1 C O N T E N T S COMMITTEE MEMBERS HIGHLIGHTS & SALIENT FEATURES Chapter-1 CONSTITUTION, FUNCTIONS & ORGANISATIONAL SET UP OF SOUTHERN REGIONAL POWER COMMITTEE Chapter-2 REGIONAL GRID PERFORMANCE Chapter-3 GRID DISTURBANCES AND PROTECTION RELATED ACTIVITIES Chapter-4 COMMERCIAL & ENERGY ACCOUNTING ACTIVITIES Chapter-5 OPERATION, PROTECTION & SYSTEM STUDIES ACTIVITIES Chapter-6 MEETING HELD Chapter-7 REPORTS AND CERTIFICATION Chapter-8 IMPLEMENTATION OF OFFICIAL LANGUAGE POL ICY ***

Upload: dinhdien

Post on 10-May-2018

214 views

Category:

Documents


1 download

TRANSCRIPT

1

C O N T E N T S

COMMITTEE MEMBERS HIGHLIGHTS & SALIENT FEATURES

Chapter-1 CONSTITUTION, FUNCTIONS & ORGANISATIONAL SET UP OF SOUTHERN REGIONAL POWER COMMITTEE Chapter-2 REGIONAL GRID PERFORMANCE Chapter-3 GRID DISTURBANCES AND PROTECTION RELATED ACTIVITIES Chapter-4 COMMERCIAL & ENERGY ACCOUNTING ACTIVITIES Chapter-5 OPERATION, PROTECTION & SYSTEM STUDIES ACTIVITIES Chapter-6 MEETING HELD Chapter-7 REPORTS AND CERTIFICATION Chapter-8 IMPLEMENTATION OF OFFICIAL LANGUAGE POL ICY

***

2

ANNEXURES

I Officers of SRPC as on 31.03.2007

II Monthly load pattern, shortages during 2006-07

III Monthwise energy requirement, consumption and shortages during

2006-07

IV Load Factor during 2006-07

V Details of power cuts in the Southern Region during 2006-07

VI Installed Capacity in Southern Region as on 31.03.2007 and

Generation during 2006-07

VII Installed Capacity in Southern Region from 2002-03 to 2006-07

VIII Performance of Thermal/Nuclear power Stations in the Southern

Region during 2006-07

IX Outages of Thermal/Nuclear Power Stations during 2006-07

X Statewise Generation and Net Consumption during 2006-07

XI Frequency Profile during 2006-07

XII Operation of Inter-State/Inter-Regional Tie Lines during 2006-07

XIII Entitlements/Schedule/Actual Drawal, Energy Exchanges, Energy Wheeled during 2006-07

XIV Allocation of shares from Central Sector Stations to constituents

of Southern Region as on 31.03.2007

XV Particulars of Major Hydel Reservoirs in Southern Region during

2006-07

XVI Generating Units Commissioned during the year 2006-07

XVII Progress of Generation Schemes as on 31.03.2007

XVIII 400 KV and 220/230 KV Substations Commissioned during 2006 -07

3

XIX Progress of construction of 220 KV/230 KV and above Sub-Stations during 2006-07.

XX Transmission lines commissioned during the year 2006-07

XXI Progress of Transmission lines under construction in Southern Region

XXII Installation of shunt capacitors in Southern Region during the year

2006-07.

XXIII Voltage Profile at selected nodes of 400 KV Regional Grid during

2006-07

XXIV Meetings held during the year 2006-07

4

EXHIBITS

I Power Map of Southern Region as on 31.03.2007

II Growth in Installed Capacity in Southern Region during 2002-03 to

2006-07

III Growth of Peak Load during the year 2002-03 to 2006-07

IV Annual Load Duration Curve of Southern Region

V Load and Frequency curves for Regional Maximum Demand Day

VI Load and Frequency Curves for Regional Minimum Demand Day

VII Generation in Southern Region during 2005-06 and 2006-07

VIII Growth of Generation in Southern Region from 2002-03 to 2006-07

IX Growth of Gross Generation from 2002-03 to 2006-07

X Particulars of Important Reservoirs of Southern Region.

5

CONSTITUTION OF SOUTHERN REGIONAL POWER COMMITTEE

(As on 31.03.2007)

CHAIRPERSON Shri L.V. Nagarajan, MD, KPCL

MEMBERS

Shri Santosh Kumar Shri K.K.Karappan Kutty Member (GO&D) Chief of Generation,KSEB

CEA, New Delhi Thiruvananthapuram Shri Bharat Lal Shri Hans Raj Verma MD, KPTCL Chairman, TNEB Bangalore Chennai Shri V.M. Chandre Gowda Shri S.Arounassalame Director (Trans.), KPTCL Member (Gen.) TNEB Bangalore Chennai Shri K. Divakara Rao Shri V.N.Mathiyalagan CE(E), SLDC, KPTCL Member (Distr.),TNEB Bangalore Chennai

Shri G. Bheemappa Dr. A.C. Verma MD, BESCOM Secretary (Power) Bangalore Puducherry Smt. Rachel Chatterjee Shri S. Mazumdar CMD, APTRANSCO Director (Opn), PGCIL Hyderabad Gurgaon, Haryana Shri Ajay Jain Shri V.Sethuraman MD, APGENCO Director (Power) Hyderabad NLC, Neyveli Shri K. Gopala Krishna Shri G. Nageswara Rao Director (PC&GO), APTRANSCO ED (Operat ion) Hyderabad NPCIL, Mumbai Shri G. Sai Prasad Shri R.S. Sharma CMD, CPDC of AP Director (Commercial) Hyderabad NTPC, New Delhi Shri T.M. Manoharan Shri K. Srinivasa Rao Chairman, KSEB Member Secretary Thiruvananthapuram SRPC, Bangalore Shri A.G. Bhadran Member (Trans.), KSEB Thiruvananthapuram

1

CHAIRPERSON, SRPC AS ON 31-03-2007

SHRI. L.V.NAGARAJAN, IAS

MD, KPCL

MEMBER SECRETARY, SRPC AS ON 31-03-2007

Shri. K.SRINIVASA RAO, MEMBER SECRETARY

2

ãÖÖ×¯ÖŸÖ �Ö´ÖŸÖÖ Installed Capacity

•Ö»Ö 11011.71 MW Hydro

�ÖîÃÖ 3586.30 MW Gas

ŸÖÖ¯ÖßµÖ 16172.50 MW Thermal

−ÖÖ׳Ö�úßµÖ 880.00 MW Nuclear

ãú»Ö (•Ö+�Öî+ŸÖÖ+−ÖÖ) 31650.51 MW Total (H + G + T + N)

›ßü•ÖÌ»Ö 939.32 MW Diesel

¯Ö¾Ö−Ö 4233.49 MW Wind+RES

ãú»Ö µÖÖê�Ö 36823.32 MW Grand Total (Source: CEA)

ׯ֔û»Öê ¾ÖÂÖÔ �úß ŸÖã»Ö−ÖÖ ´Öë ¾Öé× üü 2.14 % Net Increase Over Previous Year

´ÖÖÓ�Ö Demand

†×¬Ö�úŸÖ´Ö ¯ÖϲÖÓ×¬ÖŸÖ “Ö ü´Ö ³ÖÖ üü 25039 MW Max. Peak Load Catered

ׯ֔û»Öê ¾ÖÂÖÔ �úß ŸÖã»Ö−ÖÖ ´Öë ¾Öé× üü 1667.00 MW Increase Over Previous Year

†×¬Ö�úŸÖ´Ö †²ÖÖ×¬ÖŸÖ ´ÖÖÓ�Ö 26865 MW Max. Unrestricted Demand

−µÖæ−ÖŸÖ´Ö ´ÖÖÓ�Ö 11718 MW Min. Demand

'Ö´ÖŸÖÖ ´Öë �ú´Öß (´Öê.¾ÖÖ.) 227 to 2021 MW Capacity Shortage (Mw)

'Ö´ÖŸÖÖ ´Öë �ú´Öß (%) 1 to 7.94 Capacity Shortage (%)

¯ÖÏ,ÖÖ»Öß ³ÖÖ ü ‘Ö™ü�ú 82 % System Load Factor

‰ú•ÖÖÔ ˆŸ¯ÖÖ¤ü−Ö (�ãú»Ö) 188298.76 Energy Generation (Gross)

ׯ֔û»Öê ¾ÖÂÖÔ �úß ŸÖã»Ö−ÖÖ ´Öë ¾Öé׫ü 12.72 % Increase Over Previous Year

‰ú•ÖÖÔ �úÖ ˆ¯Ö³ÖÖê�Ö 180281 MU Energy Consumption

†²ÖÖ×¬ÖŸÖ ˆ•ÖÖÔ †Ö¾Ö¿µÖ�úŸÖÖ 185173 MU Unrestricted Energy Requirement

‰ú•ÖÖÔü ´Öë �ú´Öß (%) 0.02 to 4.65 % Energy Shortage (%)

±Ïúߌ¾Öê−ÃÖß ¸êüוÖÌ Ö Frequency Regime

±Ïúߌ¾Öê−ÃÖß 49.0 Hz ÃÖê 50.5 Hz. ŸÖ�ú 93.94 % Time Frequency remained

ÆüÖê−Öê �úÖ % ÃÖ´ÖµÖ within IEGC Range

(between 49.0 Hz To 50.5 Hz)

ãÖÖ×¯ÖŸÖ ‹“Ö. ™üß. ¿ÖÓ™ü îú¯ÖÖ×ÃÖ™ü¸ü H.T. Shunt Capacitors

Installed as on 31.03.2007

†ÖÓ¬ÖÐü ¯ÖϤêü¿Ö 6583.40 Andhra Pradesh

�ú−ÖÖÔ™ü�ú 4312.35 Karnataka

�êú ü»Ö 1005.00 Kerala

ŸÖü×´Ö»Ö −ÖÖ›ã 3947.50 Tamil Nadu

�ãú»Ö 15848.25 Total SR

†ÓŸÖ¸ü�Öê¡ÖßµÖ ‰ú•ÖÖÔ ×¾Ö×−Ö´ÖµÖ Actual Energy Exchanges

¯ÖÛ¿“Ö´Öü 'Öê¡Ö �úÖê ×−ÖµÖÖÔ×ŸÖŸÖ ‰ú•ÖÖÔ 3133.625 Mus Energy export to WR

¯Öæ¾ÖÔ 'Öê¡Ö �úÖê ×−ÖµÖÖÔ×ŸÖŸÖ ‰ú•ÖÖÔ 165.603 Mus Energy export to ER

¯ÖÛ¿“Ö´Öü 'Öê¡Ö ÃÖê †ÖµÖÖ×ŸÖŸÖ ‰ú•ÖÖÔ 194.955 Mus Energy import from WR

¯Öæ¾ÖÔ 'Öê¡Ö ÃÖê †ÖµÖÖ×ŸÖŸÖ ‰ú•ÖÖÔ 1717.29 Mus Energy import from ER

¯ÖÏ Öã)Ö ²ÖÖŸÖë/HIGHLIGHTS

3

BREAK-UP OF INSTALLED CAPACITY IN SOUTHERN REGION

AS ON 31 - 03 - 2007 IN MW

(FUEL WISE) (As per CEA)

THERMAL 16172.50

GAS 3586.30

NUCLEAR 880.00

DIESEL 939.32

WIND MILL + RES

4233.49

HYDRO

11011.71

�ãú»Ö TOTAL=36823.32

4

31.03.2007 úÖê ¤ü×�Ö9Ö �Öê¡Ö úß Ã£ÖÖ×¯ÖŸÖ �Ö´ÖŸÖÖ INSTALLED CAPACITY OF STATES IN SOUTHERN REGION

AS ON 31-03-2007 IN MW

(As per CEA)

TH+GAS4565.76

WM + RES

2721.83HYDRO

2175.85

ŸÖ× Ö»Ö −ÖÖ›ãü TAMILNADU

9463.44

HYDRO1821.60

WM + RES48.85

TH+GAS

430.44

êú ü»Ö KERALA 2300.89

TH+GAS

2184.42

WM + RES

916.92

HYDRO

3427.90

ú−ÖÖÔ™üú KARNATAKA6529.24

HYDRO3586.36

WM + RES545.29

TH+GAS5045

†ÖÓ¬ÖÐ ÖϤêü¿Ö ANDHRA PRADESH9176.65

5

†¯Öê×�ÖŸÖ ×¾ÖªãŸÖ ENERGY REQUIREMENT

†ÖÓ¬ÖÐ ¯ÖϤêü¿Ö ANDHRA PRADESH

MONTHWISE MAXIMUM DEMAND AND ENERGY REQUIREMENT

DURING 2006- 2007

´ÖÖÓ�Ö DEMAND

MAX: 8950 MW ON 18.03.2007

2006-2007 êú ¤üÖî üÖ−Ö ´ÖÆüß−ÖÖ¾ÖÖ¸ü †×¬ÖúŸÖ´Ö ´ÖÖÓ�Ö ‹¾ÖÓ †¯Öê×�ÖŸÖ ×¾ÖªãŸÖ

5000

6000

7000

8000

9000

10000

11000

Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Jan-07 Feb-07 Mar-07

MONTH

MW

ACTUAL 2005-06 ACTUAL 2006-07 UN-RESTRICTED 2005-06 UN-RESTRICTED 2006-07

3000

3500

4000

4500

5000

5500

6000

6500

Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Jan-07 Feb-07 Mar-07

MONTH

MU

ACTUAL 2005-06 ACTUAL 2006-07 UN-RESTRICTED 2005-06 UN-RESTRICTED 2006-07

6

MAX: 5959 MW on 17.02.2007

†¯Öê×�ÖŸÖ ×¾ÖªãŸÖ ENERGY REQUIREMENT

ú−ÖÖÔ™üú KARNATAKA

MONTHWISE MAXIMUM DEMAND AND ENERGY REQUIREMENT DURING 2006- 2007

´ÖÖÓ�Ö DEMAND

2006-2007 êú ¤üÖî üÖ−Ö ´ÖÆüß−ÖÖ¾ÖÖ¸ü †×¬ÖúŸÖ´Ö ´ÖÖÓ�Ö ‹¾ÖÓ †¯Öê×�ÖŸÖ ×¾ÖªãŸÖ

3500

4000

4500

5000

5500

6000

6500

7000

Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Jan-07 Feb-07 Mar-07

MONTH

MW

ACTUAL 2005-06 ACTUAL 2006-07 UN-RESTRICTED 2005-06 UN-RESTRICTED 2006-07

1500

2000

2500

3000

3500

4000

4500

Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Jan-07 Feb-07 Mar-07

MONTH

MU

ACTUAL 2005-06 ACTUAL 2006-07 UN-RESTRICTED 2005-06 UN-RESTRICTED 2006-07

7

MAX:2742 MW ON 27.02.2007

†¯Öê×�ÖŸÖ ×¾ÖªãŸÖ ENERGY REQUIREMENT

êú ü»Ö KERALA

MONTHWISE MAXIMUM DEMAND AND ENERGY REQUIREMENT

DURING 2006-2007

´ÖÖÓ�Ö DEMAND

2006-2007 êú ¤üÖî üÖ−Ö ´ÖÆüß−ÖÖ¾ÖÖ¸ü †×¬ÖúŸÖ´Ö ´ÖÖÓ�Ö ‹¾ÖÓ †¯Öê×�ÖŸÖ ×¾ÖªãŸÖ

2000

2100

2200

2300

2400

2500

2600

2700

2800

2900

Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Jan-07 Feb-07 Mar-07

MONTH

MW

ACTUAL 2005-06 ACTUAL 2006-07 UN-RESTRICTED 2005-06 UN-RESTRICTED 2006-07

900

1000

1100

1200

1300

1400

1500

Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Jan-07 Feb-07 Mar-07

MONTH

MU

ACTUAL 2005-06 ACTUAL 2006-07 UN-RESTRICTED 2005-06 UN-RESTRICTED 2006-07

8

MAX:8883 MW ON 22.03.2007

ÖÖÓ�Ö DEMAND

†¯Öê×�ÖŸÖ ×¾ÖªãŸÖ ENERGY REQUIREMENT

ŸÖ×´Ö»Ö −ÖÖ›ãü TAMIL NADU

MONTHWISE MAXIMUM DEMAND AND ENERGY REQUIREMENT

DURING 2006-2007

2006-2007 êú ¤üÖî üÖ−Ö ´ÖÆüß−ÖÖ¾ÖÖ¸ü †×¬ÖúŸÖ´Ö ´ÖÖÓ�Ö ‹¾ÖÓ †¯Öê×�ÖŸÖ ×¾ÖªãŸÖ

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Jan-07 Feb-07 Mar-07

MONTH

MW

ACTUAL 2005-06 ACTUAL 2006-07 UN-RESTRICTED 2005-06 UN-RESTRICTED 2006-07

0

1000

2000

3000

4000

5000

6000

7000

Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Jan-07 Feb-07 Mar-07

MONTH

MU

ACTUAL 2005-06 ACTUAL 2006-07 UN-RESTRICTED 2005-06 UN-RESTRICTED 2006-07

9

MAX.: 25039 MW ON 27.03.2007

MONTHWISE MAXIMUM DEMAND AND ENERGY REQUIREMENT

¤ü×�Ö9Ö �Öê¡Ö SOUTHERN REGION .

†¯Öê×�ÖŸÖ ×¾ÖªãŸÖ ENERGY REQUIREMENT

ÖÖÓ�Ö DEMAND

DURING 2006 - 2007

2006-2007 êú ¤üÖî üÖ−Ö ´ÖÖÆüß−ÖÖ¾ÖÖ¸ü †×¬ÖúŸÖ´Ö ´ÖÖÓ�Ö ‹¾ÖÓ †¯Öê×�ÖŸÖ ×¾ÖªãŸÖ

10000

11000

12000

13000

14000

15000

16000

17000

18000

19000

Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Jan-07 Feb-07 Mar-07

MONTH

MU

ACTUAL 2005-06 ACTUAL 2006-07 UN-RESTRICTED 2005-06 UN-RESTRICTED 2006-07

0

5000

10000

15000

20000

25000

Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Jan-07 Feb-07 Mar-07

MW

Simultaneous 2005-06 Simultaneous 2006-07 Aggregate 2005-06 Aggregate 2006-07

10

FREQUENCY

MAXIMUM DURING THE YEAR 50.96

MINIMUM DURING THE YEAR 48.33

AVERAGE DURING THE YEAR 49.50

DURING 2006 - 2007

2006-2007 êú ¤üÖî üÖ−Ö ¤ü×�Ö9Ö �Öê¡Ö úß ±Ïúߌ¾Öê−ÃÖß ºþ¯Ö¸êü)ÖÖFREQUENCY PROFILE OF SOUTHERN REGION

0.00

5.00

10.00

15.00

20.00

25.00

30.00

35.00

40.00

45.00

50.00

55.00

60.00

65.00

70.00

75.00

80.00

85.00

90.00

95.00

100.00

Apr-

06

May

-06

Jun-0

6

Jul-0

6

Aug-0

6

Sep-06

Oct-

06

Nov-0

6

Dec-

06

Jan-

07

Feb-07

Mar-

07

% O

F T

IME

<49 49-50.5 >50.5

11

Sheet 1

POWER STATIONS IN SOUTHERN REGION ( 2006- 2007)

¾ÖÂÖÔ 2006-2007 ´Öë ¤ü×�Ö9Ö �Öê¡Ö êú ×¾ÖªãŸÖ ëú¦üÖ ë êú

¯»Öï™ü »ÖÖê›ü ±îúŒ™ü¸üPLANT LOAD FACTOR OF

0.00

10.00

20.00

30.00

40.00

50.00

60.00

70.00

80.00

90.00

100.00

%P

LF

Kothagudem A to C Kothagudem"D" Vijayawada Ry'seema

2005-06 2006-07

12

Sheet 2

¾ÖÂÖÔ 2006-2007 ´Öë ¤ü×�Ö9Ö �Öê¡Ö êú ×¾ÖªãŸÖ ëú¦üÖë êú

¯»Öï™ü »ÖÖê›ü ±îúŒ™ü¸üPLANT LOAD FACTOR OF

POWER STATIONS IN SOUTHERN REGION ( 2006 - 2007 )

0.00

10.00

20.00

30.00

40.00

50.00

60.00

70.00

80.00

90.00

% P

LF

Raichur Brahmapuram

(Diesel)

Kozhikode(Diesel) Ramagundam STPS Neyveli TS-II Kaiga G.S( Nuclear)

2005-06 2006-07

13

Sheet 3

¾ÖÂÖÔ 2006-2007 ´Öë ¤ü×�Ö9Ö �Öê¡Ö êú ×¾ÖªãŸÖ ëú¦üÖë êú

¯»Öï™ü »ÖÖê›ü ±îúŒ™ü¸üPLANT LOAD FACTOR OF

POWER STATIONS IN SOUTHERN REGION ( 2006 - 2007 )

0

10

20

30

40

50

60

70

80

90

100

%P

LF

Ennore Tuticorin Mettur North Chennai Neyveli TS-I

2005-06 2006-07

14

2006-07 êú ×»Ö‹ ¤ü×�Ö9Ö �Öê¡ÖßµÖ ¯ÖÏ9ÖÖ×»ÖµÖÖë êúú ¾ÖÖ×ÂÖÔú »ÖÖê›ü ±îúŒ™ü¸ü ( ¯ÖÏ×ŸÖ¿ÖŸÖ ´Öë) ANNUAL LOAD FACTOR ( IN PERCENTAGE ) OF

SOUTHERN REGIONAL SYSTEMS FOR 2006-07

7477

60

81

76

82

0

10

20

30

40

50

60

70

80

90

L F

(%

)

A P KAR KERALA T N PUDUCHRRY S R

15

†¬µÖ Ö µÖ 1 CHAPTER ICHAPTER ICHAPTER ICHAPTER I

¤ ü× Ö�Ö Öê¡Ö ßµ Ö ×¾ ÖªãŸ Ö ÃÖ×´Ö×ŸÖ SOUTHERN REGIONAL POWER COMMITTEE

¯ Ö × ¸ü “Ö µÖ / INTRODUCTION

¤ü × �Ö �Ö �Ö ê¡Ö ´Ö ë ¤ü × �Ö �Ö �ê ú “ Ö Ö ¸ ü ¸ ü Ö •µ Ö † ÖÓ¬Ö Ð Ð ¯ ÖÏ ¤êü ¿Ö , �ú−Ö Ö Ô™ ü �ú, �êú¸ ü »Ö , Ÿ Ö × ´Ö »Ö − Ö Ö ›ãü ‹¾Ö Ó

Ã Ö Ó‘ Ö ¿Ö Ö × Ã ÖŸ Ö ¯Ö ã¤ãü ü “ Öê ü ß ¿Ö Ö× ´Ö »Ö Æîü × • Ö Ã Ö �úÖ × ¾Ö à Ÿ Ö Ö¸ ü �ú¸ ü ß²Ö 637, 000 ¾Ö - ÖÔ × �ú»Ö Ö ê Ö ß™ ü ¸ ü Æîü …

µ Ö Æü ¤êü ¿Ö �êú �ãú»Ö �Ö ê¡Ö �úÖ 20% Æîü …

Southern Region comprises the four Southern States of Andhra Pradesh,

Karnataka, Kerala and Tamil Nadu and the Union Territory of Puducherry

encompassing an area of approximately 637,000 Square Kilometres, constituting

about 20% of the total area of the country.

¤ü × �Ö �Ö �Ö ê¡Ö �úÖ × ¾Ö ªãŸ Ö ´Ö Ö − Ö × “ Ö ¡Ö ¯ Ö Ï ¤ü ¿Ö á- I ´Ö ë × ¤ü 5Ö Ö µ ÖÖ - Ö µ Ö Ö Æîü …

The Power Map of the Southern Region is given in Exhibit I.

MEMBERSHIPS, FUNCTIONS AND ORGANISATIONAL SET UP

1.1 MEMBERSHIP OF SRPC

As per Government Of India Resolution dated 25.05.2005 followed by Amendment Resolution dated 29.11.2005, the Membership of SRPC is as follows :

i) Member (Grid Operations), Central Electricity Authority (CEA)

ii) One representative each of Central Generating Companies, Central Transmission Utility (CTU), National Load Despatch Center (NLDC) and the Southern Regional Load Despatch Center (SRLDC)

16

iii) From each of the State in the region, the State Generating Company, Transmission Utility (STU), State Load Despatch Center (SLDC) and one Distribution Company by rotation (where more than one such company exists) would be represented.

iv) Every Independent Power Producer (IPP) having more than 1000 MW installed capacity in the region would have one representative each.

v) One member representing all other IPPs operating in the region.

vi) One member representing the Electricity Traders in the region.

vii) Member Secretary, SRPC - Convener.

1.2 FUNCTIONS

The following functions have been assigned to SRPC :

a) To undertake Regional Level Operation Analysis for improving Grid performance.

b) To facilitate Inter-State/Inter-Regional transfer of power.

c) To facilitate all functions of planning relating to Inter-State/Intra-State Transmission System with CTU/STU.

d) To coordinate planning of maintenance of generating machines of various Generating Companies of the region including those of Inter-State Generating Companies supplying electricity to the Region on annual basis and also to undertake review of maintenance programme on monthly basis.

e) To undertake planning of outage of transmission system on monthly basis.

f) To undertake operational Planning Studies including Protection Studies for stable operation of the Grid.

g) To undertake planning for maintaining proper voltages through review of reactive compensation requirement through System Study Committee and monitoring of installed capacitors.

h) To evolve consensus on all issues relating to economy and efficiency in the operation of power system in the region.

17

1.3 ORGANISATIONAL SET-UP OF SOUTHERN REGIONAL POWER COMMITTEE

The organisational set up of Southern Regional Power Committee detailing

the staff allocation during 2006 -2007 is given below :

STAFF ALLOCATION

Name of the Post No. of Posts

Posts filled up as on

31-03-2007.

A. GAZETTED

1. Member Secretary. 1 1

2 Superintending Engineer 3 3

3 Assistant Secretary / EE 7 5

4 Asst.Executive Engineer. 9 8

5 Assistant Engineer 2 2

6 Assistant Engineer(Civil ) 1 1

7 PS 1 1

B. NON- GAZETTED

1 Technical Officer. 1 -

2 Junior Engineer (Civil ) 1 1

3 D’Man Gr – I 1 1

4 D’Man Gr - II 1 1

5 D’Man Gr - III 1 1

6 Assistant 1 1

7 Stenographer Gr – I 2 2

8 Stenographer Gr – II 3 3

9 Stenographer Gr – III 1 1

10 Hindi Translator. 1 1

11 UDC 1 1

12 Store Keeper 1 1

13 LDC 4 4

14 Driver 1 1

15 Peon 6 6

16 Chowkidar 1 1

TOTAL 51 47

18

The establishment of officers in the secretariat of the SRPC as on 31.03.2007 is

given in Annexure-I.

1.4 FINANCIAL PARTICULARS :

The actual expenditure incurred by the SRPC during the financial year 2006-2007

is as follows :

Major Head - 2801 Expenditure

SRPC (Non-Plan)

a) Salaries b) Over Time Allowance c) Travel Expenses d) Office Expenses

e) Medical

TOTAL

Rs

52,44,561 10,000

4,24,881 1,22,000

67,728

58,69,170

SRLDC – (Non–Plan)

a) Salaries b) Over Time Allowance c) Travel Expenses d) Office Expenses e) Other Charges f) Medical

TOTAL

53,93,246 5,961

3,14,954 17,05,912

2,71,980 88,953

77,81,006

Minor Works- 2801 Strengthening of RPCs

4,88,747

19

†¬µÖ Ö µÖ 2 CHAPTER IICHAPTER IICHAPTER IICHAPTER II

Ö ê¡Ö ßµ Ö ×�Ö Ï ›ü ×−Ö¯ÖÖ¤ ü− Ö REGIONAL GRID PERFORMANCE

2.1 POWER SUPPLY POSITION

The registered peak demand of the Southern Regional grid during the year

was 25039 MW indicating an increase of 1667 MW over the previous year. The

unrestricted maximum demand was 26865 MW. The overall capacity shortage in

the region was of the order of 1.00 % to 7.94 % during the year 2006-07. The

maximum monthly capacity shortages were of the order of 0.77 % to 15.89 % in

Andhra Pradesh, 1.20 % to 9.06 % in Karnataka, 0.04 % to 2.62 % in Kerala and

0.27 % to 4.96 % in Tamil Nadu. The constituent wise details of monthly load

pattern viz. Registered peak demand, unrestricted demand and capacity shortages

are given in Annexure-II.

The maximum gross energy consumption of Southern Region was 561

MUs/day during the month of March 2007. The total energy consumption of the

Southern Region for the year 2006-07 was 180281 MUs at an average of around

494 MUs/day, which was 11.76 % more than that of previous year. The monthly

regional energy shortages varied from 0.02 % to 4.65 %. The energy shortages

were of the order of 0.10 % to 8.73 % in Andhra Pradesh, 0.43 % to 3.79 % in

Karnataka, 0.44 % to 3.15 % in Kerala, 0.32 % to 3.31 % in Tamil Nadu. The

constituent-wise details of monthly gross energy consumption, unrestricted energy

requirement, energy shortages and month-wise average energy consumption/day

are given in Annexure-III.

20

Load regulations were effected to by the States in varying measures.

Details of regulatory measures in force in Southern Region during 2006-07 are

given in Annexure-V.

2.2 SOUTHERN REGION INSTALLED CAPACITY

The installed capacity of Southern Region at the end of financial year 2006-

07 was 36823.32 MW (source:CEA). The total installed capacity comprises Hydro-

11011.71 MW (29.91 %), Thermal+Gas+Diesel 20698.12MW (56.20 %), Nuclear-

880 MW (2.39 %) and Wind+R.E.S- 4233.49 MW (11.50 %). There was an addition

of 806.49 MW in Southern Region. The Hydro Thermal ratio was 35:65 as on

31.03.2007.

The details of generating units commissioned during the year 2006-07 are

given in Annexure-XVI.

The State-wise installed generation capacity as on 31.03.2007 in the

Southern Region are given below:

State Hydro Thermal Gas Diesel Nuclear Wind + R.E.S

Grand Total

Andhra Pradesh 3586.36 3132.5 1875.70 36.80 0.00 545.29 9176.65

Karnataka 3427.90 1730.00 220.00 234.42 0.00 916.92 6529.24

Kerala 1821.60 0.00 174.00 256.44 0.00 48.85 2300.89

Tamil Nadu 2175.85 3220.00 934.10 411.66 0.00 2721.83 9463.44

Puducherry 0.00 0.00 32.50 0.00 0.00 0.60 33.10 Lakshdweep 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Central Sector 0.00 8090.00 350.00 0.00 880.00 0.00 9320.00

SR TOTAL 11011.71 16172.5 3586.3 939.32 880 4233.49 36823.32

The details of Installed capacity during the period 2002-2003 to 2006-2007

in respect of Southern region are given in Annexure-VII. The growth of installed

capacity of Southern Regional System during the year 2002-2003 to 2006-2007 is

given in Exhibit-II.

2.3 MAXIMUM DEMAND

Southern Region maximum demand recorded during 2006-07was 25039

MW as compared to 23372 MW in the previous year indicating an increase of 1667

MW. The registered system peak demands, unrestricted demand and registered

21

minimum demand for each constituent of the Region during the year 2006-07 are

given below:

The details of monthly registered peak demand of constituent States of

Southern Region, unrestricted demand and the monthly aggregate peak demand as

well as monthly simultaneous peak demand of the Region during the year 2006-07

are furnished at Annexure-II. Also the details of the monthly registered minimum

demand of the constituent states of the Southern Region and the demand shortages

are given in Annexure-II. The growth in Southern Regional System SEBs peak

load and the SR peak load during the year 2002-2003 to 2006-2007 are shown in

Exhibit-III.

Month-wise diversity factor in respect of Southern region varied from 1.05 to

1.11 during the year 2006-07 and is indicated in Annexure-II.

Annual load duration curve of Southern Region is shown in Exhibit-IV.

Typical load curves for a working day (Regional peak load day) and Regional

minimum demand day for the Region and the States are shown in Exhibit-V and

Exhibit-VI respectively.

2.4 ENERGY GENERATION & CONSUMPTION

The generation statistics of power stations in the Southern Region during

the year 2006-07 are given at Annexure-VI Also the performance statistics of

power stations in the region during the year 2006-07 are given at Annexure-VIII.

The quantum of hydro, Thermal+Gas+Diesel, Nuclear, State Wind Mill & IPPs

State Registered Peak demand

Max. unrestric- ted demand

Registered Minimum demand

Andhra Pradesh

8950 (Mar 18th) 10517 (Mar) 3706 (Aug 5

th)

Karnataka 5959 (Feb 17th) 6401 (Feb) 1805 (Jun 25

th)

Kerala 2742 (Feb 27th) 2803 (Mar) 767 (May 30

th)

Tamil Nadu 8883 (Mar 22nd

) 9126 (Feb) 3681 (Oct 22nd

)

22

energy generation in the region during 2006-07 was 38254.52MUs (20.32 %),

120423.03 MUs (63.95 %), 5161.53 MUs (2.74 %), 35.45 MUs (0.02%) & 24424.22

MUs (12.97%) respectively. Break-up of energy generation in 2006-07 as also in

the year 2005-06 are presented below:-

There was an increase of 12.72 % in total energy generation in 2006-07

over the previous year. State-wise generation and consumption data for the year

2006-07 is given in Annexure-X. The growth of generation of the state systems and

regional grid is represented in Exhibit-VII, VIII & IX.

2.5 SYSTEM FREQUENCY

The monthly average frequency of the Southern Regional Grid varied

between 49.17 Hz and 50.01 Hz during the year 2006-07 as against 49.42 Hz and

50.25 Hz. during 2005-06. 93.94 % of the time the grid operated within the IEGC

range (49.0 Hz to 50.5 Hz.) which is less than that of last year (96.64 %) For the

year 2006-07 as a whole, the percentage of time frequency remained between

various ranges is given below:

Type 2005-06 2006-07 % increase

Hydro 32970.78 38254.52 16.03

Thermal+Gas+ Diesel

108660.66 120423.03 10.82

Nuclear 4711.56 5161.53 9.55

Wind Mill 34.68 35.45 2.22

IPPs 20675.86 24424.22 18.13

Total 167053.54 188298.75 12.72

23

System Frequency 2005-06 2006-07

Below 48.5 Hz 0.00 0.01

Between 48.5 Hz and 49.0 Hz 2.32 5.97

Between 49.0 Hz and 49.5 Hz 15.14 50.02

Between 49.5 Hz and 50.0 Hz 42.31 28.10

Between 50.0 Hz to 50.5 Hz 39.19 15.82

Above 50.5 Hz 1.04 0.08

Within IEGC Range 49.0 Hz to 50.5 Hz. 96.64 93.94

Average Frequency (Hz) 49.84 49.50

Details of month-wise frequency levels during the year 2006-07 are given in

Annexure-XI.

2.6 VOLTAGE PROFILE

The voltage levels at the grid sub stations as given in Annexure XXIII were

satisfactory for most of the time, except for a few sub-stations where high voltage

prevailed. The details of Capacitor installations by the constituents during the year

2006-07 are given in Annexure-XXII.

2.7 PLANT LOAD FACTORS

The average plant load factors of Thermal Power Stations in the Southern

Region as a whole and for the constituent States for the year 2006-07 as well as for

the previous year 2005-06 are indicated below. Details are given in Annexure VIII.

The details of outages of power stations are given in Annexure-IX.

24

* Excludes Talcher

2.8 SYSTEM LOAD FACTORS

The annual load factors of the Southern Region and constituent systems

during 2006-07 and the previous year 2005-06 are indicated below:

CONSTITUENT SYSTEM 2005-06 2006-07

ANDHRA PRADESH 70 74

KARNATAKA 70 77

KERALA 59 60

TAMIL NADU 77 81

SOUTHERN REGION 79 82

The load factor of the constituent systems is given in Annexure-IV.

2.9 INTERCONNECTED OPERATION OF THE GRID

Power systems of the constituent States of Southern Region viz, Andhra

Pradesh, Karnataka, Kerala, Tamil Nadu and Puducherry operated in parallel during

the year. The details of inter state & inter-regional lines and the duration for which

major tie lines were open during the year 2006-2007 is given in Annexure-XII.

2.10 OPERATION WITH NEIGHBOURING STATES/REGIONS

Southern region had exchanges of power with constituents of neighbouring

Regions-UI power, Bilateral exchanges and availing of shares from ER NTPC

Constituent System 2005-06 2006-07

Andhra Pradesh 79.91 86.75

Karnataka 71.31 89.18

Tamil Nadu 72.34 81.59

Ramagundam STPS 86.45 88.90

NLC II 71.24 66.30

NLC-Expansion 83.78 88.76

Southern Region 78.17* 83.65 *

25

stations. Southern Region had Power exchanges with all the other regions through

the back-to-back HVDC stations at Chandrapur (via Ramagundam-Chandrapur

lines), Gazuwaka (via Jeypore-Gazuwaka lines) and Talcher Interconnecting point.

Talcher-Kolar HVDC link is an evacuation scheme for Talcher Stage II station (2000

MW) dedicated for Southern Region located in Eastern Region. During the year,

Southern Region also wheeled power to WR/NR constituents from NER/ER.

2.11 ENERGY EXCHANGES

The constituent wise details of entitlements and schedules from ISGSs in

SR and NTPC stations in ER, including bilateral exchanges and actual drawals from

the grid including losses are given below.

The month wise details of the same are furnished in Annexure-XIII.

The actual inter regional energy exchanges during the year 2006-07 are

given below:

From To MUs

ER SR 1717.290

SR ER 165.603

WR SR 194.955

SR WR 3133.625

Entitlement from Grid

Schedule From Grid

Actual

Andhra Pradesh 11802.23 11358.99 12323.68

Karnataka 10614.65 9011.22 9572.39

Kerala 8291.22 5968.70 5649.55

Tamil Nadu 17086.10 17742.05 17578.88

Pondicherry 1896.58 1893.07 1807.19

26

The month wise details are given in Annexure-XIII. The scheduled energy

wheeled to other regions is given in Annexure-XIII. The details of inter/intra regional

scheduled bilateral exchanges are given in Annexure-XIII, along with ex-bus

schedules of beneficiaries from Central Generating Stations.

The details of allocation of shares to the various beneficiaries of Southern

Region from ISGS stations located in Southern Region during 2006-07 are given in

Annexure-XIV.

2.12 RESERVOIR LEVELS

Salient features viz. Month-wise levels recorded, live storage and energy

contents in major hydel reservoirs in the Southern Region during 2006-07 are given

in Annexure-XV and Exhibit-X.

2.13 PROGRESS OF GENERATION SCHEMES

During the year 806.49 MW generation capacity was added in the Region.

The state wise additions are as given below:

The progress of generation schemes under construction in the region as on

31.03.07 is given in Annexure-XVII.

State CAPACITY (MW)

ANDHRA PRADESH 269.27

KARNATAKA 15.25

TAMIL NADU 471.97

CENTRAL SECTOR 50.00

TOTAL SOUTHERN REGION

806.49

27

2.14 PROGRESS OF TRANSMISSION LINES / SUB STATIONS UNDER CONSTRUCTION

The details of 400 KV and 220/230 KV Transmission lines commissioned

during the year 2006-2007 are given in Annexure-XX.

The progress of construction of 220/230 KV and above transmission lines

as on 31.03.2007 are given in Annexure-XXI.

The details of 400 KV/220 KV Sub stations commissioned during the year

2006-2007 are given in Annexure-XVIII.

The progress of construction of 400/220 KV sub stations as on 31.03.2007

are given in Annexure-XIX.

***********

28

†¬µÖ Ö µÖ 3 CHAPTER IIICHAPTER IIICHAPTER IIICHAPTER III

×�Ö Ï ›ü ´ Ö ë ¾ µ Ö¾ Ö¬ÖÖ− Ö ‹ ¾ ÖÓ Ã Ö Ó ü Ö�Ö Ã Ö ê Ã Ö Ó² ÖÛ− ¬ÖŸ Ö ×$ Îúµ ÖÖ$ú»ÖÖ¯Ö GRID DISTURBANCES AND PROTECTION RELATED ACTIVITIES

3.1 There were no major Grid Disturbances in the Southern Regional Grid

during the year 2006 – 2007. However, the system occurrences and minor trippings

that took place in the constituent systems were discussed in detail, regularly in the

Protection Sub-Committee meetings and necessary rectification / remedial

measures suggested by the Protection committee were taken up for implementation

by the constituents to avoid its recurrence.

3.2 The Protection Sub-Committee of SRPC analyses the Grid Disturbances,

System Occurrences and other trippings that occur in the Southern Regional Grid

and suggests measures to avoid their recurrence. The functions of the Protection

Sub-Committee in brief are as follows:

a) Analysis of the Grid Disturbances, System Occurrences and other trippings and

to suggest measures to avoid their recurrence.

b) Coordination of settings of protective relays in the Regional System to maintain

the security of the Grid.

c) Periodical review of under frequency load shedding schemes, df/dt load

shedding schemes and other protection schemes adopted in the Grid.

d) Review of the implementation of recommendations made by the inquiry

committee of the grid disturbances in the region concerning to above matters.

e) To suggest, discuss and implement special protection schemes to take care of

major loss of import / generation so as to ensure security of the Grid.

29

During the year 2006 – 2007, the Protection Sub Committee met twice (1st

and 2nd

Protection Sub Committee meeting on was held on 25.07.2006 and

08.12.2006 respectively). The 2nd

Protection Sub Committee meeting was

preceded, by the meeting of the Working group on Protection.

3.3 The following issues were deliberated/ implemented by the constituents in

the Protection Committee of SREB/Protection Sub-Committee of SRPC during the

year:

a) The load relief obtained at different settings of flat under frequency

relays provided in the constituent systems was reviewed for their

correctness during system occurrences / disturbances and

necessary remedial measures recommended by the committee

were implemented by the constituents.

b) The operation of df/dt relays in the constituent systems was

reviewed periodically. The operation of this scheme and the

quantum of load relief obtained is also being monitored regularly for

its effectiveness.

c) Carrier Protection in the Kaiga corridor (Nagjhari-Kodasalli on

17/08/2006, Kadra-Kodasalli on 18.08.2006, Kaiga-Kadra & Kaiga-

Kodasalli on 19.08.2006) has been installed by KPTCL.

d) Bus Bar protection at Somanahalli 220 kV substation has been

commissioned by KPTCL on 08.09.2006.

e) Kaiga have implemented an inter trip scheme at Kaiga generating

station to avoid over loading & tripping of Kaiga – Guttur lines

whenever the power flow gets diverted towards Kaiga due loss

evacuation lines between Nagjhari and Hubli stations. With the

above scheme 220kV Kaiga – Kadra & Kaiga – Kodasalli lines

would trip, whenever the current reaches 750 amp /1.5 sec on

Kaiga-Guttur 220 kV line. The tripping is interlocked with the

availability of one of the 400 kV Kaiga-Narendra lines.

30

f) Islanding scheme for Kaiga generating station is under discussion

in the protection sub committee. The scheme considers islanding of

Kaiga Units I&II along with 250 MW of KPTCL load.

g) Islanding scheme for NTPC, Ramagundam STPS is under

discussion in the protection Sub-Committee. The scheme considers

islanding formation with one unit of 500 MW and one unit of 200

MW of Ramagundam along with radial loads of Andhra Pradesh

connected to ICTs at RSTPS to avoid total shutdown of RSTPS

during grid disturbances. Subsequently APTRANSCO proposed to

form an Island for Hyderbad with Ramagundam generators. Now

the discussions are on for designing an islanding scheme of

Ramagundam generators with local loads as well as Hyderabad

loads of APTRANSCO.

h) Islanding scheme for NTPC, Talcher STPS is also under discussion

in the protection sub committee. The scheme considers the

disconnection of Talcher Stage –II Units from ER grid during under

frequency conditions and forming island with Southern Region

through Talcher-Kolar HVDC link.

i) Special Protection Scheme (SPS) for 2X1000 MW Kudankulam

Nuclear Power Plant (KNPP) is under discussion in the protection

committee. 1000 MW generators at KNPP is biggest size generator

in Southern Region whose outage could pose frequency instability.

SPS for KNPP is being worked out to care of contingency of loss of

generation due to tripping of one/ two units. A special working

group was formed in the 1st Protection Sub Committee meeting and

was entrusted with task of designing the logic scheme of the SPS

with various micro level engineering options. The special working

group submitted its report for approval by Protection Sub

Committee in its 2nd

meeting held on 08.12.2006. The sub

committee agreed to the recommendations of the special working

group except for implementing agency at Kudankulam, so the issue

was put up to TCC/SRPC for their consideration. The matter is still

under consideration of TCC/SRPC.

31

j) Up gradation to 400 KV operation of Kaiga-Guttur DC link was

under taken. The Kaiga-Guttur circuit-II has been put into regular

operation from 14.07.2006 after changing all the defective

insulators. Similarly circuit-I was charged 400 KV level w.e.f.

07.03.2007 after changing all the defective insulators.

k) KPCL have implemented a selective tripping scheme at Nagjhari

generating station to save the simultaneous tripping of all units at

Nagjhari in the event of Nagjhari having been cut-off from load

centre Hubli on account of fault & operation of reverse power

protection taking place at Kaiga, tripping Kaiga – Kadra / Kodasalli

lines and thus leaving Nagjhari generators without any evacuation.

A revision in settings on the above scheme suggested by the

protection Sub Committee was implemented by KPCL on

10.08.2006.

l) A review meeting was held at CEA, New Delhi, on 22-12-2006 to

discuss the revised tripping scheme for Talcher STPS II units

during outage of Talcher – Kolar link, proposed by NTPC. The

implemented scheme was based on 450 MW jerk to the ER system

whereas the revised scheme is based on the presumption that the

ER-NR-WR grid bear a jerk of 1100 MW after commissioning of

Tala Transmission system. The meeting was taken by Member

(PS), CEA wherein it was agreed that:

o Revised scheme to be designed to in such a way that the

sudden impact on NER-ER-WR-NR system is less than

1000 MW

o Scheme should cause minimal trippings of Talcher II units.

The unit tripping alongwith run back of other unit(s) could

be implemented in such a way that the total relief comes in

about 4-5 seconds

o NTPC may look into the possibility of designing the scheme

by measuring inrush into ER grid and building the scheme

logic accordingly.

32

m) In view of the system occurrence in Karnataka on 01.11.2006 at

14.08 hrs, wherein one Kaiga Unit got poisoned out, a special

working group was formed in the 2nd

Protection Sub Committee

meeting held on 08.12.2006 for reviewing the relay settings in

Kaiga related corridor. The special working group held a meeting at

Kaiga on 8th and 9

th Feb 2007 and has submitted its report for

approval by Protection Sub Committee.

*************

33

†¬µÖ Ö µÖ 4 CHAPTER IVCHAPTER IVCHAPTER IVCHAPTER IV

¾ ÖÖ×�ÖÛ•µ Ö$ ú † Öî ü ‰ ú•ÖÖ Ô » Ö ê- ÖÖ$ ú¸ü�Ö �Öן Ö×¾ Ö׬ֵ ÖÖÑ COMMERCIAL AND ENERGY ACCOUNTING ACTIVITIES

4.1 ENERGY ACCOUNTING: Availability Based Tariff (ABT) has been implemented in Southern

Region w.e.f. 1st January 2003. Consequently, accounting of energy for the

SR grid is being done by SRPC Secretariat regularly in line with CERC

guidelines / directives. The energy accounting involves preparation of

weekly UI, Reactive Energy Accounts and monthly Regional Energy

Accounts.

4.1.1 Weekly UI and Reactive Energy Accounts:

4.1.1.1 In line with the order of CERC, weekly accounts of Unscheduled

Interchanges (UI) and Reactive Energy are to be prepared and issued by

SREB/SRPC Secretariat every week in a time bound manner. Under the

ABT regime, each day is divided into 96 time blocks of 15 minutes each.

The schedules of generation by each Inter State Generating Station (ISGS)

and drawals by each beneficiary constituents for each time block is

compared with their actual generation / drawal for each block (computed

from the block wise reading of SEMs on all feeders). The charges for

deviation between actuals and schedules are computed on the basis of

frequency linked UI rates stipulated by the CERC from time to time. The

34

weekly UI accounts are compiled from the block wise data for all the 7

(seven) days ( Monday to Sunday ) of a week.

4.1.1.2 Weekly Reactive Energy account is prepared from the reactive

energy injected / drawn by the constituent beneficiaries with reference to

prevailing voltage conditions. Incentives for reactive energy injection at low

voltage and drawals during high voltage conditions and penalty for reactive

energy drawal at low voltage and injection during high voltage conditions

are levied at rates specified by CERC. The Reactive Energy account is also

compiled, like UI accounts, from the SEM readings every week.

4.1.1.3 UI and Reactive accounts were prepared and circulated to SR

constituents on weekly basis, as per the provisions of ABT orders and in

pursuance of CERC directions, with the soft copies of the computed files

uploaded to website so as to enable downloading by the SR constituents.

4.1.2 Monthly Regional Energy Accounts (REA)

4.1.2.1 The monthly REA, issued by SRPC, gives the details of energy

scheduled by beneficiary constituents from ISGSs within and outside the

region. The REA enables the Central Power Utilities to raise the bills on

beneficiaries for charges relating to capacity, scheduled energy, incentives,

transmission, RLDC etc. The monthly REAs, inter-alia comprise details on

the following:

i. Computation of Availability and PLF of thermal ISGSs covered by ABT.

ii. Energy scheduled to constituent beneficiaries from ISGSs for payment of energy charges.

iii. Energy scheduled by beneficiaries from ISGSs beyond target PLF for the purpose of payment of incentives to ISGS.

35

iv. Computation of weighted average percentages for the purpose of payment of Regional Transmission charges and RLDC charges.

v. Details of Intra-regional and Inter-regional scheduled bilateral exchanges and wheeled energy on short term open access.

vi. ESCOM / DISCOM wise details for Payment of Capacity / Energy charge and Incentive, wherever applicable.

4.1.2.2 The provisional REA for the current month and the final REA for the

previous month were issued latest by the 6th of each succeeding month.

4.2 UI CHARGES FOR INTER-REGIONAL EXCHANGES WITH

WESTERN & EASTERN REGIONS

4.2.1 At the time of implementation of ABT in SR, viz. 1.1.2003 it was

decided that the UI for inter-regional exchanges with WR will be settled at

the rates of the respective regions, i.e the UI receivable by the exporting

region and the UI payable by the importing region will be at their respective

frequencies. The difference amount between UI payable by the importing

region and receivable by the exporting region will be shared at 50:50 by the

two regions.

4.2.2 In the case of Eastern Region, the weekly UI accounts for inter-

regional exchanges between ER & SR are being prepared w.e.f. 1st April

2003, viz. the date of implementation of ABT in Eastern Region. EREB vide

their communication dated 1st April 2003 had intimated that UI for ER-SR

exchanges will be calculated at ER frequency only and accordingly, the UI

charges for inter-regional exchanges between ER and SR were being

computed at Eastern Region frequency. Subsequently, EREB proposed

vide letter No. EREB/COM-II/GEN/2004/ 2736-41 dated 28th May 2004 that

inter-regional UI between ER & SR be on respective regional frequencies.

EREB’s proposal was considered by SREB in a Special meeting of TCC

36

held on 23rd

August 2004. On the recommendations of TCC, the proposal

was agreed to by SRE Board in the 136th meeting and implemented with

effect from 6th September 2004, for which EREB’s concurrence was also

conveyed.

4.2.3 In view of the above, for exchanges of UI power with ER as well as

WR, amounts corresponding to respective regional frequencies are being

charged. The difference amount between UI payable by the importing

region and receivable by the exporting region were shared at 50:50 by the

two regions.

4.3 MEETINGS OF THE COMMERCIAL COMMITTEE

222nd

meeting of Commercial Committee of SREB was held in April

2006.Subsequently,Southern Regional Power Committee (SRPC) was

established and in line with Conduct of Business Rules, 2006 of SRPC,

Commercial Sub- Committee was reconstituted with representation from

member constituents of SRPC. Meeting of Commercial Sub-Committee of

SRPC were conducted in line with the provisions of revised Indian

Electricity Grid Code (IEGC) issued by Central Electricity Regulatory

Commission (CERC), effective from 1st April 2006. Accordingly, 1

st and 2

nd

meeting of Commercial Sub-Committee were held during the year 2006-07,

for audit of regional UI account and regional reactive account for the period

from 01.04.2006 to 03.09.2006.

********

37

†¬µÖ Ö µÖ 5 CHAPTER VCHAPTER VCHAPTER VCHAPTER V

¯Ö Ï “ÖÖ»Ö− Ö, ÃÖ Ó ü Ö�Ö ‹ ¾ Ö Ó ¯Ö Ï �ÖÖ»Ö ß † ¬µ Öµ Ö− Ö �Öן Ö×¾ Ö׬ֵÖÖ Ñ OPERATION, PROTECTION & SYSTEM STUDIES ACTIVITIES

5.1 GRID OPERATION HIGHLIGHTS

• LILO of 400 KV Nellore – Sriperumbudur D/C Lines at Alamathy

400 KVS/S of TNEB successfully commissioned on 24/25th May

2006 and were declared under commercial operation from 1st June

2006 by PGCIL.

• 1st ICT of 315 MVA, 2

nd ICT of 100 MVA & 3

rd ICT of 315 MVA at

400 KV Almathy Substation was commissioned on 16th June, 28

th

June & 8th Dec 2006 by TNEB .

• 400 KV Nelamangala – Mysore DC line put on commercial

operation w.e.f.01. 05.2006 by PGCIL.

• Unit I & II Bhavani Kattalai Barrage-I (15 MW each) synchronized

on 1st August & 22

nd Sep 2006 by TNEB.

• LILO of 230 KV NCTPS - Mosur Ckt 1 at Alamathi S/S was

completed on 5th August 2006 by TNEB.

• 315 MVA, 400/220 KV 2nd

ICT at Narendra commissioned on 30th

August 2006 and put at commercial operation from 1st Sep 2006 by

PGCIL.

• KPTCL has established Carrier Protection on following 220 KV links

in Kaiga Corridor between 17th to 19

th August 2006.

38

� Nagjheri PH-Kodasalli D/C Line

� Kadra-Kodasalli S/C Line

� Kaiga-Kadra S/C Line

� Kaiga-Kodasalli S/C Line

• Talcher-Kolar recorded 2030 MW on 3rd

September 2006

which is maximum till now.

• Tripped trials of SPS at Kolar were tested successfully in the

region.

• 1 x 100 MVA, 220/110 KV Transformer was charged at Nittur

on 13th September 2006 by KPTCL.

• Enercon Wind Farm Hindustan (IPP) commissioned 16.8

MW of Wind Mills on 29.12.2006 in Karnataka.

• Global Energy Limited Biomass (IPP) commissioned 5 MW

of installed capacity on 30.12.2006 in Karnataka.

• 400 KV Nelamangala- Somanahalli D/C line along with

associated bays and equipment at both Nelamangala and

Somanahalli substations was put under commercial

operation w.e.f. 01.01.2007 by PGCIL.

• MOP, GOI, vide their letter No.3/2/2006-OM dated

26.12.2006 have restored 115 MW firm share to AP in Kaiga

APS Unit 1 & 2 which was temporarily re-allocated to Tamil

Nadu in April 2002. The above allocation was implemented

w.e.f. 00:00 hrs of 28.12.2006 for operational and regional

energy/commercial accounting purposes.

• 100 MVA, 220/132/33 KV Bheemavaram Substation was

charged on 02.02.2007 by APTRANSCO.

• 20 MVA, 220/132 KV sub-station at Hyderabad International

Airport was commissioned on 05.03.2007 by APTRANSCO.

• 100 MVA, 220/132 KV sub station at Kamavarapu Kota was

test charged on 28.03.2007 by APTRANSCO.

39

• 35.2 MW of wind mills were commissioned by the IPPs in

Karnataka.

5.2 The under frequency load shedding scheme is in operation in the Southern

Regional grid with the settings of 48.0Hz, 48.2Hz & 48.5Hz instantaneous on the flat

under frequency relays provided in the constituent systems. The details of the load

relief obtained at different settings in the Region is given in the table furnished

below:

Details of UFR in constituent systems

The operation of under frequency load shedding scheme is being

monitored regularly in the OCC and Protection committee meetings and any

discrepancy in its operation were reviewed and corrective measures taken

by the constituents for its effectiveness.

5.3 The df/dt protection scheme is in operation in the Southern Regional grid

with the following two settings. The details of the load relief obtained through

this scheme is given in the table furnished below:

- 49.5Hz with rate of fall of 0.3Hz / sec. - for alarm; &

- 49.3Hz with rate of fall of 0.3Hz / sec. instantaneous - for trip.

Sl.No STATE 48.5 Hz./Inst 48.2 Hz./Inst.

48.0 Hz./Inst.

1 Andhra Pradesh 516 409 975

2

Karnataka

453-857 Off peak-Peak

369-841 Off peak-Peak

332-732 Off peak-Peak

3

Kerala

100-180 Off peak-Peak

83-125 Off peak-Peak

317-494 Off peak-Peak

4 Tamil Nadu 504 484 757

Total

1573-2057

1345-1859

2381-2958

40

df/dt Relays installed in Southern Region

The operation of df/dt protection scheme is also being reviewed

regularly in the OCC and Protection committee meetings and any

discrepancy in its operation were discussed and necessary remedial

measures were recommended for implementation in the constituent

systems. The relay settings were reviewed periodically and the

recommendations of the Operation coordination committee and Protection

committee on the upward revision of the settings from 49.0Hz with rate of

fall of 0.3Hz / sec. instantaneous for trip to 49.3Hz with rate of fall of 0.3Hz /

sec. instantaneous was put up to the SRE Board and got approved. The

revised settings were implemented in the constituents' systems in

accordance to the approval of SRE Board.

5.4 SPECIAL PROTECTION SCHEMES

HVDC Inter-trip scheme:

The inter trip scheme provided in Southern Regional grid helps in

compensating the loss of import whenever Talcher - Kolar + 500kV HVDC

system trips, by shedding corresponding loads in constituent systems

Sl.

No.

Constituent system

Df/dt Relay setting

Expected load

relief (MW)

1

APTRANSCO

49.3 Hz, 0.3 Hz / Sec, Instantaneous 1472

2

KPTCL

- do - 485 – 1036

3

KSEB

- do - 98 – 168

4

TNEB

- do - 509

Total load relief in SR

2564 – 3185

41

through the signal initiated at 400kV Kolar station during single and Bi-Pole

outage. Based on the quantum of import loss signal 1 and signal 2 are

generated at Kolar and is transmitted through wide band communication

network to the identified locations in the constituents system to give relief by

load shedding. The details of load relief expected in each constituent

system is furnished below:

Details of load relief expected during tripping of Talcher - Holar HVDC

link

Expected Load Relief in MW Sl.No.

Constituent system Signal 1 Signal 2

1

APTRANSCO

150

160-240

2

KPTCL

350

100

3

TNEB

391

235

4

KSEB

NIL

215

Total load relief in SR

891 710-790

Reverse power protection at Kaiga generating station:

Whenever the power flow gets diverted towards Kaiga due to loss

of evacuation lines between Nagjhari and Hubli stations, the increased

power flow on Kaiga – Guttur lines which are operating at 220kV level at

present, results in overloading of these lines with added generation of

42

Nagjhari, Kadra & Kodasalli generating stations and was resulting in

cascade tripping of Kaiga – Guttur lines most of the times.

Thus Kaiga gets islanded along with the above hydel generating

stations and the Units at Kaiga were tripping on loss of evacuation lines.

Earlier Kaiga was provided with a protection scheme to trip Kaiga – Kadra &

Kaiga – Kodasalli lines by sensing over load conditions on Kaiga – Guttur

lines. However the scheme failed to operate certain times due to racing of

relays.

Now Kaiga have implemented an additional protection scheme at

Kaiga generating station so as to trip 220kV Kaiga – Kadra & Kaiga –

Kodasalli lines, whenever the reverse current exceeds 600 amps for 1.0

sec. or 900 amps for 0.2 sec on these lines due to diversion of power flow

from Nagjhari, Kadra & Kodasalli generating stations towards Kaiga and

thus tripping of Kaiga – Guttur lines and islanding of Kaiga generating

station could be avoided.

Selective tripping scheme at Nagjhari generating station:

Whenever 220kV Nagjhari– Hubli lines 1, 2, 3 & 4 trips, it was

resulting in diversion of power flow from Nagjhari, Kadra & Kodasalli

generating stations towards Kaiga and leads to tripping of Kaiga – Kadra &

Kaiga – Kodasalli lines on reverse power protection provided at Kaiga. This

further results in islanding of the Units at Nagjhari, Kadra & Kodasalli

generating stations and trips due to lack of evacuation lines. KPCL have

implementing a scheme to trip the selected generators at Nagjhari

generating station by sensing power flow levels on Nagjari – Kodasalli lines

so as to limit the power flow on these lines towards Kaiga and thereby

avoid the tripping of Kaiga – Kadra & Kaiga – Kodasalli lines on reverse

power protection at Kaiga and which would in turn help in avoidance of total

loss of generation at Nagjhari, Kadra & Kodasalli generating stations. The

scheme helps in minimizing further disturbances and in improving the

system security of Southern Regional grid.

Power relays are installed on Nagjhari – Kodasalli line. Whenever

export through this line is more than 150 MW and less than 250 MW unit

1,2,4 & 5 trips sequentially with 0.1, 0.2,0.3and 0.4 seconds delay

43

respectively. If export is more than 250 MW unit 3,6 trips simultaneously

with 0.1 delays.

5.5 ISLANDING SCHEMES IN SOUTHERN REGION

Due to relatively even distribution of load and generation, the

islanding schemes are provided only in TN system, as an ultimate backup

during very low frequency conditions in Southern Regional grid. In few other

generating stations in the Region, the generators go on house load under

low frequency conditions. The details of the islanding schemes and house

load operation of generating units available in SR grid is furnished in the

table given below:

Islanding / House load of blocks during distress conditions

Station Frequency setting Remarks

ETS & BBGTPS

47.6Hz / 0.75sec

Local islanding with matching loads

GMR Vasavi

47.6Hz / 0.75sec Local islanding with matching loads

NCTPS & TCPL

47.6Hz / 2.0sec Local islanding with matching loads

NCTPS 47.5Hz / 3.0sec

52.0z / 1.0sec

Two selected Units to go on House load One selected Unit to go on House load

MTPS 47.6Hz / 2.0sec Local islanding with matching loads

Neyveli TPS Block 47.6Hz/2.0sec Local islanding with matching loads TTPS &

Hydro Block

47.6Hz / 2.0sec

Gets into two separate blocks

TTPS

47.0Hz / 5.0sec

Units 4 & 5 House load

Raichur TPS

47.5Hz / 21sec 47.5Hz / 25sec 47.5Hz / 5.0sec

Unit1 House load Unit2 House load Unit3 House load

MAPS

47.77Hz / 4.0sec or

47.5 / 1.0sec

House load

Kaiga GS

47.77Hz / 4.0sec or

47.5 / inst.

House load

44

5.6 DATA FOR MERITORIOUS PRODUCTIVITY AWARD:

The daily peak hour generation data of the thermal power stations

of Southern Region were collected from the power station authorities on

completion of every calendar month. The data were verified, compiled and

forwarded to OM Division, CEA, New Delhi for consideration for the

meritorious productivity award. The data on planned maintenance schedule

and actual maintenance taken up on the thermal units of Southern Region,

during the year 2006 - 2007 were also collected from the power station

authorities and compiled and sent to OM Division, CEA, New Delhi for

consideration of thermal stations for the award.

5.7 SYSTEM STUDIES:

The System Studies Sub Committee in which all the members of

SRPC represented is entrusted with the task of carrying out studies for

assessing quantum of capacitor requirement in the region, operational load

flow studies or any other technical studies referred by the SRPC/TCC.

Power System Studies for assessment of shunt compensation

required in the Regional grid is done for the annual peak load conditions.

The capacitor requirement is assessed with a view to maintain system

voltage at all the buses in the range of 0.90 to 1.05 per unit. The results of

the studies are brought out in the form of a report, which forms basis for the

constituents in planning the capacitor installation programme in their

respective systems.

During the year 2006-07, 24th meeting of System Studies Group

and 1st meeting System Study Sub-Committee was held on 19.04.2006 and

28.07.2006 respectively to finalise the capacitor requirement for the year

2006-07. The Report on the requirement of Shunt Compensation for March

2007 conditions was issued during August 2006. Action was also initiated to

assess capacitor requirement for the year 2007-08. In this connection,

preliminary data was collected from the constituents for conditions

prevailing on 29.03.2006 at 19:00 hrs in Southern Region. Base Case

45

Studies were carried out and circulated to the members of the System

Study Group for their comments.

The Power Map of Southern Regional Grid showing all 400 kV and

220 kV lines including all the inter-state / inter-regional lines was

periodically updated.

5.8 POWER SYSTEM STABILIZER TUNING:

In the 136th SRE Board meeting held at Hyderabad on 9

th

November 2004, the Board agreed to the carrying out of analytical studies

related to PSS tuning in SR and for forming a core group for this purpose.

For funding of these studies a tentative amount of Rs. 10 lakh, to be shared

equally by all the constituents was approved. The scope of the analytical

studies, among others, was to suggest need or otherwise, of PSS tuning of

the generators in SR. It was approved that the studies could be carried out

either through IISc, Bangalore or IIT, Mumbai, who carried out the studies in

case of WR, as per the needs.

In this context, IISc, Bangalore was approached. They agreed to be

associated for carrying out the analytical studies and also suggested for

involving Prof. R. Ramanujam of Anna University, Chennai and personnel

from CPRI Bangalore.

The core group for PSS tuning in SR was formulated and the first

meeting was core group was held 4th April 2005 in conference hall of SREB

wherein constituents agreed to provide all the relevant data for the studies.

An Interaction between Member Secretary, SRPC and Prof. R.

Ramanujam of Anna University, Chennai was held on 19.05.2006. Prof. R.

Ramanujam suggested the following methodology for doing the study for

PSS tuning in SR:

o Identify two to four base cases to reflect the operating conditions of

SR

o One to two contingency analysis on each base case to be done

46

o Eigenvalue analysis for each base to identify the least damped

mode. If any one of the rotor modes are very close to imaginary

axis then PSS is suggested

o Arrive at PSS parameters for each case and freeze on the one that

is best compromise for all cases identified above

o Perform Transient Stability analysis runs with PSS to check for

large-signal performance.

Further interaction is going on between IISC Bangalore and SRPC

secratariat.

*************

47

†¬µÖ Ö µÖ 6 CHAPTER VICHAPTER VICHAPTER VICHAPTER VI

† Öµ ÖÖêו֟ Ö ² Ö îš ü$ ëú MEETINGS HELD

The Important issues considered during the meetings held during the

year 2006-07 are as under:

6.1 1st SRPC MEETING ON 6th JUNE 2006

• In the 1st SRPC meeting held on 6th June, 2006, the Southern Regional

Power Committee (Conduct of Business) Rules, 2006 was finalised.

• The Constitution of SRPC in accordance with GOI Resolution dated

25.05.2005 followed by amendment Resolution dated 29.11.2005 was

discussed.

• The nominations to the SRPC including membership from IPPs and Traders

was discussed.

• The decisions taken in the 139th and 140th SRE Board meeting held in

December 2005 and March 2006 respectively, were ratified.

• The decisions taken in the Special TCC meeting held on 26.04.06 regarding

UI price vector were approved.

• The Roster for Hosting SRPC meetings was approved.

48

2nd SRPC MEETING HELD ON 31st OCTOBER 2006:

• It was decided that SRPC Secretariat would address letters individually to

all IPPs operating in the Southern Region, bring to their attention the

provisions contained in the MOP Resolutions dated 25.05.05 and 29.11.05.

• It was also decided that as in the case of IPPs, SRPC Secretariat would

address letters individually to all the Traders in the Southern Region, bring

to their attention the provisions contained in the MOP Resolutions dated

25.05.05 and 29.11.05.

• Regarding Lower Sileru-Barsoor National HVDC Project, the Committee

noted that SR Constituents would share 50% of O&M charges of the HVDC

link and that wheeling charges would be paid by the SR Constituents,

based on their use of link for power transfer, as applicable, to APTRANSCO

and CSEB.

• For strengthening of transmission system from Talcher to Rourkela for

export of SR surplus, the Committee approved the Talcher-Rourkela 400 kV

D/C line with Quad conductor with the provision of series compensation, if

required, at a later stage. The Committee also approved the proposal of

PGCIL for installation of 9 Reactors at different locations and requested

NPCIL to explore space requirement for installation of the Reactor at Kaiga.

• Regarding Computation of Talcher-STPS-II injection, it was decided that

clarification be sought from Hon'ble CERC. It was also agreed that till such

time, clarifications were received from CERC, the accounting methodology

as per CEA Regulations would be continued.

• The Committee approved the method for UI computation, formula for

availability of PLF in respect of NLC TS-II Station.

• The Committee agreed that SRLDC could go ahead with the AMC for

SCADA-EMS System under SR-ULDC Scheme and the MOU would be

signed by the State Utilities and SRLDC. The issue regarding over head

charges would be finalised later.

49

6.2 MEETINGS OF OPERATION & CO-ORDINATION COMMITTEE

The Operation & Co-ordination Committee consisting of System Operation

Engineers of APTRANSCO, APGENCO, APCPDCL, BESCOM, KPTCL, KSEB,

TNEB & PUDUCHERRY, SRLDC, POWERGRID, NTPC, NLC, KGS, MAPS &

KPCL reviews the system operation and prepares monthly schedules. The

Committee met regularly every month and dealt with the following activities.

• Review of Demand and Energy availability with respect to

unrestricted requirement as per PSP & LGBR.

• Reviewing the schedule v/s. actual generation category-wise and

for important power stations.

• Estimating the availability of energy and demand category- wise

and from ISGS for each state for the following month.

• Determining possible exchanges of power and energy within and

outside the Region.

• Drawing up coordinated maintenance schedule for generating units

and major transmission lines etc. and carrying out reviews.

• Reviewing the operation of Automatic Under Frequency Relays.

• Discussing system occurrences, if any, during the previous month

and evolving measures for operational improvements as required.

• Progress of installation of HT capacitors is reviewed.

• Review of progress of work on transmission schemes under state

sector linked with ISGS system.

• Review of power cuts, load shedding and supply to Agricultural

sector.

50

• Quarterly review of Load-Generation estimation with actual power

supply position; finalisation and issue of reports.

6.3 MEETINGS OF THE COMMERCIAL COMMITTEE

The Meeting of the Commercial Committee was convened in April 2006 and

ABT based Monthly Regional Energy Account for the month of March 2006 was

finalised in the meeting and related commercial issues were also addressed.

Subsequently based on CERC notification meetings were conducted on

quarterly basis to audit UI and Reactive accounts and related commercial issues

were also discussed.

6.4 MEETINGS OF PROTECTION COMMITTEE

The Protection Committee of SRPC analyses the System Occurrences,

Grid Disturbances, and other trippings that occur in the Southern Regional Grid and

suggests measures to avoid their recurrence.

*********

51

†¬µÖ Ö µÖ 7 CHAPTER VIICHAPTER VIICHAPTER VIICHAPTER VII

׸ü¯ÖÖ ê™ Ô ‹ ¾ Ö Ó ¯Ö Ï ´ ÖÖ�Ö ß$ú¸ü�Ö REPORTS & CERTIFICATION

7.1 SRPC has been issuing various reports regarding system operational data,

Load Generation Balance Data, System Studies Data, etc. The details of the

various reports/certificates issued by SRPC during the year 2006-07 are given

below.

a) Monthly Progress Reports

b) Load Generation Balance Reports

i) 130th LGB Report for the period April 2006 to March 2007

ii) 131st LGB Report for the period July 2006 to March 2007

iii) 132nd

LGB Report for the period October 2006 to March 2007

iv) 133rd

LGB Report for the period January 2006 to March 2007

c) Annual Report for 2005 - 06

d) Certification of Availability for Southern Region Transmission System of

Power Grid including that for RGCCPP (Kayamkulam) associated

Transmission Scheme, for the year 2005-06.

e) Annual Outage Plan for 2007-08

************

52

†¬µÖ Ö µÖ 8 CHAPTER VIIICHAPTER VIIICHAPTER VIIICHAPTER VIII

¸üÖ•Ö³ÖÖ ÂÖÖ − Ö ßן Ö $ úÖ $ úÖµ ÖÖ Ô− ¾ Öµ Ö− Ö IMPLEMENTATION OF OFFICIAL LANGUAGE POLICY

8.1 ¯ÖÏ ×¿ Ö Ö� Ö

TRAINING

¾ÖÂÖÔ �êú ¤üÖî üÖ−Ö ‹�ú †Ö¿Öã×»ÖׯÖ�ú �úÖê ×Æü−¤üß †Ö¿Öã×»Ö×¯Ö �êú �ÖÆü−Ö ¯ÖÏ׿Ö�Ö�Ö ¯ÖÖšü¶�Îú´Ö �êú ×»Ö‹ −ÖÖ×´ÖŸÖ ×�úµÖÖ �ÖµÖÖ £ÖÖ … ‡ÃÖ�êú †»ÖÖ¾ÖÖ ¤üÖê †¾Ö¸ü ÁÖê×�Ö ×»ÖׯÖ�úÖêÓ �úÖê ¯ÖÏÖ–Ö �ú�ÖÖ �êú ×»Ö‹ −ÖÖ×´ÖŸÖ ×�úµÖÖ �ÖµÖÖ £ÖÖ… One stenographer was nominated to attend the intensive course in Hindi stenography. In addition two LDCs were nominated for Hindi Pragya classes.

8.2 ¯Ö¡ÖÖ“ÖÖ¸ü ‹¾ÖÓ †−Öã¾ÖÖ¤ü

CORRESPONDENCE & TRANSLATION

�úÖµÖÖÔ»ÖµÖ «üÖ¸üÖ �ëú¦üßµÖ ÃÖ¸ü�úÖ¸üß �úÖµÖÖÔ»ÖµÖÖë �úÖê �ãú»Ö 4915 ¯Ö¡Ö •ÖÖ¸üß ×�ú‹ �Ö‹ וÖÃÖ´Öë ×Æü−¤üß ¯Ö¡ÖÖë �úß ÃÖÓ1µÖÖ 4129 ¸üÆüß, •ÖÖê �ãú»Ö ¯Ö¡ÖÖ“ÖÖ¸ü �êú 84% �êú ‰ú¯Ö¸ü Æîü, •Ö²Ö×�ú ¸üÖ•Ö³ÖÖÂÖÖ ×¾Ö³ÖÖ�Ö «üÖ¸üÖ “�Ö” �Öê¡Ö �êú �úÖµÖÖÔ»ÖµÖÖë �êú ×»Ö‹ ×−Ö¬ÖÖÔ׸üŸÖ »Ö�µÖ 55% Æîü … Out of the total number of 4915 letters issued to central government offices by this office, 4129 letters were issued in Hindi which is above 84%. The target fixed for the region C , is 55%.

¾ÖÂÖÔ �êú ¤üÖî üÖ−Ö �úÖµÖÖÔ»ÖµÖ ´Öë �ãú»Ö 488 �úÖµÖÖÔ»ÖµÖ †Ö¤êü¿ÖÖë �úÖê ׫ü³ÖÖÂÖß ºþ¯Ö ´Öë •ÖÖ¸üß ×�úµÖÖ �ÖµÖÖ …

488 office orders were issued in bilingual form during the year.

53

8.3 ¸üÖ• Ö³ ÖÖ ÖÖ $ ú Öµ ÖÖÔ −¾Ö µ Ö−Ö Ã Ö ×´ Öן Ö $ úß ² Öîš ü$ ëú … MEETINGS OF OFFICIAL LANGUAGE IMPLEMENTATION COMMITTEE

�úÖµÖÖÔ»ÖµÖ ´Öë ¸üÖ•Ö³ÖÖÂÖÖ �úÖµÖÖÔ−¾ÖµÖ−Ö ÃÖ×´Ö×ŸÖ �úß ²Öîšü�ëú ×−ÖµÖ×´ÖŸÖ ºþ¯Ö ÃÖê ÆüÖêŸÖß ¸üÆüß Æïü … ׸ü¯ÖÖê™Ôü �úß †¾Ö×¬Ö ´Öë �ãú»Ö “ÖÖ¸ü ²Öîšü�ëú †ÖµÖÖê×•ÖŸÖ �úß �Ö‡Ô £Öß … ²Öîšü�úÖë �êú פü−ÖÖÓ�ú ‡ÃÖ ¯ÖÏ�úÖ¸ü Æîü : During the year 2006-07 four meetings of Official Language Implementation committee were conducted. The dates of the meetings are follows :

1. 29.06.2006 2. 28.09.2006 3. 22.12.2006

4. 14.03.2007

8.4 ¯ ÖÏ ÖêŸÃ ÖÖ Æü−Ö µ ÖÖ ê• Ö− ÖÖ

INCENTIVE SCHEME

´Öæ»Ö ºþ¯Ö ´Öë ×Æü−¤üß ´Öë �úÖ´Ö �ú¸ü−Öê �êú ×»Ö‹ �úÖµÖÖÔ»ÖµÖ �êú †×¬Ö�úÖ׸üµÖÖë / �ú´ÖÔ“ÖÖ׸üµÖÖë �êú ×»Ö‹ ¯ÖÏÖêŸÃÖÖÆü−Ö µÖÖê•Ö−ÖÖ »ÖÖ�Öæ �úß �Ö‡Ô Æîü … µÖÖê•Ö−ÖÖ �êú †ÓŸÖ�ÖÔŸÖ ¾ÖÂÖÔ 2005-06 �êú ×»Ö‹ 5 ×¾Ö•ÖêŸÖÖ†Öë �úÖê −Ö�ú¤ü ¯Öã üÃ�úÖ¸ü ‹¾ÖÓ ¯ÖÏ´ÖÖ�Ö ¯Ö¡Ö ÃÖê ÃÖ´´ÖÖ×−ÖŸÖ ×�úµÖÖ �ÖµÖÖ Æîü … Incentive Scheme has been introduced for the officers and staff of this office for doing their official work in Hindi. 5 officials were honoured with cash awards for the year 2005-06.

8.5 ×Æü−¤ü ß ×¤ü¾ ÖÃ Ö ‹¾Ö Ó ×Æü− ¤ü ß ¯ Ö- Ö ¾ÖÖ› êü $ ú Ö †Ö µÖ Öê• Ö −Ö OBSERVING HINDI FORTNIGHT & CONDUCTING HINDI DIWAS

�úÖµÖÖÔ»ÖµÖ ´Öë פü−ÖÖÓ�ú 14.09.2006 �úÖê ×Æü−¤üß ×¤ü¾ÖÃÖ ‹¾ÖÓ ×¤ü−ÖÖÓ�ú 14.09.2006 ÃÖê 28.09.2006 ŸÖ�ú ×Æü−¤üß ¯Ö1Ö¾ÖÖ›üÖ ´Ö−ÖÖµÖÖ �ÖµÖÖ … ¯Ö1Ö¾ÖÖ›êü �êú ¤üÖî üÖ−Ö “ÖÖ¸ü ¯ÖÏןֵÖÖê×�ÖŸÖÖ†Öë �úÖ †ÖµÖÖê•Ö−Ö ×�úµÖÖ �ÖµÖÖ £ÖÖ ‹¾ÖÓ ×¾Ö•ÖêŸÖÖ†Öë �úÖê −Ö�ú¤ü ¯Öã üÃ�úÖ¸ü ‹¾ÖÓ ¯ÖÏ´ÖÖ�Ö ¯Ö¡Ö ¯ÖϤüÖ−Ö ×�ú‹ �Ö‹ …

Hindi day was celebrated in SREB on 14.09.2006 and Hindi fortnight from

14.09.2006 to 28.09.2006. Four competitions were �rganized during the Hindi fortnight and winners were honoured with cash prizes and certificates.

54

8.6 ×Æü−¤ü ß $ úÖ µÖÔ ¿Ö Ö» Ö Ö‹Ñ HINDI WORKSHOPS

¾Ö Â Ö Ô �êú ¤üÖî üÖ−Ö �úÖµÖÖÔ»ÖµÖ �êú †×¬Ö�úÖ¸üß / �ú´ÖÔ“ÖÖ׸üµÖÖë �êú ×»Ö‹ ŸÖß−Ö ×Æü−¤üß �úÖµÖÔ¿ÖÖ»ÖÖ‹Ñ †ÖµÖÖê×•ÖŸÖ �úß �Ö‡Ô … �úÖµÖÔ¿ÖÖ»ÖÖ†Öë ´Öë †×¬Ö�úÖ¸üß / �ú´ÖÔ“ÖÖ׸üµÖÖë −Öê ÃÖ×�ÎúµÖ ºþ¯Ö ´Öë ³ÖÖ�Ö ×»ÖµÖÖ … �úÖµÖÔ¿ÖÖ»ÖÖ†Öë �êú פü−ÖÖÓ�ú ‡ÃÖ ¯ÖÏ�úÖ¸ü ÆîüÓ : Three Hindi Workshops were organized for the officials during the year. The officials actively participated in the same. The dates on which the workshops were conducted are as follows:

1. 29.05.2006

2. 13.09.2006

3. 13.03.2007

8.7 ×−Ö¸ü ß Ö� Ö INSPECTION

ÃÖÓÃÖ¤üßµÖ ¸üÖ•Ö³ÖÖÂÖÖ ÃÖ×´Ö×ŸÖ �úß ¤æüÃÖ¸üß ˆ¯ÖÃÖ×´Ö×ŸÖ −Öê פü−ÖÖÓ�ú 14.10.2006 �úÖê, ²Öë�Ö»Öæ ü �êú �ëú¦üßµÖ ÃÖ¸ü�úÖ¸ü �êú †−µÖ �úÖµÖÖÔ»ÖµÖÖë �êú ÃÖÖ£Ö ÃÖÖ£Ö ‡ÃÖ �úÖµÖÖÔ»ÖµÖ �úÖ ³Öß ×−Ö¸üß�Ö�Ö ×�úµÖÖ… ×−Ö¸üß�Ö�Ö �úÖµÖÔ�Îú´Ö �êú ×»Ö‹ Æü´ÖÖ¸êü �úÖµÖÖÔ»ÖµÖ �úÖê ÃÖ´Ö−¾ÖµÖ �úÖµÖÖÔ»ÖµÖ −ÖÖ×´ÖŸÖ ×�úµÖÖ �ÖµÖÖ £ÖÖ… ÃÖ¤üÃµÖ ÃÖ×“Ö¾Ö −Öê ÃÖ×´Ö×ŸÖ �úÖê �úÖµÖÖÔ»ÖµÖ ´Öë ×Æü−¤üß �êú ¯ÖϵÖÖê�Ö ´Öë �úß �Ö‡Ô ¯ÖÏ�Ö×ŸÖ �êú ×¾Ö¾Ö¸ü�Ö ¯ÖÏßÖãŸÖ ×�úµÖÖ…

The second sub-committee of Parliamentary committee on Official

Language, inspected the progress of official language implementation on

14.10.2006 along with other three Govt. of India offices at Bangalore. Our office was

the coordinating office for the whole inspection programme. Member Secretary

explained the progress made in the office regarding use of Official Language.

***********

55

31.03.2007 êú †−ÖãÃÖÖ¸ü ¤ü �Öê ×¾Ö ÃÖ êú †×¬ÖúÖ¸üß �Ö9Ö OFFICERS OF SRPC AS ON 31.03.2007

Sl.No DESIGNATION NAME

1

2

3

4

5

6

7

8

9

Member Secretary

Superintending Engineer

Superintending Engineer/

Assistant Secretary

Executive Engineer

Assistant Executive Engineer

Assistant Engineer

Assistant Engineer (Civil)

Personal Secretary

JE (Civil)

1

2

1

2

3

4

5

1

2

3

4

1

2

3

4

5

Shri. K.Srinivasa Rao

Shri. A.Magudapathi

Shri. M.R.Singh

Shri. S.R.Bhat

Shri. D.V. Ranga Reddy

Shri. Asit Singh

Shri. Rakesh Goyal

Shri. T.N.Padmanabhan

Shri. A.K.Yadav

Shri. T.Sankaran

Shri. N.Manjunatha

Shri. V.P.Gangarevanna

Shri. S.P.Abraham

Shri. S.K.Rajendra. R

Shri. K.P.Madhu

Shri. K.Gopinath

Shri. J.B.Len

Smt. N.S.Malini

Shri. P.S.Mohan Kumar

Smt. Aleyamma .T

Shri. N.Ranganathan

ÃÖÓ»Ö�Öú ANNEXURE - I

56

57

58

59

60

61

1

1

ANNEXURE – V DETAILS OF POWER CUTS IN SOUTHERN REGION DURING 2006-2007

ANDHRA PRADESH

1. Power Cuts/Restrictions on Industries, Load Shedding in the State

Restriction Timing Quantum of power cut

(MW) From (Hours)

To (Hours)

Total Energy cut (MU/Year 2006-07)

(a)Power cuts/Restrictions on HT/LT industries

- - - 11.64

(b) Load shedding - - - 1442

(c) Any other information (i) weekly off (ii) Staggering of power supply

NIL - - NIL

2. Power supply to Agriculture Sector:

Supply Hours per day From (Date)

To (Date) Max

(Hours) Min

(Hours) Average (Hours)

2.1 Three phase supply 7 hours supply in one or two spells 2.2 Single phase supply No single phase supply for agriculture sector

2.3 Remarks/Notes/Any other information

Load Relief of 120 MU per month to Towns and Mandal Headquarters.

Karnataka There was no energy and power cut to any of the category of

consumers during the year 2006-07.However there was scheduled load shedding

of rural feeders.

2

(1) Entire year 8-9 hrs three phase supply

7 hours no supply

8-9 hrs single phase supply

With effect from 20.03.2007 Urban load shedding was introduced for all 11 Kv

town/city feeders except Bangalore for a duration of 30 minutes during morning

and evening peak hours that is between 0830-1030 hrs and 1830-2130 hrs.

Kerala

No Power cut or Load shedding during the year 2006-07

Tamil Nadu

I. Power Cut: Nil II. Restrictions in force

i) Agricultural loads were given 14 supply (6 hours during day time and 8 hours during night time).

ii) Lighting peak restrictions on HT and LT industrial consumers which was in vogue is still continuing.

********

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

2

3

4

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1