buying performance workshop oct 02 ntc jrtc fue unclassified 10/17/2015 mitas it 02 092704 1

19
Buying Performance Workshop Oct 02 NTC JRTC FUE UNCLASSIFIED 03/22/22 MITAS IT 02 092704 1

Upload: jonas-mckenzie

Post on 01-Jan-2016

214 views

Category:

Documents


0 download

TRANSCRIPT

Buying Performance WorkshopOct 02

NTC

JRTC

FUE

UNCLASSIFIED04/20/23

MITAS

IT 02 092704 1

UNCLASSIFIED

IT 02 092704 2UNCLASSIFIED04/20/23

AGENDA

Introduction

The Customer

System Overview

Contractor Logistics Support (CLS)

• CLS Plan

• Metrics

• Contract Strategy

Summary

UNCLASSIFIED

IT 02 092704 3UNCLASSIFIED04/20/23

One for One Replacement of the Ground TOW 2

(M220A2) System

TOW Improved Target Acquisition System (ITAS)

Modified ITAS (MITAS)

Units Fielded• 82d Airborne Division - 188• 1st IBCT - 27• 101st Airborne Division (AALT)

2/327 IN - 20• TRADOC – 7• 2ID – 40 (Currently)

UNCLASSIFIED

IT 02 092704 4UNCLASSIFIED04/20/23

The “Light” Army: 82d Airborne, 101st Airborne (Air Assault), 25th Infantry Division (Light) (Hawaii), 2ID (Korea), etc.

Rapid, Worldwide Deployability - 18 Hours “Wheels-Up”

• Varied Mission / Enemy - War to Peacekeeping

• Forced-entry - Often Remote Locations

• Limited Support 3-5 Days Later

• Limited Work Areas for Maintenance

• Limited Capacity for Transporting Repair Parts

““The Customer”The Customer”

First to Fight!!!

UNCLASSIFIED

IT 02 092704 5UNCLASSIFIED04/20/23

ITAS Performance ImprovementsITAS Performance Improvements

• Detection & Recognition 2X Current System

• Embedded Training Electronics• Auto Boresight• Improved Probability Of Hit• Eye-safe Laser Range Finder• Platform for TOW and Javelin Missiles

ITAS Support ImprovementsITAS Support Improvements• Reduced Components (Embedded Boresight &

Integrated Sight)• Elimination Of 180 Day Verification Test• BIT/BITE Eliminates Need For Organizational Test

Equipment by Isolating to Component• Modular Design For Accessibility And Reduced

Maintenance• No Special Tools • CLS Incentivizes Contractor Toward 100% OR Rates

4 LRU’s4 LRU’s

Better PerformanceEquals More Kills and

Greater Soldier Survivability

TARGET ACQUISITION SUBSYSTEM INTEGRATED SIGHT

• 2nd GEN FLIR Detector (w/Monitor) - SADA II

• Laser Range Finder• Direct View Optics

FIRE CONTROL SUBSYSTEM

• Embedded Training Cards• Missile Guidance• BIT/BITE

TRAVERSING UNIT MODS

• Brake• Pistol Grip• New TAS Mount• Ground Mounted w/Tripod

POWER SUPPLY/BATTERY BOX

• Dismounted Power• Power Conditioning• Built-In Battery Charger

• ITAS Designed to Improve Performance

• CLS Designed to Increase System Availability and Reduce Ownership Cost

• ITAS Designed to Improve Performance

• CLS Designed to Increase System Availability and Reduce Ownership Cost

System Overview

Time “In the Pits” is Reduced

UNCLASSIFIED

IT 02 092704 6UNCLASSIFIED04/20/23

Detection And Recognition Performance (Moderate Weather)

ITAS 2nd Gen FLIR

RECOGNIZE DETECTID

RECOGNIZE

JAVELIN CLU

DETECTID

TOW 2 AN/TAS-4C

DETECTID RECOGNIZE

The ITAS Performance Story

UNCLASSIFIED

IT 02 092704 7UNCLASSIFIED04/20/23

18 LRUs 6 LRUs

TOW 2TOW 2

No IFTE Van or Any Other Support Equipment For ITAS No IFTE Van or Any Other Support Equipment For ITAS

ITASITAS

ITAS Reduces Support Footprint and Cost

UNCLASSIFIED

IT 02 092704 8UNCLASSIFIED04/20/23

The CLS Performance Story

100% OR

Since Feb 01 on CLS Supported ITAS Components

UNCLASSIFIED

IT 02 092704 9UNCLASSIFIED04/20/23

Infantry Battalions FRA

CLS Execution – A Team Effort

FSBMSB

Raytheon DepotMcKinney, Texas

Field Level MaintenanceMilitary / Contractor Partnership

UNCLASSIFIED

IT 02 092704 10UNCLASSIFIED04/20/23

ITAS Contractor Logistics Support

Support Goal:

To Improve System Availability While Reducing Support Costs

Accomplished By Contracting With the Prime Contractor For:

• Operational Readiness (OR)– Minimum 90%– Incentivized for Greater Than 90%– Penalized For Less Than 90%

• Limited Depot Level Maintenance Facility Collocated With Selected Units

• Free Issue of Repair Parts to Units• Separate Options for Contingencies and Transition to Follow-on

Source

CLS Provides High Operational Readiness (OR)

UNCLASSIFIED

IT 02 092704 11UNCLASSIFIED04/20/23

Organizational (Crew / Operator)Organizational (Crew / Operator)

• PMCS

• BIT/BITE

Soldier Maintainer Retains Normal Direct Support MissionSoldier Maintainer Retains Normal Direct Support Mission

• Trouble Shoots and Repairs System

• Has Spares Loaded As Shop Stock

The Collocated Contractor FRA Functions As a Depot Forward The Collocated Contractor FRA Functions As a Depot Forward and Provides:and Provides:

• Maintenance

• Supply

CLS Is Invisible To the User

ITAS Repair Spares Provided Free As Shop

Stock to FSBs

ITAS CLS

CLS Interfaces with Army Info Systems

No Change For Soldier

UNCLASSIFIED

IT 02 092704 12UNCLASSIFIED04/20/23

TOW 2 Tripod

Only the ITAS Peculiar LRUs Are Supported by CLS Only the ITAS Peculiar LRUs Are Supported by CLS

Common Components (TOW and ITAS) Are Supported the Same As Now Common Components (TOW and ITAS) Are Supported the Same As Now

FCSTASBPS

ITAS SUPPORT PLAN

M1121 HMMWV

Free Issue of Spares and Parts

Unit Purchases Spares

TOW 2 Launch Tube and MSR

• BB-622B/U• NSN 6140-00-928-1943• AN/PPS 5B Radar• 10 hrs. Operation• Requires 4 Batteries

• BB-622B/U• NSN 6140-00-928-1943• AN/PPS 5B Radar• 10 hrs. Operation• Requires 4 Batteries

CCMS Funds and Manages

Batteries

TU

UNCLASSIFIED

IT 02 092704 13UNCLASSIFIED04/20/23

• Collocated in 782d MSB Motor Pool/Shop Area

• Division Provides Facilities, Utilities, Arms Room, and Storage Shelters

• FRA Is 18’x30’, Air Conditioned, and Heated

• Secure Storage for Minimum of 6 TASs and 4 FCSs (103 Ft. Total)

• On Unit’s Load Plan

82d Forward Repair Activity (FRA)

UNCLASSIFIED

IT 02 092704 14UNCLASSIFIED04/20/23

• Bridge Between Peacetime and Contingency OperationsBridge Between Peacetime and Contingency Operations

– Project Manager Owned Spares At FRA

– Sized to Meet Contingency Operations

– Prepackaged, Ready for Deployment, on Unit’s Load Plan

• FRA Controls, Maintains, Preps for DeploymentFRA Controls, Maintains, Preps for Deployment

• Allocated to Deploying Units IAW the Commander’s Allocated to Deploying Units IAW the Commander’s Guidance During N Hour SequenceGuidance During N Hour Sequence

• 2 FAPs Deployed to OEF2 FAPs Deployed to OEF

Fly-Away Package

UNCLASSIFIED

IT 02 092704 15UNCLASSIFIED04/20/23

Operational Readiness = ProfitOperational Readiness = Profit

– $– $

Minimum Profit

Profit Plus Minimum Performance Adjustment

Profit Plus Maximum Performance Adjustment

+ $+ $

85% 85%

90% 90%

95% 95%

100% 100%

80% 80% • Additional Metrics to Prevent “Gaming”• Separate Metrics for Contingency Options

Fixed Price - Performance Adjustment

UNCLASSIFIED

IT 02 092704 16UNCLASSIFIED04/20/23

Additional Metrics Prevent “Gaming”

– 1 Battalion below 90% for 2 consecutive one month reporting periods =

No Award Fee

– Any 1 System down more than 30 days = 50% of Award Fee MAXIMUMMAXIMUM

– 3 Battalions less than 90% (during Award Fee period) = No Award Fee

– Division less 90% for a month = No award fee for that period and Kr

increases spares by N where N is the number of unfilled requisitions

that month

– Division less 90% two consecutive months = No award fee for that

period and Kr spares increase by N2 + 1 where N2 is the number of

unfilled requisitions during month 2

ITAS OR: 99%+ Since Fielding in

1998

Additional CLS Metrics

UNCLASSIFIED

IT 02 092704 17UNCLASSIFIED04/20/23

CLS 5 Year Contract Strategy

Fixed Price Portion of Contract

To

tal

Pri

ce

pe

r Y

ea

r

Contract Price Price per System per Year

FY00 FY01 FY02 FY03 FY04 FY05 FY06$

$$$

Pri

ce

pe

r S

ys

tem

$

$$$

Incentives: $$$$• Fixed Price Contract - Contractor Incentivized to Improve Quality, Efficiency, and Performance. • Operate, Smarter, Better, Faster, and Cheaper. Result = Contractor Profit • Performance Adjustment for Exceptional Effort• Future (Potential) CLS Customers (IBCTs, USMC, FMS)• 5 Year Effort

Major Effort to Organize CLIN Structure to Track Color of Money

UNCLASSIFIED

IT 02 092704 18UNCLASSIFIED04/20/23

MOA Between 82d ABN, CCMS, and Raytheon; Subject: TOW ITAS Maintenance Policy and Procedures; Signed 22 MAR 99 by: 82d COS, DISCOM CDR, CCMS PM, and Raytheon

• Outlines Duties and Responsibilities for 82d FRA• Provides Contractor Command and Control Details• Describes What the Contractor Will Provide and What the 82d Will Provide• Details the Requirements for Deployment of Contractor Personnel

MOA Between 82d ABN and CCMS; Subject: TOW ITAS Policy and Procedures for Determining Readiness Information; Signed 7 MAY 99 by: 82d COS, DISCOM CDR, and CCMS PM

• Describes the Support Raytheon Furnishes to the 82d• Describes How Downtime Is Determined Against the Contractor• 82d Agrees to Provide OR Data to CCMS for Evaluating and Paying Contractor

CLS MOAs With The 82d

UNCLASSIFIED

IT 02 092704 19UNCLASSIFIED04/20/23

FSB / FRA at NTCFSB / FRA at NTC

CLS SuccessfulCLS Successful– To-date 99% OR Rate (Contractor

Performance) On TOW ITAS Items – Contract Metrics Working Well– FRA Deployed with 82d

CLS Well Received by UnitsCLS Well Received by Units

100% OR Since February 2001, 99%

Since FUE in September 1998

TOW ITAS CLS Results

– Valuable Asset– Deployed to OPN

Enduring Freedom

Bottom Line

It Works Well!