building project milestone december 16, 2007 7145 lantana road, lake worth, fl 33467
TRANSCRIPT
Building Project Milestone
December 16, 2007
7145 Lantana Road,
Lake Worth, FL 33467
Project in Progress:11/11/2007 – ERM allowed us to plant
trees instead of paying for the trees, savings at least $100K
11/26/2007 – Audio design complete
11/30/2007 – Pew layout finalized
Sanctuary Height: 20’
Platform to Ceiling: 16’
Where are we now
• Consolidating Audio design to the master architecture drawings to begin the engineering drawings (Jon Deng, John Pang)
Prayer Items• Building Permit Submittal by March
– For architect Steve Brock in the design phrase (structural, electrical and mechanical engineering)
– For applying for the tree removal permit
• For timely & accurate project cost estimate from General Contractor (Chuck Clark)
• For all consultants under contracts to assist us
• For all Plan and Permits review for speedy approval
• For church unity, wisdom and passion