c space examples
TRANSCRIPT
-
8/15/2019 C Space Examples
1/17
ASSET CONDITIONMONITORING
+ ASSET RELATED EXAMPLES
-
8/15/2019 C Space Examples
2/17
PERFORMANCEMONITORING:WHAT DOES IT TELL US?
-
8/15/2019 C Space Examples
3/17
NETWORKPERFORMANCE
Optimisation
process
Winter
Leakage
Winter
Leakage
Consistent
Flow / NL
profile
Consistent
CP profile
-
8/15/2019 C Space Examples
4/17
WHAT ELSE?
Optimisation
process
Winter
Leakage
Winter
Leakage
Consistent
Flow / NL
profile
Consistent
CP profile
-
8/15/2019 C Space Examples
5/17
CLOSER INSPECTION:SEPTEMBER - APRIL
-
8/15/2019 C Space Examples
6/17
CLOSER INSPECTION:WITHOUT FLOW
-
8/15/2019 C Space Examples
7/17
-
8/15/2019 C Space Examples
8/17
IF YOU ENABLE ADVANCEDMONITORING:WHAT DOES THIS TELL US NOW?
-
8/15/2019 C Space Examples
9/17
SO WHAT WAS GOINGON?
PRV sticking
Increased
Unexpected
P2/P3 pressures
-
8/15/2019 C Space Examples
10/17
SEQUENCE OF EVENTS
Phase 1
Event 1
Event 2
Event 3 Event 4
-
8/15/2019 C Space Examples
11/17
APV ACTIVITY LOG
PRV
Serviced
-
8/15/2019 C Space Examples
12/17
THE OUTCOME
+ Root cause was PRV asset condition
+ Initially perceived to be zone integrity issue
+ Increase in NL –
presumed leakage
+ Assumed control equipment failure
+ Advanced monitoring confirmed root cause
+ 3 major service visits required to PRV before finally resolving
problem
+ Is your PRV monitoring and maintenance programme
delivering the quality and results you expect?
-
8/15/2019 C Space Examples
13/17
PRV STABILITY ANDHIGH SPEED LOGGING
Long term optimised performance – with flow CP
pressure reduced from 40m to 24m
-
8/15/2019 C Space Examples
14/17
UNDERSTANDING THEROOT CAUSE
Rectified remotely by flow modulating during day and operating in
fixed outlet mode at night
Before After
-
8/15/2019 C Space Examples
15/17
HIGH SPEED LOGGING:1 MINUTE
-
8/15/2019 C Space Examples
16/17
HIGH SPEED LOGGING:1 SECOND
-
8/15/2019 C Space Examples
17/17