building 4, jersey international finance ... - mjp · pdf filebeen developed by mjp architects...

6
4 1 2 3 5 6 01. The first building in the much anticipated St Helier Esplanade Quarter was approved by the States Minister for Planning and the Environment in May 2013. The design of the building has been developed by MJP Architects and Richard MacCormac, with Eric Parry Architects responsible for the basement infrastructure and access. The building will provide around 67,000 sqft of purpose built Grade A office accommodation for the Island’s finance industry. The specification of the building is based on Central London standards and will provide tenants with complete flexibility as a result of column free space and the regular shape of the floorplate. Uniquely for St Helier, the layout of the building provides natural light on all four sides. Building 4, Jersey International Finance Centre St. Helier, Jersey Client States of Jersey Development Company Planning Permission May 2013 Completion 2016 02. 1 2 3 5 6 4

Upload: ngohanh

Post on 10-Feb-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

41 2 3

5

6

01.

The first building in the much anticipated St Helier Esplanade Quarter was approved by the States Minister for Planning and the Environment in May 2013. The design of the building has been developed by MJP Architects and Richard MacCormac, with Eric Parry Architects responsible for the basement infrastructure and access. The building will provide around 67,000 sqft of purpose built Grade A office accommodation for the Island’s finance industry. The specification of the building is based on Central London standards and will provide tenants with complete flexibility as a result of column free space and the regular shape of the floorplate. Uniquely for St Helier, the layout of the building provides natural light on all four sides.

Building 4, Jersey International Finance CentreSt. Helier, Jersey

Client States of Jersey Development CompanyPlanning Permission May 2013 Completion 2016

02.

1 2 3

5

6

4

1

2

35

6

4

PB

04.

01. Plan of completed phase 1 ‘Jersey International Finance Centre’

02. Plan of completed phases 1 and 203. Aerial View of phase 104. Computer model of Building 4

03.

Environmental Performance It will be the first building in the Channel Islands to target a BREEAM Excellent environmental rating. SBEM modelling has demonstrated that its performance will be 19% better than the minimum requirement of Jersey Building Bye-Law Part 11 2A 2007 and Watermans, the building’s engineers, predict that it will achieve at least a 20% reduction in energy through the use of low or zero carbon technologies.

“ The building will provide premium, column free office space. It will have an elegance and finesse equal to the best of the Island’s historic buildings. Its distinctive appearance and efficient layout, together with its progressive, flexible and sustainable environmental strategy, sets a new standard for development in Jersey.”

Lee Henry, CEO of the States of Jersey Development Company

View from the South

PB

Building 4, Jersey International Finance CentreSt. Helier, Jersey

01.

02.

PB

01. Model view of North East corner02. Nighttime view of North East corner03. North elevation looking East04. Detailed perspective of window bay

03.

04.

“ We’re really pleased to be on the team delivering the first building in this world class new district for Jersey’s premier industry. It has an important place in the overall development, forming a link between the new Waterfront and the Historic Town, and sets the standard for future phases.”

Reza Schuster, Director MJP Architects