The installation of a traffic signal at the Fourth Street and Monterey Road intersection. Associated work includes traffic control,removal and replacement of the decorative brick work.

Project Contact: Kat Corrales 408-310-4672Email: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

17-00337

0

2:00 PM3/2/17

Addenda:FOURTH STREET & MONTEREY ROAD SIGNALIZATION PROJECT

502Q16

City of Morgan Hill DPW 408-778-6480

Page 22: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

San Jose $2,029,840

Removal of 6- inch diameter and 8-inch diameter cast iron pipe (CIP), and the installation of 6-inch and 8-inch ductile iron pipe (DIP).This project also includes the replacement of existing and construction of new sanitary sewer manholes and the evaluation, repair andreconnection of sanitary sewer service laterals.

Project Contact: Bryan Pignone 408-793-4141

Plans and specs also available for review at Santa Clara Builders Exchange

17-00350

1

3:00 PM3/2/17

Addenda:8354-CAST IRON SEWER REPLACEMENT FY 16-17 PACKGE II

8354

City of San Jose - DPW 408-535-8300

Bidders:

Plan Issuer:

San Jose $3,100,000

Demolition and abatement of built-up roofs; repairs to roofing substrate, furnishing and installation of TPO and Standing Seam Metalroofs, insulation, walking pads, aluminum ladders, hatches, drains, pipe supports, flashing, 8” curbs, repair and/or replacement of roofgutters and miscellaneous others.

Project Contact: Robert Kagiyama, Swinerton Management 415-500-1108Email: [email protected]

Available ONLINE ONLY

2/14 & 2/21 at 10AM

17-00360

0

2:00 PM3/2/17

Addenda:ANDREW HILL HIGH SCHOOL AND PIEDMONT HILLS HIGH SCHOOL DW ROOF REPLACEMENT(PACKAGE B) - ESUHSD (ONLINE)

B-21-16-17

Prebid Conf:

East Side Union High School District (ESUHSD) 408-347-5100

General Contractor Fax: 510-777-1102Office: 510-777-1100Andy's Roofing Co., Inc.

Plan Issuer:

San Jose $1,700,000

Demolition and abatement of built-up roofs; repairs to roofing substrate, furnishing and installation of TPO and Standing Seam Metalroofs, insulation, walking pads, aluminum ladders, hatches, drains, pipe supports, flashing, 8” curbs, repair and/or replacement of roofgutters and miscellaneous others.

Project Contact: Robert Kagiyama, Swinerton Management 415-500-1108Email: [email protected]

Available ONLINE ONLY

2/14 & 2/21 at 10AM

17-00361

0

2:30 PM3/2/17

Addenda:MOUNT PLEASANT HIGH SCHOOL AND W. C. OVERFELT HIGH SCHOOL DW ROOF REPLACEMENT(PACKAGE C) - ESUHSD (ONLINE)

B-22-16-17

Prebid Conf:

East Side Union High School District (ESUHSD) 408-347-5100

Bidders:

Plan Issuer:

San Jose $2,250,000

Mobilization, demolition of built-up roofs; environmental abatement, repairs to roofing substrate, furnishing and installation of Single-plyand Standing Seam Metal roofs, insulation, walking pads, aluminum ladders, hatches, drains, pipe supports, flashing, 8” curbs, gutterrepair and/or replacement, and miscellaneous others.

Project Contact: Robert Kagiyama, Swinerton Management 415-500-1108Email: [email protected]

Available ONLINE ONLY

2/14 & 2/21 at 10AM

17-00362

0

3:00 PM3/2/17

Addenda:EVERGREEN HIGH SCHOOL. FOOTHILL HIGH SCHOOL, JAMES LICK HIGH SCHOOL, SANTA TERESAHIGH SCHOOL & YERBA BUENA HIGH SCHOOL ROOF REPLACEMENT (PACKAGE D) - ESUHSD(ONLINE)

B-23-16-17

Prebid Conf:

East Side Union High School District (ESUHSD) 408-347-5100

General Contractor Fax: 510-777-1102Office: 510-777-1100Andy's Roofing Co., Inc.

Page 23: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Mountain View

Development of 500 Ferguson Parcel 1, Phase 1 (Building 1) in Mountain View, CA hereinafter referred to as 500 FergusonApartment. The site consists of 7.7 acres of land on one contiguous parcel.

Project Contact: Bhargav PatelEmail: [email protected]

Available ONLINE ONLY

17-00393

0

5:00 PM3/3/17

Addenda:500 FERGUSON PHASE 1 (BUILDING 1) COURTYARD A & B ONLY (ONLINE)

Palisade Builders 408-429-7700 408-429-7701

NEW

Excavation/SiteWork/Irrigation/Drainage/Landscape

Fax: 661-000-0000Office: 661-808-4884Trident Construction Services

Sub-Contractor/SpecialtyContractor

Fax: 559-528-6703Office: 559-528-6705Garcia Window Screens

Plan Issuer:

San Jose

It is mandatory that all Contractors who intend to submit a bid fully complete the pre-qualification questionnaire, provide all materialsrequested herein, and be approved by VTA to be included on the final qualified Bidders list. No bid will be accepted from a Contractorthat has failed to comply with these requirements. If two or more business entities submit a bid as part of a Joint Venture, or expect tosubmit a bid as part of a Joint Venture, each entity within the Joint Venture must be separately qualified to bid.

Project Contact: Florante TanadaEmail: [email protected]

Available ONLINE ONLY

17-00270

0

4:00 PM3/6/17

Addenda:REQUEST FOR PRE-QUALIFICATION OF BIDDERS NORTH YARD DIVISION PAVEMENTREHABILITATION - SCVTA (ONLINE)

C17019

SCVTA-Contracts 408-321-7189

Bidders:

Plan Issuer:

San Jose

Demolition of the existing concession building, site demolition, and the installation of infrastructure and underground utilities for a newmodular concession and restroom building. The new modular concession and restroom building will be provided under a separatecontract; coordination with the portable’s contractor is required. All site work including the installation of a new ornamental fence andgate is also required.

Project Contact: Michael Carson, Kitchell 408-280-7889Email: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

MAND 2/8 & 2/15 at 2PM (Bldg 300, Rm 354)

17-00297

1

2:00 PM3/7/17

Addenda:YERBA BUENA HIGH SCHOOL CONCESSION/RESTROOM BUILDING - ESUHSD

B-20-16-17

Prebid Conf:

East Side Union High School District (ESUHSD) 408-347-5100

General Contractor Fax: 408-279-2044Office: 408-279-2027Guerra Construction & Engineering, Inc

Plan Issuer:

Cupertino

Placing various roadway surfaces treatments including micro surfacing, slurry seal, and rubberized chip seal, replacing traffic stripingand pavement markers, and other miscellaneous work.

Project Contact: Roger LeeEmail: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

17-00366

0

2:00 PM3/7/17

Addenda:2017 PAVEMENT MAINTENANCE PROJECT-PHASE 2

2017-110

City of Cupertino DPW 408-777-3354

Page 24: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Santa Clara County

Establish a term contract with a contractor to provide Flooring Maintenance and Repair Services on an as-needed basis.

Project Contact: Leslie Harper 408-993-4748Email: [email protected]

Specs also available for review at Santa Clara Builders Exchange

2/16 at 10AM (2310 N. First St, Ste 200)

17-00392

1

10:00 PM3/7/17

Addenda:FLOORING MAINTENANCE & REPAIR SERVICES

ITB-FAF-FY-17-0196

Prebid Conf:

County of Santa Clara Facilities & Fleet 408-993-4600

NEW

Plan Issuer:

San Jose

Perform HVAC duct system maintenance services at the Santa Teresa DMV field office.

Specs also available for review at Santa Clara Builders Exchange

MAND 2/7 at 11AM

17-00142

0

3:00 PM3/8/17

Addenda:HVAC DUCT SYSTEM MAINTENANCE SERVICES SANTA TERESA DMV

Prebid Conf:

DMV - Lorena 916-657-6973

Bidders:

Plan Issuer:

Palo Alto $2,000,000 $5,000,000

Replacement of 2 existing air cooled reciprocating chillers located at Building 100, VA Palo Alto Health Care System.

Project Contact: Dennis Becker 925-372-2307

Available ONLINE ONLY

17-00168

1

2:00 PM3/8/17

Addenda:UPGRADE CHILLER UNITS E & F WINGS, BUILDING 100 - VA PALO ALTO (ONLINE)

VA261-17-B-0138 to

Department of Veterans Affairs

General Contractor Fax: 000-000-0000Office: 805-620-1705BVB Construction

General Contractor Fax: 503-650-1902Office: 503-650-1720Glen Mar Construction

General Contractor Fax: 619-447-4192Office: 619-593-3527Halbert Construction Company, Inc.

General Contractor Fax: 970-252-1487Office: 970-252-1477Hawk Contracting

General Contractor Fax: 858-277-2500Office: 858-277-7100Herman Construction

General Contractor Fax: 209-249-5301Office: 209-982-9900Patriot Construction

General Contractor Fax: 209-982-9909Office: 209-982-9900Patriot Construction, Inc.

Bidders:

Plan Issuer:

San Jose

Remove and replace fencing at Alta Vista Elementary School, Carlton Elementary School, Guadalupe Elementary School, LietzElementary School and Union Middle School.

Project Contact: Theresa NovothyEmail: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

2/15 at 11AM (starts at Guadalupe ES 6044 Vera Cruz Dr, SJ)

17-00289

1

1:00 PM3/9/17

Addenda:ALTA VISTA, CARLTON, GUADALUPE & LIETZ ELEMENTARY SCHOOLS & UNION MIDDLE SCHOOLFENCING PROJECT - UNION SCHOOL DISTRICT

Prebid Conf:

Greystone West Company 707-933-0624 707-996-8390

General Contractor Fax: 408-970-8680Office: 408-727-5465AAA Fence Company

Sub-Contractor/SpecialtyContractor

Fax: 707-822-9512Office: 707-822-9511Humboldt Fence Co.

Page 25: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Los Altos $45,000

Install (OFCI) Electric Vehicle Charging Stations and payment kiosk machines in 3 separate parking lots.

Project Contact: Annette Perez - 650-949-6163Email: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

MAND 2/15 at 1PM (Plant Services Conference Room, Bldg D160_

17-00307

0

2:00 PM3/9/17

Addenda:EV CHARGING STATIONS FOOTHILL COLLEGE - FDACCD

1735

Prebid Conf:

Foothill - DeAnza Community College District 408-864-5888

Bidders:

Santa Clara And LosGatos

$810,000

Replace asphalt concrete surfacing In Santa Clara County In Santa Clara And Los Gatos From 0.1 Mile North Of Hebard Road To 0.16Mile South Of Blossom Hill RoadThe Contractor must have either a Class A license or one of the following Class C licenses: C-12.

17-00069

0

2:00 PM3/9/17

Addenda:DOT 04-0K9504 REPLACE ASPHALT CONCRETE SURFACING.

04-SCl-17-2.8/7.5

General Contractor Fax: 408-327-7090Office: 408-327-7000Granite Construction

General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company

Plan Issuer:

San Jose $2,000,000

Provide state-of-the-cart turnkey fire alarm system replacement inside an existing correctional facility environment.

Project Contact: Paulo Garcia 408-993-4619Email: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

2/23 at 10AM

17-00391

0

2:00 PM3/9/17

Addenda:SANTA CLARA COUNTY MAIN JAIL NORTH FIRE ALARM REPLACEMENT

263-CP17017

Prebid Conf:

County of Santa Clara, Capital Projects 408-993-4600

NEW

Bidders:

Plan Issuer:

Sunnyvale

The demolition and abatement have already been contracted for. For the purpose of this bid, assume this work will be complete prior tothe April start. The rock and gravel under the existing building slab on grade, concrete flatwork and asphalt paving will remain to beremoved under this Contract. The roots for the trees will need to be removed under this Contract.

Construct residential building for affordable housing that will occupy most of the site and an emergency vehicle access (EVA) roadalong the western property line. The proposed residential building will consist of three stories of wood-framed residential unitsconstructed above one level of at-grade concrete podium.

This is a Prevailing Wwage project.

Available ONLINE ONLYThe at-grade concrete podium will consist of parking space, office space, and commonspace.

17-00394

1

2:00 PM3/9/17

Addenda:EDWINA BENNER PLAZA (ONLINE)

Roberts-Obayashi Corporation 925-820-0600 925-820-1993

NEW

General Contractor Fax: 925-820-1993Office: 925-820-0600Roberts-Obayashi Corporation

Page 26: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

San Jose

Sign contractor to fabricate, remove, and install signs in the San Jose Convention Center Parking Garage.

Project Contact: Kim Mguyen 408-535-7058Email: [email protected]

Available ONLINE ONLY

MAND 2/22 at 3:15PM (Enter at Market St/San Salvador St. Meet at Parking Office located near the gate arms)

17-00370

1

2:00 PM3/10/17

Addenda:RFB SAN JOSE CONVENTION CENTER PARKING GARAGE SIGNS (ONLINE)

RFB 16-17-25

Prebid Conf:

City of San Jose - DPW 408-535-8300

Plan Issuer:

San Jose

Replace existing poured in place rubber surfaces with new synthetic turf surfaces, rubber wear mats and small repairs to playgroundequipment.

Project Contact: Cristian Van Der Leij 669-200-8771Email: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

MAND 4/28 at 10AM (Booksin ES, 1590 Dry Creek Rd, Admin Bldg)

17-00416

0

2:00 PM3/14/17

Addenda:PLAYGROUND MODERNIZATION AT FOUR ELEMENTARY SCHOOLS: BOOKSIN, EMPIRE GARDENS,TRACE, RIVER GLEN - SJUSD

80012/3002C

Prebid Conf:

SJUSD-San Jose Unified School District 408-535-6071

NEW

Plan Issuer:

San Jose

Provide parking garage and surface lot management services, including operational, maintenance, janitorial and administrativeservices, at each of the City’s parking facilities, in support of the Department of Transportation.

Project Contact: Jay Coleman 408-535-7057Email: [email protected]

Available ONLINE ONLY

MAND 2/22 at 11AM (200 E Santa Clara St, 9th Flr, Room 955)

17-00371

1

4:00 PM3/15/17

Addenda:RFP PARKING GARAGE & SURFACE LOT MANAGEMENT SERVICES (ONLINE)

RFP 16-17-07

Prebid Conf:

City of San Jose - DPW 408-535-8300

Bidders:

Plan Issuer:

Palo Alto

Demolition of two existing buildings and selective demolition of portions of Spangenberg Theater. New construction consists of a new 2-story building housing classrooms and offices, and an addition of music classrooms to Spangenberg Theater. There is somerenovation work within Spangenberg Theater also. The Project will include underground utility work, site work, asphalt, concrete,cabinetry, steel, mechanical, plumbing, fire protection, electrical, data, and fire alarm systems.

Available ONLINE ONLY

MAND 2/23 at 10AM (front of Administration Building)

17-00385

0

11:00 AM3/15/17

Addenda:GUNN HIGH SCHOOL CENTRAL BUILDING PROJECT - PAUSD (ONLINE)

Prebid Conf:

Palo Alto Unified School District 650-329-3927

General Contractor Fax: 650-557-1239Office: 650-557-1238Cal Pacific Construction

General Contractor Fax: 650-508-1705Office: 650-508-1700Rodan Builders Inc.

Plan Issuer:

Sunnyvale

Restroom accessibility and building and fire code upgrades, new interior finishes, circulation improvements and repair at sites of roof,and upgrade water infiltration in the Recreation Building, Indoor Sports and Creative Arts Centers, and Theatre..

Project Contact: Pete Gonda 408-730-7418Email: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

MAND 2/28 at 8:30AM (Front of Senior Center)

17-00415

0

3:00 PM3/15/17

Addenda:SUNNYVALE COMMUNITY CENTER

PW17-05, PR-13/02-14

Prebid Conf:

City of Sunnyvale DPW 408-730-7403

NEW

Page 27: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

San Jose $60,000

Removal of existing AV systems and designated speaker. Provide and install new AV system per bid documents provided for theStadium area.

Project Contact: ?Priscilla LouangrathEmail: [email protected]

MAND 2/28 at 10AM (Building K)

17-00396

0

2:00 PM3/16/17

Addenda:SJCC (SAN JOSE CITY COLLEGE) AUDIO VISUAL SYSTEMS IMPROVEMENTS FOR STADIUM -SJECCD

G.2010.0167

Prebid Conf:

San Jose Evergreen Community College [email protected]

408-270-6431 408-239-8807

NEW

Bidders:

Plan Issuer:

San Jose

Partial building demolition services with the central utility room to remain intact for the Roble Building at the Evergreen Valley CollegeCampus. Demolition Services includes the abatement/removal of asbestos containing materials, lead based paints and otherhazardous building materials that are impacted by the abatement and demolition of the Roble Building. Contractor to cap, label, re-route, reconnect existing utilities and create a new roof deck over the central utility room. Grading to be required to facilitate demolitionwork and provide a structural building pad with hydro-seeding placement over the ground cover.

Project Contact Chau Duong, Gilbane 408-592-7264Email: [email protected]

MAND 2/24 at 1PM (Gilbane Measure G Conference Room)

17-00336

0

2:00 PM3/21/17

Addenda:ROBLE DEMOLITION EVERGREEN VALLEY COLLEGE (EVC) - SJECCD

G2010.0162

Prebid Conf:

San Jose Evergreen College 408-270-6487

Demolition Contractor Office: 661-204-9942PSC

Plan Issuer:

San Jose

Create & conduct a comprehensive Americans with Disabilities Act (ADA) Self-Evaluation Report for SJECCD that will serve as apragmatic application tool that will identify existing and future accessibility needs.

Project Contact: Priscilla LouangrathEmail: [email protected] also available for review at Santa Clara Builders Exchange

MAND 2/22 at 2PM

17-00319

0

2:00 PM3/23/17

Addenda:RFQ SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT (SJECCD) ADA TRANSITION PLAN:ACCESSIBILITY SURVEY & IMPROVEMENTS

G2010.0138

Prebid Conf:

San Jose Evergreen College 408-270-6487

Bidders:

Plan Issuer:

Sunnyvale

Increment 1 Includes: All remaining site demo, clearing and preparation work to allow the construction of five(5) new single storymodular buildings (D1,D2,G1,G2,H) and two(2) new two story modular buildings (F1, F2), including building pads, foundations.

Increment 2 Includes: All preparation work to allow the construction of two new two story modular buildings (F1, F2), including buildingpads, foundations, all under floor work shown in the drawings. All underground utilities and utility work to the POCs at the modularbuildings.

Available ONLINE ONLY

MAND 2/9 at 2PM (Operations Building)

17-00341

1

2:00 PM3/23/17

Addenda:BISHOP ELEMENTARY SCHOOL MODERNIZATION INCREMENT 1 & 2 (BID PACKAGE 2) - SUNNYVALESCHOOL DISTRICT (ONLINE)

2014067

Prebid Conf:

Aedis Architects 408-300-5160

General Contractor Fax: 510-632-9769Office: 510-568-6600Sausal Corporation

Page 28: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

San Jose

Traffic control and lane closure, signal shut down, temporary traffic detection, traffic lane and crosswalk restriping and lanerealignment, removal of existing thermoplastic traffic/bicycle/ arrow striping and bicycle legends, furnish and install proposedthermoplastic traffic/bicycle/arrow striping and bicycle legends, abandon existing traffic signal pole foundation, loop detectors anddetector hand holes(s), remove existing traffic signal pole, install County-furnished traffic signal pole and furnish and install trafficsignal pole foundation, traffic signs and traffic signal heads and conductors,furnish and install proposed loop detectors.for vehicles andbicycles, furnish and install proposed detector lead-in cables (DLC's), detector handlhole(s) and signal conductors, removal of existingDLC's and signal conductors and pull in with new conductors as one unit, demolition, reconstruction and painting of median island,relocation and readjustment of existing traffic signal heads, install Countv-furnished CCTV cameras, furnished and install microwavebicycle sensors and audible pedestrian signals, re-wiring for existing pedestrian sensors, and other improvements.

Project Contact: Nora Chung 408-494-1390Email: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

3/14 at 2PM (Roads & Airports, 101 Skyport Dr, SJ)

17-00335

0

2:00 PM3/30/17

Addenda:TRAFFIC SIGNAL MODIFICATION AT ALMADEN EXPRESSWAY & TRINIDAD DRIVE

Prebid Conf:

County of Santa Clara Roads & Airports 408-573-2440

Plan Issuer:

Sunnyvale

seeking proposals from licensed Engineering firms to provide professional services for design and preparation for SecondaryTreatment Dewatering Project.

Project Contact: Husam Aburabi 408-730-7627Email: [email protected]

RFP also available for review at Santa Clara Builders Exchange

3/3 at 9:30AM (456 W. Olive Ave, City Council Chambers) (Recommedned)

17-00349

0

3:00 PM4/6/17

Addenda:RFP FOR PROFESSIONAL DESIGN SERVICES ASSOCIATED WITH SECONDARY TREATMENT &DEWATERING PROJECT

UY-20-01

Prebid Conf:

City of Sunnyvale DPW 408-730-7403

Plan Issuer:

San Jose

Removal of existing 48 and 54 inch diameter sanitary sewer pipe, installation of an approximately 4,500 feet of 84 inch diameterinterceptor pipe along North 4th Street, and approximately 300 feet of 72 inch diameter interceptor pipe along Commercial Street toconvey the sewage from Structure G on Commercial Street to Structure E on Old Bayshore Road just north of US Highway 101, andinstallation of small diameter local collector sanitary sewer system.

Available ONLINE ONLY

MAND 2/15 at 1PM (200 E. Santa Clara St, SJ, City Hall)

17-00352

4

3:00 PM4/16/17

Addenda:4880-RFP FOURTH STREET 84" INTERCEPTOR PHASE VI-A PROJECT (ONLINE)

4880

Prebid Conf:

City of San Jose - DPW 408-535-8300

Santa Cruz County

Bidders:

Plan Issuer:

Aptos

Furnish all labor, materials, tools and equipment necessary to (1) renovate five comfort stations, (2) modify the sales counter in theexisting visitors center, and (3) replace an existing beach access ramp to allow wheelchair access, all for meeting current coderequirements for accessibility at SEACLIFF STATE BEACH.

PREVAIING WAGE

A job showing will not be held; however, the Contractor is required to visit the job site and carefully examine andthoroughly acquaint himself/herself with the conditions at the site of the work prior to submitting a bid

17-00344

0

2:00 PM3/1/17

Addenda:SEACLIFF STATE BEACH - ACCESSIBILITY UPGRADES

C16E0055

Prebid Conf:

CA State Natural Resources Agency [email protected] 916-445-8889 916-445-9027

General Contractor Fax: 831-475-1173Office: 863-475-5122Earthworks Paving Contractors, Inc.

Page 29: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Felton $12,000

Provide Heating Ventilation and Air Conditioning (HVAC) air supply duct delivery system replacement at Henry Cowell RedwoodsState Park, Nature Store in Santa Cruz County.

PREVAILING WAGE

2/21 @ 10am- site

17-00369

0

2:00 PM3/1/17

Addenda:HENRY COWELL REDWOODS STATE PARK NATURE STORE HVAC DUCT

C1668039

Prebid Conf:

Department of Parks & Recreation Santa Cruz [email protected]

831-335-6318 831-335-6394

Plan Issuer:

Santa Cruz County

The County of Santa Cruz (Owner) invites qualification-based proposals for Architectural and Engineering (A&E) services from fullylicensed and insured firms/teams (Respondents) to furnish all labor, tools, equipment, and incidentals required to provide professionaldesign, permit and funding plans and documents, general consulting, and related services for the Santa Cruz County Juvenile HallRenovation and Upgrades Project (Project) for a new Seed-To-Table Program (Program).

17-00191

0

5:00 PM3/2/17

Addenda:RFP FOR ARCHITECTURAL & ENGINEERING SERVICES FOR THE JUVENILE HALL RENOVATION ANDUPGRADES

16P1-006

County of Santa Cruz 831-454-2210 831-454-2710

Bidders:

Plan Issuer:

Scotts Valley $31,500,000

Request for Sealed Proposals For Lease-Leaseback Construction Services Construction of the Scotts Valley Middle School CampusModernization Project.

The scope of the Work is the new construction of a library building, an administration building (modular construction), three classroombuildings (including pre-fabricated components), and a gymnasium; and the modernization of three classroom wings and a multi-purpose building. The Work will occur on an approximately 8.5-acre District-owned site located at 8 Bean Creek Road, in Scotts Valley,Santa Cruz County, California. The Project will include approximately 52,394 square feet of buildings. Athletic facilities will include thenew gymnasium and locker rooms, as well as resurfacing of existing basketball courts. Extensive site work to accommodate utilitieswork and accessible path of travel throughout the site is also included in the project.

PREVAILING WAGE

MAND 2/2 3:30 pm @ 4444 Scotts Valley Drive, Suite 5B

17-00091

6

3:30 PM3/3/17

Addenda:SCOTTS VALLEY MIDDLE SCHOOL CAMPUS MODERNIZATION

Prebid Conf:

Scotts Valley Unified School District 831-438-1820 831-438-2314

Asbestos Abatement /Hazardous Materials Contract

Fax: 831-384-0696Office: 831-384-6505Parc Environmental

Communications/TechnologyContractor

Fax: 831-763-3838Office: 831-334-1250Epico Systems Inc.

Demolition Contractor Fax: 831-761-5513Office: 831-761-5511Coastwide Environmental Tech, Inc.

Demolition Contractor Office: 661-204-9942PSC

Electrical Contractor Office: 408-298-6670General Lighting Services Inc

Excavation/SiteWork/Irrigation/Drainage/Landscape

Fax: 831-761-1042Office: 831-763-6100Granite Construction

Flooring Contractor Fax: 650-593-7002Office: 650-593-6837Hy Floor and Gameline Painting

General Contractor Fax: 650-243-5679Office: 650-243-5665Balfour Beatty

General Contractor Fax: 510-237-2435Office: 510-231-5505C. Overaa & Co

General Contractor Fax: 650-802-2970Office: 650-802-2960Gonsalves & Stronck Construction

General Contractor Fax: 530-229-0070Office: 530-229-0001Seward L. Schreder Construction

General Contractor Fax: 415-459-0665Office: 415-456-8972Thompson Builders Corp.

General Contractor Fax: 510-236-4979Office: 510-236-9111Vila Construction

Glass & Glazing Contractor Fax: 408-922-0554Office: 408-922-0555Lincoln Glass & Mirror

Sub-Contractor/SpecialtyContractor

Fax: 408-413-4130Office: 408-848-4088R Titus Waterproofing

Page 30: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Santa Cruz

The Santa Cruz Metropolitan Transit District (Santa Cruz METRO) is requesting sealed bids for a fixed-price contract for An AccessControl Security System.

PREVAILING WAGE

2/14 @ 9:30- 110 Vernon Street, Santa Cruz

17-00272

0

2:00 PM3/3/17

Addenda:ACCESS CONTROL SECURITY SYSTEM

17-09

Prebid Conf:

Santa Cruz Metro Transit District [email protected] 831-426-0199 831-469-1958

Plan Issuer:

Scotts Valley

The Residence Inn, which is a new build, 120 guestroom room hotel, 4-story wood frame Type 3A over typical concrete foundation,swimming pool, to be constructed at Polo Ranch Rd in Scotts Valley, CA.

This project is incorporating fully complete (with finishes) Bathroom pods for 113 of the 120 guest rooms. The other 7 are ADAbathroom that are separate. Please bid accordingly.

BID DUE DATE - ASAP - Feb. 23rd EOB is preferred as our budget review meeting with Ownership is on the 24th, official cut off is3/3/2017 EOB.

17-00402

0

5:00 PM3/3/17

Addenda:RESIDENCE INN - SCOTTS VALLEY

Angeles Contractor, Inc. [email protected] 626-923-3800 626-923-3801

NEW

Plan Issuer:

Santa Cruz $450,800

Upgrade Fire Alarms at Graduate Student Housing & Kresge East (Redwood Apartments).

MAND 2/21 @ 10am- Physical Planning & Construction Conference Rm at Barn G

17-00398

1

3:00 PM3/6/17

Addenda:CAMPUS WIDE FIRE ALARM UPGRADES - GRADUATE STUDENT HOUSING APARTMENTS ANDKRESGE EAST REDWOOD GROVE APARTMENTS

9400-004

Prebid Conf:

UCSC Physical Planning & Construction 831-459-2366 831-459-5540

NEW

Bidders:

Plan Issuer:

Aptos

Interior remodel of the Administration Office, campus upgrades to the electrical service and bells / clocks system, handicapaccessibility upgrades to site parking and paths of travel, and accessibility upgrades to student and staff restrooms.

PREVAILING WAGE

MAND 2/8 @ 10am- site

17-00292

0

2:00 PM3/7/17

Addenda:RIO DEL MAR ELEMENTARY SCHOOL - CAMPUS MODERNIZATION

B-17-6-2-843-8140

Prebid Conf:

Watsonville Blueprint 831-728-7717

General Contractor Fax: 831-459-9297Office: 831-459-9270Cen-Con, Inc.

General Contractor Fax: 831-641-0586Office: 831-915-6823Pueblo Construction , Inc.

General Contractor Fax: 831-422-0566Office: 831-422-9696Tombleson Inc

Plan Issuer:

Capitola

The County of Santa Cruz invites sealed bids for services to extend electrical power from a County Park restroom to a another locationin “The Hook” parking lot from fully licensed, insured, bonded, certified Class “A” General Engineering Contractors to furnish all labor,tools, equipment, and incidentals required to provide the services specified herein.

Contact Person: Phil Santaluce, Senior BuyerEmail: [email protected]: (831) 454-2723Fax: (831) 454-2710

2/22 @ 10am- “The Hook” Parking Lot located at end of 41st Ave & East Cliff Dr

17-00351

0

2:00 PM3/7/17

Addenda:EXTENDING ELECTRICAL POWER AT HOOK PARKING LOT

IFB 16B2-006

Prebid Conf:

County of Santa Cruz 831-454-2210 831-454-2710

Page 31: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Santa Cruz $500,000

In general, project consists of vegetation removal, sediment removal/dredging, trucking within the site for temporary storage, anddrying, and trucking both to the off site final disposal site (likely the Marina Landfill). Work period is from August 15 to October 13,2017.

Project Contact: Desiree Douville (831) 420-5183 [email protected]

17-00374

0

2:00 PM3/7/17

Addenda:NEARY LAGOON TULE AND SEDIMENT REMOVAL

m409668

City of Santa Cruz 831-420-5160 831-420-5161

Plan Issuer:

Santa Cruz

The City of Santa Cruz is soliciting proposals from eligible Design-Build Entities (DBEs) to design, obtain system approval from PG&Eand the Santa Cruz Building Department, procure, install and interconnect a 266.5 kW (DC) Photovoltaic Solar Power GenerationSystem on the roof of a new concrete water tank at the Bay Street Reservoir Site. A California C-10 or C-46 license is required.

MAND 3/1 @ 9am- 200 Cardiff Place, Santa Cruz

17-00418

0

4:00 PM3/8/17

Addenda:DESIGN/BUILD SERVICE FOR BAY STREET RESERVOIR SOLAR PV SYSTEM

c701607

Prebid Conf:

City of Santa Cruz - Water Department 831-420-5211 831-420-5201

NEW

Plan Issuer:

Watsonville

Roofing replacement at Renaissance High School.

PREVAILING WAGE

2/22 @ 10am- site

17-00430

0

2:00 PM3/8/17

Addenda:RENAISSANCE HIGH SCHOOL ROOFING REPLACEMENT

B-16-1-12-805-8160-RB

Prebid Conf:

Pajaro Valley USD 831-786-2380

NEW

Bidders:

Plan Issuer:

Aptos

New sidewalk and hydration stations at Aptos High School.

PREVAILING WAGE

MAND 2/23 @ 10am- site

17-00372

0

2:00 PM3/13/17

Addenda:APTOS HIGH SCHOOL - NEW SIDEWALK REBID

B-16-6-12-802-8105-RB

Prebid Conf:

Watsonville Blueprint 831-728-7717

General Contractor Fax: 831-422-0566Office: 831-422-9696Tombleson Inc

Plan Issuer:

Santa Cruz $750,000

Replacement of two existing boilers with three new condensing boilers. Replacement of two existing heating hot water pumps with twonew variable speed pumps. Replacement of domestic hot water tank and water heater with two new domestic hot water tanks.Removal of existing boiler flue and installation of 2 new flues. Scope of work to include asbestos abatement, electrical, controls,concrete pads, and other ancillary work. Project is located in the mechanical room of Cowell College below the Dining Commons.

***Bidding documents will be available by 5:00pm on Thursday February 23rd.

MAND 2/28 @ 9am- Physical Planning & Construction Conference Rm at Barn G

17-00420

0

3:00 PM3/14/17

Addenda:COWELL COLLEGE – DINING COMMONS BOILER REPLACEMENT REBID

1600-175

Prebid Conf:

UCSC Physical Planning & Construction 831-459-2366 831-459-5540

NEW

Felton

The California Department of Forestry and Fire Protection (CAL FIRE) currently has a contracting opportunity for Roof Replacementservices with its San Mateo-Santa Cruz Unit (CZU), CAL FIRE CZU Headquarters (HQ).

Dispose of an existing roof and install a new roof.

MAND 3/1 @ 10:30am- site

17-00377

0

2:30 PM3/16/17

Addenda:CZU HEADQUARTERS (HQ) ROOFING

1CA03587

Prebid Conf:

Page 32: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Watsonville $3,000,000

Addition of a 1.25 MGD package conventional treatment system and associated facilities to the Corralitos Creek WTP.

MAND 3/9 @ 10am- 6 Eureka Canyon Rd, Watsonville

17-00323

0

2:00 PM3/30/17

Addenda:CORRALITOS CREEK WATER TREATMENT PLANT IMPROVEMENTS

W-17-01

Prebid Conf:

City of Watsonville 831-768-3115 831-763-4065

Sub-Contractor/SpecialtyContractor

Fax: 408-727-7051Office: 408-727-6999Mission City Rebar, Inc

Accurate Finance Group125 Bethany Drive, Suite 11

Scotts Valley, CA 95066Ph 831.515.8383

Fax 831.515.5026www.AccurateFinanceGroup.com

-- Karen Stebbins - Owner

Accounting & BookkeepingServices for Contractors

Accounting & BookkeepingServices for Contractors

• Job Costing• Payroll/Certified Payroll• AIA invoicing• Lien Releases• Work Comp, Liability, Union audits• Quarterly and Year End Reporting• QuickBooks Hosting• QuickBooks Hosting• Receivables & Collections

“You Keep Bidding, Building & Earning... We’ll Handle the Accounting for You.”

Page 33: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17
Page 34: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17
Page 35: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17
Page 36: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

When the State Legislature ‘rains’ new law on the contractor parade making their intent clear can get a little murky. Sometimes those rules and regulations for contractors are as clear as…mud! Let’s dig into this ‘legislative’ ‘mud’ to clarify some questions that seem to bubble up regularly! It may seem familiar, but consider it ‘continuing education’…

Q: I have a scenario to run by you that I’m hoping you have some insight on. There is a local hardware store which has contracts with tradespeople (mostly licensed contractors, some unlicensed ‘handymen’) that stipulate a fixed percentage fee to be paid from any jobs being referred to that tradesperson.

They are a licensed General Contractor. They are also a Hardware Store. Is it legal for them to accept referral fees from Licensed GCs?

If it’s not legal, would canceling the GC license make it legal?

A: Referral fees exceeding $5 between two contractors for the procurement of a home improvement contract are unlawful.

However, in discussions with the CSLB, if the hardware store is acting as a retail establishment and not a contractor the prohibition would not apply. The hardware store does not need to cancel their license, only not have contracted with the homeowner. For example, if they responded to a plumbing leak and then referred a general contractor to repair the water damage.

Q: We have a “C-61”/”D-28” (Doors, Gates, and Activating Devices) license and install automatic gate systems. I would estimate that at least 75% of our competition comes from contractors with licenses other than the correct one. These include Fencing, Structural Steel, Electrical, and Ornamental Iron licenses. They are even hired by GCs to install automatic gates. It seems to me that as long as a company has a license of some kind, the CSLB leaves them alone. This can easily be ascertained by looking at advertising and checking what license they have. We are not looking to create enemies, but the automatic gate industry has safety standards that these companies either ignore or don’t know about, creating the possibility of serious injury to the public.

A: There are actually several classifications that are authorized to install all or part of automatic gate systems.

In addition to the “C-61”/”D-28” classification, a “C-28” (Locks and Security Equipment) can perform this work, and excluding the electrical components, a “C-13” Fencing Contractor can install the gates. A

“C-10” (Electrical) contractor can install the motors that run the automatic gates.

If there are other contractors performing this work “out of classification”, the CSLB would need a formal complaint filed so they can investigate it. The public, including licensed contractors, are the ‘eyes and ears’ of law enforcement.

Q: Several years ago my license was revoked for reasons that I won’t get into and since then I’ve been working for another licensed company. I’d like to get my license back, is that possible?

A: It’s possible. You need to re-apply for the license and as long as it’s been under 5 years since the revocation you would not need to re-test. To re-instate the license you would have to show proof that you have fully complied with the terms and conditions of the revocation. In addition, you will likely need to post a Disciplinary Bond in addition to the Contractor’s Bond. If you are applying under the same entity with the same personnel, and the entity is in good standing with the Secretary of State, you can request that the license number be re-issued.

While knowledge is power, knowing where to go for the answers is half the battle. Get expert assistance immediately when you call 866-443-0657, email [email protected], or write us at Capitol Services, Inc., 1225 8th St. Ste. 500, Sacramento, CA 95814. Research past columns at www.cutredtape.com.

Page 37: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17
Page 38: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

City Building Permits Salinas

Permit No. B17-0006 Permit Amount $15000.00Owner(s) RODRIGUEZ BROTHERS

20 N SANBRON RD City SALINASBuilder BLANCAS CONSTRUCTIONProperty Address SAME Permit Type COM

Permit No. R17-0050 Permit Amount $15000.00

Owner(s) SWEET ROSS BRICKLEY TR ET114 E ROMIE LN City SALINAS

Builder PREMO ROOFING COMProperty Address 114 E ROMIE LN Permit Type REROOF

Page 39: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

Richard ZenkLic #0E21165

Ted J. RinkerLic #0486570

Rinker/Zenk I N S U R A N C E S E R V I C E S

Exchange member since 1988Serving the Tri-County area since 1974

See our ad on the Membership Listings tab

“We Specialize in Construction”Ted J. Rinker, Broker/Agent • Richard Zenk, Broker/Agent

35 E. Romie Lane, Suite C - Salinas, CA 93901Toll Free: (800) 991-8822 • Office: (831) 758-8472 • Fax: (831) 758-8942

[email protected]

Page 40: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17
Page 41: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

Bid ResultsWatsonville 1/31 Calabasas Elementary School - Restroom Modernization Tombleson Inc. $226,735 Commercial Plumbing $272,850 Watsonville 2/1 Linscott Charter School Roofing Replacement Legacy Roofing & Waterproofing $282,074 Scudder Roofing $315,695 Capitola 2/1 41st Avenue Adaptive Traffic Signal System DV Electric Co $314,220 St. Francis Electric $536,450 Tennyson Electric, Inc $546,575 Watsonville 2/7 H.A. Hyde Elementary School - Relocatable Replacement Monterey Peninsula Engineering $815,750 Tombleson Inc. $880,750 Guerra Construction $939,100 Aptos 2/8 Campus Wide Ridge Metal, Paint, Repair & Replace Project-Phase I Black Hawk Painting Co Inc $56,660 A Plus Painting $115,000 Cen-Con Inc $127,000 Watsonville 2/9 Alianza Charter School - Restroom Modernization Tombleson Inc. $465,400 Commercial Plumbing & Building $543,750 Schreder Construction $547,000 Watsonville 2/9 Amesti Elementary School-Exterior Drainage & Ground Improvement Schreder Construction apparent low Freedom 2/9 Freedom Elementary School - Perimeter Safety Fencing Pueblo Construction, Inc. apparent low Watsonville 2/9 Alianza Charter School - Relocatable Replacement Don Chapin Co. $1,543,465 Monterey Peninsula Engineering $1,590,000 Guerra Construction $1,700,000 Marina 2/13 MRF Improvement & Equipment Procurement apparent low Watsonville 2/14 Mintie White ES Safety Perimeter Fence & Site Improvements Pueblo Construction $566,464 Tombleson Inc. $603,864 Schreder Construction $622,000

Page 42: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

Rent a temporary Debris Box— Earn a Bonus.

“We’ll drop it off and you load it up.”

Republic Services of Salinaswww.republicservicessalinas.com For further information call: 831-775-3840

r P

rinte

d on

recy

cled

pape

r.

PARTNERS for a GREENER,CLEANER Salinas.

SALINAS RECYCLES

Why should I rent a debris box?

• Sanitary • Reduces Fire Hazard • Saves Labor• Aids in pest control • Versatile in a variety of sizes

For every 5th Debris Box you rent*, receive a $50. Gift Card Certificate for any

Oldtown Salinas business of your choice!

*Account must be paid current to receive Gift Card Certificate

$50.Gift Card Certificate=

3 or 4 Yard Dumpster

10 Yard (Limited to Rock and Concrete)

15 Yard

20 Yard

30 Yard

Debris box promo_bleeds.indd 1 10/7/11 9:32:55 AM

Page 43: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

Notice of Completion

Mechanic’s Liens

Release of Lien

DATE CREDITOR DEBTOR AMOUNT

02/13 BRYAN ELECTRIC NORTHRIDGE OWNER 371832.90

02/13 REGENCY CONSTRUCTION VANDENBERG CYNTHIA 2000.00

02/14 BRETT GEORGE CON. CIRULNICK ARTHUR 16852.00

DATE GRANTOR GRANTEE CITY

02/14 DISASTER KLEENUP THOMAS JOHN SALINAS

DATE GRANTOR GRANTEE CITY

02/13 COUNTY OF MONTEREY GRANITE CONSTRUCTION LAS LOMAS

02/13 COUNTY OF MONTEREY GRANITE CONSTRUCTION CHUALAR

02/14 SHEA HOMES SHEA HOMES MARINA

02/14 UCP SOLEDAD UCP SOLEDAD SOLEDAD

02/14 BMC EG GARDEN BMC EG GARDEN EAST GARRISON

02/16 BMC EG VILLAGE BMC EG VILLIAGE EAST GARRISON

02/16 CLEAR RIDGE MUTUAL BLAZE ENG. BIG SUR

02/16 SOLEDAD 93 L P SOLEDAD 93 L P SOLEDAD

Page 44: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

Get strategic counseling for increased bond capacity.

575 Price Street, #207 Pismo Beach, CA 93449

805-343-7434

www.cndbonding.com

Work with the largest independently owned surety only brokerage in the Western US.

Myrna Smith, FPO Title

We specialize in bonds of all types:

• Bidbonds• Subdivisionbonds• PerformanceandPaymentbonds• Commercial,licenseandpermitbonds

Withover80yearsofcombinedsuretyandunderwritingexperience,weprovidebondstocontractors,developersandallotherusersofsuretycreditsectors.

Your link to the right SuretY Bond CompanY

Myrna Smith, Vice President

Page 45: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

Get strategic counseling for increased bond capacity.

575 Price Street, #207 Pismo Beach, CA 93449

805-343-7434

www.cndbonding.com

Work with the largest independently owned surety only brokerage in the Western US.

Myrna Smith, FPO Title

We specialize in bonds of all types:

• Bidbonds• Subdivisionbonds• PerformanceandPaymentbonds• Commercial,licenseandpermitbonds

Withover80yearsofcombinedsuretyandunderwritingexperience,weprovidebondstocontractors,developersandallotherusersofsuretycreditsectors.

Your link to the right SuretY Bond CompanY

Myrna Smith, Vice President

Page 46: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17
Page 47: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17
Page 48: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

Classified Ads

Page 49: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

Safety Tip of the WeekFLOOR & WALL OPENINGS

These safety requirements pertain to construction activities and are not to be used as design criteria for permanent structures. They cover construction work area conditions where there is the danger of employees or materials falling through floor, roof or wall openings.

Floor openings into which persons can accidentally walk shall be guarded by either a standard railing with standard toe board on all exposed sides, or a floor hole cover of standard strength and construction. The cover must also be secured to guard against accidental displacement. While the cover is not in place, the hole must be protected by a standard railing.

Wall openings from which there is a drop of more than 4 feet shall be guarded by a standard rail. In addition to the above, every open-sided floor or platform 6 feet or more above the adjacent floor or ground level shall be guarded by a standard railing or equivalent on all open sides, except where there is an entrance to a ramp, stairway or fixed ladder.

The definition of a standard railing is a railing consisting of a top rail , intermediate rail, toe board and posts, with a vertical height of approximately 42 inches from the upper surface of the top rail to the floor, platform, runway, or ramp level. The top rail should be smooth surfaced throughout the length of the railing. The intermediate rail shall be halfway between top rail and the floor, platform, runway or ramp. The ends of the rails shall not overhang terminal posts except where such overhang does not constitute a projection hazard. Wood railings, pipe railings, and structural steel railings are all acceptable, but please note that you may not use re-bar f or railings because of its brittleness and unpredictable strength. One additional method is the use of 1/2" wire rope, provided it is installed properly with a minimum of deflection. Standard guardrails must be capable of withstanding a 200 pound load in any direction.

All railings and covers must be checked routinely and repaired as needed.

NEVER LEAN ON A RAILING - IF IT FAILS YOU COULD FALL AND BE SERIOUSLY INJURED

Safety Recommendations:__________________________________________________________________________________

Job Specific Topics:_______________________________________________________________________________________

M.S.D.S Reviewed:_______________________________________________________________________________________

Attended By:

_______________________________________________________________________________________________________

_______________________________________________________________________________________________________

_______________________________________________________________________________________________________

_______________________________________________________________________________________________________

_______________________________________________________________________________________________________

Page 50: Builders Bulletin - CCBA · 2/28/17 Santa Clara Main Building Replacement Phase Ii -10c Front Entry Signs Mission ... 2/28/17 3:00 PM Palo Alto Rinconada Pool Reroof Project 2/28/17

The Flyers Fuel Program offers member discounts of 2-5 cents per gallon at over 240,000 gas stations throughout the United States. In addition, you can utilize their Fleet Management System that helps members control costs, set limits on fuel services, and streamline reporting. Contact Irish Chapman to sign up today to sign up or to get your free fuel cost analysis.

• 5 cents per gallon discount at CFN sites

• 2 cents at gas stations everywhere

Discount Fuel Program for CCBA Members

CONTROL YOUR FUEL Contact Irish Chapman

[email protected] (530) 885-0401 ext. 2181