8/4/2019 Business Continuity Plan PGS_QA
1/36
PGS - Business ContinuityPlan
________________________________________________________________
Principal Global Services Pvt. Ltd.
Business Continuity Plan
_________________________________________________________________Last Updated on: 30th April 2007
Page 1 of 36This document contains information classified as non-restricted internal use
only. No part may be released externally without prior consent of the PGS.
-
8/4/2019 Business Continuity Plan PGS_QA
2/36
PGS - Business ContinuityPlan
________________________________________________________________
CONTENTS
DOCUMENT CONTROL.....................................................................................................................................3
SECTION A: - INTRODUCTION........................................................................................................................5
BUSINESS CONTINUITY PLAN........................................................................................................................5
PURPOSE................................................................................................................................................................5
BCP GOALS..........................................................................................................................................................5
SCOPE....................................................................................................................................................................5
DEFINITIONS........................................................................................................................................................5
BUSINESS IMPACT ANALYSIS.........................................................................................................................7
.................................................................................................................................................................................7
SECTION B: - RECOGNITION..........................................................................................................................8
NOTIFICATION....................................................................................................................................................8
GENERAL RECOVERY ISSUES......................................................................................................................10
BUSINESS SPECIFIC RECOVERY ISSUES...................................................................................................12
SECTION C: - REACTION................................................................................................................................13
NOTIFICATION..................................................................................................................................................13BCP MANAGEMENT TEAM............................................................................................................................15
CALLING CHECKLIST.....................................................................................................................................16
CALLING TREE..................................................................................................................................................18
BCP CORE TEAM...............................................................................................................................................20
PGS EMERGENCY RESPONSE TEAM (PERT)............................................................................................23
SECTION D: - RECOVERY...............................................................................................................................24
FUNCTION RECOVERY APPROACH............................................................................................................24
STAFFING REQUIREMENT............................................................................................................................25
VITAL RECORDS & DOCUMENTS................................................................................................................26
SECTION E: - RESTORATION.........................................................................................................................27
VENDOR LIST.....................................................................................................................................................27
CORPORATE BCP TEAM.................................................................................................................................30
_________________________________________________________________Last Updated on: 30th April 2007
Page 2 of 36This document contains information classified as non-restricted internal use
only. No part may be released externally without prior consent of the PGS.
-
8/4/2019 Business Continuity Plan PGS_QA
3/36
PGS - Business ContinuityPlan
________________________________________________________________INTERNAL BUSINESS CONTACT..................................................................................................................31
SECTION F: - RETURN TO NORMAL...........................................................................................................33
PGS BCP PLANNING TEAM............................................................................................................................33
EMPLOYEE COMMUNICATION SCENARIO.............................................................................................34
STATUS REPORT................................................................................................................................................35
Document control
DocumentName
Business Continuity Plan
Abstract This document provides appropriateBusiness continuity process to be followedin event of disaster.
DocumentReference
Authorization
Prepared By Reviewed By Authorized ByAditya Mishra, Head ITInfraShamita Deshpande
PGS ManagementTeam
Lalit Vij BusinessHead
Information Classification:Non restricted internal useonly
Distribution list:
Issued ToMaster IT Infrastructure Team
01(soft copy) All Functional Heads, BCP Core Team, Corporate BCP and DRHeads02(soft copy) On LAN S:\PGS Pune Policy\IT Infrastructure
_________________________________________________________________Last Updated on: 30th April 2007
Page 3 of 36This document contains information classified as non-restricted internal use
only. No part may be released externally without prior consent of the PGS.
-
8/4/2019 Business Continuity Plan PGS_QA
4/36
PGS - Business ContinuityPlan
________________________________________________________________
03(Hard Copy) PGS Management Team and BCPCore TeamVersion History:
Version
Date Preparedby
Changes & reasons forchange
Draft 1.0 AM & SD First DraftVer 1.0 AM & SD Final approved version
_________________________________________________________________Last Updated on: 30th April 2007
Page 4 of 36This document contains information classified as non-restricted internal use
only. No part may be released externally without prior consent of the PGS.
-
8/4/2019 Business Continuity Plan PGS_QA
5/36
PGS - Business ContinuityPlan
________________________________________________________________
Section A: - Introduction
Business Continuity Plan
PURPOSE
The purpose of this Plan is to formulate and document the process for effectively
identifying, responding to, and recovering from incidents/event that may have the
potential to become a disaster for the organization.
BCP GOALS
The goal of PGS Business Continuity Plan is to effectively manage incidents and
prevent crisis through:
1 Maintaining or restoring business operations as soon as possible
2 Protection of people, property, and other Corporate assets
3 Effective communications internally and externally
4 Flexible but clearly defined processes and responsibilities
5 High level of readiness for a wide range of incidents/events
6 Protection of the Corporate brand, image and reputation
SCOPE
The scope covers response for all current line of businesses performed at PGS in the
event of any incident which contains a potential threat to disrupt business.
Definitions
For the purposes of this plan the following definitions will be used:
BCP Business Continuity Plan process.
_________________________________________________________________Last Updated on: 30th April 2007
Page 5 of 36This document contains information classified as non-restricted internal use
only. No part may be released externally without prior consent of the PGS.
-
8/4/2019 Business Continuity Plan PGS_QA
6/36
PGS - Business ContinuityPlan
________________________________________________________________Disaster An incident/event, series of incidents/events, or set of circumstances that
disrupt normal business operating procedures.Emergency An incidentthat threatens human life, safety, health, property or the
environment if not controlled, contained or eliminated immediately.
Business Interruption An incidentthat threatens the delivery of products, services,
or commerce transactions.
Emerging Issues - Growing controversy or negative climates that threaten the
reputation, brand, organizational or financial stability of the Corporation.
Crisis A circumstance or situation that threatens to imminently alter or
fundamentally affect the way the PGS conducts business.
PERT PGS Emergency Response Team is group of people who will act for employee
and infrastructure safety incase of any event affecting office or business. Team
details in section 14.
BCP Core Team is group of people representing various business and support
functions at PGS who are responsible for this document and implementation of
recovery of business operation incase need arises due to unforeseen event disrupting
the business operation. As mentioned in Section 15.
_________________________________________________________________Last Updated on: 30th April 2007
Page 6 of 36This document contains information classified as non-restricted internal use
only. No part may be released externally without prior consent of the PGS.
-
8/4/2019 Business Continuity Plan PGS_QA
7/36
PGS - BusinessContinuity Plan
___________________________________________________________________
Business Impact Analysis
Business Impact Analysis is conducted annually.Please refer to business unit wise Business Impact Analysis Documentsavailable separately with each Functional Heads and BCP Core team members.
_________________________________________________________________Last Updated on: 30th April 2007
Page 7 of 36This document contains information classified as non-restricted internal use only.
No part may be released externally without prior consent of the PGS.
-
8/4/2019 Business Continuity Plan PGS_QA
8/36
PGS - BusinessContinuity Plan
___________________________________________________________________
Section B: - Recognition
NotificationThe corporate notification process is outlined below.
Notification toSecurity
Security notice toEmergencyManagement
Quick ResponseTeam
Notification toaffected areas
Event
Basic Disaster Notification Process
_________________________________________________________________Last Updated on: 30th April 2007
Page 8 of 36This document contains information classified as non-restricted internal use only.
No part may be released externally without prior consent of the PGS.
-
8/4/2019 Business Continuity Plan PGS_QA
9/36
PGS - BusinessContinuity Plan
___________________________________________________________________
Notification to Security is calling the 515-247-SAFE number. BCPLeader (or Alternate Leader) will initiate this notification in case ofany event occurring.Another option is to call Tom Banse or Don Wells (numbers inCorporate BCP Team in section 19).
_________________________________________________________________Last Updated on: 30th April 2007
Page 9 of 36This document contains information classified as non-restricted internal use only.
No part may be released externally without prior consent of the PGS.
-
8/4/2019 Business Continuity Plan PGS_QA
10/36
PGS - BusinessContinuity Plan
___________________________________________________________________
General Recovery Issues
1. Based on the information received from reliable sources PERT Incidence controller(or alternate), BCP leaderA Contacts PGS Management and BCP Leader and if needed a meeting is
convened. These are fixed locations for meeting :
1. Primary Location 1: Lobby of the Taj Blue Diamond, Koregaon Park,Pune. In case this location is not accessible or available the BCP leaderwill inform meeting at alternate location.
2. Alternate Location 2: Caf coffee day, Fatima Nagar, Pune.Incase of change of meeting location due to unforeseen circumstancessame will be communicated.
B Calls the BCP Core team members - primary contacts (or alternates) and tellsthem:
The disaster declaration
Management Team location and phone number _____________________
PERT location and phone number ______________
Initial evaluation report
Deaths/injuries, if known
When/where the team will meet
C Calls the Corporate BCP team and lets them know where and when the PGSManagement Team and BCP Core team is meeting and details of the event.
2. The PGS Management team and BCP Core team will:A Review and update the following:
See bulleted list in Business Specific Recovery Issues (Section 8)
B Communicate status to the Corporate BCP contact Tom Banse basisassessment of A above
C At the request of the QRT, help evaluate/assess the damage ofequipment/furnishings and the contents of files, desks, etc. Pre-disasterinventory lists and instructions will be provided if this is necessary.
D Using the HR Staff List and Internal Business Contacts determine appropriatestaffing levels and establish schedules.
3. During the recovery period, the BCP Core Team members will coordinate thefollowing:
_________________________________________________________________Last Updated on: 30th April 2007
Page 10 of 36This document contains information classified as non-restricted internal use only.
No part may be released externally without prior consent of the PGS.
-
8/4/2019 Business Continuity Plan PGS_QA
11/36
PGS - BusinessContinuity Plan
___________________________________________________________________
A Daily status reports to the PGS Management Team and Corporate BCP Team.
B Summary and documentation of recovery activities
C The move back to the permanent work site, at the appropriate time.
4. Other tasks occurring concurrently during the recovery:A Damage Assessment (IT Infra Team and Facility & Administration)
B Equipment/Media Salvage (IT Infra Team and Facility & Administration)
C Equipment Procurement (Corporate Purchasing)
_________________________________________________________________Last Updated on: 30th April 2007
Page 11 of 36This document contains information classified as non-restricted internal use only.
No part may be released externally without prior consent of the PGS.
-
8/4/2019 Business Continuity Plan PGS_QA
12/36
PGS - BusinessContinuity Plan
___________________________________________________________________
Business Specific Recovery Issues
First Priority Concerns1. Identify who is filling the following roles:
Decision Maker Responsibility for decisions with respect to the event.The person filling this role will vary based on type of event.
Scribe Responsible for taking notes on our event response.
Communicator Responsible for communication of event tostakeholders like Internal Business Contacts, PERT and Corp BCP Team
Appropriate Communication to the employees.
2. Evaluate extent of disaster Initial impact to infrastructureReport from PGS IT Infrastructure Head and F&A Head in consultation withrespective service owners.
3. Identify communication needs.Whos been communicated to so far?Who needs to be communicated to?
4. Account for staff and report to PGS HR. This is done by HR Generalist primary(or alternate contact) part of BCP Core team.
Second Priority Concerns5. Monitor progress of recovery/transfer of critical mass of Businesses conducted
by PGS to Home Office.Monitor declaration of disaster by PGS BCP Core Team to determine time tofully activate recovery plans.
Third Priority Concerns6. Establish a meeting schedule of PGS BCP Core team with Home Office BCP
Business contacts for status updates.7. Establish communication schedule to stakeholders.
_________________________________________________________________Last Updated on: 30th April 2007
Page 12 of 36This document contains information classified as non-restricted internal use only.
No part may be released externally without prior consent of the PGS.
-
8/4/2019 Business Continuity Plan PGS_QA
13/36
PGS - BusinessContinuity Plan
___________________________________________________________________
Section C: - Reaction
Notification
Notification to PGS Security is by calling the 91.20.66214001number.
_________________________________________________________________Last Updated on: 30th April 2007
Page 13 of 36This document contains information classified as non-restricted internal use only.
No part may be released externally without prior consent of the PGS.
PGS Security isinformed about the
event.
PGS Security informsthe PERT Incidence
The BCP Leader informs thePGS Management Team and
Corporate BCP Team &
Notification toBCP LeaderBCP Core Team
Business Heads (ordesignate) to notify
to all internal
EventOccurs
-
8/4/2019 Business Continuity Plan PGS_QA
14/36
PGS - BusinessContinuity Plan
___________________________________________________________________
Enquiry Number to be configured & published.
_________________________________________________________________Last Updated on: 30th April 2007
Page 14 of 36This document contains information classified as non-restricted internal use only.
No part may be released externally without prior consent of the PGS.
-
8/4/2019 Business Continuity Plan PGS_QA
15/36
PGS - BusinessContinuity Plan
___________________________________________________________________
BCP Management Team
Management Leader BCP LeaderName: Lalit Vij Name: Girish AwachatAddress: F1 Clover Highland Address: 10-Sahajanand Society,
Off NIBM Road, Near Gandhi Bhawan,Kondhwa, Pune - 411028 Kothrud Pune - 411029
PrimaryHomePhone:
+912026837057 HomePhone:
+912025381418
Work Phone: +912066214025
AlternateHomePhone:
+912032663766 Cellular 1: +919860793911Cellular 2: +919850577329
WorkPhone:
+912066214010
Cellular 1: +919822557678BCP Alternate LeaderName: Sachin JadhavAddress:
HomePhone:Work Phone:Cellular 1:Cellular 2:
_________________________________________________________________Last Updated on: 30th April 2007
Page 15 of 36This document contains information classified as non-restricted internal use only.
No part may be released externally without prior consent of the PGS.
-
8/4/2019 Business Continuity Plan PGS_QA
16/36
PGS - BusinessContinuity Plan
___________________________________________________________________
Calling Checklist
Use this checklist when notifying staff of a disaster, along with the Calling Tree. TheCalling Tree will be located with representative from various business units in PGS BCPCore team.
NOTE: Do NOT discuss the situation with anyone other than the employee.
_____ Identify yourself
_____ Provide the employee with:
___ the current status.
___ if a team member, the location and phone number of the PERT.
___ Action to be taken (wait for further instructions or report to aspecified location.
___ emphasize the situation should NOT be publicized!
___ the phone number to call for status, +91206621xxxx.4004
___ TV and radio stations to listen to for public announcements.
_____ If the employee is not available:
___ ask if there is a phone number the employee can be reached at. Ifyes, call them. If not,
leave a number for them to call. Do NOT discuss the situation withthe person on the
phone.
___ if the phone is busy, keep trying. Break in on the line if necessary.
___ if there is an answering machine, leave a message for the employeeto call you.
___ if no one answers the phone, the BCP Core team will continue to tryto reach them.
_________________________________________________________________Last Updated on: 30th April 2007
Page 16 of 36This document contains information classified as non-restricted internal use only.
No part may be released externally without prior consent of the PGS.
-
8/4/2019 Business Continuity Plan PGS_QA
17/36
PGS - BusinessContinuity Plan
___________________________________________________________________
_____ Record all calls on the HR Staff List and any relevant details.
_________________________________________________________________Last Updated on: 30th April 2007
Page 17 of 36This document contains information classified as non-restricted internal use only.
No part may be released externally without prior consent of the PGS.
-
8/4/2019 Business Continuity Plan PGS_QA
18/36
PGS - BusinessContinuity Plan
___________________________________________________________________
Calling Tree IT App Dev
BCP Core TeamMember
Level 1 Contact Number Level 2
Kunal SShankar Mridha
Landline +912066214049
Mobile +919860606671
Atul DeshmukhLandline +912027273585
Mobile +919881091416
Abhijit DankeLandline +912025455724
Mobile +919822897802
Vivek TickooLandline
Mobile +919881150061
Vaishali GiriLandline
Mobile +919922068931
Abhik BSanjiv Jain
Landline
Mobile +919892546874
Nilotpal GuptaLandline
Mobile +919960203363
Makarand
Upasani
Landline
Mobile +919922424155
Rajeev AryaLandline
Mobile +919371063508
Milind PatilLandline
Mobile +919823142296
Vinay GhuleLandline
Mobile +919822254024
IT QA
BCP Core TeamMember
Level 1 Contact Number Level 2
Rajesh PChandan Dudhal
Landline +912026822737Mobile +91 9881474739
Pradeep SaxenaLandline
Mobile +919850823745
Ganesh SharmaLandline
Mobile + 919970186879
Pooja Sachdeva Landline
_________________________________________________________________Last Updated on: 30th April 2007
Page 18 of 36This document contains information classified as non-restricted internal use only.
No part may be released externally without prior consent of the PGS.
-
8/4/2019 Business Continuity Plan PGS_QA
19/36
PGS - BusinessContinuity Plan
___________________________________________________________________
Mobile +91 9960027027Prasad V Parag
ChandratreyaLandline
Mobile +91 9975488826
Mandar GokarnLandline +9120 25465579Mobile +91 9822478486
Sumeet KulkarniLandline +9120 25389594
Mobile +91 9922990738
GayatriKhanchandani
Landline +91 9823107030
Mobile +91 9923099099
Salil PhanseLandline
Mobile +91 9422317410
Mohan Chavan
Landline
Mobile +919922440235 &
+91 9860274608
RIS
BCP Core TeamMember
Level 1 Contact Number Level 2
Shibu TGurmeet K
Landline
Mobile +919823722991Geeta D
Landline
Mobile +919860003658
Sandip PLandline
Mobile +919890653655
Rajat KLandline
Mobile +919890667027
Ritu NayyarLandline
Mobile
Sheeba KhanLandline
Mobile
Health
BCP Core TeamMember
Level 1 Contact Number Level 2
Keshuv TKanchan Rane
Landline
Mobile +919890163111
Pamel KaurLandline
Mobile +919881745245Jacob James Landline
Mobile +919822827959
_________________________________________________________________Last Updated on: 30th April 2007
Page 19 of 36This document contains information classified as non-restricted internal use only.
No part may be released externally without prior consent of the PGS.
-
8/4/2019 Business Continuity Plan PGS_QA
20/36
PGS - BusinessContinuity Plan
___________________________________________________________________
SukhwinderNarang LandlineMobile +919823419733
Support Functions
BCP Core TeamMember
Level 1Contact Number Level 2
Aditya Mishra SachinPimpodkar
Balaji Bidarkar
Shamita DeshpandeSanjeev Nawani
TanmoyMavinkurve
Girish AwachatSameer Thete
Jayant Kad
Priyanka MitraRonnie Dias
Moumita Gokhale
Level 2 onwards calling tree will be aligned to logical hierarchy. Incase ofunavailability of leader at any level the next level designate will take the
responsibility.
BCP Core Team
Department&
Function
Primary Contact Secondary Contact
ApplicationDevelopment
Name Kunal Sen NameWork +912066214046 Work Phone
_________________________________________________________________Last Updated on: 30th April 2007
Page 20 of 36This document contains information classified as non-restricted internal use only.
No part may be released externally without prior consent of the PGS.
-
8/4/2019 Business Continuity Plan PGS_QA
21/36
PGS - BusinessContinuity Plan
___________________________________________________________________
PhoneCellNumber
+919860922218 Cell Number
HomePhone
+912026824264 Home Phone
QualityAssurance
Name Rajesh Punjabi Name Chandan DudhalWorkPhone
+912066214068 Work Phone +912066214155
CellNumber
+919890245676 Cell Number +919881474739
HomePhone
+912065283301 Home Phone +9120
RIS Name Shibu Thomas Name Sandip PatraWorkPhone
+912066214042 Work Phone +912066214047
CellNumber
+919860008065 Cell Number +919890653655
HomePhone
+912026687293 Home Phone NA
Health Name Keshuv Tandon Name James Jacob
WorkPhone
+912066214000 Work Phone +912066214000
CellNumber
+919960431414 Cell Number +919822827959
HomePhone
Home Phone +912026802492
HR Name Priyanka Mitra NameWorkPhone
+912066214059 Work Phone
Cell
Number
+919823177362 Cell Number
HomePhone
Home Phone
Quality andMigration
Name ShamitaDeshpande
Name
WorkPhone
+912066214070 Work Phone
CellNumber
+919850076514 Cell Number
Home Home Phone
_________________________________________________________________Last Updated on: 30th April 2007
Page 21 of 36This document contains information classified as non-restricted internal use only.
No part may be released externally without prior consent of the PGS.
-
8/4/2019 Business Continuity Plan PGS_QA
22/36
PGS - BusinessContinuity Plan
___________________________________________________________________
Phone
Administration andFacilities
Name Girish Awachat Name Jayant KadWorkPhone
+912066214025 Work Phone +912066214061
CellNumber
+919850577329 Cell Number +9960139396
HomePhone
+912025381418 Home Phone +9422312880
Administration andFacilities
Name Name NAWorkPhone
Work Phone
CellNumber
Cell Number
HomePhone
Home Phone
ITInfrastructure
Name Aditya Mishra Name Sachin PimpodkarWorkPhone
+9120662 14024 Work Phone +912066214040
CellNumber
+919860793912 Cell Number +919890907922
HomePhone
+912026823032 Home Phone +9120
_________________________________________________________________Last Updated on: 30th April 2007
Page 22 of 36This document contains information classified as non-restricted internal use only.
No part may be released externally without prior consent of the PGS.
-
8/4/2019 Business Continuity Plan PGS_QA
23/36
PGS - BusinessContinuity Plan
___________________________________________________________________
PGS Emergency Response Team (PERT)
ERT Core Team Member Name Designation
Regular Substitute10:30-19:30 19:30- 00:00 10:30-19:30 19:30- 00:00GirishAwachat
AkhileshSunkle
Samir TheteSarangKhekale
IncidenceController
Naved Khan Ashish Apte Vamshikrishna Mekala
Arif Shaikh Floor Monitor6th Floor
(North Side)Jayant Kad
YogeshKadam
NeeleshSunkle
Sati ShankarFloor Monitor7th Floor
KrishnatPawar
SachinSuvarna
Chetan KKhaladkarNaresh
MaleSearchers 6th
Floor
RushikeshPanse
NARajeshKharat
NAMaleSearchers 7th
Floor
Aparna
DeshmukhPriya Nair
Anuradha
BodasAmita Khekale
FemaleSearchers 6th
Floor
Uma Sajip NANitashaMulik
NAFemaleSearchers 7th
Floor
Guru M Indranil M Ronnie Dias Shibu ThomasHead CountManager
Ajay Kamat Gurmeet Kalsi ERTCommunication
Anita Dutta, Shaikh Mujtaba & the Incidence Controllers ERT Fire
FightersPayal Jog Sachin Suvarna First Aid Team
02 per shiftSecurityPatrollingSupervisors
One Security Guard of G4S on all exits Exit Guards
_________________________________________________________________Last Updated on: 30th April 2007
Page 23 of 36This document contains information classified as non-restricted internal use only.
No part may be released externally without prior consent of the PGS.
-
8/4/2019 Business Continuity Plan PGS_QA
24/36
PGS - BusinessContinuity Plan
___________________________________________________________________
Section D: - Recovery
Function Recovery Approach
Function Name:
List of Project/Processes:
Sr.No.
Projects/Process Priority *
Point ofcontact
RecoveryStatus
Comments
1.
2.
3.
4.
5.
Please add rows to add more process.* Please prioritize your projects/processes for sequential recovery based onrecovery plans.
BUs will maintain this list with themselves.
_________________________________________________________________Last Updated on: 30th April 2007
Page 24 of 36This document contains information classified as non-restricted internal use only.
No part may be released externally without prior consent of the PGS.
-
8/4/2019 Business Continuity Plan PGS_QA
25/36
PGS - BusinessContinuity Plan
___________________________________________________________________
Staffing Requirement
Sr.No.
Business Unit CriticalSkills
required
Min. no. ofstaff required
Primary Alternate
1. IT App Dev BCP contacts 2 Kunal S Abhik B
2. Quality Assurance BCP contacts 2 Rajesh P Prasad V
3. RIS BCP contacts 2 Shibu T
4. Health BCP contacts 2 Keshuv T
5. HR BCP contacts 1 Priyanka M
6. Finance None Tanmoy M
7. Quality & Migration BCP contacts 1 Shamita D
8. Facilities & Admin BCP contacts 2 Girish A Jayant K
9. IT Infrastructure BCP contacts 1 Aditya M Sachin P
10.
As per current disaster recovery strategy in all the Business Cases, the work isbeing transferred to Home Office or some other alternate locations. Hence, nocritical staffing requirement at the site for operations.
Employee Relocation BU will identify on regular basis employees who wouldbe available to relocate to Des Moines/Pella area on a temporary basis duringthe recovery effort to ensure business continuity on Critical Projects.
_________________________________________________________________Last Updated on: 30th April 2007
Page 25 of 36This document contains information classified as non-restricted internal use only.
No part may be released externally without prior consent of the PGS.
-
8/4/2019 Business Continuity Plan PGS_QA
26/36
PGS - BusinessContinuity Plan
___________________________________________________________________
Vital Records & Documents
Department: PGS Business unitsCompletedBy:
PGS Business units Phone No.
Who has access torecall:
BU Heads
Descriptionof Document
or Record
Medium(Paper,
Fiche, Tape,Etc.)
Rating ofCriticality
(High,Medium,
Low)
Is aDuplicate
CopyMaintained?
Where is theDuplicate
Stored?
PGS RecoveryPlans
Paper, CD,Diskette
High Yes PGSManagement
Team and BCPCore team
All critical documents are available/stored in soft form. Backups are taken.
_________________________________________________________________Last Updated on: 30th April 2007
Page 26 of 36This document contains information classified as non-restricted internal use only.
No part may be released externally without prior consent of the PGS.
-
8/4/2019 Business Continuity Plan PGS_QA
27/36
PGS - BusinessContinuity Plan
___________________________________________________________________
Section E: - Restoration
Vendor List
Sr.No.
Product/Services
VendorName
ContactPerson
ContactNumber 1
ContactNumber 2
1 Recruitment
Services
EmmayHRServices
Limited
Jazmin Iraniassistant
manager /Fiona Rebelloseniorassociate
B:+91.20.6561.9
991/2/3/4/5
F:+91.20.4006.4
074 / D:+91.20.4000.6997/ M:+91.98507.77376
2 RecruitmentServices
Reis Staffing& HRServices
Neeraj MalikSr Consultant
Mobile - +9198203 51599
Tel :+91 02232922692, 02228780062www.reishr.com
3 Recruitment
Services
NSRPlacement
Services -Your Path ToSuccess
PrashantDikshit
Direct: 02040130318
Board: 02040130300, Fax
: 02040130388,Mobile:9960648444,[email protected],www.nsrplacements.com
4 RecruitmentServices
iQuestConsultants
Anuya -Sr.TechnicalConsultant
Ph: 02026851932/26851942 (44)
Cell:9890167560
5 RecruitmentServices
ManpowerServicesIndia Pvt. Ltd
Swapnil RodeConsultant /MaheshGosavi / AjitSali
T : +91 203048 1000,D : +91 203048 1019
F : +91 203048 1001/M :+91 [email protected]
6 RecruitmentServices
MASSACCESS
TECHNOLOGI
Rajaram Phone : 044-42113424 / 5
Mobile : 0 -9444080888 /0-9381018050 /
_________________________________________________________________Last Updated on: 30th April 2007
Page 27 of 36This document contains information classified as non-restricted internal use only.
No part may be released externally without prior consent of the PGS.
-
8/4/2019 Business Continuity Plan PGS_QA
28/36
PGS - BusinessContinuity Plan
___________________________________________________________________
7 ReferenceCheck
FIRSTADVANTAGE
Sujet Parera Tel:+91-22-40697000
Fax: +91-22-56782585
8 LegalAdvisor
Amar Raut AmarRaut/SanjayPujari
9325095888 9373315036
9 PayrollProcessor HewittAssociates SajithaManoj/Souvik 9892547728 9900177069
10 SalaryAccount
Citi bank DhananjaySisla
9881464560 9822321972
11 RecruitmentServices
FujitsuConsultingIndia Limited
MurliVenkatraman
9890900365 020-27690001
12 Computer
Systems
SHRO
SYSTEMSPVT.LTD
Seema 020-22399627
13 ComputerSystems
SOFTCELLTECHNOLOGI
ES LTD
0413-4206408
14 ComputerSystems
Soft Access 020-30923828 9822014277
15 SecurityServices
G4S SecurityServices
Uppal 020-25443702
16 Tea/Coffee vending
machine
TechnocratIndia
020-25536178
17 Tea/Coffee vendingmachine
SnapMarketing
Pvt.Ltd
9823012724 9823062724
18 Tea/Coffee vendingmachine
Conceptmarketing
9822442996 9226860709
19 Air Travel CarlsonWagonlitTravel
Manisha 020-26201074
_________________________________________________________________Last Updated on: 30th April 2007
Page 28 of 36This document contains information classified as non-restricted internal use only.
No part may be released externally without prior consent of the PGS.
-
8/4/2019 Business Continuity Plan PGS_QA
29/36
PGS - BusinessContinuity Plan
___________________________________________________________________
20 Meals MEGAMEALSHOSPITALITY&CTR P.L
020-26342797
21 Meals SanskrutiFoods
9371841345
22 Furniture& Fittings
NAMRATASEATING
COMFORTS
9822522501
23 Furniture& Fittings
Cubicals 'NFurniture
020-24331127
24 Water Sai TechEngineers
9890010014
25 Stationary Colorcraft Faisal 9823792928
26 Stationary VenusTraders
020-26055406 020-25535757,ext-136
27 CarTravels
Travel timeCar Rental
020-25899660
28 ElectronicGoods
MAHARASHTRA
ELECTRONICS CORP
020-26347681
29 ElectronicConsumables
A-1 VenusEnterprises 020-24475230 9422001352
30 ElectronicConsumables
RJ SALESCORPORATIO
N
9890084888
31 Employeetravels
WINGSTRAVELS
020-26634618
32 UPS &Inverter
Shah & Co 020-24432367 9890902460
33 UPS &Inverter
V Tech PowerSystems
020-66207161
34 NetworkCabling
FlairTechnologies
Pvt. Ltd.
020-25460646
_________________________________________________________________Last Updated on: 30th April 2007
Page 29 of 36This document contains information classified as non-restricted internal use only.
No part may be released externally without prior consent of the PGS.
-
8/4/2019 Business Continuity Plan PGS_QA
30/36
PGS - BusinessContinuity Plan
___________________________________________________________________
Corporate BCP Team
Primary Contact:Name Tom BanseWork Phone: - +1 (515) 246-7059Cell Number: - +1 (515) 988-1123Home Phone: - +1 (515) 987-1852
Secondary Contact:Name Don WellsWork Phone: - +1 (515) 246-7023Cell Number: - +1 (515) 771-2388Home Phone: - +1 (515) 953-5650
_________________________________________________________________Last Updated on: 30th April 2007
Page 30 of 36This document contains information classified as non-restricted internal use only.
No part may be released externally without prior consent of the PGS.
-
8/4/2019 Business Continuity Plan PGS_QA
31/36
PGS - BusinessContinuity Plan
___________________________________________________________________
Internal Business Contact
Department&
Function
Primary Contact Secondary Contact
ISBCP contact
Name Mia Arter Name Phil GionetWorkPhone
001515-247-5053 Work Phone 001515-247-7923
CellNumber
001515-770-4616 Cell Number 001515-996-2934
HomePhone
001515-994-3144 Home Phone 001515-556-4353
RISBCP contact
Name Robin Saathoff Name Laurie JohnsonWorkPhone
001641-421-4866 Work Phone 001641-421-4657
CellNumber
Cell Number
Home
Phone
Home Phone
HealthBCP contact
Name Cindy Pool Name Wayne EllisWorkPhone
001719-548-4315 Work Phone 001515-247-6342
CellNumber
Cell Number 001515-771-1701
HomePhone
Home Phone
IT ApplicationDevelopmentBCP contact
Name Steve Terlouw NameWorkPhone
001641-628-2111 Work Phone
CellNumber
001515-7790458 Cell Number
HomePhone
001641-628-4314 Home Phone
IT QABCP contact
Name Regina Lowery NameWorkPhone
001641-628-2111 Work Phone
CellNumber
001515-988-5076 Cell Number
_________________________________________________________________Last Updated on: 30th April 2007
Page 31 of 36This document contains information classified as non-restricted internal use only.
No part may be released externally without prior consent of the PGS.
-
8/4/2019 Business Continuity Plan PGS_QA
32/36
PGS - BusinessContinuity Plan
___________________________________________________________________
HomePhone 001641-620-1413 Home Phone
CorporateServicesBCP contact
Name Jed Fisk NameWorkPhone
001515-247-6543 Work Phone
CellNumber
001515-554-7667 Cell Number
HomePhone
001515-2247666 Home Phone
StrategicSourcingBCP contact
Name Jan Becker NameWorkPhone
001515-248-3897 Work Phone
CellNumber
001515-210-1610 Cell Number
HomePhone
001515-961-0528 Home Phone
_________________________________________________________________Last Updated on: 30th April 2007
Page 32 of 36This document contains information classified as non-restricted internal use only.
No part may be released externally without prior consent of the PGS.
-
8/4/2019 Business Continuity Plan PGS_QA
33/36
PGS - BusinessContinuity Plan
___________________________________________________________________
Section F: - Return To Normal
PGS BCP Planning Team
1. Aditya Mishra 2. Girish AwachatF-205, Daffodils, 10-Sahajanand Society,Magarpatta City, Near Gandhi Bhawan,Pune - 411028 Kothrud Pune - 411029Home
Phone:
+912026823032 Home Phone: +912025381418
WorkPhone:
+912066214024 Work Phone: +912066214025
Cellular: +919860793912 Cellular: +919860793911
3. Shamita Deshpande 4. Jayant Kad502, Sunshree Gold, NIBM Road, JPs Nest ,Plot No.15 B,Shajiraje Hsg.
Society ,Bhosalenagar,HadapsarKondhwa, Pune 411028. Hadapsar,Pune-411028HomePhone:
+912026851922 Home Phone: +91 20 66214061
WorkPhone: +912066214070 Work Phone: +919960139396
Cellular: +919850076514 Cellular: +91 9422312880
During the recovery, the Continuity Planning Unit:
1. Leads the PGS Emergency Response Team (PERT).
2. Keeps Senior Management informed.
3. Acts as an advisor to all teams, as required in consultation with Corporate
4. Assures unforeseen requirements are satisfied.
_________________________________________________________________Last Updated on: 30th April 2007
Page 33 of 36This document contains information classified as non-restricted internal use only.
No part may be released externally without prior consent of the PGS.
-
8/4/2019 Business Continuity Plan PGS_QA
34/36
PGS - BusinessContinuity Plan
___________________________________________________________________
Employee Communication Scenario
There are two possible scenarios from employees perspective when disasterstrikes.
a) Employees are in office
PERT will take a lead to look after safety of each and every employeepresent in office. Depending on situation make appropriate arrangementto reach them their home safely.
b) Employees are not in office
In this situation BCP Core team along with PERT will work tocommunicate to all employees and then automated communicationsystem will be updated for employees to get the appropriate informationupdate on the developments.
_________________________________________________________________Last Updated on: 30th April 2007
Page 34 of 36This document contains information classified as non-restricted internal use only.
No part may be released externally without prior consent of the PGS.
-
8/4/2019 Business Continuity Plan PGS_QA
35/36
PGS - BusinessContinuity Plan
___________________________________________________________________
Status Report
Send to:
Every recovery team member completes this form to document his or her activitiesduring the recovery period. Complete all requested information for ease of monitoringthe recovery progress. The Quick Response Team uses this information for briefings toexecutive management and analysis of the recovery once normal operations arerestored.
Team Name: PGS BCP CoreTeam
Alternate Work SiteLocation:
Name: Title:PhoneNumber:
Function:
Date/Time:
Accomplishments/Problems/Comments:
_________________________________________________________________Last Updated on: 30th April 2007
Page 35 of 36This document contains information classified as non-restricted internal use only.
No part may be released externally without prior consent of the PGS.
-
8/4/2019 Business Continuity Plan PGS_QA
36/36
PGS - BusinessContinuity Plan
___________________________________________________________________
Sent to all Internal Business Contacts listed in Section 19.