Primary Cementing Equipment Exit • Tools ◦ Help Text Size ◦ Feedback ◦ Notes Please select feedback type My comments Do you require a response? Yes, I would like IHRDC to contact me with an answer to my comments. Please use this email adress to contact me: 245~H147687 Note: a Help Desk Customer Support ticket will be created on your behalf and you will receive a response from the IHRDC Help Desk. SUBMIT Go To Feedback Form New Note Click NEW NOTE to add your notes. Save Cancel Delete Subject Listing Bulk Loading and Transport Cement Mixing and Pumping Equipment Cementing Head Float Equipment, Guide Shoe Wiper Plugs Page 1 of 4 IPIMS | Primary Cementing Equipment 25-05-2015 http://www.ipims.com/scorm/app/index.asp?s=1466&u=H147687&ce=1&ma=3&pg...

Upload: nicholas-hopkins

Post on 08-Nov-2015

222 views

Category:

Documents


4 download

TRANSCRIPT

  • Primary Cementing Equipment

    Exit

    Tools

    Help

    Text Size

    Feedback

    Notes

    Please select feedback type

    My comments

    Do you require a response?

    Yes, I would like IHRDC to contact me with an answer to my comments.

    Please use this email adress to contact me:

    245~H147687

    Note: a Help Desk Customer Support ticket will be created on your behalf and you will receive a

    response from the IHRDC Help Desk.

    SUBMIT

    Go To Feedback Form

    New Note

    Click NEW NOTE to add your notes.

    Save

    Cancel

    Delete

    Subject Listing

    Bulk Loading and Transport

    Cement Mixing and Pumping

    Equipment

    Cementing Head

    Float Equipment, Guide Shoe

    Wiper Plugs

    Page 1 of 4IPIMS | Primary Cementing Equipment

    25-05-2015http://www.ipims.com/scorm/app/index.asp?s=1466&u=H147687&ce=1&ma=3&pg...

  • Centralizers

    Wipers, Scratchers, Agitators

    All videos

    Bulk Loading and Transport

    01:20

    Cement Mixing and Pumping

    Equipment 02:26

    Cementing Head 01:19

    Float Equipment, Guide Shoe

    03:51

    Centralizers 01:44

    Wipers, Scratchers, Agitators

    03:15

    Subtopic Duration: 13:55

    Exercises

    Exercise 1

    Exercise 2

    Exercise 3

    Exercise 4

    Exercise 5

    Exercise 6

    Exercise 7

    Assessment *

    *Required

    BEVIN BABU

    Status: Not Started0

    7 Questions

    Instructions:

    Answer each assessment

    question.

    After you have answered all

    questions, click the "Submit All"

    button.

    A passing score is 80%.

    Bulk Loading and

    Transport

    Page 2 of 4IPIMS | Primary Cementing Equipment

    25-05-2015http://www.ipims.com/scorm/app/index.asp?s=1466&u=H147687&ce=1&ma=3&pg...

  • You can attempt the assessment

    up to 3 times.

    START ASSESSMENT

    Reference

    Rate This Course

    You will be able to rate this

    course once you have completed

    the assessment

    Needs improvement

    Good

    Excellent

    Thank you for rating this course. If you

    have any feedback on how we can

    improve this course, please complete

    our feedback form.

    Go to Feedback Form

    IPIMS

    IHRDC

    Copyright 1998-2015 International Human Resources Development Corporation All Rights reserved. Privacy

    Policy. v3.0

    Normal

    Increase 20%

    Increase 40%

    Show Tips

    Support Center

    About IPIMS

    >To minimize mixing time on

    location, the service company

    Transcript

    >To minimize mixing time on

    location, the service company

    normally prepares the dry

    bulk cement mixture at it's bulk

    cement plant.

    The company engineer will have

    inspected the bulk cement plant

    well in advance of the job

    to ensure that conditions are

    sanitary and that accurate

    methods are available to blend

    the mixtures.

    Since precision is crucial, when

    weighing and mixing cement

    and additives, it is

    essential that equipment

    be certified accurate.

    Bulk Loading and Transport is a video only

    IPIMS Subject.

    Page 3 of 4IPIMS | Primary Cementing Equipment

    25-05-2015http://www.ipims.com/scorm/app/index.asp?s=1466&u=H147687&ce=1&ma=3&pg...

  • A bulk cement facility that

    uses state-of-the-art weighing

    equipment is best.

    The dry ingredients are placed

    in a batch blender and mixed

    pneumatically.

    The company engineer routinely

    requests a copy of the bulk

    plant load sheet to confirm

    what dry additives were used.

    The load sheet is retained

    in the permanent well file.

    The dry ingredients are

    then loaded into bulk cement

    transports.

    These trucks will carry the

    bulk cement to the location.

    A compressor on the transport

    pressurizes the cement storage

    bins, enabling them to be placed

    in any position without the need

    to depend on gravity feed.

    Most cement transports have

    storage bins that are vertical

    cylinders with domed

    heads and conical bottoms.

    When the job begins, the

    pressure in the bins will force

    the dry ingredients into

    discharge pipes that lead

    to the mixer.

    Page 4 of 4IPIMS | Primary Cementing Equipment