Reference Revision Client Date Author Trident /FRA - Formal Investments September 2015 LJ APPENDIX D Gloucestershire Strategic Flood Risk Assessment – Tile A3, Watercourse Map Gloucester City Council reference WB/GLOS/DRAWING-019 dated 26 th March 2008 Gloucestershire Strategic Flood Risk Assessment – Tile E3, Historic Flooding Gloucester City Council reference WB/GLOS/DRAWING-026 dated 26 th March 2008

Upload: lamdung

Post on 31-Jan-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: C21396 - Beaufort Academy, Gloucester - FRA rev Acaps.gloucestershire.gov.uk/gcc_images/16_0119_GLR3MJ_FRA_P3.pdf · C21396 - Beaufort Academy, Gloucester Foul flow rate calculation

Reference Revision Client Date Author

Trident /FRA - Formal Investments September 2015 LJ

APPENDIX D

Gloucestershire Strategic Flood Risk Assessment – Tile A3, Watercourse Map Gloucester

City Council reference WB/GLOS/DRAWING-019 dated 26th March 2008

Gloucestershire Strategic Flood Risk Assessment – Tile E3, Historic Flooding Gloucester City Council reference WB/GLOS/DRAWING-026 dated 26th March 2008

Page 2: C21396 - Beaufort Academy, Gloucester - FRA rev Acaps.gloucestershire.gov.uk/gcc_images/16_0119_GLR3MJ_FRA_P3.pdf · C21396 - Beaufort Academy, Gloucester Foul flow rate calculation
Page 3: C21396 - Beaufort Academy, Gloucester - FRA rev Acaps.gloucestershire.gov.uk/gcc_images/16_0119_GLR3MJ_FRA_P3.pdf · C21396 - Beaufort Academy, Gloucester Foul flow rate calculation
Page 4: C21396 - Beaufort Academy, Gloucester - FRA rev Acaps.gloucestershire.gov.uk/gcc_images/16_0119_GLR3MJ_FRA_P3.pdf · C21396 - Beaufort Academy, Gloucester Foul flow rate calculation

Reference Revision Client Date Author

Trident /FRA - Formal Investments September 2015 LJ

APPENDIX E

IH124 Drainage Calculation

Page 5: C21396 - Beaufort Academy, Gloucester - FRA rev Acaps.gloucestershire.gov.uk/gcc_images/16_0119_GLR3MJ_FRA_P3.pdf · C21396 - Beaufort Academy, Gloucester Foul flow rate calculation

Simpson Associates Page 1

Unit B10, Elmbridge Court

Business Park

Gloucester GL3 1JZ

Date 29/11/2016 12:04 Designed by luke.johnson

File Checked by

XP Solutions Source Control 2014.1.1

IH 124 Mean Annual Flood

©1982-2014 XP Solutions

Input

Return Period (years) 100 Soil 0.400

Area (ha) 50.000 Urban 0.000

SAAR (mm) 700 Region Number Region 4

Results l/s

QBAR Rural 170.1

QBAR Urban 170.1

Q100 years 437.2

Q1 year 141.2

Q2 years 152.5

Q5 years 209.2

Q10 years 253.5

Q20 years 302.4

Q25 years 319.5

Q30 years 333.3

Q50 years 374.6

Q100 years 437.2

Q200 years 513.7

Q250 years 539.3

Q1000 years 707.7

Page 6: C21396 - Beaufort Academy, Gloucester - FRA rev Acaps.gloucestershire.gov.uk/gcc_images/16_0119_GLR3MJ_FRA_P3.pdf · C21396 - Beaufort Academy, Gloucester Foul flow rate calculation

Reference Revision Client Date Author

Trident /FRA - Formal Investments September 2015 LJ

APPENDIX F

Unit Discharge Method Results: New Extension – Existing Flows

New Extension – Proposed Flows New Teaching Block – Existing Flows

New Teaching Block – Existing Flows less Redundant Sources New Teaching Block – Proposed Flows

Page 7: C21396 - Beaufort Academy, Gloucester - FRA rev Acaps.gloucestershire.gov.uk/gcc_images/16_0119_GLR3MJ_FRA_P3.pdf · C21396 - Beaufort Academy, Gloucester Foul flow rate calculation

C21396 - Beaufort Academy, Gloucester Foul flow rate calculation in accordance With BS EN 12056-2

New Extension - Existing Flows Prepaired LJ Checked LJ Approved RW

Schedule to be read in conjunction with Architects, M&E Engineers drawings SHEET 1.0

REV A

(SCHOOL) k

0.5

0.7

Congested Use eg, toilets, and/or showers open to public 1.0

1.2

System I System II System III System IIII

DU Sum of DU Sum of DU Sum of DU Sum of

L/sec DU L/sec DU L/sec DU L/sec DU

0.5 26.5 0.3 15.9 0.3 15.9 0.3 15.9

0.6 0.0 0.4 0.0 0.4 0.0 0.4 0.0

0.8 0.0 0.5 0.0 1.3 0.0 0.5 0.0

0.8 18.4 0.5 11.5 0.4 9.2 0.5 11.5

0.5 0.0 0.3 0.0 no data - 0.3 0.0

0.2 0.0 0.2 0.0 0.2 0.0 0.2 0.0

0.8 0.0 0.6 0.0 1.3 0.0 0.5 0.0

0.8 1.6 0.6 1.2 1.3 2.6 0.5 1.0

0.8 0.0 0.6 0.0 0.2 0.0 0.5 0.0

0.8 0.0 0.6 0.0 0.6 0.0 0.5 0.0

1.5 0.0 1.2 0.0 1.2 0.0 1.0 0.0

N/A - 1.8 0.0 N/A - N/A -

2.0 0.0 1.8 0.0 1.7 0.0 2.0 0.0

2.0 70.0 1.8 63.0 1.8 63.0 2.0 70.0

2.5 0.0 2.0 0.0 2.0 0.0 2.5 0.0

0.8 0.0 0.9 0.0 no data - 0.6 0.0 1 2 3 4

1.5 0.0 0.9 0.0 no data - 1.0 0.0 System I System II System III System IIII

2.0 4.0 1.2 2.4 no data - 1.3 2.6

120.5 94.0 90.7 101.07.035

1

Waste Water Flowrate (Qww)

7.684 6.787 6.6672

0

0

Date 05/12/16

Typical Frequency Factor (k)

Usage of Applications

Intermittent use eg, dwelling, guesthouse, office

0

0

Frequent use eg, hospital, school, restaurant, hotel

Special Use eg, laboratory

Floor gully DN 50

Floor gully DN 70

WC with 9.0L cistern

Dishwasher (Household)

Washing machine (up to 6kg)

0

0

0

0

35

Floor gully DN 100

Type of development

Typical Frequency Factor (k)

Port Terminal

System Reference (1, 2, 3 or 4) 1

0.7

Wash basin, bidet

Shower without plug

Slab urinal

Number of

Similar

Buildings

3 4

Urinal with flushing valve

53

0

0

23

0

0

Shower with plug

Single urinal with cistern

Bath

Kitchen Sink

0

2

total 115

1 2

Appliance TypeTotal Number of

Applicances

Washing machine (up to 12kg)

WC with 4.0L cistern

WC with 6.0L cistern

WC with 7.5L cistern

Page 8: C21396 - Beaufort Academy, Gloucester - FRA rev Acaps.gloucestershire.gov.uk/gcc_images/16_0119_GLR3MJ_FRA_P3.pdf · C21396 - Beaufort Academy, Gloucester Foul flow rate calculation

C21396 - Beaufort Academy, Gloucester Foul flow rate calculation in accordance With BS EN 12056-2

New Extension - Proposed Flows Prepaired LJ Checked LJ Approved RW

Schedule to be read in conjunction with Architects, M&E Engineers drawings SHEET 1.0

REV A

(SCHOOL) k

0.5

0.7

Congested Use eg, toilets, and/or showers open to public 1.0

1.2

System I System II System III System IIII

DU Sum of DU Sum of DU Sum of DU Sum of

L/sec DU L/sec DU L/sec DU L/sec DU

0.5 1.5 0.3 0.9 0.3 0.9 0.3 0.9

0.6 0.0 0.4 0.0 0.4 0.0 0.4 0.0

0.8 0.0 0.5 0.0 1.3 0.0 0.5 0.0

0.8 0.0 0.5 0.0 0.4 0.0 0.5 0.0

0.5 0.0 0.3 0.0 no data - 0.3 0.0

0.2 0.0 0.2 0.0 0.2 0.0 0.2 0.0

0.8 0.0 0.6 0.0 1.3 0.0 0.5 0.0

0.8 0.8 0.6 0.6 1.3 1.3 0.5 0.5

0.8 0.0 0.6 0.0 0.2 0.0 0.5 0.0

0.8 0.0 0.6 0.0 0.6 0.0 0.5 0.0

1.5 0.0 1.2 0.0 1.2 0.0 1.0 0.0

N/A - 1.8 0.0 N/A - N/A -

2.0 0.0 1.8 0.0 1.7 0.0 2.0 0.0

2.0 4.0 1.8 3.6 1.8 3.6 2.0 4.0

2.5 0.0 2.0 0.0 2.0 0.0 2.5 0.0

0.8 0.0 0.9 0.0 no data - 0.6 0.0 1 2 3 4

1.5 0.0 0.9 0.0 no data - 1.0 0.0 System I System II System III System IIII

2.0 0.0 1.2 0.0 no data - 1.3 0.0

6.3 5.1 5.8 5.4

Date 05/12/16

Type of development Port Terminal Typical Frequency Factor (k)

Typical Frequency Factor (k) 0.7 Usage of Applications

System Reference (1, 2, 3 or 4) 1 Intermittent use eg, dwelling, guesthouse, office

Frequent use eg, hospital, school, restaurant, hotel

Special Use eg, laboratory

Appliance TypeTotal Number of

Applicances

Number of

Similar

Buildings

1 2 3 4

Wash basin, bidet 3

1

Shower without plug 0

Shower with plug 0

Single urinal with cistern 0

Urinal with flushing valve 0

Slab urinal 0

Bath 0

Kitchen Sink 1

Dishwasher (Household) 0

Washing machine (up to 6kg) 0

Washing machine (up to 12kg) 0

WC with 4.0L cistern 0

WC with 6.0L cistern 0

WC with 7.5L cistern 2Waste Water Flowrate (Qww)

WC with 9.0L cistern 0

Floor gully DN 50 0

1.686 1.627total 6

Floor gully DN 70 0

Floor gully DN 100 01.757 1.581

Page 9: C21396 - Beaufort Academy, Gloucester - FRA rev Acaps.gloucestershire.gov.uk/gcc_images/16_0119_GLR3MJ_FRA_P3.pdf · C21396 - Beaufort Academy, Gloucester Foul flow rate calculation

C21396 - Beaufort Academy, Gloucester Foul flow rate calculation in accordance With BS EN 12056-2

New Teaching Block - Existing Flows Prepaired LJ Checked LJ Approved RW

Schedule to be read in conjunction with Architects, M&E Engineers drawings SHEET 1.0

REV A

(SCHOOL) k

0.5

0.7

Congested Use eg, toilets, and/or showers open to public 1.0

1.2

System I System II System III System IIII

DU Sum of DU Sum of DU Sum of DU Sum of

L/sec DU L/sec DU L/sec DU L/sec DU

0.5 1.0 0.3 0.6 0.3 0.6 0.3 0.6

0.6 0.0 0.4 0.0 0.4 0.0 0.4 0.0

0.8 0.0 0.5 0.0 1.3 0.0 0.5 0.0

0.8 0.0 0.5 0.0 0.4 0.0 0.5 0.0

0.5 0.0 0.3 0.0 no data - 0.3 0.0

0.2 0.0 0.2 0.0 0.2 0.0 0.2 0.0

0.8 0.0 0.6 0.0 1.3 0.0 0.5 0.0

0.8 8.8 0.6 6.6 1.3 14.3 0.5 5.5

0.8 0.0 0.6 0.0 0.2 0.0 0.5 0.0

0.8 0.0 0.6 0.0 0.6 0.0 0.5 0.0

1.5 0.0 1.2 0.0 1.2 0.0 1.0 0.0

N/A - 1.8 0.0 N/A - N/A -

2.0 0.0 1.8 0.0 1.7 0.0 2.0 0.0

2.0 6.0 1.8 5.4 1.8 5.4 2.0 6.0

2.5 0.0 2.0 0.0 2.0 0.0 2.5 0.0

0.8 0.0 0.9 0.0 no data - 0.6 0.0 1 2 3 4

1.5 0.0 0.9 0.0 no data - 1.0 0.0 System I System II System III System IIII

2.0 14.0 1.2 8.4 no data - 1.3 9.1

29.8 21.0 20.3 21.23.154 3.223

total 23

Floor gully DN 70 0

Floor gully DN 100 73.821 3.208

WC with 7.5L cistern 3Waste Water Flowrate (Qww)

WC with 9.0L cistern 0

Floor gully DN 50 0

Washing machine (up to 12kg) 0

WC with 4.0L cistern 0

WC with 6.0L cistern 0

Kitchen Sink 11

Dishwasher (Household) 0

Washing machine (up to 6kg) 0

0

Urinal with flushing valve 0

Slab urinal 0

Bath 0

3 4

Wash basin, bidet 2

1

Shower without plug 0

Shower with plug 0

Single urinal with cistern

System Reference (1, 2, 3 or 4) 1 Intermittent use eg, dwelling, guesthouse, office

Frequent use eg, hospital, school, restaurant, hotel

Special Use eg, laboratory

Appliance TypeTotal Number of

Applicances

Number of

Similar

Buildings

1 2

Date 05/12/16

Type of development Port Terminal Typical Frequency Factor (k)

Typical Frequency Factor (k) 0.7 Usage of Applications

Page 10: C21396 - Beaufort Academy, Gloucester - FRA rev Acaps.gloucestershire.gov.uk/gcc_images/16_0119_GLR3MJ_FRA_P3.pdf · C21396 - Beaufort Academy, Gloucester Foul flow rate calculation

C21396 - Beaufort Academy, Gloucester Foul flow rate calculation in accordance With BS EN 12056-2

New Teaching Block - Existing Flows less Redundant Sources Prepaired LJ Checked LJ Approved RW

Schedule to be read in conjunction with Architects, M&E Engineers drawings SHEET 1.0

REV A

(SCHOOL) k

0.5

0.7

Congested Use eg, toilets, and/or showers open to public 1.0

1.2

System I System II System III System IIII

DU Sum of DU Sum of DU Sum of DU Sum of

L/sec DU L/sec DU L/sec DU L/sec DU

0.5 0.5 0.3 0.3 0.3 0.3 0.3 0.3

0.6 0.0 0.4 0.0 0.4 0.0 0.4 0.0

0.8 0.0 0.5 0.0 1.3 0.0 0.5 0.0

0.8 0.0 0.5 0.0 0.4 0.0 0.5 0.0

0.5 0.0 0.3 0.0 no data - 0.3 0.0

0.2 0.0 0.2 0.0 0.2 0.0 0.2 0.0

0.8 0.0 0.6 0.0 1.3 0.0 0.5 0.0

0.8 7.2 0.6 5.4 1.3 11.7 0.5 4.5

0.8 0.0 0.6 0.0 0.2 0.0 0.5 0.0

0.8 0.0 0.6 0.0 0.6 0.0 0.5 0.0

1.5 0.0 1.2 0.0 1.2 0.0 1.0 0.0

N/A - 1.8 0.0 N/A - N/A -

2.0 0.0 1.8 0.0 1.7 0.0 2.0 0.0

2.0 4.0 1.8 3.6 1.8 3.6 2.0 4.0

2.5 0.0 2.0 0.0 2.0 0.0 2.5 0.0

0.8 0.0 0.9 0.0 no data - 0.6 0.0 1 2 3 4

1.5 0.0 0.9 0.0 no data - 1.0 0.0 System I System II System III System IIII

2.0 14.0 1.2 8.4 no data - 1.3 9.1

25.7 17.7 15.6 17.92.765 2.962

total 19

Floor gully DN 70 0

Floor gully DN 100 73.549 2.945

WC with 7.5L cistern 2Waste Water Flowrate (Qww)

WC with 9.0L cistern 0

Floor gully DN 50 0

Washing machine (up to 12kg) 0

WC with 4.0L cistern 0

WC with 6.0L cistern 0

Kitchen Sink 9

Dishwasher (Household) 0

Washing machine (up to 6kg) 0

0

Urinal with flushing valve 0

Slab urinal 0

Bath 0

3 4

Wash basin, bidet 1

1

Shower without plug 0

Shower with plug 0

Single urinal with cistern

System Reference (1, 2, 3 or 4) 1 Intermittent use eg, dwelling, guesthouse, office

Frequent use eg, hospital, school, restaurant, hotel

Special Use eg, laboratory

Appliance TypeTotal Number of

Applicances

Number of

Similar

Buildings

1 2

Date 056/12/16

Type of development Port Terminal Typical Frequency Factor (k)

Typical Frequency Factor (k) 0.7 Usage of Applications

Page 11: C21396 - Beaufort Academy, Gloucester - FRA rev Acaps.gloucestershire.gov.uk/gcc_images/16_0119_GLR3MJ_FRA_P3.pdf · C21396 - Beaufort Academy, Gloucester Foul flow rate calculation

C21396 - Beaufort Academy, Gloucester Foul flow rate calculation in accordance With BS EN 12056-2

New Teaching Block - Proposed Flows Prepaired LJ Checked LJ Approved RW

Schedule to be read in conjunction with Architects, M&E Engineers drawings SHEET 1.0

REV A

(SCHOOL) k

0.5

0.7

Congested Use eg, toilets, and/or showers open to public 1.0

1.2

System I System II System III System IIII

DU Sum of DU Sum of DU Sum of DU Sum of

L/sec DU L/sec DU L/sec DU L/sec DU

0.5 6.5 0.3 3.9 0.3 3.9 0.3 3.9

0.6 0.0 0.4 0.0 0.4 0.0 0.4 0.0

0.8 0.0 0.5 0.0 1.3 0.0 0.5 0.0

0.8 0.0 0.5 0.0 0.4 0.0 0.5 0.0

0.5 0.0 0.3 0.0 no data - 0.3 0.0

0.2 0.0 0.2 0.0 0.2 0.0 0.2 0.0

0.8 0.0 0.6 0.0 1.3 0.0 0.5 0.0

0.8 0.8 0.6 0.6 1.3 1.3 0.5 0.5

0.8 0.0 0.6 0.0 0.2 0.0 0.5 0.0

0.8 0.0 0.6 0.0 0.6 0.0 0.5 0.0

1.5 0.0 1.2 0.0 1.2 0.0 1.0 0.0

N/A - 1.8 0.0 N/A - N/A -

2.0 0.0 1.8 0.0 1.7 0.0 2.0 0.0

2.0 26.0 1.8 23.4 1.8 23.4 2.0 26.0

2.5 0.0 2.0 0.0 2.0 0.0 2.5 0.0

0.8 0.0 0.9 0.0 no data - 0.6 0.0 1 2 3 4

1.5 0.0 0.9 0.0 no data - 1.0 0.0 System I System II System III System IIII

2.0 2.0 1.2 1.2 no data - 1.3 1.3

35.3 29.1 28.6 31.7

Date 05/12/16

Type of development Port Terminal Typical Frequency Factor (k)

Typical Frequency Factor (k) 0.7 Usage of Applications

System Reference (1, 2, 3 or 4) 1 Intermittent use eg, dwelling, guesthouse, office

Frequent use eg, hospital, school, restaurant, hotel

Special Use eg, laboratory

Appliance TypeTotal Number of

Applicances

Number of

Similar

Buildings

1 2 3 4

Wash basin, bidet 13

1

Shower without plug 0

Shower with plug 0

Single urinal with cistern 0

Urinal with flushing valve 0

Slab urinal 0

Bath 0

Kitchen Sink 1

Dishwasher (Household) 0

Washing machine (up to 6kg) 0

Washing machine (up to 12kg) 0

WC with 4.0L cistern 0

WC with 6.0L cistern 0

WC with 7.5L cistern 13Waste Water Flowrate (Qww)

WC with 9.0L cistern 0

Floor gully DN 50 0

3.744 3.941total 28

Floor gully DN 70 0

Floor gully DN 100 14.159 3.776

Page 12: C21396 - Beaufort Academy, Gloucester - FRA rev Acaps.gloucestershire.gov.uk/gcc_images/16_0119_GLR3MJ_FRA_P3.pdf · C21396 - Beaufort Academy, Gloucester Foul flow rate calculation

Reference Revision Client Date Author

Trident /FRA - Formal Investments September 2015 LJ

APPENDIX G

Below Ground Drainage General Arrangement rev P1 ref C21396-0500 by Simpson Associates LLP

Page 13: C21396 - Beaufort Academy, Gloucester - FRA rev Acaps.gloucestershire.gov.uk/gcc_images/16_0119_GLR3MJ_FRA_P3.pdf · C21396 - Beaufort Academy, Gloucester Foul flow rate calculation