C-Hook HMI project designed by win-CC program.
Prepared by: Sherif Fayek
# ESTABLISHING A C-HOOK DRIVER AT THE MAIN WIN-CC PROJECT.# ESTABLISHING A SUB-FOLDER (DB203) TO CONTAIN THE ASSIGNED TAGS.
#CONFIGURING AND IDENTIFYING THE TAGS IN THE SUB-FOLDER OF THE C-HOOK DRIVER.
# ESTABLISHING THE COMMUNICATION BETWEEN HMI AND PLC BY CONFIGURING THE IP ADDRESS OF THE C-HOOK PLC STATION.
#GRAPHIC DESIGNER:PAGE 1: C-HOOK STATIONS (FROM STATION 138 TO STATION 106)#EVERY DESIGNED OBJECT HAS TO BE ASSIGNED BY A CONFIGURED TAG.
PAGE 2: C-HOOK STATIONS (FROM STATION 106 TO 138 EXCLUDING FROM 113 TO 123)
PAGE 3: C-HOOK STATIONS (FROM STATION 113 TO 124)
PAGE 4: HYDRAULIC PUMPS.
PAGE 5: ROTATING STATIONS ENCODERS SETTING VALUES AND CALIBRATION.
PAGE 6: ID READERS VALUES AND PROGRAMMING AT STATION 137.
PAGE 7: TRACKING OF COILS FROM THREE DIFFERENT PLACES.
PAGE 8: EMERGENCY STOP AND MAIN ISOLATORS INDICATIONS.