Renewable Energy Management Center

by

T R Ganesh

WHY REMC?

• Ambitious plan by Govt of India for 175 GW RE.

• Recognise that RE is a different ball game• Must run

• Flexi watts, Reserves, Balancing etc

• Forecasting and Scheduling

• Interface with existing SCADA and

security tools

• Interface with existing scheduling suite

• Skill set requirement

Pattern of Renewable Generation in India

*SCADA Data

Annual Solar Generation

Annual Wind Generation

4

* Based on SCADA Data

3D Plot of Kadamparai Generation and Pump Operation during 2016

96 - Blocks365 Days

Large Scale Integration of Renewables

Forecasting (Demand/ RE generation & Scheduling)

Flexi Watts - Thermal [Technical Minimum, Reserve Shut down] Inter-state Co-operation to

optimize resources

Spinning ReservesFrequency Control

(Primary/Secondary/ Tertiary)Pumped Hydro & Flexible Load

Managing Deviations Optimally Approach ERCs for regulatory Electricity Market Measures - PX

to be RTC

6

Bidding Procedure

• Tender-9091: Establishment of Renewable Energy Management Centre at Southern Region (Tamil Nadu, Andhra Pradesh, Karnataka and SRLDC)

• Two Stage Bidding Procedure

• Domestic Competitive Bidding

• e-procurement procedure: https://www.tcil-india-electronictender.com

• Date Of Issuance Of IFB : 26.08.2016

• Pre-Bid meeting : 09.09.2016

• First Stage Bids Uploading before: 26.09.2016

• First Envelope i.e. Techno -Commercial Part shall be opened on 28.09.2016

• No Bid Security is required to be accompanied with the First Stage Bids.

Establishment of Renewable Energy Management Centre at Southern

Region (Tamil Nadu, Andhra Pradesh, Karnataka and SRLDC)

Owners,Consultant

• Owners of the Project : TN SLDC, APSLDC, SLDC KPTCL, SRLDC For respective package

• Consultant : POWERGRID and Project shall be handed over to respective SLDCs and SRLDC upon completion.

• Funding for the project shall be from Ministry of Power Gross Budgetary Support (GBS) allocation.

• For the purpose of all procurement activities related to the said project POWERGRID shall be referred to as ‘Employer’.

• Payments shall be made by POWERGRID. However, POWERGRID intends to use fund to be provided by Ministry of Power through Gross Budgetary Support for eligible payments under the contracts for subject package.

Functional Scope of REMCs

• Setting up of SCADA, Forecasting Tool & Scheduling Tool systems

• Integration of existing and New RTUs/DCPC/AMR to collect data from pooling stations.

• Integration of REMC with existing main & backup xLDC SCADA System

• Data exchange with Forecasting and Scheduling tools & FSP interface

• Providing RE information to its concerned xLDC for dispatching and balancing RE power

Renewable Energy Management Centres

Status of Implementation• 11 Nos. REMC

• State level (7 Nos.): Tamil Nadu, AP, Karnataka, Gujarat, Maharashtra, MP & Rajasthan

• National/Regional level (4 Nos.): SRLDC, WRLDC, NRLDC and NLDC

• Implementation under progress

Co-located with respective Load Despatch Centres

• State, Regional and National level

• Forecasting , Real time tracking of generation from RE sources

• Advanced decision-making and control systems

• Single source information repository and coordination point for RE

Different skill sets for personnel manning REMCs and LDCs

11

Conceptual architecture of REMC

ICCP

Forecasting

Tool

RE

Scheduling

Application

Current

Scheduling

Application

FSP #1

FSP #2

FSP #n

Weather Forecast Data

REMC

SCADA

(x)LDC

SCADA

+ EMC

Real Time RE Generation

RTU

RE

Develope

rRE Schedule

Backup

control centreICCP

Real Time Data from field

•Acquire data from RTUs•IEC-101, IEC-104

•Interface with controlcenter on ICCP

•High availability, based onfully redundant hot standbyconfiguration.

•Ability to integrate withforecast tool.

SCHEMATIC OF FORECASTING TOOL

FSP : previous experience in providing Renewable (Wind/Solar) Power forecasting servicesfor at least 2000 MW of Wind or Solar generation or both combined for atleast one year ofcontinuous service in past seven (7) years as on originally scheduled date of first stagebid opening for any Transmission system operator/ Independent system operator/ RE(Wind/Solar) developer or Generator

• Day ahead/Intra Day/Weekahead power forecast

• Forecast for• aggregated at

state/region level

• Pooling station level

• Interface with multipleparties Forecasting serviceprovider (FSP) system

• Internal Forecast module

• Interface with Schedulingtool

Day ahead Scheduling and dispatch

RE-scheduling of day-ahead schedule on intra-day basis

Interface with RE generator

Configuration Diagram

SRLDC Appendix-K

Data Acquisition LAN

WAN

Router

for RTU

IEC 101/104RTUs

Application Servers(2)123456

789 `

SCADA LAN

Video

Projecti

on

GPS

ICCP Servers (2)

ICCP

LAN

LAN switch for

ICCP LAN (2)

Development

Workstation (2)

Program

Development

System

LAN switch for

PDS (2)

PDS

LAN

NMS Server

(2)

Historian &

NMS VLAN

SAN

Box (1)SAN

Box (1)

SCADA server(2)

Server

management

console

Management LAN

Data Replica

server (2)

Identity

Server (2)Centralized

management

console

EXTER

NAL

DMZ

Web Servers

(2)

Corporat

e LAN

Printer

(2)

SCADA Work

station (4)

LAN switch for Data

acquisition (2)

LAN switch for

SCADA (2)

LAN

switch

for

Interna

l DMZ

LAN

(2)

LAN

switch

for

Extern

al

DMZ

LAN

(2)

Historian

server(2)

Forecasting/S

cheduling

repository (2)

WAN

Router

for ICCP

ICCP for RLDC (main &

backup)/SLDC/NLDC

Printer

(2)

SAN

Management

Server & SAN

Switch &

Storage (2)

CFE Server (2)

S.No

ServicesQuant

ity

1 Installation, testing & Commissioning

Integration with new/existing

Control Centres on ICCP

15

Integration of existing/new

RTUs with REMC SCADA

250

Integration with Offline

application

5

2 Annual Maintenance Contract

Warranty Period 1 year

Annual maintenance contract

after expiry of Warranty

Period

6 year

3 FSP services3 nos. of FSP 2

years

2 nos. of FSP 2 years

4 Weather Services for

internal forecasting

tool

4

years

• CYBER SECURITY• DATA SECURITY• ACCESS BASED RIGHTS

DATA FROM RTU• DEMAND SCAN• PERIODIC SCAN

Critical & Non Critical functions

Critical functions:a) All SCADA functions

b) Forecasting & Scheduling functions

c) Historian

d) User Interface Requirements

e) Network Management system

f) Web Applications

Non-Critical functions:a) Database modification and generation.

b) Display modification and generation.

c) Report modification and creation.

d) Software configuration and system generation.

SCADA

FUNCTIONS

SOE

SUPERVISORY CONTROL

NMS

DATA AQUISTIONHISTORIAN

REPORTINGDASHBOARDS

ALARMSUSER

INTERFACE

Data Exchange AND DATA PROCESSING

• Data Exchange with Control Centres

• Data Exchange with Forecasting Application

• Data Exchange with RE Scheduling Application

• Data Exchange with Weather data service

• Data Exchange with RE Developers

• Data Exchange with Historian system

• Data Exchange with Offline Systems & Third-party applications

• Analog Data Processing

• Digital status Input Data processing

• Calculated Data processing • MVA Calculation

• MW and MVAR Integration

• Rate of Change

• Average Value Calculations

• Max and Min Value Calculations

• Unscheduled Interchange (UI) Charge

• Quality Codes

• Real-time data storage and playback

• Redundant data Source processing

FOCUS ON FORECAST ACCURACY• EVALUATION OF FSPs----METHODOLOGY

Other Features

• Dynamic Data Presentation

• Element high lighting

• Display Types• Power System Network Display• Sub Station Single Line Diagram (SLD) Display Menu• Sub Station SLD Displays• Sub Station Tabular Displays• Alarm/Event Summary Displays• Operating Information Summaries• Computer system Configuration and Monitoring Displays• Communication Network display• Voltage Profile Display• Log Sheets Displays

- Page 19