Bunker Interpretive Center Energy Efficiency Project. Engineering 333 December 6, 2011. Introduction: LEED ®. LEED: Leadership in Energy and Environmental Design Certification Ratings: Certified (40-49 points) Silver (50-59 points) Gold (60-79 points) Platinum (80+ points) - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/1.jpg)
BUNKER INTERPRETIVE CENTER ENERGY EFFICIENCY
PROJECTEngineering 333
December 6, 2011
![Page 2: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/2.jpg)
Introduction: LEED®
LEED: Leadership in Energy and Environmental Design Certification
Ratings: Certified (40-49 points) Silver (50-59 points) Gold (60-79 points) Platinum (80+ points)
Encourages design of energy efficient buildings
LEED (to date) does not address actual energy use
Does LEED work?
![Page 3: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/3.jpg)
Introduction: Energy Star®
Addresses the energy use of a building
Compares your building to “peer group” (e.g. K-12 school, hospital, office, etc.)
Accounts for climate, size, purpose, etc.
Best 25% of a building category
![Page 4: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/4.jpg)
BIC - Bunker Interpretive Center BIC earned the LEED Gold rating Test case: if BIC can get Energy Star®
, LEED works
Introduction: BIC
![Page 5: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/5.jpg)
Can the Bunker Interpretive Center attain Energy Star®
rating?
![Page 6: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/6.jpg)
Portfolio Manager Created by Environmental Protection Agency
(EPA) Purpose: Generate an Energy Use Intensity (EUI)
Combines different energy forms into one broad statistic
Units of kBtu/ft2-yr
ENGR 333 used Portfolio Manager as a tool to determine if BIC meets Energy Star® requirements
![Page 7: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/7.jpg)
Understanding EUI
Qualify
![Page 8: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/8.jpg)
BIC Star Can only obtain Energy Star® in
predefined categories BIC doesn’t fit. Closest are:
K-12 School Building Office
Solution: Create “BIC Star”
![Page 9: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/9.jpg)
BIC Floor Plan
N
K-12 (68%)Office (23%)Other (9%)
![Page 10: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/10.jpg)
68%
23%
9%
![Page 11: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/11.jpg)
How does the BIC perform?
![Page 12: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/12.jpg)
Investigation Overview
Natural Gas
Air &Water Flow
Lighting
Outlets & SmallAppliances
What is the BIC’s actual performance?
![Page 13: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/13.jpg)
BIC Performance: Natural Gas Boiler
Floor heating Domestic water (taps)
Fireplace Aesthetic value Space heating
![Page 14: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/14.jpg)
May-05 October-06 February-08 July-09 November-10 April-120
10000000
20000000
30000000
40000000
50000000
60000000
70000000 BIC Natural Gas
EstimatedMeasured
Time (Month-Year)
Nat
ural
Gas
Use
d (M
MBT
U)
![Page 15: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/15.jpg)
Fireplace Boiler0
10000000
20000000
30000000
40000000
50000000
60000000
70000000
80000000
90000000
BIC Natural Gas Consumption(June-November 2011)
Tota
l Nat
ural
Gas
Con
sum
ed
from
June
-Nov
embe
r 201
1 (M
MBT
U)
9%
91%
![Page 16: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/16.jpg)
BIC Performance: Electricity Air and Water Flow:
Circulation Fans Pumps
Outlets and Small Appliances: Refrigerator & microwave Wall outlets
Lighting All interior lights
Hobbs Meter Kill-A-Watt Meter
![Page 17: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/17.jpg)
Boiler
LED Lights
Light Timer
Sept Oct Nov Dec Jan Feb Mar Apr May June July Aug Sept0
1000
2000
3000
4000
5000
6000
Electricity Use (Sept. 2009 to Sept. 2011 )
2009-2010
2010-2011
Time (Month)
Elec
tric
ity U
se (k
W-h
r)
![Page 18: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/18.jpg)
0
1,000
2,000
3,000
4,000
5,000
6,000BIC Electricity Consumed Over 5 Months by Category
(June 2011 to Oct 2011)Cu
mul
ative
Ele
ctric
ity C
onsu
mpti
on (k
W-h
r)
Outlets and Small Appliances
Lighting
Air and Water Flow
![Page 19: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/19.jpg)
Ventilation Fan
Air-Conditioning
Hall Track
Hall Indire
ctOffice
Conferen
ce
Pump 4
Compost Deh
umidifier
Communication Room
Lab 2
Lab 1
Terra
rium
0
500
1,000
1,500
2,000
2,500
Top 12 Electricity Consumers Over 6 Months (June 2011 to Oct 2011)
Components
Cum
ulati
ve E
lect
ricity
Con
sum
ption
(kW
-hr)
Outlets and Small AppliancesLightingAir and Water Flow
Circulation Fa
n
![Page 20: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/20.jpg)
Electricity 31%
Natural Gas 69%
Electricity Natural Gas
![Page 21: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/21.jpg)
BIC Performance
Qualify
![Page 22: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/22.jpg)
Building ComparisonsNature Park Interpretive Center
Bunker Interpretive
Center
De Graaf Nature Center
EnvironmentalInterpretive
Center
![Page 23: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/23.jpg)
Building Comparisons
Building Operated by Location Area (ft2)
Bunker Interpretive Center (BIC) Calvin College Grand Rapids, MI 5,300
DeGraaf Nature Center (DeGraaf) City of Holland Holland, MI 3,100
Environmental Interpretive Center (EIC) University of Michigan Dearborn, MI 13,000
Nature Park Interpretive Center (NPIC) Tualatin Hills Park & Recreation District Beaverton, OR 7,700
![Page 24: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/24.jpg)
![Page 25: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/25.jpg)
What can we do?
![Page 26: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/26.jpg)
Options for Reducing EUI Behavior modification Natural gas efficiency Electricity efficiency Renewables
![Page 27: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/27.jpg)
![Page 28: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/28.jpg)
![Page 29: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/29.jpg)
BIC Improvements Behavioral
Leaving the BIC closed on Monday Closing the BIC 30 minutes early every day Turning off the fireplace Shades on the windows
All violate the intended purpose of the BIC!“One purpose of the facility is to help visitors understand
their role in the world as stewards of creation”-Professor Randy Van Dragt
![Page 30: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/30.jpg)
BIC Improvements (cont.) Natural Gas
High-efficiency Boiler Improving Insulation Replacing Windows
![Page 31: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/31.jpg)
Boiler
![Page 32: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/32.jpg)
BIC Improvements (cont.) Electricity
LED lights Replacing appliances Shutting off water pumps Zoned Ventilation
![Page 33: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/33.jpg)
Pumps
Zoned Ventilation
LED Lights
Light Timer
![Page 34: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/34.jpg)
BIC Improvements (cont.)Renewable Energy Improvements
Increased Solar PV Panels Wind Turbine Solar Water Heater
![Page 35: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/35.jpg)
Solar Water Heater
Wind turbine 3kW
Wind turbine 1.5kW
Solar Panels
![Page 36: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/36.jpg)
Insulation in Blocks
Window Improvements
Solar Water Heater
Wind turbine 3kWWind turbine 1.5kWSolar Panels
LightTimers
Zoned VentilationBoiler
LEDlights
Pumps
![Page 37: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/37.jpg)
Recommendations Solar Water Heater
Pump Operation
![Page 38: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/38.jpg)
Solar Water Heater
![Page 39: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/39.jpg)
Solar Water Heater Specifications
Solar Water Heater: heats water inside concentrated tubes using sun’s energy
Total Cost Estimation $615 for system $5,000 estimated installation
EUI reduction of 16 kBtu/ft2-yr Payback in 2 years
![Page 40: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/40.jpg)
January
February
March
AprilMay June
July
August
September
October
November
December
0
5000
10000
15000
20000
25000
30000
35000Solar Water Heater Natural Gas Analysis
Natural Gas Offset
BIC Natural Gas Usage
Nat
ural
Gas
Usa
ge/R
educ
tion
(kBt
u)
![Page 41: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/41.jpg)
Pump Description Turn off pumps for the floor radiant
heating loops during the summer months Total Cost Estimation:
Electronic Controller - $200 EUI Reduction: 7 kBtu/ft2-yr Payback in 56 days
![Page 42: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/42.jpg)
![Page 43: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/43.jpg)
![Page 44: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/44.jpg)
Summary Does LEED work?
Almost What will it take for the BIC to get Energy
Star®? Can’t!
Small improvements will earn BIC Star Solar Water Heater Pump Operation
![Page 45: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/45.jpg)
Future Work Continue monitoring BIC energy use Design a solar water heater system Modify pump operation
![Page 46: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/46.jpg)
Acknowledgements Dr. Henry DeVries
Calvin College VP Finance Professor Randy Van Dragt
Calvin College Ecosystem Preserve Director Jeanette Henderson
Calvin College Ecosystem Preserve Manager Dan Slager
Calvin College Energy Purchasing Paul Pennock
Calvin College Physical Plant Mechanical Dept. Eric DeVries
Midwest Energy Group Mike Troupos
Calvin College CERF Intern Professor Matthew Heun
ENGR 333
![Page 47: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/47.jpg)
Questions or Comments?
![Page 48: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/48.jpg)
![Page 49: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/49.jpg)
Appendix
![Page 50: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/50.jpg)
Upper BIC-Star Range
![Page 51: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/51.jpg)
Lower BIC-Star Range
![Page 52: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/52.jpg)
Environmental Interpretive Center
NOTE: 50th and 75th percentiles numbers have units of kBtu/ft2-yr
![Page 53: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/53.jpg)
Nature Park Interpretive Center
NOTE: 50th and 75th percentiles numbers have units of kBtu/ft2-yr
![Page 54: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/54.jpg)
Degraaf Nature Center
NOTE: 50th and 75th percentiles numbers have units of kBtu/ft2-yr
![Page 55: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/55.jpg)
BIC DeGraaf NPIC EIC0.00
0.50
1.00
1.50
2.00
2.50
0.98 0.68 1.79 1.14
0.41
0.21
0.16
0.76
ECI Comparison
Nat. GasElec
ECI (
$/yr
-ft2)
![Page 56: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/56.jpg)
BIC Improved BIC DeGraaf NPIC EIC0.00
0.50
1.00
1.50
2.00
2.50
0.98 0.80 0.68 1.79 1.14
0.41
0.410.21
0.16
0.76
ECI Comparison
Nat. GasElec
ECI (
$/yr
-ft2)
![Page 57: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/57.jpg)
Cost Analysis
0 2 4 6 8 10 12 14 16 18 20$0
$200
$400
$600
$800
$1,000
$1,200
$1,400
Incadescent
CFL
LEDs
Time (years)
Tota
l Cos
t
Assumes Constant $0.12/kW-hr to account for consumption during peak hours
![Page 58: Bunker Interpretive Center Energy Efficiency Project](https://reader036.vdocument.in/reader036/viewer/2022062501/5681691c550346895de03e43/html5/thumbnails/58.jpg)
Install additional solar panels