business oil & gas profile (1).pdfid software q’ty status 1 hysys ver. 7.1 1 2 tank...
TRANSCRIPT
1
BUSINESS - OIL & GAS
- PETROCHEMICAL
CONSULTANCY, ENGINEERING, CONSTRUCTION SERVICE AND EQUIPMENT SOLUTION
HTTEK
INTRODUCING
HUNGTHINH CONSULTANCY AND TECHNICAL SERVICE JSC
VISION
COOPERATION
SUCCESS
2
INTRODUCTION
Office:
Head Office: 118/157 Phan Huy Ich St., Ward 15, TanBinh Dist., HoChiMinh City, R.S Vietnam.
Tel.: 84 8 62 816 575
Fax: 84 8 62 816 574
Email: [email protected]
Manpower
Year Established
Services Pre-Feasibility
Feasibility Study
Conceptual design
Front-End Engineering Design
Detail Engineering Design
Cost Estimation
2007
Over 40 Employees
LEGAL COMPANY‟S LICENSE
3
COMPANY „S POLICIES
QUALITY POLICY SAFETY POLICY
Satisfying all legitimate demands expected by the Clients is the
key to success.
1/ To implement this policy, our Company:
- Applies a quality management system complying with
ISO 9001:2008 to the production and business activities
throughout the company (under build);
- Ensures to provide Clients with products and services
satisfying their demands;
- Continuously improves and renews to satisfy the demands
of the Clients;
Our aims:
• Acting together for common purposes.
• Performing correctly the task from the beginning.
• Doing better in the next time.
2/ This quality policy has to be disseminated to and understood
by all employees of the Company for implementation.
3/ HTTEK commits to provide sufficient resources for
performing and maintaining this quality policy.
Establishing a safe working environment to protect the
“RESOURCES” is the conscience and responsibility of
all employees of HTTEK in which the highest
responsibility will be taken care by a senior leader who is
assigned to be specialized in safety task.
To implement this policy, HTTEK:
1/ Establishes and operates the "HSE Management System"
and "Safety personnel" to meet the National Standards
and towards the International Standards.
2/ Consider the first objective is the identify and eliminate
all risks and occupational accident hazards.
3/ All risk managements and solutions are aiming towards
the only purpose of creating the security and increasing
the satisfaction for "Employees" when working for
HTTEK.
4/ Regularly and continuously checks and supplies the
finance to maintain “Effect” and “Efficiency” of the Safety
policy.
“HTTEK, CREDIBLE CHOICE OF CLIENTS”
“HTTEK IS ALWAYS WILING TO CLOSED CO-OPERATE WITH
DOMESTIC AND OVERSEA CLIENTS WITH FRIENDSHIP AND
MUALTURE DEVELOPMENT”
“EMPLOYEES ARE THE MOST IMPORTANT FACTORS, THE
MOST VALUABLE ASSETS OF THE COMPANY”
SAFETY POLICY HAS TO BE DISSEMINAT ED TO AND
UNDERSTOOD BY ALL EMPLOYEES SO THAT EACH EMPLOYEE
SHALL BE A “SAFETY OFFICER”. 4
5
ORGANIZATION
MANAGEMENT BOARD
DIRECTOR
COMMERCIAL DEPT. ENGINEERING DEPT. ACOUNT DEPT.
6
ENGINEERING
1. Manpower:
Our manpower has much
experience and been doing many
oil & gas projects in Vietnam
2. Codes & Standards:
Local code & standards using the
latest VietNam codes & standards
and other national codes &
standards as required by project.
Foreign codes & standards: API,
ASTM, ASME, NFPA, BS etc and
other one as specified by the
project.
7
ENGINEERING
3. Engineering Software
ID SOFTWARE Q’ty Status
1 HYSYS VER. 7.1 1
2 TANK CALCULATION-API 650 1 Owner
3 PRESSURE VESSEL CAL 1 Owner
4 CAD WORX (P&ID AND EQUIPMENT) 1 Owner
5 AUTOCAD VER. 2007 10 Owner
6 MICROSOFT OFFICE 30 Owner
7 STRUCTURE ANALYSES – SAP 2000 1 Owner
8 LINE SIZING CAL. – IN HOUSE SOFTWARE 1 Owner
9 PUMP CAL. – IN HOUSE SOFTWARE 1 Owner
10 HYDRAULIC CAL-IN HOUSE SOFTWARE 1 Owner
8
HUNGTHINH
ID PROJECT SCOPE CLIENT PICTURE
1 LOW PRESS GAS FOR
FRITTA VIETNAM PLANT
EPC CONTRACTOR FRITTA VN
2 UPGRADING FOR NAM VIET
REFINERY PLANT
- FEASIBILITY STUDY
- DETAIL ENGINNERING
DESIGN (PIPING SYS);
-COST ESTIMATION
NAMVIET
OIL & GAS
JSC
3 PHUMY CONDENSATE
PROCESSING PLANT
(JETTY-1 &2 PRODUCT
PIPILINE)
- FEASIBILITY STUDY;
- DETAIL ENGINNERING
DESIGN;
- COST ESTIMATION
PVOIL
EXPERIENCE
9
ID PROJECT SCOPE CLIENT PICTURE
4 XIJIANG 30-2 FIELD-CHINA
AND OFON FIELD -
INDONESIA
DETAIL ENGINEERING
FOR PRODUCED WATER
TREAMENT SYSTEM
CONOCOP
HILIP / MI
SWACO
5 DAIHUNG CONDENSATE
PROCESSING PLANT
- FEASIBILITY STUDY;
- DETAIL ENGINNERING
DESIGN;
-COST ESTIMATION.
ORIENT
OIL JSC
6 CANTHO GASOLINE /
DIESEL OIL STORAGE TANK
- DETAIL ENGINNERING
FOR 3 X12.000M3
STORAGE TANKS;
- COST ESTIMATION
PVOIL MK
EXPERIENCE
10
EXPERIENCE
ID PROJECT SCOPE CLIENT PICTURE
7 HAU GIANG GASOLINE / DO
STORAGE TANK PROJECT
-FEASIBILITY STUDY;
- DETAIL ENGINNERING
DESIGN;
-COST ESTIMATION
PVOIL MK
8 LONGHUNG RESIDUE OIL
PROCESSING PLANT
(UPGRADING UP TO 20.000
M3 STORAGE TANKS)
-DETAIL ENGINNERING
DESIGN;
-COST ESTIMATION.
LONGHUN
G VN JSC
9 REFRIGERATED LPG
STORAGE TANK
- FRONT-END
ENGINNERING DESIGN
FOR FIRE PROTECTION
SYSTEM
PVGAS /
WORLEY
PARSONS
THE END
THANK YOU!
11