cabig ® vcde workspace tactics thru june 14, 2010: how working groups fit together, and other...

15
caBIG ® VCDE Workspace Tactics thru June 14, 2010: How working groups fit together, and other activities Brian Davis April 1, 2010 VCDE WS Teleconference

Upload: johnathan-carter

Post on 16-Jan-2016

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CaBIG ® VCDE Workspace Tactics thru June 14, 2010: How working groups fit together, and other activities Brian Davis April 1, 2010 VCDE WS Teleconference

caBIG® VCDE Workspace

Tactics thru June 14, 2010:How working groups

fit together, and other activities

Brian Davis

April 1, 2010

VCDE WS Teleconference

Page 2: CaBIG ® VCDE Workspace Tactics thru June 14, 2010: How working groups fit together, and other activities Brian Davis April 1, 2010 VCDE WS Teleconference

Goals of Multiple Working Groups

1.Contribute to SAIF-ECCF Implementation Guide• Explicit descriptions of how Interoperability will

work in caBIG according to ECCF (and other aspects of SAIF)

• Link

2.Contribute to Arch and VCDE WS Operational Planning • “XC WS Version 2.0”• Processes and Work in XC WS post June 14,

2010

Page 3: CaBIG ® VCDE Workspace Tactics thru June 14, 2010: How working groups fit together, and other activities Brian Davis April 1, 2010 VCDE WS Teleconference

Interoperability and XC WS Operations

ECCF Impl Guide

Strategies

Goals

Tactics/Projects

SAIF/ ECCF

Adopt and Adapt

Standards

KnowledgeCenters (KC)

Mentoring

XC WS Participants

How to interact with Standards

BodiesInterop. Reviews

XC WS operations

(v2.0)

CDE reviews

Vocab Reviews

Analytical Service SpecsData Service

Specs

Gap Analysis

Harmonize Activities

Coordination

Training

Semantic Infra.

VKC and Grid KCIso21090

DTs

Sem. Infra.

caGrid

Page 4: CaBIG ® VCDE Workspace Tactics thru June 14, 2010: How working groups fit together, and other activities Brian Davis April 1, 2010 VCDE WS Teleconference

NCI CBIIT/caBIG Confluence Wiki site

• NCI CBITT confluence site for caBIG (dashboard):

• https://wiki.nci.nih.gov/dashboard.action

Page 5: CaBIG ® VCDE Workspace Tactics thru June 14, 2010: How working groups fit together, and other activities Brian Davis April 1, 2010 VCDE WS Teleconference

VCDE WS Confluence Wiki site

• https://wiki.nci.nih.gov/x/gYs1AQ

Page 6: CaBIG ® VCDE Workspace Tactics thru June 14, 2010: How working groups fit together, and other activities Brian Davis April 1, 2010 VCDE WS Teleconference

Contributions to ECCF IMPL Guide: “How to achieve caBIG Interoperability”

• IMPL Guide Link: https://wiki.nci.nih.gov/x/fldyAQ

• Description of Groups link: https://wiki.nci.nih.gov/x/_WNyAQ

• Draft Chapter Titles1. Introduction and overview

2. Why is CBIIT adoptiong ECCF

3. CBIIT ECCF Artifacts: Content and Representation

4. CBIIT Role-based ECCF Implementation: responsibilities and Deliverables • Certification and Meaningful Use

5. CBIIT ECCF Architecture Governance and Project team Contract Implications

6. Best Practices, Lessons Learned and Examples

7. Glossary

8. References

Page 7: CaBIG ® VCDE Workspace Tactics thru June 14, 2010: How working groups fit together, and other activities Brian Davis April 1, 2010 VCDE WS Teleconference

Contributions to ECCF IMPL Guide (2)

• IMPL Guide Link: https://wiki.nci.nih.gov/x/fldyAQ

• Description of Groups link: https://wiki.nci.nih.gov/x/_WNyAQ

• Groups (Not restricted to XC WS, rather applicable across caBIG):• Data Service (caBIO) ECCF-style Specification• Analytical Service (BioSpecimen) ECCF-style

Specification• SAIF – Effects on Mentoring• SAIF – Effects on Interoperability Reviews• SAIF - Effects on CDE Reviews• SAIF – Effects on Vocabulary Reviews• SAIF – Effects on Workflow

Page 8: CaBIG ® VCDE Workspace Tactics thru June 14, 2010: How working groups fit together, and other activities Brian Davis April 1, 2010 VCDE WS Teleconference

Contributions to XC WS Operations “XC WS version 2.0”

• Pilot Groups link: https://wiki.nci.nih.gov/x/_WNyAQ • Standards (of interest to XC WS)• Training (XC WS Participants)• Coordination of groups (help communication

among the many XC WS groups)• Gap Analysis (XC WS from Here to There)• Fit together new activities (XC WS “There”)• Vocabulary KC and Grid KC: Role with XC WS in

future.

Page 9: CaBIG ® VCDE Workspace Tactics thru June 14, 2010: How working groups fit together, and other activities Brian Davis April 1, 2010 VCDE WS Teleconference

Illustration of issues: Interaction of “Mentoring” and “Interoperability reviews” and “Education and Training”

• Historically mentoring has meant:• Educating (Training) on caBIG compatibility guidelines• Educating (Training) on caBIG tools and processes• Informal review of artifacts (Design, specs, UML, XMI, CDEs,

APIs, etc.)• Help loading model (with Dianne Reeves team)• Help getting on caGrid• Collecting artifacts for Silver Level Compatibility reviews• Other questions and answers on caBIG compatibility• Formal review (formal results document) for Silver level

Compatibility• Usually additional mentoring, re-load of UML model into caDSR and

re-review was needed

Page 10: CaBIG ® VCDE Workspace Tactics thru June 14, 2010: How working groups fit together, and other activities Brian Davis April 1, 2010 VCDE WS Teleconference

Illustration of issues: Interaction of “Mentoring” and “Interoperability reviews” (2)

• Three different groups are examining much of these aspects:• SAIF-effects on Mentoring (concentrating on “Training and

Education” needed by caBIG)• SAIF-effects on Interoperability reviews (concentrating on

Informal review and formal review for certification needed by caBIG)

• Pilot Training (concentrating on how to efficiently and effectively train XC WS participants on SAIF/ECCF)

• They will need to coordinate and communicate• End result: Answers to these questions:

• DECONSTRUCT: What are the needs for training, education, mentoring, informal review and formal review (certification) for caBIG?

• How do XC WS participants learn best about SAIF and ECCF?

Page 11: CaBIG ® VCDE Workspace Tactics thru June 14, 2010: How working groups fit together, and other activities Brian Davis April 1, 2010 VCDE WS Teleconference

Other Groups in VCDE WS

• Requirements Elicitation for Semantic Infrastructure • Req. from Community, develop use cases, traceability• Denise Warzel

• Standards bodies• Engagement with W3C and CTS2 (Common Terminology

Services 2)• Reporting and communication of Standard Bodies engagement

• Representation and advertisement of Vocabularies for Usage• caBIG• NCRI• NCBO

• Vocabulary Reviews of ICD (International Classification of Disease)

Page 12: CaBIG ® VCDE Workspace Tactics thru June 14, 2010: How working groups fit together, and other activities Brian Davis April 1, 2010 VCDE WS Teleconference

Semantic Concept of Operations (Semantic Infrastructure)

• https://cabig-kc.nci.nih.gov/Vocab/KC/index.php/SI_Conop_The_Semantic_Infrastructure_View

• https://cabig-kc.nci.nih.gov/Vocab/KC/index.php/SI_Conop_Initiatives

• The caBIG Semantic Infrastructure and its operational model will be extended to provide integrated support for: • Initiative 1.

Distributed, federated metadata repositories and model repositories and operations.

• Initiative 2. Automated generation of metadata from line-of-business artifacts. • Initiative 3. Rules management and contracts support (behavioral semantics) • Initiative 4. Semantics support for W3C service oriented architecture

resources. • Initiative 5. HL7 CTS II/ OMG MIF compliant federated terminology services. • Initiative 6. Controlled biomedical terminology, ontology and metadata

content. • Initiative 7. Assessment of semantic unification of compositional and

derivational models

Page 13: CaBIG ® VCDE Workspace Tactics thru June 14, 2010: How working groups fit together, and other activities Brian Davis April 1, 2010 VCDE WS Teleconference

caGrid

• caGrid KC: https://cabig-kc.nci.nih.gov/CaGrid/KC/index.php/Main_Page

• caGrid Wiki: http://cagrid.org/display/cagridhome/Home

• caGrid Portal: http://cagrid-portal.nci.nih.gov/web/guest/home

Page 14: CaBIG ® VCDE Workspace Tactics thru June 14, 2010: How working groups fit together, and other activities Brian Davis April 1, 2010 VCDE WS Teleconference

Process

• Updates to VCDE WS on VCDE WS Teleconferences thru June 14.• Also: Wiki Sites available now: read and provide

feedback (on wiki)• Presentations at upcoming XC WS F2F (June 2-4th,

2010)• Opportunity for feedback to groups for final revisions to

whitepapers and recommendations• Final Research, Whitepapers, and Recommendations

due no later than June 14, 2010.• Provide to XC WS Leadership and caBIG leadership for

decisions.

Page 15: CaBIG ® VCDE Workspace Tactics thru June 14, 2010: How working groups fit together, and other activities Brian Davis April 1, 2010 VCDE WS Teleconference

Interoperability and XC WS Operations

ECCF Impl Guide

Strategies

Goals

Tactics/Projects

SAIF/ ECCF

Adopt and Adapt

Standards

KnowledgeCenters (KC)

Mentoring

XC WS Participants

How to interact with Standards

BodiesInterop. Reviews

XC WS operations

(v2.0)

CDE reviews

Vocab Reviews

Analytical Service SpecsData Service

Specs

Gap Analysis

Harmonize Activities

Coordination

Training

Semantic Infra.

VKC and Grid KCIso21090

DTs

Sem. Infra.

caGrid