Water Management Improvement Project 75362 Project ID: P040712 Implementing Agency: BWDB Original Revised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Central Zone, BWDB, Dhaka 1 BWDB: WMIP/SIMT/ MYM/W -1 Re-excavation of Sutia khal from km .000- 6.120, Goraikuthi khal from km 0.000- km.7.680, Lakri beelar khal from km. 0.000- km.3.520, Dublakurir khal from km 0.000 -1.193 (U/S of Dublakuri WCS) Km.0.000- km.3.378( D/S of Dublakuri WCS) kachua khal from km.0.000- km.0.800 total = km 22.691 in Dublakuri Katakhali sub- project in Upazilla Mymensingh Sadar and Muktagacha, district mymensingh in connection with Water Management Improvement Project (WMIP)during 2011- 2012 km. No. Drainage channel = 22.70 km. (P) Water Control structure = 2 Nos. (P) 140.00 NCB/OTM PPA /BG No *Jan '12 Feb '12 Feb '12 Feb '12 May'12 Jun '12 M/S Mamun Enterprise 2 BWDB: WMIP/ OMPI/ MYM/W -2 Re-excavation of 7.095 Bannyarl khal, including repair of Bannyar khal regulator in Bannyar khal Sub project in Upazilla Muktagacha, District Mymensingh under Water Management Improvement Project (WMIP) during 2011- 2012. km. No. Drainage channel = 7.00 km. (P) Water Control structure = 1 No. (P) 80.00 NCB/OTM PPA /BG No Jan '12 Feb '12 Feb '12 Feb '12 May'12 Jun '12 AKM Abdul Kuddus Shaikh 3 BWDB: WMIP/OMPI/ MYM /W-3 Re-excavation of Bokabeel khal, Kuiser khal and Godar khal, total 5.720 km. including repair of Bokabeel Regulator under Bokabeel Sub project in Upazilla Trishal, District Mymensingh under Water Management Improvement Project (WMIP) during 2011- 2012. km. No. Drainage channel = 6.00 km. (P) Water Control structure = 1 No. (P) 60.00 NCB/OTM BG No Jan '12 Feb '12 Feb '12 Feb '12 May'12 Jun '12 Md.Eunus & Brothers Quantity Estimated Price in Tk. (Lac) (Actual Contract price in Contract Currency) Mymenshingh O&M Division BWDB: Procurement Plan for Works: WMIP (S-1) 2011-2012 IDA Credit # 4359 BD and the Netherlands Trust Fund Number TF 094800 Unit Planned Date of invitation of Tender (Date of receipt) Planned Date of Contract signing (Actual date of Contract signing) Planned Date of completion (Actual date of completion) Name of Contractor Contract Package Number Sl. No. Prog. of Proc.as of Feb, 2011 (Physical %/ Fin. Lac Tk.) Name of Work Procedure /Method PPA/BG Prior Review (Yes / No) Planned Date of Bid Evaluation ( Actual Evaluation completion date) Page 1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Upload: phungnhu

Post on 22-May-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BWDB: Procurement Plan for Works: WMIP (S-1) 2011 … excavation of i) Andijuri khal ii) jamaipara khal total 2.930 km. including repair of 1) Bahatra regulator 2)Chullar khal regulator,

Water Management Improvement Project 75362Project ID: P040712

Implementing Agency: BWDB

Original Revised

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Central Zone, BWDB, Dhaka

1 BWDB: WMIP/SIMT/

MYM/W -1

Re-excavation of Sutia khal from km .000- 6.120,

Goraikuthi khal from km 0.000- km.7.680, Lakri

beelar khal from km. 0.000- km.3.520, Dublakurir

khal from km 0.000 -1.193 (U/S of Dublakuri

WCS) Km.0.000- km.3.378( D/S of Dublakuri

WCS) kachua khal from km.0.000- km.0.800 total

= km 22.691 in Dublakuri Katakhali sub- project in

Upazilla Mymensingh Sadar and Muktagacha,

district mymensingh in connection with Water

Management Improvement Project (WMIP)during

2011- 2012

km.

No.

Drainage

channel =

22.70 km. (P)

Water Control

structure = 2

Nos. (P)

140.00 NCB/OTM PPA /BG No *Jan '12

Feb '12

Feb '12 Feb '12

May'12

Jun '12 M/S Mamun

Enterprise

2 BWDB: WMIP/ OMPI/

MYM/W -2

Re-excavation of 7.095 Bannyarl khal, including

repair of Bannyar khal regulator in Bannyar khal

Sub project in Upazilla Muktagacha, District

Mymensingh under Water Management

Improvement Project (WMIP) during 2011- 2012.

km.

No.

Drainage

channel = 7.00

km. (P)

Water Control

structure = 1

No. (P)

80.00 NCB/OTM PPA /BG No Jan '12

Feb '12

Feb '12 Feb '12

May'12

Jun '12 AKM Abdul

Kuddus

Shaikh

3 BWDB: WMIP/OMPI/

MYM /W-3

Re-excavation of Bokabeel khal, Kuiser khal and

Godar khal, total 5.720 km. including repair of

Bokabeel Regulator under Bokabeel Sub project in

Upazilla Trishal, District Mymensingh under Water

Management Improvement Project (WMIP) during

2011- 2012.

km.

No.

Drainage

channel = 6.00

km. (P)

Water Control

structure = 1

No. (P)

60.00 NCB/OTM BG No Jan '12

Feb '12

Feb '12 Feb '12

May'12

Jun '12 Md.Eunus &

Brothers

Quantity Estimated

Price in Tk.

(Lac)

(Actual

Contract

price in

Contract

Currency)

Mymenshingh O&M Division

BWDB: Procurement Plan for Works: WMIP (S-1) 2011-2012IDA Credit # 4359 BD and the Netherlands Trust Fund Number TF 094800

Unit Planned

Date of

invitation

of Tender

(Date of

receipt)

Planned

Date of

Contract

signing

(Actual

date of

Contract

signing)

Planned

Date of

completion

(Actual date

of

completion)

Name of

Contractor

Contract Package

Number

Sl.

No.

Prog. of

Proc.as of

Feb, 2011

(Physical %/

Fin. Lac Tk.)

Name of Work Procedure

/Method

PPA/BG Prior

Review

(Yes / No)

Planned

Date of Bid

Evaluation

(Actual

Evaluation

completion

date)

Page 1

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: BWDB: Procurement Plan for Works: WMIP (S-1) 2011 … excavation of i) Andijuri khal ii) jamaipara khal total 2.930 km. including repair of 1) Bahatra regulator 2)Chullar khal regulator,

Original Revised

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Quantity Estimated

Price in Tk.

(Lac)

(Actual

Contract

price in

Contract

Currency)

Unit Planned

Date of

invitation

of Tender

(Date of

receipt)

Planned

Date of

Contract

signing

(Actual

date of

Contract

signing)

Planned

Date of

completion

(Actual date

of

completion)

Name of

Contractor

Contract Package

Number

Sl.

No.

Prog. of

Proc.as of

Feb, 2011

(Physical %/

Fin. Lac Tk.)

Name of Work Procedure

/Method

PPA/BG Prior

Review

(Yes / No)

Planned

Date of Bid

Evaluation

(Actual

Evaluation

completion

date)

4 BWDB: WMIP/ OMPI/

MYM/W-4

Re- excavation of i) Andijuri khal ii) jamaipara khal

total 2.930 km. including repair of 1) Bahatra

regulator 2)Chullar khal regulator, 3) Suktajuri

regulator 4) Andijuri regulator and 5) Jamaipara

regulator under Suktajuri Pilot scheme Upazilla

Bhalukal, District Myensingh in connection with

Water Management Improvement Project WMIP

during the FY 2011-2012.

km.

No.

Drainage

channel = 3.00

km. (P)

Water Control

structure = 5

No. (P)

60.00 NCB/OTM PPA /BG No Jan '12

Feb '12

Feb '12 Feb '12

May'12

Jun '12 M/S Fair

Constructio

n

Sub-Total 340.00

Page 2

Page 3: BWDB: Procurement Plan for Works: WMIP (S-1) 2011 … excavation of i) Andijuri khal ii) jamaipara khal total 2.930 km. including repair of 1) Bahatra regulator 2)Chullar khal regulator,

Original Revised

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Quantity Estimated

Price in Tk.

(Lac)

(Actual

Contract

price in

Contract

Currency)

Unit Planned

Date of

invitation

of Tender

(Date of

receipt)

Planned

Date of

Contract

signing

(Actual

date of

Contract

signing)

Planned

Date of

completion

(Actual date

of

completion)

Name of

Contractor

Contract Package

Number

Sl.

No.

Prog. of

Proc.as of

Feb, 2011

(Physical %/

Fin. Lac Tk.)

Name of Work Procedure

/Method

PPA/BG Prior

Review

(Yes / No)

Planned

Date of Bid

Evaluation

(Actual

Evaluation

completion

date)

5 BWDB: WMIP/ OMPI/

KISHORE/W-1

Re-excavation of 4.100 km Adampur khal,

including repair of Adampur regulator in Adampur

Sub-project in Upazilla Katiadi, District Kishoregonj

under Water Management Improvement Project

(WMIP) during 2011- 2012.

km.

No.

Drainage

channel =

4.100 km. (P)

Water Control

structure = 1

No. (P)

80.00 NCB/OTM PPA /BG No Jan '12

Feb '12

Feb '12

Mar'12

Feb '12 Jun '12 M/S Mamun

Enterprise

6 BWDB: WMIP/ OMPI/

KISHORE/W-2

Re-excavation of khal total 8.785 km including

repair of Gazaria khal regulator of Gazaria Beel

Scheme.

80.00 NCB/OTM PPA /BG No Jan '12

Feb '12

Feb '12

Mar'12

Feb '12 Jun '12 Shahil

Enterprise

7 BWDB: WMIP/ SIMT/

KISHORE/W-3

Re-sectioning of embankment in between km

0.000 to km 12.000 total 8.80 Km repair of 2 no.

WCS in Charfaradi Jungalis sub project in

connection with Water Management Improvement

Project WMIP during the FY 2011-2012.

km.

No.

Embankment =

10.500 km. (P)

300.00 NCB/OTM PPA /BG No Jan '12

Feb '12

Feb '12

Mar'12

Feb '12 Dec'12 Md.Eunus &

Brothers

Sub-Total 460.00

Netrakona O&M Division

BWDB: WMIP/ SIMTI/

NETRA/W-1

8 Lot No. BWDB:

WMIP/ SIMTI/

NETRA/W-1A

Re-sectioning of Embankment from km 0.000 to

km 13.300 Total 13.000 km in Thakurakuna Flood

Control and Drainage Improvement Project under

Upazilla Netrakona Sadar, District Netrakona in

connection with Water Management Improvement

Project (WMIP) during 2011- 2012.

km.

No.

Embankment =

13.300 km. (P)

Water Control

structure = 3

No. (P)

210.00 NCB/OTM PPA /BG No Jan '12

Feb '12

Feb '12 Feb '12

May'12

Dec'12 Md.Eunus &

Brothers

Kishoreganj WD Division

Page 3

Page 4: BWDB: Procurement Plan for Works: WMIP (S-1) 2011 … excavation of i) Andijuri khal ii) jamaipara khal total 2.930 km. including repair of 1) Bahatra regulator 2)Chullar khal regulator,

Original Revised

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Quantity Estimated

Price in Tk.

(Lac)

(Actual

Contract

price in

Contract

Currency)

Unit Planned

Date of

invitation

of Tender

(Date of

receipt)

Planned

Date of

Contract

signing

(Actual

date of

Contract

signing)

Planned

Date of

completion

(Actual date

of

completion)

Name of

Contractor

Contract Package

Number

Sl.

No.

Prog. of

Proc.as of

Feb, 2011

(Physical %/

Fin. Lac Tk.)

Name of Work Procedure

/Method

PPA/BG Prior

Review

(Yes / No)

Planned

Date of Bid

Evaluation

(Actual

Evaluation

completion

date)

Lot No. BWDB:

WMIP/ SIMTI/

NETRA/W-1B

Re-excavation of drainage channel (MD-1, MD-2 &

MD-3) total 6.25 km of & repair of 3 no. regulator in

Thakurakuna Flood Control and drainage

Improvement Project in connection with Water

Management Improvement Project (WMIP) during

2011- 2012

Drainage

channel =

6.250 km. (P)

104.00 NCB/OTM PPA /BG No Jan '12

Feb '12

Feb '12 Feb '12

May'12

May '12 M/S Belabo

Traders

Sub-Total 314.00

Page 4

Page 5: BWDB: Procurement Plan for Works: WMIP (S-1) 2011 … excavation of i) Andijuri khal ii) jamaipara khal total 2.930 km. including repair of 1) Bahatra regulator 2)Chullar khal regulator,

Original Revised

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Quantity Estimated

Price in Tk.

(Lac)

(Actual

Contract

price in

Contract

Currency)

Unit Planned

Date of

invitation

of Tender

(Date of

receipt)

Planned

Date of

Contract

signing

(Actual

date of

Contract

signing)

Planned

Date of

completion

(Actual date

of

completion)

Name of

Contractor

Contract Package

Number

Sl.

No.

Prog. of

Proc.as of

Feb, 2011

(Physical %/

Fin. Lac Tk.)

Name of Work Procedure

/Method

PPA/BG Prior

Review

(Yes / No)

Planned

Date of Bid

Evaluation

(Actual

Evaluation

completion

date)

BWDB: WMIP/SIMT/

NAR/ W-1

9 Lot No. BWDB:

WMIP/SIMT/ NAR/ W-

1A

Re-excavation of intake channel from km 0.000 to

0.110, Removal of slushy earth from reservoir, re-

excavation of No. 1, No 2 Drainage channel and,

No. 2 lateral channel of No. 1 main channel total

Km. 6.500 km. ; repairing and maintenance of

northern irrigation canal in between km 0 to 4.500,

No1 main canal from km 0.000 to 2.170 and No1

sub lateral canal from km 0.000 to 0.670 total

7.000 km; Ferro cement lining works of Northern

Irrigation Canal in between km. 0.000 to 2.500

total 0.414 km, of North Rupgonj Water

Conservancy Project under Water Management

Project (WMIP) during 2011-2012.

km.

Intake channel

and drainage

channel = 6.50

km (P).

Canal dyke

including canal

= 7.00 km (P).

Ferro cement

linning = 0.414

km (F).

220.00 NCB/OTM PPA /BG No Jan '11

Feb '12

Feb '12

Mar'12

Feb '12

May'12

Dec'12 Kh.Mainul

Islam

Lot No. BWDB:

WMIP/SIMT/ NAR/ W-

1B

Repairing and maintenance of General Irrigation

Canal from km. 0.000 to 1.200, Southern Irrigation

Canal in between km 0.000 to km. 4.500, No. 2

main canal from km 0.000 to km. 2.850 total =

10.952 km. Ferro cement lining of Southern

Irrigation Canal in between km.1.200 to km.1.800

total = 0.448 km. and construction of 5 nos Foot

bridges in different chainages of North Rupgonj

Water Conservancy Project under Water

Management Improvement (WMIP) during 2011-

2012.

km.

No.

Irrigation canal

= 11.00 km.

Ferro cement

linning = 0.448

Km.

Foot bridge =

5 Nos.

204.00 NCB/OTM PPA /BG No Jan '11

Feb '12

Feb '12

Mar'12

Feb '12

May'12

Dec'12 M/S

Associated

Builders

10 BWDB: WMIP/SIMT/

NAR/ W-2

Re-excavation of Dhaor khal from km 0.000 to

6.500 total 6.500 km in Dhaor Bridge sub-project in

connection with Water Management Improvement

project during 2011-2012.

km. Drainage

channel 6.500

(P)

80.00 NCB/OTM PPA /BG No Jan '11

Feb '12

Feb '12

Mar'12

Feb '12

May'12

Jun '12 M/S Rafique

Constructio

n

Sub-Total 504.00

1618.00Total of Central Zone

Narsingdi O&M Division

Page 5

Page 6: BWDB: Procurement Plan for Works: WMIP (S-1) 2011 … excavation of i) Andijuri khal ii) jamaipara khal total 2.930 km. including repair of 1) Bahatra regulator 2)Chullar khal regulator,

Original Revised

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Quantity Estimated

Price in Tk.

(Lac)

(Actual

Contract

price in

Contract

Currency)

Unit Planned

Date of

invitation

of Tender

(Date of

receipt)

Planned

Date of

Contract

signing

(Actual

date of

Contract

signing)

Planned

Date of

completion

(Actual date

of

completion)

Name of

Contractor

Contract Package

Number

Sl.

No.

Prog. of

Proc.as of

Feb, 2011

(Physical %/

Fin. Lac Tk.)

Name of Work Procedure

/Method

PPA/BG Prior

Review

(Yes / No)

Planned

Date of Bid

Evaluation

(Actual

Evaluation

completion

date)

Southern Zone, BWDB Barisal

11 BWDB: WMIP/ SIMT/

PAT /W-1

Reconstruction and Rehabilitation of Embankment

from km 0.000 to km 20.000 Total 20.000 km &

Construction of 10 Nos. inlet at km. 0.90, km. 2.45,

km. 4.30, km. 12.10, km. 14.50, Km. 16.40 km.

18.30, km. 26.20 km. 32.55 & km. 35.90 including

Repair of 5 Nos. WCS (P) at different location in

Muradia-Kalagachia Sub-Project under WMIP

during the year 2011-2012.

km. Embkt 20.000

(P)

Pipe inlets (F)

= 10

WCS (P) = 5

450.00 NCB/OTM PPA /BG No Jan '11

Feb '12

Feb '12 Feb '12

April'12

Dec'12 Mohiuddin

Ahmed

12 BWDB: WMIP/ SIMT/

PAT /W-2

Re-sectioning of Embankment in between km

2.000 to km 38.000 total 8.500 km including

Construction of 10 nos. Flushing inlet in km 3.56,

km 4.92, km 8.92, km 12.42, km 17.25, km 22.50,

km 30.12, km 33.40, km 35.50 & km 36.70 & Re-

excavation of Madhobkhali, Dakhin Amragachia,

Gazi Bari, Kasinath & Sailatala Khal total 16.00 km

in Subidkhali Madhobkhali Sub-project under

Water Management Improvement Project (WMIP)

during 2011-12 & 2012-13.

km. Embkt 8.500

(P)

Pipe inlets (F)

= 10

Drainage

Channel =

16.00 km (P).

200.00

303.00

NCB/OTM PPA /BG No Jan '11

Feb '12

Feb '12 Feb '12

April'12

Dec'12 RU-LT(JV)

Sub-Total 753.00

13 BWDB: WMIP/SIMT/

PAT WD/W-1

Repair and re-sectioning of 10.000 km.

embankment (P) between km. 0.000 to 78.000

including construction of 3 nos inlet flushing inlet in

Polder 43/1B under upazila- Kalapara in District-

Patuakhali in connection with Component 1:

Rahabilitation and Improvement under WMIP

during the FY 2011-2012 and FY 2012-2013.

km. Embkt 10.000

(P)

Inlet = 3 nos.

(F)

300.00 NCB/OTM PPA /BG No Jan '11

Feb '12

Feb '12

March'12

Feb '12

May'12

Dec'12 Gangamoti

Enterprise

14 BWDB: WMIP/ SIMT/

PAT WD/W-2

Re-sectioning of Embankment from km 0.000 to

km 8.550 and from km 16.230 to km 17.400 Total

9.720 km in Polder 47/2 under upazila- Kalapara in

District- Patuakhali in connection with Component

1: Rahabilitation and Improvement under WMIP

during the FY 2011-2012 and FY 2012-2013.

km. Embkt 9.720

(P)

230.00 NCB/OTM PPA /BG No Jan '11

Feb '12

Feb '12

March'12

Feb '12

April'12

Dec'12 Gangamoti

Enterprise

Sub-Total 530.00

Patuakhali W.D. Division

Patuakhali O&M Division

Page 6

Page 7: BWDB: Procurement Plan for Works: WMIP (S-1) 2011 … excavation of i) Andijuri khal ii) jamaipara khal total 2.930 km. including repair of 1) Bahatra regulator 2)Chullar khal regulator,

Original Revised

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Quantity Estimated

Price in Tk.

(Lac)

(Actual

Contract

price in

Contract

Currency)

Unit Planned

Date of

invitation

of Tender

(Date of

receipt)

Planned

Date of

Contract

signing

(Actual

date of

Contract

signing)

Planned

Date of

completion

(Actual date

of

completion)

Name of

Contractor

Contract Package

Number

Sl.

No.

Prog. of

Proc.as of

Feb, 2011

(Physical %/

Fin. Lac Tk.)

Name of Work Procedure

/Method

PPA/BG Prior

Review

(Yes / No)

Planned

Date of Bid

Evaluation

(Actual

Evaluation

completion

date)

1283.00Total of Southern Zone

Page 7

Page 8: BWDB: Procurement Plan for Works: WMIP (S-1) 2011 … excavation of i) Andijuri khal ii) jamaipara khal total 2.930 km. including repair of 1) Bahatra regulator 2)Chullar khal regulator,

Original Revised

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Quantity Estimated

Price in Tk.

(Lac)

(Actual

Contract

price in

Contract

Currency)

Unit Planned

Date of

invitation

of Tender

(Date of

receipt)

Planned

Date of

Contract

signing

(Actual

date of

Contract

signing)

Planned

Date of

completion

(Actual date

of

completion)

Name of

Contractor

Contract Package

Number

Sl.

No.

Prog. of

Proc.as of

Feb, 2011

(Physical %/

Fin. Lac Tk.)

Name of Work Procedure

/Method

PPA/BG Prior

Review

(Yes / No)

Planned

Date of Bid

Evaluation

(Actual

Evaluation

completion

date)

North-Eastern Zone, BWDB, Comilla

15 BWDB: WMIP/SIMT/

COM/W-1

Lot: BWDB:

WMIP/SIMT/ COM/W-

1A

Re-excavation of Sonaichari khal from km 0.000 to

km 17.350 Total 17.350 km and repair of 2 Nos

Water Control Structures in Sonaichari irrigation

and Flood Control scheme in connection with

Water Management Improvement Project (WMIP)

during 2011- 2012 and 2012-2013.

km. Drainage

Channel =

17.350 (P)

WCS (P) = 2

nos.

135.00

370.00

NCB/OTM PPA /BG No Jan '11

Feb '12

March'12

Feb '12

May'12

Feb '12 Jun '12 M/S Niaz

Traders

BWDB: WMIP/SIMT/

COM/W-1

Lot: BWDB:

WMIP/SIMT/ COM/W-

1B

Re-excavation of New Dakatia from km 0.000 to

km 11.000 Total 11.000 km in Sonaichari irrigation

and Flood Control scheme in connection with

Water Management Improvement Project (WMIP)

during 2011- 2012 and 2012-2013.

km. Drainage

Channel =

11.000 (P)

WCS (P) = 2

nos.

410.00 March'12 May'12 ARC-KC(JV)

Sub-Total 780.00

Habigonj O&M Division

16 BWDB: WMIP/SIMT/

HABI/W-1

Re-Construction of sub-mersible embankment in

between km. 11.000 to 23.000 and re-sectioning of

embankment in between km 0.000 to 11.000 total

12.900 km in Sutki River FCD Project in

connection with Water Management and

Improvement Project during the FY 2011-2012

km. Embkt 12.590

(P)

135.00 NCB/OTM PPA /BG No Jan '11

Feb '12

Feb '12 Feb '12

May'12

Jun '12 Sharif Ullah

Sub-Total 135.00

17 BWDB: WMIP/SIMT/

MOULVI/W-1

Re-sectioning of Embankment from km 0.000 to

5.100 and from km 8.250 to 9.000, total 5.850 km;

Re-excavation of drainage channel U/S and D/S of

Sluice No. S-1A/C1, U/S of Sluice No. S-2/C3, U/S

and D/S of Sluice No. S-1A/C2 total 2.400 km and

Construction of Telibeel regulator (1V-1.800m x

1.520m) of Sharifpur FCD Sub-project under

Water Management Improvement Project (WMIP)

during 2011- 2012 & 2012-2013.

km. Embkt =

5.850 (P)

Drainage

channel =

2.400 (P)

WCS 1 No. (F)

380.00 NCB/OTM PPA /BG No Jan '11

Feb '12

March'12

Feb '12

April'12

Feb '12 Dec '12

Sub-Total 380.00

1295.00

Moulvibazar O&M Division

Total of North-Eastern Zone

Comilla O&M Division

Page 8

Page 9: BWDB: Procurement Plan for Works: WMIP (S-1) 2011 … excavation of i) Andijuri khal ii) jamaipara khal total 2.930 km. including repair of 1) Bahatra regulator 2)Chullar khal regulator,

Original Revised

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Quantity Estimated

Price in Tk.

(Lac)

(Actual

Contract

price in

Contract

Currency)

Unit Planned

Date of

invitation

of Tender

(Date of

receipt)

Planned

Date of

Contract

signing

(Actual

date of

Contract

signing)

Planned

Date of

completion

(Actual date

of

completion)

Name of

Contractor

Contract Package

Number

Sl.

No.

Prog. of

Proc.as of

Feb, 2011

(Physical %/

Fin. Lac Tk.)

Name of Work Procedure

/Method

PPA/BG Prior

Review

(Yes / No)

Planned

Date of Bid

Evaluation

(Actual

Evaluation

completion

date)

North-Western Zone, BWDB, Rajshahi

18 BWDB: WMIP/SIMT/

NAWAB/W-1

Lot: BWDB:

WMIP/SIMT/

NAWAB/W-1A

Bank Revetment work in the right bank of

Mohananda River from km 40.800 to km 40.590

total 0.210 km of Marichar Danra scheme in

connection with Water Management Improvement

Project (WMIP) during 2011- 2012 & 2012-2013.

km. Bank

revetment =

0.210 (F)

135.00

310.00

NCB/OTM PPA /BG No Jan '11

Feb '12

April'12

Feb '12

May'12

Feb '12 Jun '12 M/S Kamrul

Enterprise

BWDB: WMIP/SIMT/

NAWAB/W-1

Lot: BWDB:

WMIP/SIMT/

NAWAB/W-1B

Re-sectioning of 8.390 km embankment in

between km 39.500 to km 61.500 of Marichar

Danra scheme in connection with Water

Management Improvement Project (WMIP) during

2011- 2012 & 2012-2013.

km. Embankment =

8.390 (P)

245.00 April'12 May'12 Kh.Mainul

Islam

BWDB: WMIP/SIMT/

NAWAB/W-1

Lot: BWDB:

WMIP/SIMT/

NAWAB/W-1C

Re-excavation of Trimohini khal, Boro Danra khal,

Laholamari khal, Chalkkirti Motora Danra khal total

27.550 km including repair of Trimohini regulator of

Marichar Danra scheme in connection with Water

Management Improvement Project (WMIP) during

2011- 2012 & 2012-2013.

km. Drainage

Channel =

27.550 (P)

WCS (P) = 1

no.

330.00 April'12 May'12 Kh.Mainul

Islam

Sub-Total 885.00

885.00

Mid-Western Zone, BWDB, Faridpur

19 BWDB: WMIP/SIMT/

FAR/W-1

Re-sectioning of Embankment from km 10.260 to

km 12.130; km 14.550 to km 15.094; km 16.110

to km 19.360 total 5.664 km & re-excavation of

Choto Lakhundia Khal, Jalalpur Khal, Sanidanga

Khal, Similar Khal and Zomaddar Dangi Khal total

3.290 km. including repair of 13 Nos. Water

Control Structures in Shakpaldia FCDI Scheme

under Water Management Improvement Project

(WMIP) during 2011-12 & 2012-13.

km. Embankment =

5.664 (P)

Drainage

Channel =

3.290 (P)

WCS = 13 nos

(P)

135.00 NCB/OTM PPA /BG No Jan '11

Feb '12

May'12

Feb '12

Aug'12

Feb '12 Jun '12 M/S Noor

Constructio

n

Total of North-Western Zone

Faridpur O&M Division, BWDB, Faridpur

Nawabganj O&M Division, BWDB, Chapai Nawabganj

Page 9

Page 10: BWDB: Procurement Plan for Works: WMIP (S-1) 2011 … excavation of i) Andijuri khal ii) jamaipara khal total 2.930 km. including repair of 1) Bahatra regulator 2)Chullar khal regulator,

Original Revised

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Quantity Estimated

Price in Tk.

(Lac)

(Actual

Contract

price in

Contract

Currency)

Unit Planned

Date of

invitation

of Tender

(Date of

receipt)

Planned

Date of

Contract

signing

(Actual

date of

Contract

signing)

Planned

Date of

completion

(Actual date

of

completion)

Name of

Contractor

Contract Package

Number

Sl.

No.

Prog. of

Proc.as of

Feb, 2011

(Physical %/

Fin. Lac Tk.)

Name of Work Procedure

/Method

PPA/BG Prior

Review

(Yes / No)

Planned

Date of Bid

Evaluation

(Actual

Evaluation

completion

date)

20 BWDB:

WMIP/SIMT/FAR/W-2

Lot : BWDB:

WMIP/SIMT/FAR /W-

2A

Re-sectioning/ Breach Closing of Embankment

from km 17.500 to km 17.560; km 20.000 to km

20.089 & from km 21.100 to km 21.363 total 0.412

km. including repair of 11 Nos. Water Control

Structures in Boro Manikdi FCDI Scheme under

Water Management Improvement Project (WMIP)

during 2011-12 & 2012-13.

km. Embankment

=0.410 (P)

WCS = 11

nos. (P)

60.00 May'12 Aug'12 M/S

Rahman

Enterprise

BWDB:

WMIP/SIMT/FAR/W-2

Lot : BWDB:

WMIP/SIMT/FAR /W-

2B

Re-excavation of Maniknagor khal from km 3.650

to km 9.550; Nurkhali khal from km 5.700 to km

11.725; Aliabad khal from km 0.000 to km 0.680;

Bakhunda khal from km 0.000 to km 0.650;

Fulbaria khal from km 0.000 to km 0.508 &

Gopalpur Dakatia khal from km 1.400 to km 2.515

total 14.950 km in Boro Manikdi FCDI Scheme

under Water Management Improvement Project

(WMIP) during 2011-12 & 2012-13.

km. Drainage

Channel =

14.950 (P)

265.00 May'12 Aug'12 Starlite

Services

Ltd.

Sub-Total 460.00

21 BWDB: WMIP/SIMT/

MAD/W-1

Lot : Lot : BWDB:

WMIP/SIMT/MAD/W-

1A

Re-sectioning of Embankment from km 0.000 to

km 7.765, km 10.165 to km 12.805, km 16.400 to

km 19.400, km 25.300 to km 31.000 & km 31.220

to km 31.770 Total 19.655 km in North Kalkini

FCDI Schemes in connection with Water

Management Improvement Project (WMIP) during

2011- 2012 & 2012-2013.

km. Embankment =

19.655 (P)

135.00

265.00

NCB/OTM PPA /BG No Jan '11

Feb '12

April'12

Feb '12

July'12

Feb '12 Jun '12 SE-MRC(JV)

BWDB: WMIP/SIMT/

MAD/W-1

Lot : Lot : BWDB:

WMIP/SIMT/MAD/W-

1B

Re-excavation of Swasthal Khal from km 0.000 to

km 5.050 & Purba Alipur Khal from km 0.000 to km

3.800 Total 8.850 km in North Kalkini FCDI

Schemes in connection with Water Management

Improvement Project (WMIP) during 2011- 2012 &

2012-2013.

km. Drainage

Channel =

8.850 (P)

135.00 NCB/OTM PPA /BG No Jan '11

Feb '12

April'12

Feb '12

July'12

Feb '12 Jun '12 M/S Shara

Enterprise

Sub-Total 400.00

860.00

Legend:

P = Partial *=Proposed/Actual

F = Full

NCB = National Competitive Bidding

OTM = Open Tendering Method

Total of Mid-Western Zone

Madaripur O&M Division, BWDB, Madaripur

Page 10

Page 11: BWDB: Procurement Plan for Works: WMIP (S-1) 2011 … excavation of i) Andijuri khal ii) jamaipara khal total 2.930 km. including repair of 1) Bahatra regulator 2)Chullar khal regulator,

Original Revised

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Quantity Estimated

Price in Tk.

(Lac)

(Actual

Contract

price in

Contract

Currency)

Unit Planned

Date of

invitation

of Tender

(Date of

receipt)

Planned

Date of

Contract

signing

(Actual

date of

Contract

signing)

Planned

Date of

completion

(Actual date

of

completion)

Name of

Contractor

Contract Package

Number

Sl.

No.

Prog. of

Proc.as of

Feb, 2011

(Physical %/

Fin. Lac Tk.)

Name of Work Procedure

/Method

PPA/BG Prior

Review

(Yes / No)

Planned

Date of Bid

Evaluation

(Actual

Evaluation

completion

date)

PPA = Public Procurement Act

BG = Bank Guideline

LCS = Landless Contracting Society

Page 11

Page 12: BWDB: Procurement Plan for Works: WMIP (S-1) 2011 … excavation of i) Andijuri khal ii) jamaipara khal total 2.930 km. including repair of 1) Bahatra regulator 2)Chullar khal regulator,

Starting year: 2011-12

16

BWDB: Procurement Plan for Works: WMIP (S-1) 2011-2012IDA Credit # 4359 BD and the Netherlands Trust Fund Number TF 094800

Remarks

Page 12

Page 13: BWDB: Procurement Plan for Works: WMIP (S-1) 2011 … excavation of i) Andijuri khal ii) jamaipara khal total 2.930 km. including repair of 1) Bahatra regulator 2)Chullar khal regulator,

16

Remarks

Page 13

Page 14: BWDB: Procurement Plan for Works: WMIP (S-1) 2011 … excavation of i) Andijuri khal ii) jamaipara khal total 2.930 km. including repair of 1) Bahatra regulator 2)Chullar khal regulator,

16

Remarks

Page 14

Page 15: BWDB: Procurement Plan for Works: WMIP (S-1) 2011 … excavation of i) Andijuri khal ii) jamaipara khal total 2.930 km. including repair of 1) Bahatra regulator 2)Chullar khal regulator,

16

Remarks

Page 15

Page 16: BWDB: Procurement Plan for Works: WMIP (S-1) 2011 … excavation of i) Andijuri khal ii) jamaipara khal total 2.930 km. including repair of 1) Bahatra regulator 2)Chullar khal regulator,

16

Remarks

Page 16

Page 17: BWDB: Procurement Plan for Works: WMIP (S-1) 2011 … excavation of i) Andijuri khal ii) jamaipara khal total 2.930 km. including repair of 1) Bahatra regulator 2)Chullar khal regulator,

16

Remarks

Page 17

Page 18: BWDB: Procurement Plan for Works: WMIP (S-1) 2011 … excavation of i) Andijuri khal ii) jamaipara khal total 2.930 km. including repair of 1) Bahatra regulator 2)Chullar khal regulator,

16

Remarks

Page 18

Page 19: BWDB: Procurement Plan for Works: WMIP (S-1) 2011 … excavation of i) Andijuri khal ii) jamaipara khal total 2.930 km. including repair of 1) Bahatra regulator 2)Chullar khal regulator,

16

Remarks

Page 19

Page 20: BWDB: Procurement Plan for Works: WMIP (S-1) 2011 … excavation of i) Andijuri khal ii) jamaipara khal total 2.930 km. including repair of 1) Bahatra regulator 2)Chullar khal regulator,

16

Remarks

Page 20

Page 21: BWDB: Procurement Plan for Works: WMIP (S-1) 2011 … excavation of i) Andijuri khal ii) jamaipara khal total 2.930 km. including repair of 1) Bahatra regulator 2)Chullar khal regulator,

16

Remarks

Page 21

Page 22: BWDB: Procurement Plan for Works: WMIP (S-1) 2011 … excavation of i) Andijuri khal ii) jamaipara khal total 2.930 km. including repair of 1) Bahatra regulator 2)Chullar khal regulator,

16

Remarks

Page 22