building goodwill under pressure - hvac rebuild in charlotte, nc

1
M cKenney’s replaced an aging, inefficient HVAC system as part of a large expansion to an office building in Charlotte, North Carolina. THE CHALLENGE The existing HVAC system, with the exception of the central plant, for the entire facility needed to be replaced with a new system in just 12 weeks. The rebuild included new terminal units, water-cooled AC units, split system units, exhaust fans, air distribution, ductwork and piping for more than 200,000 square feet of space. THE SOLUTION McKenney’s reassessed and reassigned key personnel weekly to optimize available resources. The crews dismantled and replaced the old HVAC system, relocating 25 terminal units, adding 262 new terminal units and installing 13 fan coil units, one split system unit, 60 fire dampers and an exhaust fan. They also installed supporting ducting, pipework and air distribution. The team followed LEED procedures during construction—cleaning and storing materials correctly with proper documentation. THE RESULTS The HVAC installation was completed on time and the general contractor and owners were impressed with McKenney’s quality, production, efficiency and workmanship. Building Goodwill Under Pressure PROJECT NAME Corporate Campus HVAC Rebuild PROJECT LOCATION Charlotte, North Carolina PROJECT TEAM Owner: Financial Institution General Contractor: Vannoy Construction Architect: Gensler Engineer: Barrett Woodyard & Associates Subcontractor: McKenney’s, Inc. SPECIALIZATIONS Design/Assist LEED Certification Pipe Shop Prefab Sheet Metal Shop Prefab MARKETS Commercial Office The content of this document is not intended as an endorsement. www.mckenneys.com © 2014 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A. McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners. 404-622-5000 [email protected] 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316 704-357-1200 [email protected] 3601 Performance Road Charlotte, North Carolina 28214

Upload: mckenneys-inc

Post on 14-Jun-2015

56 views

Category:

Business


2 download

DESCRIPTION

McKenney’s replaced an aging, inefficient HVAC system as part of a large expansion to an office building in Charlotte, North Carolina.

TRANSCRIPT

Page 1: Building Goodwill Under Pressure - HVAC Rebuild in Charlotte, NC

McKenney’s replaced an aging, inefficient HVAC system as part of a large expansion to

an office building in Charlotte, North Carolina.

THE CHALLENGEThe existing HVAC system, with the exception of the central plant, for the entire facility needed to be replaced with a new system in just 12 weeks. The rebuild included new terminal units, water-cooled AC units, split system units, exhaust

fans, air distribution, ductwork and piping for more than 200,000 square feet of space.

THE SOLUTIONMcKenney’s reassessed and reassigned key personnel weekly to optimize available resources. The crews dismantled and replaced the old HVAC system, relocating 25 terminal units, adding 262 new terminal units and installing 13 fan coil units, one split system unit, 60 fire dampers and an

exhaust fan. They also installed supporting ducting, pipework and air distribution. The team followed LEED procedures during construction—cleaning and storing materials correctly with proper documentation.

THE RESULTSThe HVAC installation was completed on time and the general contractor and owners were impressed with McKenney’s quality, production, efficiency and workmanship.

Building Goodwill Under PressurePROJECT NAME

� Corporate Campus HVAC Rebuild

PROJECT LOCATION

� Charlotte, North Carolina

PROJECT TEAM

� Owner: Financial Institution

� General Contractor: Vannoy Construction

� Architect: Gensler

� Engineer: Barrett Woodyard & Associates

� Subcontractor: McKenney’s, Inc.

SPECIALIZATIONS

Design/Assist

LEED Certification

Pipe Shop Prefab

Sheet Metal Shop Prefab

MARKETS

� Commercial Office

The content of this document is not intended as an endorsement.

www.mckenneys.com© 2014 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A.

McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners.

404-622-5000 [email protected] 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316

704-357-1200 [email protected]

3601 Performance Road Charlotte, North Carolina 28214