In this presentation, Faithful+Gould's Sean Lockie discusses the main drivers for investing in sustainable building solutions. He cites examples of clients that are benefiting from improvements in energy efficiency, health and safety, and performance. This presentation was originally delivered in October 2013. Read more: http://www.atkinsglobal.com/en-GB/media-centre/events/atkins-lectures/2013/building-a-low-carbon-economyTRANSCRIPT
![Page 1: Building a low carbon economy](https://reader034.vdocument.in/reader034/viewer/2022042714/554a2409b4c90542548b4841/html5/thumbnails/1.jpg)
Building a low carbon economy
Chinese media delegation briefing
![Page 2: Building a low carbon economy](https://reader034.vdocument.in/reader034/viewer/2022042714/554a2409b4c90542548b4841/html5/thumbnails/2.jpg)
Sean Lockie, director of
sustainability, Faithful+Gould
11 October 2013
![Page 3: Building a low carbon economy](https://reader034.vdocument.in/reader034/viewer/2022042714/554a2409b4c90542548b4841/html5/thumbnails/3.jpg)
A framework for sustainability
Energy
Carbon
Waste
Water
Ecology
Comfort
![Page 4: Building a low carbon economy](https://reader034.vdocument.in/reader034/viewer/2022042714/554a2409b4c90542548b4841/html5/thumbnails/4.jpg)
Drivers
Cost Compliance
CSR Customer
Sustainability
![Page 5: Building a low carbon economy](https://reader034.vdocument.in/reader034/viewer/2022042714/554a2409b4c90542548b4841/html5/thumbnails/5.jpg)
Drivers - Cost
● Energy costs 25 per cent of total business cost
● Energy costs increasing
● Internal Rate of Return (IRR) of circa 40 per cent on some projects
● Changing business case (valuations, rentals, voids)
● Costs of techs coming down.
Cost Compliance
CSR Customer
Sustainability
![Page 6: Building a low carbon economy](https://reader034.vdocument.in/reader034/viewer/2022042714/554a2409b4c90542548b4841/html5/thumbnails/6.jpg)
Drivers - Compliance
● Energy Act 80 per cent by 2050
● Carbon budgets
● Carbon Reduction Commitment
● Mandatory reporting
● 2016 / 2019
● Faithful+Gould rated buildings 2018.
Cost Compliance
CSR Customer
Sustainability
![Page 7: Building a low carbon economy](https://reader034.vdocument.in/reader034/viewer/2022042714/554a2409b4c90542548b4841/html5/thumbnails/7.jpg)
Risks - unsustainable traits
![Page 8: Building a low carbon economy](https://reader034.vdocument.in/reader034/viewer/2022042714/554a2409b4c90542548b4841/html5/thumbnails/8.jpg)
Savings are available
Hospital Office Restaurant
Hotel Shopping Centre School
Source: Siemens Building Technologies 2012
![Page 9: Building a low carbon economy](https://reader034.vdocument.in/reader034/viewer/2022042714/554a2409b4c90542548b4841/html5/thumbnails/9.jpg)
Drivers - CSR
● Productivity
● Health
● Carbon footprint
● CSR strategies required certain investment funds
● Local jobs
● Voluntary reporting – CDP, GRI, GRESB etc.
Cost Compliance
CSR Customer
Sustainability
![Page 10: Building a low carbon economy](https://reader034.vdocument.in/reader034/viewer/2022042714/554a2409b4c90542548b4841/html5/thumbnails/10.jpg)
The business case is there
Source: WGBC 2013
![Page 11: Building a low carbon economy](https://reader034.vdocument.in/reader034/viewer/2022042714/554a2409b4c90542548b4841/html5/thumbnails/11.jpg)
And it’s not just a label
Valuations > rental > demand > voids > brown discount > green premium
![Page 12: Building a low carbon economy](https://reader034.vdocument.in/reader034/viewer/2022042714/554a2409b4c90542548b4841/html5/thumbnails/12.jpg)
Drivers - Customer demand
● Increasing amount of labelling
● Leading players aggressive targets
● Labelling of products.
Cost Compliance
CSR Customer
Sustainability
![Page 13: Building a low carbon economy](https://reader034.vdocument.in/reader034/viewer/2022042714/554a2409b4c90542548b4841/html5/thumbnails/13.jpg)
![Page 14: Building a low carbon economy](https://reader034.vdocument.in/reader034/viewer/2022042714/554a2409b4c90542548b4841/html5/thumbnails/14.jpg)
Atkins' turnkey energy
efficiency solution How it works
![Page 15: Building a low carbon economy](https://reader034.vdocument.in/reader034/viewer/2022042714/554a2409b4c90542548b4841/html5/thumbnails/15.jpg)
Client advantages
● Atkins designs, finances, installs and maintains the systems
● Atkins’ costs are repaid through the energy savings
● Reduce overall client operation cost
● Risks and responsibilities are rested on Atkins
● No upfront costs or investment for the client.
![Page 16: Building a low carbon economy](https://reader034.vdocument.in/reader034/viewer/2022042714/554a2409b4c90542548b4841/html5/thumbnails/16.jpg)
Identification of opportunities
Full investment grade proposal
Detailed design
Agree M&V strategy
Install & PM energy conservation
measures
Implement M&V
Ongoing guarantee of energy savings
Survey
Funding
Design
Maintenance
‘Energy
performance
contract’
Installation
The process
![Page 17: Building a low carbon economy](https://reader034.vdocument.in/reader034/viewer/2022042714/554a2409b4c90542548b4841/html5/thumbnails/17.jpg)
How can we be certain
technologies will pay back?
![Page 18: Building a low carbon economy](https://reader034.vdocument.in/reader034/viewer/2022042714/554a2409b4c90542548b4841/html5/thumbnails/18.jpg)
saved per year
34,000tCO2
Salix finance
£750m
9000
143 funds established
saved over project lifetimes
projects in 662 organisations
“A government fund
for the public sector ”
![Page 19: Building a low carbon economy](https://reader034.vdocument.in/reader034/viewer/2022042714/554a2409b4c90542548b4841/html5/thumbnails/19.jpg)
Technology Typical payback
LED lighting – lamp retrofit 4 to 5 years
LED lighting – complete luminaire upgrade 6 to 7 years
Building fabric insulation 3 to 10 years
Building management system upgrades 3 to 4 years
Combined heat & power (cogeneration) 5 years
Boiler replacements 4 to 5 years
Heating zoning and controls 3 years
Free cooling 4 years
Motor variable speed drives 3 years
Technologies and paybacks / Salix
![Page 20: Building a low carbon economy](https://reader034.vdocument.in/reader034/viewer/2022042714/554a2409b4c90542548b4841/html5/thumbnails/20.jpg)
UK case study - Frimley Park hospital
3.5 £3m
£900k loan for 17 EE projects
years payback
lifetime savings
![Page 21: Building a low carbon economy](https://reader034.vdocument.in/reader034/viewer/2022042714/554a2409b4c90542548b4841/html5/thumbnails/21.jpg)
UK case study – Marks & Spencer
Faithful+Gould is undertaking an in-depth Post Occupancy Evaluation (POE) of
Marks & Spencer’s (M&S) second largest store at Cheshire Oaks near Chester.
This prestigious new study is part of an extensive £8 million programme funded by the
Technology Strategy Board (TSB) designed to deliver more efficient, better performing buildings.
![Page 22: Building a low carbon economy](https://reader034.vdocument.in/reader034/viewer/2022042714/554a2409b4c90542548b4841/html5/thumbnails/22.jpg)
Post occupancy evaluation
Source: Marks and Spencer
![Page 23: Building a low carbon economy](https://reader034.vdocument.in/reader034/viewer/2022042714/554a2409b4c90542548b4841/html5/thumbnails/23.jpg)
Post occupancy evaluation
Source: Marks and Spencer
![Page 24: Building a low carbon economy](https://reader034.vdocument.in/reader034/viewer/2022042714/554a2409b4c90542548b4841/html5/thumbnails/24.jpg)
Post occupancy evaluation
Source: Marks and Spencer
![Page 25: Building a low carbon economy](https://reader034.vdocument.in/reader034/viewer/2022042714/554a2409b4c90542548b4841/html5/thumbnails/25.jpg)
China case study Confidential technology company
![Page 26: Building a low carbon economy](https://reader034.vdocument.in/reader034/viewer/2022042714/554a2409b4c90542548b4841/html5/thumbnails/26.jpg)
Production facility in Suzhou
2,500m² production area
24 hour operation
Injection machines
High-speed stamping.
![Page 27: Building a low carbon economy](https://reader034.vdocument.in/reader034/viewer/2022042714/554a2409b4c90542548b4841/html5/thumbnails/27.jpg)
• Poor HVAC design for production
area with insufficient cooling
capacity and distribution
• High energy consuming metal
halide lighting
• No use of free heating energy
from production waste heat for
heating offices in winter
• No energy monitoring system
• No effective maintenance
programme.
Problems
![Page 28: Building a low carbon economy](https://reader034.vdocument.in/reader034/viewer/2022042714/554a2409b4c90542548b4841/html5/thumbnails/28.jpg)
• New chillers and free cooling
• Re-design of HVAC System in
production & office areas
• Implementation of power meter
monitoring system (PMMS) to
improve equipment reliability and
energy consumption efficiency
• New lighting
• China and UK skills and products
used.
What we did
![Page 29: Building a low carbon economy](https://reader034.vdocument.in/reader034/viewer/2022042714/554a2409b4c90542548b4841/html5/thumbnails/29.jpg)
15% 36
£300k savings in 3 years
energy saving
The results
month ROI
![Page 30: Building a low carbon economy](https://reader034.vdocument.in/reader034/viewer/2022042714/554a2409b4c90542548b4841/html5/thumbnails/30.jpg)
Concluding themes
● Business case is changing
● Regulation and targets are getting tougher
● Importance of good data (evidence)
● New technologies.
![Page 32: Building a low carbon economy](https://reader034.vdocument.in/reader034/viewer/2022042714/554a2409b4c90542548b4841/html5/thumbnails/32.jpg)
Celebrating 75 years of
design, engineering and
project management
excellence.
www.atkinsglobal.com