Building Team
ClientArchitect/Consultant
Contractor
8/3/2019 Building Team[1]
http://slidepdf.com/reader/full/building-team1 2/23
Architect/Consultant
Architectural Engineers/Architects
Structural EngineersQuantity Surveyors [Architects QS]
Draughtsman
Technical Officers
8/3/2019 Building Team[1]
http://slidepdf.com/reader/full/building-team1 3/23
ContractorEngineers
Surveyors
Quantity Surveyors [Contractors QS]Estimators
Draughtsman
Technical Officers
Supervisorscraftsman
8/3/2019 Building Team[1]
http://slidepdf.com/reader/full/building-team1 4/23
Quantity Surveyor's Stationeries
Query sheet
Dimensions sheet
Abstract sheet
Bill Page
8/3/2019 Building Team[1]
http://slidepdf.com/reader/full/building-team1 5/23
Measurement procedures
Entering Dimensions
Spacing of item
WasteOder of Dimensions
Timesing
Abbreviations and SymbolsGrouping of Dimensions
Measurements of irregular figures
Alterations to dimensions
8/3/2019 Building Team[1]
http://slidepdf.com/reader/full/building-team1 6/23
Standard Method of Measurements 7 [SMM7]
Bill of Quantities [BOQ]
This consists of a schedule of items of work
to be carried out under the contract with
quantities entered against each item, prepared
in accordance with SMM
8/3/2019 Building Team[1]
http://slidepdf.com/reader/full/building-team1 7/23
Major Parts of a BOQ Preliminaries
Sectional Trade Bills
Preambles
Money Provisions
General Summary
8/3/2019 Building Team[1]
http://slidepdf.com/reader/full/building-team1 8/23
The first wk. secn. In a BOQ is
often termed the PreliminariesBill and covers many important
financial matters which relate to
the contract as a whole and arenot confined to any particular
wk. secn.
Preliminaries
8/3/2019 Building Team[1]
http://slidepdf.com/reader/full/building-team1 9/23
1. Items which are not specific to work
sections but which have an identifiable
cost which is best consideredseparately for tendering process, such
as contractual requirements for
insurances, site facilities for theemployers representative and
payments to the local authorities.
The Preliminaries section of a BOQ
contains two separate and distinct types
of items.
8/3/2019 Building Team[1]
http://slidepdf.com/reader/full/building-team1 10/23
2. Items for fixed and time related costs
which derive from the contractors
expected method of carrying out thework, such as bringing plant to and from
the site, providing temporary works and
supervision.
8/3/2019 Building Team[1]
http://slidepdf.com/reader/full/building-team1 11/23
Typical preliminary clauses in respect
of;1.water for work
The contractor shall provide clean, fresh water for
use on he works. Pay all necessary charges, provide
all temporary storage, plumbing services andconnections and shall clear away and make good on
completion.
2. Temporary Work
The contractor shall provide and maintain all
necessary roads, crossings and the like and shall clear
away and make good on completion
8/3/2019 Building Team[1]
http://slidepdf.com/reader/full/building-team1 12/23
3. Scaffolding
The contractor shall provide and
maintain all necessary temporary
scaffolding for the execution of work
8/3/2019 Building Team[1]
http://slidepdf.com/reader/full/building-team1 13/23
Sectional Trade BillsThere would be a number of sectional trade
bills in accordance with the scope, or
complexity of the project. All the measuredwork will be inserted in to sectional trade bills.
Such as;
Bill No. 2 D- Ground work
Bill No 3 F- Masonry
Bill No 4 E- In-situ Concrete etc..
8/3/2019 Building Team[1]
http://slidepdf.com/reader/full/building-team1 14/23
Preamble
Preambles are clauses usually inserted at thehead of each work section bills, and principally
contained descriptions of material and
workmanships as found in specifications,
together with another relevant information of
which the contractor should be aware in pricing.
Inserting the preamble in the B.O.Q, the lenth of
the work descriptions are reduced and thespecifications is not necessary if they provide the
information
8/3/2019 Building Team[1]
http://slidepdf.com/reader/full/building-team1 15/23
Functions of Preambles
Specify quality of materials,
Specify the standard of the workmanship
required,Assist in pricing measured work,
Repetition of same information item by item
will be avoided and hence the work descriptionswill be more concise.
8/3/2019 Building Team[1]
http://slidepdf.com/reader/full/building-team1 16/23
Preambles for Excavation.
The quantities of excavation, includingdisposal of excavated material have been
measured nett and the contractor is to allow
in his bill rates for any increase in bulk and for
any additional excavation that may be
required for working space, other than that
provided in accordance with the SMM.
Excavation rates shall include for grubbing up
and removing any tree roots and similar
obstructions that may be encountered
8/3/2019 Building Team[1]
http://slidepdf.com/reader/full/building-team1 17/23
Excavation shall be inspected and approved by
the Architect and the representative of the Local
Authority before any concrete or filling is laid,and any variations measured by the Quantity
Surveyor.
If any excavations are carried out to a greater
width or depth than directed or required, then the
Contractor is to make up or fill in to the required
width or depth with concrete [1:12] at his own
expense, where directed by the Architect, and nopayment will be made for the additional
excavation
8/3/2019 Building Team[1]
http://slidepdf.com/reader/full/building-team1 18/23
Hard core shall be clean, hard brick or stone
broken to pass a 5 diameter ring and be well
graded and compacted in layers not exceeding
150 mm thick, with a 800 kg vibrating roller
running at a slow speed with a minimum of
three passes over each layer.
8/3/2019 Building Team[1]
http://slidepdf.com/reader/full/building-team1 19/23
Money Provision
Prime Cost Sum[ PC sum]
Provisional Sum
8/3/2019 Building Team[1]
http://slidepdf.com/reader/full/building-team1 20/23
R
easons for the use of PC sums1. It gives architect control over the
choice of firm to carry out work
in the case of nominated subcontractor
2. It will enable the architect to
select good or materials
manufactured by particular firms.
8/3/2019 Building Team[1]
http://slidepdf.com/reader/full/building-team1 21/23
General Summary
The general summary is to provide monetary
collection at the end of each group of work
sections such as, D Ground Work, andF
masonry, the total of which are then
transferred to the general summary
8/3/2019 Building Team[1]
http://slidepdf.com/reader/full/building-team1 22/23
£ P
D. Ground Work
E. In situ Concrete
F. Masonry
G Structural/ Carcassing Timber
H. Cladding/Covering
J. Waterproofing
.
.
Total carried to final summary
General Summary