LESSONS LEARNT OF CHINA LNG PROJECTS & LNG BUSINESS MODEL Presented for: Lessons Learnt Session BKK PII
Habibie Razak, P. Eng., ASEAN Eng. Project Manager, Indonesia Black & Veatch Energy, OIL & GAS
AGENDA • INTRODUCTION TO B&V PRICO®
TECHNOLOGY
• PROCESS OVERVIEW
• Process Flow Overview
• Inlet Pressure Control
• CO2 Removal
• Dehydration
• Liquefaction
• Refrigeration
• Boil-off Gas
• Regeneration Gas
• Equipment Arrangement
• Utilities Description
AGENDA (cont.)
• OPERATING SYSTEM
• Shutdown
• Restart
• EPC PROJECT EXECUTION STRATEGY
• CHINA LNG BUSINESS DISTRIBUTED
MODEL
• LNG BUSINESS IN THE WORLD, OVERVIEW
• LESSONS LEARNT
• CLOSING REMARKS AND QUESTIONS
INTRODUCTION TO B&V PRICO® TECHNOLOGY
April 2013
BLACK & VEATCH SERVICE AREAS
ENERGY
WATER
TELECOMMUNICATIONS
MANAGEMENT CONSULTING FEDERAL
ENVIRONMENTAL
2
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II,
Ap
ril 2
01
3
6
April 2013 B&V
INTRODUCTION TO B&V PRICO® TECHNOLOGY
•50 YEARS OF LNG LEADERSHIP • 23 Plants in operation • Experienced with SMR, Expander, Cascade, N2
Process • 140 MM Tons LNG • Focus in PRICO® SMR process 18 Plants in Operation 14 new Plants in Engineering/Construction Broad range of sizes (3 to 150 MMSCFD) Covered by 3 US international patents/new
filings • New developments internationally and in US
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II,
Ap
ril 2
01
3
7
April 2013 B&V
INTRODUCTION TO B&V PRICO® TECHNOLOGY
•SMR PROCESS CHARACTERISTICS • Single refrigeration system • Lower equipment count (low cost) • Simplified process operation • Compression can be parallel/series • Flexible with changing feed-stocks • Easy to start-up, shutdown and restart • Systems hold refrigerant when idle • Applied over a broad range of capacities Le
sso
ns
Le
arn
t Se
ssio
n, B
KK
PII
, A
pri
l 20
13
8
April 2013 B&V INTRODUCTION TO B&V PRICO® TECHNOLOGY
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
9
April 2013 B&V
INTRODUCTION TO B&V PRICO® TECHNOLOGY
•ADVANTAGE OF MODERN SMR PROCESS • Versus N2 or Expander Processes 30 – 40 % more efficient Much less steel components and piping Only one compressor, no expander Composition flexibility • Versus C3/MR, DMR or Cascade No series system Can be parallel configuration Much simpler, easy to operate No loss of refrigerant on shutdown
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II,
Ap
ril 2
01
3
10
April 2013 B&V
INTRODUCTION TO B&V PRICO® TECHNOLOGY
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II,
Ap
ril 2
01
3
11
INTRODUCTION TO B&V PRICO® TECHNOLOGY • PRICO® MAIN EXCHANGER (COLD BOX)
April 2013 B&V
Aluminum plate fin exchangers (cores) in parallel
Strictly use external connections
No valves or equipment in cold box
Plate fins are highly efficient and reliable
More than 30+ years of service (no repairs)
More than 100 cores in operation
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II,
Ap
ril 2
01
3
12
April 2013 B&V INTRODUCTION TO B&V PRICO® TECHNOLOGY
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II,
Ap
ril 2
01
3
13
April 2013 B&V INTRODUCTION TO B&V PRICO® TECHNOLOGY
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II,
Ap
ril 2
01
3
14
April 2013 B&V
INTRODUCTION TO B&V PRICO® TECHNOLOGY
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II,
Ap
ril 2
01
3
PROCESS OVERVIEW
16
April 2013 B&V
PROCESS OVERVIEW
• DESIGN BASIS • One of small scale LNG Plant in China is designed to process
960,000 Nm3/day of feed gas to produce a guaranteed 692.86 tons/day of LNG.
• Production of LNG involves removal of CO2, water and
mercury from the natural gas stream, cooling it sufficiently to totally condense the gas, hydrogen flash removal, and then directing the LNG to the storage tanks.
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II,
Ap
ril 2
01
3
17
April 2013 B&V
PROCESS OVERVIEW • DESIGN BASIS
• Treated gas enters the cold box at about 40C LNG, leaves the cold box condensed at -156C and flashes down to -164C in the storage tanks.
• The resulting high-nitrogen flash gas as well as other boil-
off gas is recovered with the BOG compressor and sent back to the cold box for re-liquefaction and nitrogen removal. Re-liquefied BOG is returned to the tank as LNG product while the purged N2 stream is blended into the plant fuel system.
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
18
April 2013 B&V
PROCESS OVERVIEW • The PRICO® Refrigerant system is
specifically tailored to the design gas composition.
• Some components in the gas will freeze at LNG temperatures and must be removed during liquefaction to prevent this.
• Nitrogen and Hydrogen must be specially handled to prevent excess accumulation in the system.
Component Design
(mol %)
Methane (C1) 92.94
Ethane (C2) 3.97
Propane (C3) 0.69
i-C4 0.12
n-C4 0.12
i-C5 0.05
n-C5 0.03
C6 0.09
C7 -
C8 -
C9 -
C10 -
C11 -
Nitrogen1 0.63 (1.2 max)
Hydrogen2 0.01 (0.8 max)
CO23 1.31 (3.0 max)
He -
H2S,mg/Nm3 2.8
, mg/Nm3 -
Benzene 0.0034
Cyclohexane 0.0061
Mcyclohexane 0.0027
Toluene 0.0011
O2 0.000
Mercury4, μg/Nm3 <100
Design Feed Gas Composition 21C & 7.0 Mpag
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
19
April 2013 B&V
PROCESS OVERVIEW
Amine
CO2 Removal Mole Sieve
Dehydration
PRICO ®
Refrigeration
LNG Storage Tank
Liquefaction
Regen Compression
Regen Gas
LNG
FEED Gas
H2-Rich to FG
N2-Rich to FG
Heavies
H2 Removal
N2 Removal
BOG
LNG
To FG
BOG Compression
To Storage
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
Process Flow Overview
21
B&V April 2013
Process Flow Overview
• Inlet Gas Pressure Control
• Feed gas arrives at about 7.0 Mpag and is pressure controlled at approximately this pressure.
• Less refrigeration is required to liquefy a given amount of gas at higher pressures, so in general the higher pressure the better.
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
22
B&V April 2013
Process Flow Overview
• CO2 Removal
• Gas must be treated to <50ppmv CO2 to prevent freezing during liquefaction with Proprietary MDEA Amine-based solvent
• Absorbs Acid Gases (CO2, H2S, etc) as the feed is contacted within a tray tower
• Absorption is reversed by hot stripping vapors in a regenerator tower
• Vapors generated via a steam-heated re-boiler Less
on
s L
ear
nt
Sess
ion
, B
KK
PII
, Ap
ril 2
01
3
23
B&V April 2013
Process Flow Overview CO2 Removal Le
sso
ns
Le
arn
t Se
ssio
n, B
KK
PII
, Ap
ril 2
01
3
24
B&V April 2013
Process Flow Overview
• Mole Sieve Dehydration • Gas must be treated to <0.1 ppmv H2O to prevent freezing during
liquefaction
• Molecular Sieve Adsorbs water at moderate temperatures and releases it at high temperatures
• Regeneration via heated dry feed gas slipstream; regen gas is then cooled, separated, compressed and recycled.
• Dust is removed via after filters
• Mercury can attack the aluminum in the liquefaction process so is removed via a bed of sulfur-impregnated carbon.
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
25
B&V April 2013
Process Flow Overview Mole Sieve Dehydration
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
26
B&V 18 April 2012
Process Flow Overview
• Refrigeration
• Refrigeration process uses a single mixed refrigerant loop compressed by a 2-section centrifugal compressor
• Refrigerant is compressed, partially condensed and sent to the main refrigerant exchanger via vapor pressure and refrigerant pumps
• Chilling occurs when the high pressure refrigerant is let down to low pressure (Joule-Thompson Effect)
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
27
B&V April 2013
Process Flow Overview, Refrigeration Le
sso
ns
Le
arn
t Se
ssio
n, B
KK
PII
, Ap
ril 2
01
3
28
B&V April 2013
Process Flow Overview
• Liquefaction • Heavies are condensed from the feed gas at about -60℃ and removed
to ensure that the LNG equipment will not plug or foul at LNG temperatures.
• Gas is chilled to -156℃ for full liquefaction at the end of the Refrigerant Exchanger.
• H2 is preferentially removed in the Hydrogen Flash via product flash to 0.7Mpag.
• LNG taken from the Hydrogen Flash Drum bottom is routed to the storage tank.
• The compressed boil-off gas from the tank is re-liquefied in the Refrigerant Exchanger. N2 contained in the BOG is removed in the Nitrogen Flash Drum. LNG from the drum is returned to the tank and the N2-rich gas is blended into plant fuel.
• H2-rich gas and N2-rich gas are both warmed by dry treated gas before being blended into the fuel system.
• The startup exchanger is needed during initial startup in order to condense and remove heavies that could otherwise freeze in the colder bottom section of the Refrigerant Exchanger.
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
29
B&V April 2013
Process Flow Overview, Liquefaction Le
sso
ns
Le
arn
t Se
ssio
n, B
KK
PII
, Ap
ril 2
01
3
30
B&V April 2013
Process Flow Overview • Heavies Handling
• Heavies are warmed and partially vaporized in 3 steps using a stream of warm refrigerant liquid from the refrigerant loop. (E-305 HP Heavies Exchanger, E304 LP Heavies Exchanger & E311 Condensate Exchanger.
• The vapor produced in the first vaporization step at V-310 HP Heavies Flash Drum is mixed with the used mole sieve regeneration gas and recycled into the feed using the regeneration gas compressor. Liquid goes on to the next vaporization step (V-311 LP Heavies Flash Drum).
• Vapors from the 2nd and 3rd vaporization steps (from V311 LP Heavies Flash Drum & V-312 Condensate Drum) are blended into the plant fuel system.
• Any remaining heavies liquids are sent to the condensate drum for storage and eventual removal via truck.
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
31
B&V April 2013
Process Flow Overview Heavies Handling
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
32
B&V April 2013
Process Flow Overview
• Refrigerant Storage
• The PRICO refrigerant is a mixture of nitrogen and hydrocarbons that is optimized for a given feed gas composition.
• It is therefore important to store these separate components on-site to make composition adjustments to the loop as needed.
• Liquid refrigerants (ethylene V402, propane V403, iso-pentane V404) are stored in vessels on-site
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
33
B&V April 2013
Process Flow Overview
• Refrigerant Storage
• Storage is also provided for any excess refrigerant mixture in the loop; this can be saved for later use.
• Refrigerant is introduced via a small slipstream of hot refrigerant from the compressor discharge.
• For methane makeup, feed gas may generally be used if the hydrogen content is low. If the feed H2 content is high, LNG may be used to limit accumulation of H2 in the loop.
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
34
B&V April 2013
Process Flow Overview Refrigerant Storage
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
35
B&V April 2013
Process Flow Overview
• Boil-Off Gas Handling
• Boil-off and flash gas from the tank and loading truck loading system is combined and compressed
• BOG compressor is an oil-flooded screw compressor for high turndown capabilities
• The BOG cross exchanger is used to ensure non-cryogenic operation of the compressor.
• The compressed BOG is returned back to the Refrigerant Exchanger to be re-liquefied to LNG and purged of excess nitrogen
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
36
B&V April 2013
PFD Review BOG Compression Le
sso
ns
Le
arn
t Se
ssio
n, B
KK
PII
, Ap
ril 2
01
3
37
B&V April 2013
Process Flow Overview LNG Storage
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
Equipment Arrangement
39
B&V April 2013
Project Plot Plan
Process Facility
LNG Storage
Flare
LNG Loadout
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
40
B&V April 2013
Liquefaction Area Equipment Layout
Amine System
Dehydration
Refrigerant Storage
BOG/Regen Compressors Refrigeration /Liquefaction
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
41
B&V April 2013
Process Area Equipment Elevation
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
Utilities Description
•Fuel Gas
•Flare
•Nitrogen
• Instrument Air
•Water
43
B&V April 2013
Fuel Gas
• Fuel Gas is supplied from a variety of sources.
H2-Rich Vapor from V-308 Hydrogen Flash Drum/E-309 Hydrogen Flash Heater
N2-Rich Vapor from V-309 Nitrogen Flash Drum/E-310 Nitrogen Flash Heater
Heavies Flash Vapor from V-311 Heavies Flash Drum
Heavies Flash Vapor from V-312 Condensate Drum
• Inlet feed gas may be used as a makeup supply to the fuel gas header
• Fuel gas is used in the following places;
• Steam Boiler
• Regeneration Gas Heater
• Flare tip & Flare header sweep
• Pad gas or sweep gas to various vessels.
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
44
B&V April 2013
Flare • Both a Cold Flare Header and Warm Flare Header are provided in the
plant.
• Relief valves and manual drains in refrigerant and cryogenic services discharge to the cold flare header.
• Relief valves and manual drains of amine system, dehydration and regeneration gas system discharge to the warm flare header.
• The outlet of DCS controlled depressuring valve downstream of the F202 A/B dust filters are connected to the cold flare header. This is used if the feed-gas is not meeting CO2 & H2O level before going to the cold-box.
• The outlet of DCS controlled depressuring valve on the V-301 refrigerant suction drum overhead are connected to the cold flare header. This is used if the suction pressure of the refrigerant compressor is higher than design pressure.
• Flare headers are provided with purges (fuel gas) to keep air from infiltrating into the flare headers and potentially resulting in a flammable mixture of hydrocarbons and air within the piping system.
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
45
B&V April 2013
Flare
• The cold/warm flare knockout drums, are located in the flare headers to trap liquids.
• The headers should be sloped so that the flare knockout drums are
the low point in the system and everything else free drains to the drums.
• The drums keep liquids from accumulating in the flare headers
resulting in liquids being entrained up the flare stack during a high flow case, potential high backpressure in the flare system, and/or entrained liquids “raining” to grade around the stack.
• An electric heater is located in the cold KO drum to weather off the
liquids to the flare.
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
46
B&V 18 April 2012
Nitrogen • Nitrogen is supplied at 0.6 Mpag. • There are two sources for nitrogen:
• Plant PSA nitrogen system for general utility use • Vaporized liquid nitrogen for refrigerant makeup and other dry
services • The nitrogen headers supply nitrogen for
• Refrigerant makeup • Compressor seal purges • Refrigerant Exchanger insulation space purge • Other miscellaneous purging services • Utility Stations • Start-Up purging and drying
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
47
B&V 18 April 2012
Instrument Air
• Instrument air is provided at 0.6 Mpag • IA is compressed air that has been dried to a -40°C
dewpoint for use in moisture sensitive services • The instrument air system supplies dry air to:
• Control actuators • Utility stations in the plant • Flare system
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
48
B&V April 2013
Demineralized Water
• Usually treated on site via filtration and reverse osmosis and stored
in a plastic, FRP or SS tank • Used where the natural mineral content of local water can lead to
poor performance or corrosion • Demineralized water is used for water make-up in:
• Steam boiler – to help maintain proper chemical concentrations • Lean amine surge drum – to replace water lost in saturated
treated feed gas • Amine storage tank – to dilute neat amine to a manageable
consistency
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
OPERATION SYSTEM
Shutdown
51
B&V April 2013
Shutdowns
• Utilities
• Support Systems (Flare and Fuel Gas)
• CO2 Removal (Amine System)
• Dehydration (Mol Sieve)
• Liquefaction
• Refrigerant
• Plant Isolation
• Unplanned Shutdowns
• Emergency Shutdowns
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
52
B&V 18 April 2012
Shutdowns Cause and Effect Diagram
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
53
B&V April 2013
Shutdowns
EXTENDED REFRIGERANT LOOP SHUTDOWN
• For shutdowns, unless maintenance is planned or the system will require opening, the refrigerant can remain in the system and may be allowed to warm to ambient temperature, as the system design pressures will accommodate this condition.
• However, if maintenance requires access to the refrigeration loop, it is desirable to de-inventory to V-401 Refrigerant Make-up Tank and save as much refrigerant as possible prior to opening the system.
• If only working on a single piece of equipment, isolate and drain that equipment and associated piping only, and keep refrigerant in the rest of the system. Le
sso
ns
Le
arn
t Se
ssio
n, B
KK
PII
, Ap
ril 2
01
3
54
B&V April 2013
Shutdowns
UNPLANNED
• Unplanned shutdown may be initiated by:
• In the control room or in the field, operators may initiate an emergency shutdown (SIS trip) from switches in the control room or in the field in the event of a catastrophic fire, explosion or uncontrolled release of hazardous materials to atmosphere
• An emergency shutdown will be activated automatically on plant power failure, instrument air failure, or one of several abnormal process conditions listed in the Cause and Effect Diagram.
• For unplanned shutdown responses of the systems, refer to the plant Cause and Effect Diagram.
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
55
B&V April 2013
Shutdowns
UNPLANNED
• If any equipment in the unit shuts down, operators should attend to the following items:
• Discontinue NG feed if necessary to prevent untreated NG
from entering downstream equipment.
• Verify that all levels and pressures have been properly maintained, all valves are in their proper positions, alarms and shutdowns have cleared, and no personnel are in an area that might be a hazard to themselves or the equipment.
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
Restart
57
B&V April 2013
Restart
• General
• Amine System
• Utility System
• Dehydration
• Refrigeration
• Liquefaction
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
58
EPC PROJECT EXECUTION STRATEGY
59
April 2013 B&V
PROJECT EXECUTION STRATEGY
• Black & Veatch provide total Engineering, Procurement, Construction (EPC) for all projects.
• We work with local contractors to execute the construction led by construction management team including to provide all pre-commissioning, commissioning, start-up services to hand over a complete operating facility.
• Engineering Stage
• B & V provide engineering services starting with Front-End Engineering Design (FEED) to Detailed Engineering Design (DED) for whole packages with:
Process Engineering Civil & Structural Engineering Rotating Equipment & Piping Engineering Instrument & Control Engineering Scheduling & Cost Estimates
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
60
April 2013 B&V
PROJECT EXECUTION STRATEGY
• Procurement Stage Typical LNG Plant, major equipment and materials are
procured from and contracted to several vendors/contractor/suppliers managed by project manager of Black & Veatch Brazed Aluminum Heat Exchanger (BAHE) or Cold-box
supplied by multiple qualified vendors The refrigerant compressor complete with gear-box and
driver supplied as one package by qualified vendors having experiences in handling refrigerant components. Their scope is to include technical assistance and commissioning.
BOG compressor, regeneration gas compressor and/or recycle gas compressor sourced from qualified vendors.
Dehydration, amine treating package supplied by packagers delivering with or without pre-assembled skids including technical assistance during installation until commissioning
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
61
April 2013 B&V
PROJECT EXECUTION STRATEGY • Procurement Stage (Continued) Carbon steel & stainless steel for pressure vessels, heat
exchangers, condensers, and any associated drums supplied and fabricated by respective vendors. Preferred to go with local fabricators subject to vendor surveillance program conducted by construction and procurement team.
Piping bulk materials including carbon and stainless steel pipe including fittings supplied by certified manufacturers as per the international standards and codes such as ASME, ANSI, etc.
Valves and special cryogenic materials supplied by trusted manufacturers as per the international standards.
All utility system comprised demineralization package, nitrogen packages, flare system, emergency power, consumable storage, instrument air, office, DCS, fire protection system supplied by different reputable vendors.
LNG tank materials & loading system supplied by reputable vendors.
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
62
April 2013 B&V PROJECT EXECUTION STRATEGY • Construction Stage Construction manager & team provided construction work
breakdown structure along with the schedule development to run the project on site.
There are several main scope of works can be decomposed to work breakdown structure (WBS) for LNG Plant Project 1. Inlet gas compression 2. Amine treating package 3. Dehydration system 4. Liquefaction system 5. Refrigerant make-up 6. Boil off gas compression 7. Regeneration gas compression 8. Flare system 9. Utility system 10.LNG tank 11.Buildings 12.Transfer System
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
63
April 2013 B&V PROJECT EXECUTION STRATEGY • EXMAR PROJECT, AN EPC PROJECT
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
64
April 2013 B&V PROJECT EXECUTION STRATEGY • EXMAR PROJECT, AN EPC PROJECT
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
65
B & V April 2013
EXMAR LNG Barge
32
66
April 2013 B&V PROJECT EXECUTION STRATEGY • EXMAR FLSRU PROJECT Black & Veatch has been a pioneer in the LNG industry since
1960s and provide EPC for topsides liquefaction equipment & packages using its patented PRICO® LNG technology.
Black & Veatch also provide on site commissioning and start-up Once the EXPORTTM has been built, it will be towed from China
to Colombia where it will be owned and operated by EXMAR for Pacific Rubiales Corporation.
The project is on progress for fabrication and expected to finish on 4th quarter of 2014. The fabrication is located in Zhang Jia Gang, 2 hours by land from Shanghai
Wison offshore & Marine Ltd is delivering overall EPCI to EXMAR. Headquartered in Shanghai, Wison is constructing the facility through its wholly owned fabrication facility in Nantong, China
A global Black & Veatch team working from offices in several countries supporting Wison on this project
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
67
April 2013 B&V PROJECT EXECUTION STRATEGY • Project Organization Chart
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
Project Owner/Client
Project Manager
Site Management
QA/QC
National/Local Contractor
Scheduler
Local Procurement
Commissioning & Start-up
Process Engineer
Civil/Structural Engineer
Rotating/Piping Mechanical Eng
Electrical Engineer
Instrument & Control Engineer
Project Control & Scheduler
Engineering & Project Support
Construction
Procurement
Procurement Services
Purchase Orders
Vendor Qualification
Traffic & Logistics
Expediting
68
April 2013 B&V PROJECT EXECUTION STRATEGY • EPC Project Responsibilities B & V manages the entire scope of works as the EPC
contractor to coordinate the design, procurement & construction performed by B&V and partners including all contractors and suppliers who are working for project. A typical project would include the following: Perform engineering design internally within B&V engineers
comprised multidiscipline of engineering to meet the standard and specification.
Review the design package from each vendor and identify the interfaces and interconnections among them. Project Manager to ensure there are no missed items.
Manage and coordinate with B & V construction. management team during construction, commissioning and start-up stage.
Management of subcontractors and suppliers to ensure that all works are completed to the specifications and meeting B & V EHS policy and regulation.
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
69
April 2013 B&V PROJECT EXECUTION STRATEGY • EPC Project Responsibilities (Continued) B & V manages the entire scope of works as the EPC
contractor to coordinate the design, procurement & construction performed by B&V and partners including all contractors and suppliers who are working for project. A typical project would include the following: Project management to meet planned schedules and within
the agreed financial budgets. Ensure financial controls are in place and provide reporting
via project controls officer that reflects the status of each cost center under project manager’s control.
Complete reviews of projects to ensure engineering, risk management, QA/QC are all being attained and kept to the minimum standard.
Procure major equipment to ensure all these equipment are complying with standard and specification.
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
70
CHINA LNG DISTRIBUTED MODEL
71
April 2013 B&V CHINA LNG DISTRIBUTED MODEL Le
sso
ns
Le
arn
t Se
ssio
n, B
KK
PII
, Ap
ril 2
01
3
72
April 2013 B&V CHINA LNG DISTRIBUTED MODEL Le
sso
ns
Le
arn
t Se
ssio
n, B
KK
PII
, Ap
ril 2
01
3
73
LNG BUSINESS IN THE WORLD; OVERVIEW
74
April 2013 B&V LNG BUSINESS IN THE WORLD, OVERVIEW
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
75
April 2013 B&V LNG BUSINESS IN THE WORLD, OVERVIEW
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
76
• Diesel substitution
UP to 65%
• V16 engine
• 4500 HP
• Multiple point injection
Method .
LNG BUSINESS IN THE WORLD, APPLICATION OF LNG
77
• Diesel substitution
Up to 65% .
• 6 cylinders in line / 210 Hp .
• Fumigation Method .
LNG BUSINESS IN THE WORLD, APPLICATION OF LNG
78
• TO CONVERT THE LARGEST DIESEL ENGINES THAT WILL REMAIN UNDER OPERATION .
LNG BUSINESS IN THE WORLD, APPLICATION OF LNG
79
1. Dump Truck
2. Tug Boat
LNG BUSINESS IN THE WORLD, APPLICATION OF LNG
80
WHAT IS DUAL FUEL
• DUAL FUEL MEANS :
• A mixture of two fuels at the same time.
• Natural Gas fuel is introduced into the diesel engine
combustion chambers and becomes the main fuel .
• A portion of diesel is required for the ignition and
lubrication process .
LNG BUSINESS IN THE WORLD, APPLICATION OF LNG
81
Investment depends on
• Engine Size & number of cylinders
• Method : Fumigation or multiple points injection
• Level of required protection and monitoring
• Amount of LNG to be carried onboard
Savings depends on
• Diesel oil price .
• LNG price .
• Operation cycles .
• Diesel per MMBTU @ +/- 28 US$
• LNG per MMBTU FOB PT Badak NGL for example @ +/- 12US$
LNG BUSINESS IN THE WORLD, APPLICATION OF LNG
82
LESSONS LEARNT
83
April 2013 B&V LESSONS LEARNT SMR PRICO® offer modular concept with more flexibility. SMR technology fits well across a broad range, offshore &
onshore. In term of EPC work, PRICO® LNG technology is easy to
build since the equipment layout is consistent therefore the project can be done properly and on timely manner.
LNG is becoming competitively to substitute diesel (USD 12 – 14/MMBTU versus USD 28 – 30/MMBTU)
Non-traditional uses for LNG: Distributed LNG Vehicle fuels LNG in China is used for domestic need, NO EXPORTS. B & V experienced and capable to undertake lump sump
EPC projects with proven track records.
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13
84
B&V April 2013
QUESTIONS?
1. Quo Vadis Indonesia in term
of Energy Policy Strategy?
2. Can we get more VALUE ADDED?
3. Where are we (PII)?
Less
on
s L
ear
nt
Sess
ion
, BK
K P
II, A
pri
l 20
13