building division (714) 961-7120 structural …

2
CITY OF YORBA LINDA 4845 Casa Loma Avenue Yorba Linda, California 92886 BUILDING DIVISION (714) 961-7120 Created 02/18/2020 Page 1 STRUCTURAL OBSERVATION REPORT FORM STRUCTURAL OBSERVATION means the visual observation of the structural system, for general conformance to the approved plans and specifications, at significant construction stages and at completion of the structural system. Structural observation does not include or waive the responsibility for the inspections required by Section 108, 1701 or other sections of the code. Per the 2019 California Building Code, Section 17045-1704.6.2 structural observations shall be required for the following: All new Commercial and industrial structures being constructed from the ground up. This shall include tract developments, condominiums, apartments and single-family homes. Structural observations shall be made as required by the engineer or architect of record, but at a minimum of the required notes below. Each observation shall be accompanied by a completed structural observation form. Footing Slab Framing, prior to rough mechanical, electrical, and plumbing inspection. This report includes all construction through ______________ to _______________ Job Address: Permit Number: Structural Observer of Record (SOR): Phone No. of SOR: Structural Observer Performed by: Phone No. of Observer: Professional Lic./Reg. No. of Observer: OBSERVED STRUCTURAL ELEMENTS AND THEIR CONNECTIONS FOUNDATION WALL FRAMES FLOOR ELEMENTS/CONNNECTION OBSERVATION LOCATION Footing, Stem Walls Concrete Steel Moment Frame Concrete Mat Foundation Masonry Steel Braced Frame Steel Deck Caisson, Piles Grade Beams Wood Concrete Moment Frame Wood Retaining Foundation Hillside Special Anchors Other: Masonry Wall Frame Other: Other: ___________ Other:_______________ ____________________ ____________ ____________ ___________ ___________

Upload: others

Post on 09-Nov-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

CITY OF YORBA LINDA 4845 Casa Loma Avenue Yorba Linda, California 92886

BUILDING DIVISION (714) 961-7120

Created 02/18/2020 Page 1

STRUCTURAL OBSERVATION REPORT FORM STRUCTURAL OBSERVATION means the visual observation of the structural system, for general conformance to the approved plans and specifications, at significant construction stages and at completion of the structural system. Structural observation does not include or waive the responsibility for the inspections required by Section 108, 1701 or other sections of the code.

Per the 2019 California Building Code, Section 17045-1704.6.2 structural observations shall be required for the following: • All new Commercial and industrial structures being constructed from the ground up.• This shall include tract developments, condominiums, apartments and single-family homes.

Structural observations shall be made as required by the engineer or architect of record, but at a minimum of the required notes below. Each observation shall be accompanied by a completed structural observation form.

• Footing• Slab• Framing, prior to rough mechanical, electrical, and plumbing inspection.

This report includes all construction through ______________ to _______________

Job Address: Permit Number:

Structural Observer of Record (SOR): Phone No. of SOR:

Structural Observer Performed by: Phone No. of Observer:

Professional Lic./Reg. No. of Observer:

OBSERVED STRUCTURAL ELEMENTS AND THEIR CONNECTIONS

FOUNDATION WALL FRAMES FLOOR ELEMENTS/CONNNECTION OBSERVATION LOCATION

Footing, Stem Walls Concrete Steel Moment Frame Concrete

Mat Foundation Masonry Steel Braced Frame Steel Deck

Caisson, Piles Grade Beams Wood Concrete Moment Frame Wood

Retaining Foundation Hillside Special Anchors

Other: Masonry Wall Frame Other:

Other: ___________ Other:_______________

____________________

____________

____________

___________

___________

CITY OF YORBA LINDA 4845 Casa Loma Avenue Yorba Linda, California 92886

BUILDING DIVISION (714) 961-7120

Created 02/18/2020 Page 2

NOTED DEFICIENCIES with the proposed corresponding corrective actions with the respect to general conformance with the approved plans or in the load path: (A final report by the structural observer which states that all observed deficiencies have been resolved is required before acceptance of the work by the Building Official.)

Please List Deficiencies:

STAMP OF STRUCTURAL OBSERVER

______________________________________ ____________________ Signature of Structural Observer Date

I DECLARE THAT THE FOLLOWING STATEMENTS ARE TRUE TO THE BEST OF MY KNOWLEDGE:

1. I AM THE ENGINEER OR ARCHITECT RETAINED BY THEOWNER TO BE IN RESPONSIBLE CHARGE FOR THESTRUCTURAL OBSERVATION IN ACCORDANCE WITH THEREQUIREMENTS OF THE CITY OF YORBA LINDA

2. 1, OR ANOTHER ENGINEER OR ARCHITECT WHO I HAVEDESIGNATED ABOVE IS UNDER MY RESPONSIBLE CHARGE,HAS PERFORMED THE REQUIRED SITE VISTS AT EACHSIGNIFICANT CONSTRUCTION STAGE TO VERIFY IF THESTRUCTURE IS IN GENERAL CONFORMANCE WITHAPPROVED PLANS AND SPECIFICATIONS;

3. ALL NOTED DEFICIENCIES WHICH REMAIN TO BECORRECTED HAVE BEEN INDICATED ABOVE;

4. I RECOMMEND THAT ACCEPTANCE OF THE STRUCTURALSYSTEMS BY THE CITY OF YORBA LINDA BE WITHHELDUNTIL ALL OBSERVED DEFICIENCES ARE CORRECTED.