building success into your next construction project
DESCRIPTION
A Special presentation for NJSBA – September 2013 various locations . Building Success into your Next Construction Project. Introductions. Rocco R. Vespe, P.E., F.CMAA, Vice President, Hill International 40 years of experience in the construction industry including - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/1.jpg)
Building Success into your Next Construction Project
A Special presentation for NJSBA – September 2013 various locations
![Page 2: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/2.jpg)
Introductions
• Rocco R. Vespe, P.E., F.CMAA, Vice President, Hill International
• 40 years of experience in the construction industry including• 20 years as a contractor• 20 years as a consultant on project management, construction management, estimating, schedule analysis, dispute resolution, claims evaluation, delay and damages, contractor and construction manager performance evaluations, troubled project intervention, OSHA and safety evaluations, and provision of expert testimony. • Projects include education, transportation, municipal, hospital and medical, manufacturing, hotel, gaming, roads and bridges, parking structures, shopping centers, casinos, as well as commercial and residential buildings.• Member of the College of Fellows – Construction Managers Association of America• School Board Member for over 25 years
![Page 3: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/3.jpg)
Introductions
• Michael R. Kueny, Construction Manager, Hill International
• Over 23 years of construction management and inspection experience• Skilled in CPM scheduling, project management, estimating and engineering.• Mike has managed the construction of schools, automotive restoration facilities, hospitals and courthouses.• Mike has worked for School Districts, Pennsylvania Department of General Services (PA DGS), and other private clients.• Member of the Construction Management Association of America (CMAA).
![Page 4: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/4.jpg)
Today’s Agenda
• Success• Teamwork• Common Problems• Solutions• Keys to Success
![Page 5: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/5.jpg)
Mission Statement
• Careful selection and effective management of the Construction Team will enhance the chances of success on your next construction project.
![Page 6: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/6.jpg)
Risky Business
• Differing views and objectives result in a risky environment for all parties
• We must understand these views in order to select the right team members
![Page 7: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/7.jpg)
Project Team
• School District/Administration• Architect/Consultants• Contractor(s)
![Page 8: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/8.jpg)
Success Factors
• Cost• Time• Scope (Needs)• Quality
![Page 9: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/9.jpg)
Perspectives of Project Team
• Each team member has a different view regarding the success factors
• For example the contractor’s view of cost (PROFIT) vs the District’s view (BUDGET)
• The architect’s view of quality
![Page 10: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/10.jpg)
Defining Success or Failure - The Perspectives of the Parties
• The District, Contractor, and Designer each have their own objectives as they relate to the project
• These objectives fall into five general categories:
• Cost• Time• Need• Quality• Risk
![Page 11: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/11.jpg)
Perspectives of the Parties - The District
• Cost
• On Budget
• Project Parameters versus Return on Investment
• Time• On time versus educational needs• Cost of late completion• Cost of early completion
![Page 12: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/12.jpg)
Perspectives of the Parties - The District
• Need• Have these been properly defined?• Are cost and time compromises appropriate?
• Quality• Is industry standard acceptable?• Are special quality requirements been properly spec’d?
• Risk• Are cost and time contingencies adequate?
![Page 13: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/13.jpg)
Perspectives of the Parties - The Contractor
• Cost• Price versus Profit• Profit versus Needs• Cost of unknowns • Cost of changes• Design Issues
• Time• Normal versus accelerated effort• L/Ds (Liquidated Damages)
![Page 14: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/14.jpg)
Perspectives of the Parties - The Contractor
• Need• Workload • Typical project versus new market or area (new risk)
• Quality• Clarity of plans and specs• Impact of specified higher standards
• Risk• Cash flow• Claims
![Page 15: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/15.jpg)
Perspectives of the Parties - The Designer
• Cost• On budget?• Owner impact on cost
• Time• How does job fit into other workload?• What impact will a change in timing have?
• Need• Prestige• Client relationship
![Page 16: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/16.jpg)
Perspectives of the Parties - The Designer
• Quality• Normal design versus increased complexity• Staff expertise / standard of care• Owner preferences versus budget
• Risk• Unforeseen changes• Design time versus bidding/construction dates• Performance• Reputation
![Page 17: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/17.jpg)
Building the Team for Success • Team Mission• Team Members
![Page 18: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/18.jpg)
Team Mission
• Team conductor• Establish measurable goals • Develop realistic schedule• Monitor and measure performance & progress• Take action early to stay on track• Ignoring an issue is not acceptable• Process to get issues to proper parties for quick resolution
– the construction clock is running• Document and communicate
![Page 19: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/19.jpg)
School District/Administration
• Building/Property Committee• Superintendent• Business Official/Business Administrator• Facilities/Maintenance • Educators
![Page 20: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/20.jpg)
Architect Selection
• Qualification Based Process• Establish Criteria• Experience• Similar projects• Individuals• Scope of Services
![Page 21: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/21.jpg)
Consultants
• A/E Team / Sub-consultants• Independent Inspections
• Earthwork• Foundations & Superstructures• Mechanical, electrical and security systems
• Commissioning• HVAC design review• Testing and balancing• Systems Commissioning
![Page 22: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/22.jpg)
Local Code Officials
• Owner’s liaison• One party from start to finish• Buildings and grounds representative• Get early involvement and keep no secrets• The keys to the palace
![Page 23: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/23.jpg)
Preparation of Design
• Establish consultant selection procedures; this should include consideration of past claims history
• Perform an adequate evaluation of existing conditions
• Manage the administration and scheduling of the design consultant contract
• Commission a design review by qualified third parties
• Commission a constructability review by qualified third parties
• Consultants should be required to provide professional liability insurance
• Consider the use of a commissioning agent
• If a construction manager is to be hired, bring the CM on early
![Page 24: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/24.jpg)
Contractor Documents
• Clear, concise, fair contract documents• Disclose existing conditions/As-builts• Changes clauses
• Allowable costs• Overhead and profit
• Time-management clauses• Scheduling, delays, time extensions • Define substantial completion
![Page 25: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/25.jpg)
• Read the contract documents in their entirety, including General Conditions, Standard Specifications, Supplemental Provisions, Special Provisions, plans, referenced documents, etc., and address the following:
• Conflicts• Omissions• Ambiguities
Preparation of Contract Documents
![Page 26: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/26.jpg)
Preparation of Contract Documents
• Understand how the contract allocates risk among the stakeholders.
• Be careful of exculpatory language that may be difficult or impossible to enforce.
• Lessons learned on one project should be incorporated into the contract documents of future projects.
![Page 27: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/27.jpg)
Preparation of Contract Documents
• Read the contract as if everything has gone wrong and you are in the middle of litigation, then answer the following question:
“Does this contract provide adequate protection from risk?”
• Make the necessary revisions until your answer to this question is “Yes.”
• Do not ignore the contract or defer its preparation to the last minute. The contract spells out the rules of the game and is your most important tool in claims mitigation.
![Page 28: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/28.jpg)
The New Team Member – The Contractor
• Change of focus for some team members• Who builds your project?• How does contractor view success factors?• Project construction schedule• Open communication
![Page 29: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/29.jpg)
Adding the Contractor to the Team
• The Low Bid Process - Luck of the draw• Prequalification• Communication
![Page 30: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/30.jpg)
Pre-Bid Meetings
• Schedule meetings so that contractors have time to prepare; but well before the bid date to allow time to answer questions.
• Prepare and issue meeting minutes as an addendum.• Consider making attendance mandatory and coordinating the
meeting with a site visit or “showing.”• Answer pre-bid questions promptly and in writing. Issue
answers as addenda.• Provide full disclosure to bidders. This includes borings and
other subsurface investigation results, as-built drawings, etc.
![Page 31: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/31.jpg)
The Bidding and Award Process
• Understand the project timing • Understand the scope and budget• Use alternates• Limit addenda• Award to lowest qualified bidder
![Page 32: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/32.jpg)
Common Problems
• Delays• Change orders• Disputes/Claims
![Page 33: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/33.jpg)
Delay
What is delay?
• Things don’t go as planned
• Critical versus non-critical delay
• Critical – delays to an activity on the longest path
• Non – Critical – activity has float – not on longest path
• Measured in the context of the most current schedule
![Page 34: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/34.jpg)
Beyond Contractor'sControl
Within Owner'sControl
Within Contractor'sControl
Beyond Owner'sControl
Excusable Non-Excusable
Compensable Non-Compensable
This figure represents a generic contract interpretation. Individual contracts will vary.
Types of Delays
Owner-Caused DelayChanges
Differing Site ConditionsSuspensions
Impeded Access to Work
Delay Caused by Neither PartyStrikes
Acts of GodUnusually Severe Weather
Floods and Fires
Contractor-Caused DelaySlow Performance
Subcontractor DelayEquipment Failures
Late Delivery
![Page 35: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/35.jpg)
Change Order Management
• Entitlement• Impacts• Costs• Not all change orders have a guilty party• Not all change orders are bad• Indicative of working RFI process• Scope clarification
![Page 36: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/36.jpg)
Definition of a Claim
• A claim is an unresolved change. It is a demand for money, time, or some other adjustment in the contract terms. A claim can exist when:• A contractor believes a change exists, but the owner
disagrees, or• Both parties agree that a change exists, but cannot
agree on the impacts or costs of the change.• Based on this definition of a claim, the essence of claims
avoidance is reducing potential changes and providing dispute resolution mechanisms.
![Page 37: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/37.jpg)
Claims Avoidance
• A claims avoidance system should be thought of as a system or collection of actions working in concert to reduce the number of claims filed on a project and enhance the chances of quick resolution of disputes.
• Successful claims avoidance systems foster a culture of issue resolution. The roots of these systems are anchored in the design, the contract, and project administration.
![Page 38: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/38.jpg)
Components of a Disputes Avoidance System
1. Careful preparation of design documents2. Careful preparation of contract documents3. Pre-bid meetings4. Open and effective communications5. Maintenance of proper project
documentation6. Effective, project-level dispute resolution
procedures
![Page 39: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/39.jpg)
Project Documentation
• Maintaining proper project documents plays an important role in every claims avoidance system. A lack of proper documentation makes it harder to resolve a dispute.
• Remember: If it wasn’t written down, it didn’t happen.• Maintain a copy of all bid documents for future reference.
This includes the contractor’s estimate, assumptions, schedules, take-offs, and calculations. Consider escrowing bid documents.
![Page 40: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/40.jpg)
Project Documentation
• Take jobsite photographs and videotapes and record the dates taken. Written descriptions should accompany the photographs and videotapes as well. These should be carefully archived to prevent damage. Consult with legal counsel regarding the admissibility of photographs and videotapes as evidence.
![Page 41: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/41.jpg)
Daily Reports
• Reports should be dated and signed.
![Page 42: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/42.jpg)
Daily Reports
• Establish guidelines for daily reports that standardize both format and content.
• Uniform report format helps organize data among multiple projects.
• Ensures that all categories of information are included or considered.
![Page 43: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/43.jpg)
What goes in a Daily Report?
• Headcount by trade and level• Areas of work and crew size,
including subcontractor work• Quantities of work performed• Hours expended• Supervisory personnel• Material deliveries
• Equipment mobilized or demobilized to site; note owned or rented, operating or idle, and record serial numbers
• Work area access restraints• Lack or loss of power or utilities• Weather
![Page 44: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/44.jpg)
Project Schedules
• Maintain all pre-bid and project schedule submissions and updates, including computer files.
• Document when specific schedule items of work begin and when they are completed.
• The schedule should include a narrative report describing what occurred during the update period.
• Note any situations that have occurred that might be construed as a change.
• Make sure any changes in logic or sequence, and the reasons for these revisions, are fully explained and understood.
![Page 45: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/45.jpg)
Project Correspondence
• Every letter or e-mail needs a prompt and complete reply
• Avoid letter-writing wars • Address each issue raised
directly• Use references when
responding• Let the facts and the contract
speak for themselves
• Be professional; remember you wear the “white hat”
• A letter should follow all oral direction
• Insist on timely notice and timely action
• Keep correspondence impersonal
![Page 46: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/46.jpg)
Project Correspondence
• Carefully draft all project documentation; remember your audience
• Preserve original documents• Some documents, usually only those you write to your
attorney, are privileged, which means that the document does not have to be turned over as part of the discovery process. Keep these documents separate.
• Remember that deleted electronic documents are recoverable from computer hard drives
• Good correspondence is essential to effective disputes avoidance.
![Page 47: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/47.jpg)
Other Important Documentation
• Cost and payroll records• Pay requisitions and supporting information• Submittals, test results, and other miscellaneous QA/QC
reports• Change orders, including all back-up information• Requests for Information• Weather data• Daily reports and job diaries
![Page 48: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/48.jpg)
Approach to Problem Resolution
• Define the problem• Review the contract• Review the facts• Identify liabilities• Identify solutions
![Page 49: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/49.jpg)
Maintain Team Approach
• Changes will occur• Disputes will occur• Remember the parties perspectives• Manage changes• Manage disputes• Get independent evaluation
![Page 50: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/50.jpg)
Keys to Success
• Careful selection of team members• Include all parties, ie facilities/maintenance• Clear concise contract documents• Manage changes and disputes• Realistic Project schedule • Maintain team approach• Get advice
![Page 51: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/51.jpg)
Questions
![Page 52: Building Success into your Next Construction Project](https://reader035.vdocument.in/reader035/viewer/2022062521/568168a2550346895ddf394e/html5/thumbnails/52.jpg)
Presenters
Rocco Vespe, P.E., F.CMAAVice President – Hill International
Michael Kueny, Construction Manager – Hill International