Business Process Design TeamLevel 1 Process Diagram

SUBJECT: Customer Switching Scenario 1

Title Dual fuel domestic customer with SMETS2 credit meter

TOM Ref

Author Daniel Simons

Version 1.3

Agreement Date 16/02/2016

Approver Jenny Boothe

15/04/2016 1

Level 1 – Customer Switching – Scenario 1Brief Description Customer successfully switches from Supplier A to Supplier B

Key Scenarios• Scenario 1 is a dual fuel domestic customer with SMETS2 credit meter.  Transfer proceeds smoothly with the following scenario assumptions:

• Customer signs up directly with their chosen supplier rather than through a Third Party Intermediary (TPI)• Objection status has been pre‐loaded• No objection made• Customer does not invoke their right to cancel within the cooling‐off period• Opening and closing meter readings are obtained from the meter• No export metering• No auxiliary load control• Switch is dual fuel to dual fuel• No change of tenancy • No related MPANs• No change of meter point administration detail• No change in Data Aggregator• Supplier will select agents to appoint based on their individual contractual arrangements – i.e. the agents may or may not change  

Actors• Customer• Supplier A – Losing Supplier• Supplier B – Gaining Supplier• Registration Agent• Supplier Agents (MOP, MAM, DC, DA, Shipper)• Network Operators (gas and electricity)• Data Communications Company (DCC)

PreconditionsCustomer has elected to switch supplier and has selected a potential switch date, payment method and tariff with their chosen supplier

15/04/2016 2

Post Conditions• Customer

• Enters into new contract with Gaining Supplier• Smart meter tariff etc updated and visible on meter• Closing statement (which may include a bill) received from Supplier A• Opening statement (which may include a bill) received from Supplier B

• Gaining Supplier• Data Communications to smart meter active• Opening read captured• Supplier agents and shipper (gas) selected• Internal systems updated• Shipper updated• Accurate opening statement issued (which may include a bill) 

• Losing Supplier• Accurate final statement issued (which may include a bill) 

• Supplier Agents• Supplier Agents selected• Internal systems updated with meter technical details and invoicing details

• Network Operator• Notification of switch received (supplier / shipper)• Opening read recorded and processed (gas only)

• Registration Agent• CRS data updated

• Data Communications Company (DCC)• Access control records updated

15/04/2016 3

Level 1 – Customer Switching – Scenario 1

Level 1 Customer Switching 

1.3 Register switch

1.6 Process cooling off request (not applicable)

1.5 Complete post switch admin (billing, agents 

etc)

Notes for 1.1: Notes for 1.3 : Notes for 1.4 :

Notes for 1.6:• Not included as part of this 

scenario

1.2 Complete Supplier checks and request 

switch

Notes for 1.2 :• Different suppliers are likely 

to undertake different validation activities prior to submitting a registration request

15/04/2016 4

1.4 Execute switch

Notes for 1.5 :

Level 1 – Customer Switching – Scenario 1

1.1 Complete pre‐contract activities

Business Process Design TeamLevel 2 Process Diagram

15/04/2016 5

SUBJECT: Customer Switching Scenario 1

Title: Dual fuel domestic customer with SMETS2 credit meter

TOM Ref:

Author Daniel Simons

Version 1.3

Agreement Date 16/02/2016

Approver Jenny Boothe

Level 2 – Customer Switching – Scenario 1Title: 1.1 Complete pre contract activities

Brief Description:Customer successfully agrees contractual terms to switch from Supplier A to Supplier B

Key Scenarios• Scenario 1 is a dual fuel domestic customer with SMETS2 credit meter. Transfer proceeds smoothly i.e there is no objection, rejection and the 

customer does not invoke cooling‐off

Actors• Customer• Supplier B – Gaining Supplier

Preconditions• Customer has decided to obtain a quote to switch directly through a supplier

Post Conditions• Customer

• Contractual terms agreed to switch supplier

15/04/2016 6

Customer Switching

1.3 Register switch

1.5 Complete post switch admin (billing, agents, 

etc)

1.2 Complete Supplier checks and request 

switch 

1.1 Complete pre contract activities

1.1.1 Request energy quote and provide necessary data

1.1.3. Agree contractual terms and provide necessary data 

1.1.2. Provide quote and offer contractual terms 

Complete pre contract activities

L1

L2

15/04/2016 7

1.4 Execute switch

Level 2 – Customer Switching – Scenario 1

1.6 Process cooling off request (not applicable) 

Notes :• A dashed line indicates actions that are optional but that 

individual actors may undertake as part of their internal processes. These steps have been included to provide context to activities prescribed by the switching arrangements.   

Title: 1.2 Complete Supplier checks and request switch 

Brief Description:• Supplier B carries out any validation of customer contract data and sends the registration request 

Key Scenarios• Scenario 1 is a dual fuel domestic customer with SMETS2 credit meter. Transfer proceeds smoothly i.e there is no objection, rejection and the 

customer does not invoke cooling‐off

Actors• Customer• Supplier B – Gaining Supplier• Registration Agent

Preconditions• Customer has entered a contract with Supplier B

Post Conditions• Gaining Supplier

• Any internal validation or credit check process successfully completed• All required information gained from customer or elsewhere• Shipper in place• Supplier agents selected• Registration request submitted

15/04/2016 8

Level 2 – Customer Switching – Scenario 1

1.3 Register switch

1.6 Process cooling off request (not applicable) 

1.5 Complete post switch admin (billing, agents, 

etc)

1.1 Complete pre contract activities

1.2 Complete Supplier checks and request 

switch 

1.2.3. Carry out Triangulation / validate 

meter

1.2.2 Carry out credit check

1.2.4. Notify customer of any additional action 

required  and/or acquire any additional data

1.2.5. Select supplier agents

L1

L2 Complete Supplier checks and request switch

15/04/2016 9

1.4 Execute switch

Level 2 – Customer Switching – Scenario 1

1.2.1 Complete validation of customer 

data

1.2.6. Submit registration request with preferred  

switch date

Notes :• A dashed line indicates actions that are optional but that 

individual actors may undertake as part of their internal processes. These steps have been included to provide context to activities prescribed by the switching arrangements.   

Title: 1.3 Register switch

Brief Description:• Registration Agent validates and accepts the switching request as pending and notifies relevant parties of the switch date and the supplier agents 

selected by the Gaining SupplierKey Scenarios• Scenario 1 is a dual fuel domestic customer with SMETS2 credit meter. Transfer proceeds smoothly i.e there is no objection, rejection and the 

customer does not invoke cooling‐offActors• Supplier A – Losing Supplier• Supplier B – Gaining Supplier• Registration Agent• Supplier Agents (Shipper)• Network OperatorPreconditions• Customer has entered a contract with Supplier B who has sent a switching request to the Registration Agent• Supplier agents have been validated by the Registration AgentPost Conditions• Customer

• Notification of switch and switch date received• Leaving communication received from Losing Supplier

• Gaining Supplier• Notification of confirmed switch and switch date have been received and records have been updated

• Losing Supplier• Notification of confirmed switch and switch date have been received and records have been updated• Leaving communication sent to Customer

• Registration Agent• Confirmed Gaining Supplier and switch date updated in supply point register and notified to parties• Validated the Supplier Agent’s identity and updated its records

• Gaining Shipper• Notification of confirmed switch and switch date have been received and records have been updated

• Losing Shipper• Notification of confirmed switch and switch date have been received and records have been updated 

• Network Operator• Notification of confirmed switch and switch date received• Invoicing details updated (supplier / shipper)

• Supplier Agents • Supplier Agents selected by the Gaining Supplier

15/04/2016 10

Level 2 – Customer Switching – Scenario 1

1.6 Process cooling off request (not applicable) 

1.4 Execute switch1.2 Complete Supplier checks and request 

switch 

1.1 Complete pre contract activities

1.3.1. Validate Registration Request

1.3.2. Check Objection status / register

1.3.3. Update records and notify confirmed switch details and 

switch date 

1.3 Register switch

L1

L2

15/04/2016 11

Register switch

1.5 Complete post switch admin (billing, agents, 

etc)

Level 2 – Customer Switching – Scenario 1

1.3.4. Notify customer of successful registration and 

switch date 

Notes :• A dashed line indicates actions that are optional but that 

individual actors may undertake as part of their internal processes. These steps have been included to provide context to activities prescribed by the switching arrangements.   

Title: 1.4 Execute switch

Brief Description:• Gaining and Losing Supplier execute switching activity once notification of an accepted switch is received from Registration Agent

Key Scenarios• Scenario 1 is a dual fuel domestic customer with SMETS2 credit meter. Transfer proceeds smoothly i.e there is no objection, rejection and the 

customer does not invoke cooling‐off

Actors• Customer• Supplier A – Losing Supplier• Supplier B – Gaining Supplier• Data Communications Company (DCC)• Network Operators (gas and elec)• Registration Agent

Preconditions• Registration request has been validated and accepted with no objection by the Losing Supplier and notification of a confirmed registration has 

been sent to relevant parties by the Registration Agent• Supplier agents selected by the Gaining Supplier

Post Conditions• Customer 

• New supplier and tariff, etc. are displayed on the smart meter  • Gaining Supplier

• Data communications to smart meter active• Change of Supplier Meter Reading obtained 

• Losing Supplier• Relationship ended with smart meter• Change of Supplier Meter Reading obtained 

• DCC• Access control records updated

• Registration Agent• Registration gate closure i.e. the final point at which a registration request may be withdrawn, has passed• New registration updated from confirmed to active

15/04/2016 12

Level 2 – Customer Switching – Scenario 1

1.6 Process cooling off request (not applicable) 

1.2 Complete Supplier checks and request 

switch 

1.1 Complete pre contract activities 1.3 Register switch

1.4.1. Registration gate closure

L1

L2

15/04/2016 13

1.4.2. Close out relationship with meter 

Execute switch

1.5 Complete post switch admin (billing, agents, 

etc.)

1.4 Execute switch

1.4.4. Update security credentials  1.4.5 Configure smart meters

Level 2 – Customer Switching – Scenario 1

1.4.3. Update registration from confirmed to active

1.4.6. Obtain CoS meter reading

Title: 1.5 Complete post switch admin (billing, agents, etc)

Brief Description:• Parties complete post switch admin to facilitate billing the customer and completion of the switch from Supplier A to Supplier B

Key Scenarios• Scenario 1 is a dual fuel domestic customer with SMETS2 credit meter. Transfer proceeds smoothly i.e there is no objection, rejection and the 

customer does not invoke cooling‐off

Actors• Customer• Supplier A – Losing Supplier• Supplier B – Gaining Supplier• Registration Agent• Supplier Agents (MOP, MAM, MAP, DC, DA) • Data Communications Company (DCC)• Network Operators (gas and elec)

Preconditions• Switch date has passed and Gaining Supplier has configured meter

Post Conditions• Customer

• Closing and opening statements received (which may include a bill)• Gaining Supplier

• Supplier agents selected• Internal systems updated• Accurate opening statement sent

• Losing Supplier• Accurate final statement issued • Agents selected

• Supplier Agents (MOP, MAM, DC, DA)• Internal systems updated with MTD, consumption data invoicing details and opening meter read captured (electricity only)

• Network Operator• Opening read recorded and processed (gas only)

15/04/2016 14

Level 2 – Customer Switching – Scenario 1

1.6 Process cooling off request (not applicable) 

1.2 Complete Supplier checks and request 

switch 

1.1 Complete pre contract activities 1.3 Register switch

1.5.4 Final and opening statements sent and received

L1

L2

15/04/2016 15

Complete post switch admin (billing, agents, etc)

1.5 Complete post switch admin (billing, agents, 

etc.)

1.5.2. Collect any additional information required to manage 

customer account

1.5.3 Validate CoSmeter reading

1.4 Execute switch

Level 2 – Customer Switching – Scenario 1

Notes :• A dashed line indicates actions that are optional but that individual actors may 

undertake as part of their internal processes. These steps have been included to provide context to activities prescribed by the switching arrangements.   

Business Process Design Team Customer Switching –

Process Mapping Conventions SUBJECT: Level 3 Process Mapping Conventions

TOM Ref:

Author Kevin Mettam

Version 0.3

Agreement Date

Approver

04/02/2016 1

Brief Description This document sets out the conventions adopted within the Business Process Design Level 3 Process Maps. The actions shown in the TPI, Supplier (old and new) and customer swim lanes are deliberately generic. We recognise that individual actors will wish to design their internal processes to meet their specific business requirements. The generic processes are included to provide context to activities that will be prescribed by the switching arrangements. Symbol Legend • Colour – The colour of a Rectangle or Diamond can indicate the fuel type that has an association to the action or decision

• Circle – Indicates where to begin and a finishing point of the process

• Rectangle – Indicates a process, task, action, or operation. Text in the rectangle should include a verb

04/02/2016 2

Reference

Action

Customer Switching – Process Mapping Conventions

Gas and elec

Gas only

Elec only

Finish

Begin

Symbol Legend • Rectangle (shadow) – Indicates a process that requires more than one actor from the same actor type. For example both old and new Data Collector

• Diamond – Indicates a decision or choice that is required

• Connector – Indicates the direction that the process flows. If the connector originates from a Diamond (decision), it will include text to indicate the different ‘Yes’ or ‘No’ option

• Connect Shape – Used in conjunction with connections, indicates a continuation of a process from/to another page or if necessary the same page

• Clock – Indicates a time constraint relevant to a process

04/02/2016 3

Customer Switching – Process Mapping Conventions

Decision

Direction

Origin

Question

Destination

Swim Lane Legend (order of appearance is relative to ALL Level 3 diagrams) • TPI

• Third Party Intermediaries include switching websites, energy brokers and energy efficiency advice providers who interact with energy customers

• Old Supplier

• The supplier that is losing the right to supply gas and/or electricity at a supply point

• Customer

• The person(s) contracting with a supplier in relation to the supply of gas and/or electricity at a supply point

• New Supplier

• The supplier that is taking over the supply of gas and/or electricity at a supply point

04/02/2016 4

Customer Switching – Process Mapping Conventions

Swim Lane Legend • Registration Service

• CRS – Centralised Registration Service is a future service to be procured and run by the DCC to facilitate switching at gas and electricity premises, designed to be used by authorised users and will also support the provision of on-line data enquiry services to defined market participants in relation to the switching process

• Supplier Agents (the actions that appear in this swim lane do not refer to ALL supplier agents – please refer to the specific description)

• MOP – Meter Operator is responsible for installing and maintaining electricity meters • MAM – Meter Asset Manager is responsible for installing and maintaining gas meters • MAP – Meter Asset Provider owns and leases metering equipment to suppliers and consumers • DC - Data Collector is appointed by suppliers to retrieve and validate metering data and forward it to the Data Aggregator • DA – Data Aggregator is involved in the electricity settlement process, appointed by a supplier to package up consumption data • Shipper - Gas Shipper arranges for gas to be delivered across a Gas Transporters network on behalf of its contracted Gas Supplier

• DCC

• Manages the data and communications network to connect smart meters to the business systems of energy suppliers, network operators and other authorised service users of the network

• Network Operator

• DNO - Distribution Network Operators own and operate the distribution network that brings electricity from the national transmission network to customers

• iDNO – Independent Distribution Network Operators own and operate local electricity networks that deliver electricity to consumers GT – Gas Transporters own and operate the distribution network that brings gas from the national transmission network to customers

• iGT – Independent Gas Transporters own and operate local gas networks that deliver gas to consumers

04/02/2016 5

Customer Switching – Process Mapping Conventions

Customer Switching ‐ 1.1 Complete pre contract activities – Scenario 1     Page 1 of 21Cu

stom

erLosin

g Su

pplier

Gaining

 Sup

plier

Registratio

n Service

Network 

Ope

rator

Supp

lier 

Agen

tsDC

CTP

I

1.1.1,1.1.2,1.1.3 Complete pre contract activities

To1.2

1.1.1.1Request energy 

quote and provide 

necessary data

1.1.1.2Provide quote 

and offer contractual 

terms

Agree with terms?

1.1.1.4Send notification of resolution 

steps

1.1.1.3Agree 

contractual terms and provide 

necessary data

End

YesRe‐submit?

End

1.1.1.5Receive 

notification of resolution steps

NoNo

Yes 

Necessary data provided?

No

Yes

Start

Customer Switching ‐ 1.2 Complete Supplier checks – Scenario 1    Page 2 of 21Losin

g Su

pplier

Gaining

 Sup

plier

Network 

Ope

rator

Supp

lier 

Agen

tsDC

CRe

gistratio

n Service

TPI

Custom

er1.2.1 Complete validation of customer data

1.2.1.1Complete 

validation of customer data

1.2.1.2Add to customer notification of outstanding data/actions

MPXN or address provided?

Switch date feasible?Yes

To1.2.2

Other information 

valid?Yes

No No

Yes

From 1.1.1

Customer Switching ‐ 1.2 Complete Supplier checks – Scenario 1    Page 3 of 21Losin

g Su

pplier

Gaining

 Sup

plier

Network 

Ope

rator

Supp

lier 

Agen

tsDC

CRe

gistratio

n Service

TPI

Custom

er

1.2.2 Carry out credit check

1.2.2.1Carry out credit 

check

To 1.2.3

Meet credit criteria?

No

1.2.2.2Prepare credit 

report

Yes

1.2.2.3Add to customer notification of outstanding data/actions

From 1.2.1

Customer Switching ‐ 1.2 Complete Supplier checks – Scenario 1    Page 4 of 21Losin

g Su

pplier

Gaining

 Sup

plier

Network 

Ope

rator

Supp

lier 

Agen

tsDC

CRe

gistratio

n Service

TPI

Custom

er1.2.3 Carry out Triangulation / validate meter

Premises served address?

MPXN? Meter serial number?Yes Yes

To1.2.4

Confirm customer via CIN test?

Yes Yes

1.2.3.3Add to customer notification of outstanding data/actionsNoNoNo

1.2.3.1 Check enquiry 

service

1.2.3.2Provide required triangulation 

data

From1.2.2

Customer Switching ‐ 1.2 Complete Supplier checks – Scenario 1    Page 5 of 21Losin

g Su

pplier

Gaining

 Sup

plier

Network 

Ope

rator

Supp

lier 

Agen

tsDC

CRe

gistratio

n Service

TPI

Custom

er1.2.4 Notify customer of any additional action required and/or acquire any additional data

1.2.4.1Check and if 

necessary notify customer of any additional action required/acquire additional data

End

1.2.4.3Receive 

notification of  resolution steps

Resolve?

To1.2.5

1.2.4.2 Notify 

outstanding data and actions

No

Outstanding actions/data? No

Yes

To1.2.1 Yes

From 1.2.3

Customer Switching ‐ 1.2 Complete Supplier checks – Scenario 1    Page 6 of 21Losin

g Su

pplier

Gaining

 Sup

plier

Network 

Ope

rator

Supp

lier A

gents

DCC

Registratio

n Service

TPI

Custom

er

1.2.5 Select critical path supplier agents and 1.2.6 Submit registration request with preferred switch date

1.2.5.1Select Gas Shipper

To1.3 

1.2.6.1Submit 

registration request with 

preferred switch date

1.2.5.2 Notify 

acceptance to Gaining Supplier (Gas Shipper) 

From 1.2.4

Customer Switching ‐ 1.3 Register Switch – Scenario 1                        Page 7 of 21

Custom

erLosin

g Su

pplier

Gaining

 Sup

plier

Registratio

n Service

Network 

Ope

rator

Supp

lier 

Agen

tsDC

CTP

I

1.3.1 Validate Registration Request

Yes

No

1.3.1.2Reject 

registration application and notify reasons

1.3.1.3Receive notification of rejection and 

processes

To 1.3.2

Resolve & re‐submit End

Valid content?   Supplier ID valid? 

GD Plan in place?

Proposed switch date 

valid? 

Shipper provided? Yes Yes No Yes

NoNo

No

1.3.1.1Validate 

Registration Request 

Related MPAN checkYes Pass

GD Supplier?

Yes

No

Yes

To1.2.6

From1.2.6

Fail

End

Compile full list of rejection reasons 

All validation steps completed?

Yes 

No 

No 

Customer Switching ‐ 1.3 Register Switch – Scenario 1      Page 8 of 21Cu

stom

erLosin

g Su

pplier

Gaining

 Sup

plier

Registratio

n Service

Network 

Ope

rator

Supp

lier 

Agen

tsDC

CTP

I

1.3.2 Check objection status / register

1.3.2.4Receive notification of objection and 

process

Re‐submit? End

1.3.2.3Decline registration application and notify reason 

Objection present?

To1.2.6

Yes

No

Yes

No

1.3.2.1Check objection status/register

Change of tenancy notified?

No

Yes

From1.3.1

To 1.3.3

Customer Switching ‐ 1.3 Register Switch – Scenario 1     Page 9 of 21Cu

stom

erLosin

g Su

pplier

Gaining

 Su

pplier

Registratio

n Service

Network Ope

rator

Supp

lier A

gents

DCC

TPI

1.3.3 Update records and notify confirmed switch details and switch date

1.3.3.3Process and update 

records

1.3.3.2Receive confirmation of confirmed switch details 

and end date

1.3.3.4Receive confirmation of successful confirmed switch and switch date

1.3.3.6Gas DNO receive confirmation of 

confirmed switch details and switch date

End

1.3.3.10Receive confirmation of confirmed switch details and switch date (Gas 

Shipper)

1.3.3.1Update records and notify confirmed switch details and 

switch date

1.3.3.5Process and update 

records

1.3.3.8Electricity DNO receive 

confirmation of confirmed switch details 

and switch date

1.3.3.11Process and update 

recordsEnd

1.3.3.14Receive confirmation of confirmed switch details 

and switch date 

End

End

1.3.3.7Process and update 

records

1.3.3.9Process and update 

records

From 1.3.2

To 1.3.4

To 1.3.4

To 1.4.1

Customer Switching ‐ 1.3 Register Switch – Scenario 1           Page 10 of 21Cu

stom

erLosin

g Su

pplier

Gaining

 Sup

plier

Registratio

n Service

Network 

Ope

rator

Supp

lier A

gents

DCC

TPI

1.3.4 Notify customer of successful registration and switch date

1.3.4.1Notify customer of 

successful registration and switch date

1.3.4.2Notification of successful registration and switch 

date received 

From 1.3.3

From 1.3.3

1.3.4.3Send leaving 

communication

1.3.4.4Receive leaving communication

End End 

Customer Switching ‐ 1.4 Execute Switch – Scenario 1   Page 11 of 21Cu

stom

erLosin

g Su

pplier

Gaining

 Su

pplier

Registratio

n Service

Network 

Ope

rator

Supp

lier A

gents

DCC

TPI

1.4.1 Registration gate closure 

1.4.1.1Registration gate closure  

To 1.4.3

To 1.4.2

From 1.3.3

Customer Switching ‐ 1.4 Execute Switch – Scenario 1               Page 12 of 21Cu

stom

erLosin

g Su

pplier

Gaining

 Su

pplier

Registratio

n Service

Network Ope

rator

Supp

lier A

gents

DCC

TPI

1.4.2 Close out relationship with meter 

1.4.2.1Obtain meter reading history & any other desired information

From 1.4.1

To 1.4.6

Customer Switching ‐ 1.4 Execute Switch – Scenario 1               Page 13 of 21Cu

stom

erLosin

g Su

pplier

Gaining

 Sup

plier

Registratio

n Service

Network 

Ope

rator

Supp

lier A

gents

DCC

TPI

1.4.3 Update registration from confirmed to active

1.4.3.2Add Gaining Supplier 

details and effective from date

1.4.3.1Update registration from 

confirmed to active

To1.4.4

From 1.4.1

Customer Switching ‐ 1.4 Execute Switch – Scenario 1               Page 14 of 21Cu

stom

erLosin

g Su

pplier

Gaining

 Sup

plier

Registratio

n Service

Network 

Ope

rator

Supp

lier 

Agen

tsDC

CTP

I1.4.4 Update security credentials 

1.4.4.1Inform DCC of successful CoS and provide relevant 

information

1.4.4.2Receive notification of successful CoS and relevant information 

1.4.4.9Security credentials 

updated 

To 1.4.5

1.4.4.3Check supplier is 

registered

1.4.4.10Notify suppliers of security credentials 

update 

1.4.4.11Notification received 

1.4.4.12Notification received 

1.4.4.4Process request 

Check Gaining Supplier registered 

matches

1.4.4.5Respond to DCC

Yes

No

1.4.4.6Reject the request to update security 

credentials

1.4.4.7Notify Gaining 

Supplier

1.4.4.8Gaining Supplier 

notified

Resolve?

No 

Yes

End 

From 1.4.3

End 

Customer Switching ‐ 1.4 Execute Switch – Scenario 1           Page 15 of 21Cu

stom

erLosin

g Su

pplier

Gaining

 Sup

plier

Registratio

n Service

Network 

Ope

rator

Supp

lier A

gents

DCC

TPI

1.4.5 Configure smart meters

1.4.5.1Send service requests 

with the new configuration details to 

the smart meter

1.4.5.2Process service 

requests

To 1.4.6

1.4.5.3New supplier and tariff, etc. displayed on the 

smart meters  

From 1.4.4

Customer Switching ‐ 1.4 Execute Switch – Scenario 1           Page 16 of 21Cu

stom

erLosin

g Su

pplier

Gaining

 Sup

plier

Registratio

n Service

Network 

Ope

rator

Supp

lier A

gents

DCC

TPI

1.4.6 Obtain CoS meter reading

1.4.6.1Obtain CoS meter 

readings

1.4.6.2Validate Cos meter readings in internal 

systems

To1.5.1

From 1.4.5

1.4.6.3Obtain meter 

readings

From 1.4.2

1.4.6.4Send meter readings

Customer Switching ‐ 1.5 Complete post switch admin – Scenario 1     Page 17 of 21Losin

g Su

pplier

Gaining

 Sup

plier

Network 

Ope

rator

Supp

lier A

gents

DCC

Registratio

n Service

TPI

Custom

er

1.5.1 Appoint / De‐Appoint Agents and receive confirmation

1.5.1.6Notify agent identities

To 1.5.2

1.5.1.9 Send agent appointment notifications

1.5.1.10 Receive and validate 

appointment notification

1.5.1.11 Accept 

appointment and update systems

1.5.1.1 Send agent de‐appointment notification

1.5.1.12Send 

appointment acceptance notification

1.5.1.3Accept de‐

appointment and update systems

1.5.1.2Receive and validate de‐appointment notification

1.5.1.4 Send de‐

appointment acceptance notifcation

Accept? Yes

No1.5.1.13 Reject 

appointment 

1.5.1.14 Send 

appointment rejection 

notification

All agents accepted?

1.5.1.7DC, MAM and MOP identity accepted and 

systems updated

Accept? Yes1.5.1.8

Agent details invalid

1.5.1.5Update systems

Yes

From 1.4.6

From 1.4.6

To 1.5.1 No

To 1.5.1

No

Customer Switching ‐ 1.5 Complete post switch admin – Scenario 1  Page 19 of 21Losin

g Su

pplier

Gaining

 Sup

plier

Network Ope

rator

Supp

lier 

Agen

tsDC

CRe

gistratio

n Service

TPI

Custom

er

1.5.3 Validate COS meter reading (gas)

1.5.3.1Send CoS meter 

reading

1.5.3.2Validate CoS meter reading against relevant 

criteria

1.5.3.3Send CoS meter 

reading 

1.5.3.13CoS meter 

reading received

1.5.3.4CoS meter 

reading received

1.5.3.6Send notification of rejected CoS read to Gaining 

Supplier

1.5.3.7Notification of 

rejection received

1.5.3.9Send estimated 

CoS meter reading

1.5.3.11Determine CoS meter reading for billing

1.5.3.8Generate 

estimated CoS meter reading 

CoS meter reading accepted?

No

Yes

End

1.5.3.12Estimated CoS meter reading 

received

1.5.3.10Estimated CoS meter reading 

received

Resolve and resend? No

To1.5.4

To 1.5.4

From 1.5.2

To 1.5.3.1

Yes 

1.5.3.14Determine CoS 

meter reading for billing

Customer Switching ‐ 1.5 Complete post switch admin – Scenario 1      Page 20 of 21Losin

g Su

pplier

Gaining

 Sup

plier

Network 

Ope

rator

Supp

lier A

gents

DCC

Registratio

n Service

TPI

Custom

er

1.5.3 Validate COS meter reading (electricity)

1.5.3.1Send CoS meter 

reading

1.5.3.4DCs validate CoS meter readings against relevant 

criteria

1.5.3.5Send CoS meter 

reading 

1.5.3.2CoS meter 

reading received

1.5.3.6CoS meter 

reading received

1.5.3.8Send notification of rejected CoS read to Gaining 

Supplier

1.5.3.9Notification of 

rejection received

1.5.3.11Send estimated 

CoS meter reading

1.5.3.13Determine CoS 

meter reading for billing

1.5.3.10Generate 

estimated CoS meter reading 

CoS meter reading accepted?

No

Yes

End

1.5.3.14Estimated CoS meter reading 

received

1.5.3.12Estimated CoS meter reading 

received

Resolve and resend? No

To1.5.4

To 1.5.4

From 1.5.2

To 1.5.3

Yes 

1.5.3.15Determine CoS 

meter reading for billing

1.5.3.3Send CoS meter 

reading

1.5.3.7CoS meter 

reading received

Customer Switching ‐ 1.5 Complete post switch admin – Scenario 1          Page 18 of 21Losin

g Su

pplier

Gaining

 Sup

plier

Network 

Ope

rator

Supp

lier 

Agen

tsDC

CRe

gistratio

n Service

TPI

Custom

er1.5.2 Collect any additional information required to manage customer account

1.5.1.1 Collect any 

additional info to manage cust. accounts

1.5.2.3Request / Access 

additional information

Additional information required?

To1.5.3No

1.5.2.2 Assess additional information 

required e.g. meter, old supplier and 

customer details?

1.5.2.5 Provide required 

information

1.5.2.4Provide required 

information

Yes

From 1.5.1

Customer Switching ‐ 1.5 Complete post switch admin – Scenario 1      Page 21 of 21 Losin

g Su

pplier

Gaining

 Sup

plier

Network 

Ope

rator

Supp

lier 

Agen

tsDC

CRe

gistratio

n Service

TPI

Custom

er

1.5.4 Final and opening statement sent and received

1.5.4.1 Send opening statement/bill

1.5.4.2Opening 

statement/bill received

End 

1.5.4.3 Send final 

statement/bill

1.5.4.4Final statement/bill received

End 

From 1.5.3

From 1.5.3