cable layouts, connectors for the lhc gas systems gas coordination meeting, october 2005 ph / dt1 gs

15
Cable Layouts, Connectors for the LHC GAS SYSTEMS GAS COORDINATION MEETING, OCTOBER 2005 PH / DT1 GS

Upload: beverly-hudson

Post on 18-Jan-2016

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Cable Layouts, Connectors for the LHC GAS SYSTEMS GAS COORDINATION MEETING, OCTOBER 2005 PH / DT1 GS

Cable Layouts, Connectors for the LHC GAS SYSTEMS

GAS COORDINATION MEETING, OCTOBER 2005

PH / DT1 GS

Page 2: Cable Layouts, Connectors for the LHC GAS SYSTEMS GAS COORDINATION MEETING, OCTOBER 2005 PH / DT1 GS

October 20th, 2005 Mar 2

Typical Layout

GasRacks

Entranceto Shaft

Surface Gas Buidling

ControlRack

CAN Bus

3 P+N

Profibus PA

TT

Signal Cable

Profibus DP

VoltageReference ForCAN Bus

Ethernet

Ethernet

DistributionRack

DistributionRack

GasRacks

Profibus DP

CAN Bus

VoltageReference ForCAN Bus

Profibus PA

CavernSignal Cable

ControlRack

ValveIslands

ValvePositionerElectronic

Rack

SignalCable

CAN Bus

Flow MeterDC Power

3 P+N

Profibus PA

PT

PT

PT

Ethernet

Surface, SG building

US (CR5, UXA) UX

Page 3: Cable Layouts, Connectors for the LHC GAS SYSTEMS GAS COORDINATION MEETING, OCTOBER 2005 PH / DT1 GS

October 20th, 2005 Mar 3

Agreement

• Cables and connectors* between SG - US - UX - SG are procured and installed by the experiments to PH-DT1/Gas specification

• After several iterations, the cable schedule for the 4 experiments are released, available in EDMS

• The Gas Group takes full care of cables between racks in SG and US

* In ATLAS, the Gas Group will assemble the connectors (after cable installation)

Sub Det.

Source Source Location Source Ident. LabelSource

Connector Type

Destination Destination Location Dest. Ident. Label

RPC RPC Cont. Rack SGX Building 1.PB to RPC Cont. Rack E RPC Cont. Rack USA 15 Gas Room 1.PB from RPC Cont. RackRPC RPC Cont. Rack SGX Building 2.CB to RPC Cont. Rack B RPC Cont. Rack USA 15 Gas Room 2.CB from RPC Cont. RackRPC RPC Cont. Rack SGX Building 3.CB to RPC Cont. Rack B RPC Cont. Rack USA 15 Gas Room 3.CB from RPC Cont. RackRPC RPC Cont. Rack USA 15 Gas Room 4.CB to Gas Dist. Rack 42-5 B Gas Dist. Rack 42-5UX15 HS_US Level 8 4.CB from RPC Cont. RackRPC Gas Dist. Rack 42-5UX15 HS_US Level 8 5.CB to Gas Dist. Rack 42-2 C Gas Dist. Rack 42-2UX15 HS_US Level 7 5.CB from Gas Dist. Rack 42-5RPC Gas Dist. Rack 42-2UX15 HS_US Level 7 6.CB to Gas Dist. Rack 43-2 C Gas Dist. Rack 43-2UX15 HS_US Level 4 6.CB from Gas Dist. Rack 42-2RPC Gas Dist. Rack 43-2UX15 HS_US Level 4 7.CB to Gas Dist. Rack 43-3 C Gas Dist. Rack 43-3UX15 HS_US Level 1 7.CB from Gas Dist. Rack 43-2RPC Gas Dist. Rack 43-3UX15 HS_US Level 1 8.CB to Gas Dist. Rack 43-5 C Gas Dist. Rack 43-5UX15 HS_US Level 0 8.CB from Gas Dist. Rack 43-3RPC RPC Cont. Rack USA 15 Gas Room 9.CB to Gas Dist. Rack 43-5 B Gas Dist. Rack 43-5UX15 HS_US Level 0 9.CB from RPC Cont. RackRPC RPC Cont. Rack USA 15 Gas Room 10.PB_PA to Reg. Valve Pos Rack F Reg. Valve Pos RackUSA (Position to be determined)10.PB_PA from RPC Cont. RackRPC RPC Cont. Rack USA 15 Gas Room 11.PB_PA to Reg. Valve Pos Rack F Reg. Valve Pos RackUSA (Position to be determined)11.PB_PA from RPC Cont. RackRPC Reg. Valve Pos.RackUSA (Position to be determined) 12.CV in Gas Dist. Rack 43-5 T Gas Dist. Rack 43-5UX15 HS_US Level 0 12.CV from Reg. Valve Pos.RackRPC Reg. Valve Pos.RackUSA (Position to be determined) 13.CV in Gas Dist. Rack 42-5 T Gas Dist. Rack 42-5UX15 HS_US Level 8 13.CV from Reg. Valve Pos.RackRPC Reg. Valve Pos.RackUSA (Position to be determined) 14.CV in Gas Dist. Rack 43-3 T Gas Dist. Rack 43-3UX15 HS_US Level 1 14.CV from Reg. Valve Pos.RackRPC Reg. Valve Pos.RackUSA (Position to be determined) 15.CV in Gas Dist. Rack 43-2 T Gas Dist. Rack 43-2UX15 HS_US Level 4 15.CV from Reg. Valve Pos.RackRPC Reg. Valve Pos.RackUSA (Position to be determined) 16.CV in Gas Dist. Rack 42-2 T Gas Dist. Rack 42-2UX15 HS_US Level 7 16.CV from Reg. Valve Pos.RackRPC RPC SB Cont. RackSGX Building 17.VR to RPC Cont. Rack P RPC Cont. Rack USA 15 Gas Room 17.VR from RPC SB Cont. RackRPC RPC Cont. Rack USA 15 Gas Room 18.Power to Gas Dist. Rack 43-5 M Gas Dist. Rack 43-5UX15 HS_US Level 0 18.Power from RPC Cont. RackRPC RPC Cont. Rack USA 15 Gas Room 19.Power to Gas Dist. Rack 42-5 M Gas Dist. Rack 42-5UX15 HS_US Level 8 19.Power from RPC Cont. RackRPC RPC Cont. Rack USA 15 Gas Room 20.Power to Gas Dist. Rack 43-3 M Gas Dist. Rack 43-3UX15 HS_US Level 1 20.Power from RPC Cont. RackRPC RPC Cont. Rack USA 15 Gas Room 21.Power to Gas Dist. Rack 43-2 M Gas Dist. Rack 43-2UX15 HS_US Level 4 21.Power from RPC Cont. RackRPC RPC Cont. Rack USA 15 Gas Room 22.Power to Gas Dist. Rack 42-2 M Gas Dist. Rack 42-2UX15 HS_US Level 7 22.Power from RPC Cont. RackRPC RPC Cont. Rack USA 15 Gas Room 23.PTs in Gas Dist. Rack 43-5 K Gas Dist. Rack 43-5UX15 HS_US Level 0 23.PTs to RPC Cont. RackRPC RPC Cont. Rack USA 15 Gas Room 24.PTs in Gas Dist. Rack 42-5 K Gas Dist. Rack 42-5UX15 HS_US Level 8 24.PTs to RPC Cont. RackRPC RPC Cont. Rack USA 15 Gas Room 25.PTs in Gas Dist. Rack 43-3 K Gas Dist. Rack 43-3UX15 HS_US Level 1 25.PTs to RPC Cont. RackRPC RPC Cont. Rack USA 15 Gas Room 26.PTs in Gas Dist. Rack 43-2 K Gas Dist. Rack 43-2UX15 HS_US Level 4 26.PTs to RPC Cont. RackRPC RPC Cont. Rack USA 15 Gas Room 27.PTs in Gas Dist. Rack 42-2 K Gas Dist. Rack 42-2UX15 HS_US Level 7 27.PTs to RPC Cont. RackRPC PT-6104 Mounted on Detector in UX Cavern 28.PT-6104 to Gas Dist. Rack 43-5 H Gas Dist. Rack 43-5UX15 HS_US Level 0 28. from PT-6104RPC PT-6504 Mounted on Detector in UX Cavern 29.PT-6504 to Gas Dist. Rack 42-5 H Gas Dist. Rack 42-5UX15 HS_US Level 8 29. from PT-6504RPC PT-6204 Mounted on Detector in UX Cavern 30.PT-6204 to Gas Dist. Rack 43-3. H Gas Dist. Rack 43-3.UX15 HS_US Level 1 30. from PT-6204RPC PT-6304 Mounted on Detector in UX Cavern 31.PT-6304 to Gas Dist. Rack 43-2 H Gas Dist. Rack 43-2UX15 HS_US Level 4 31. from PT-6304RPC PT-6404 Mounted on Detector in UX Cavern 32.PT-6404 to Gas Dist. Rack 42-2 H Gas Dist. Rack 42-2UX15 HS_US Level 7 32. from PT-6404RPC RPC Cont. Rack USA 15 Gas Room 33.Signals to Valve Panel 3 R Valve Panel 3 UX15 HO_A Level 8 33.Signals from RPC Cont. RackRPC RPC Cont. Rack USA 15 Gas Room 34.Signals to Valve Panel 3 R Valve Panel 3 UX15 HO_A Level 8 34.Signals from RPC Cont. RackRPC Valve Panel 3 UX15 HO_A Level 8 35.Valve Panel 3/Gas Dist. Rack 43-5.U Gas Dist. Rack 43-5.UX15 HS_US Level 0 35.Gas Dist. Rack 43-5./Valve Panel 3RPC Valve Panel 3 UX15 HO_A Level 8 36.Valve Panel 3/Gas Dist. Rack 43-5.U Gas Dist. Rack 43-5.UX15 HS_US Level 0 36.Gas Dist. Rack 43-5./Valve Panel 3RPC Valve Panel 3 UX15 HO_A Level 8 37.Valve Panel 3/Gas Dist. Rack 43-5.U Gas Dist. Rack 43-5.UX15 HS_US Level 0 37.Gas Dist. Rack 43-5./Valve Panel 3RPC Valve Panel 3 UX15 HO_A Level 8 38.Valve Panel 3/Gas Dist. Rack 43-5.U Gas Dist. Rack 43-5.UX15 HS_US Level 0 38.Gas Dist. Rack 43-5./Valve Panel 3RPC Valve Panel 3 UX15 HO_A Level 8 39.Valve Panel 3/Gas Dist. Rack 43-5.U Gas Dist. Rack 43-5.UX15 HS_US Level 0 39.Gas Dist. Rack 43-5./Valve Panel 3RPC Valve Panel 3 UX15 HO_A Level 8 40.Valve Panel 3/Gas Dist. Rack 42-5U Gas Dist. Rack 42-5UX15 HS_US Level 8 40.Gas Dist. Rack 42-5/Valve Panel 3RPC Valve Panel 3 UX15 HO_A Level 8 41.Valve Panel 3/Gas Dist. Rack 42-5U Gas Dist. Rack 42-5UX15 HS_US Level 8 41.Gas Dist. Rack 42-5/Valve Panel 3RPC Valve Panel 3 UX15 HO_A Level 8 42.Valve Panel 3/Gas Dist. Rack 42-5U Gas Dist. Rack 42-5UX15 HS_US Level 8 42.Gas Dist. Rack 42-5/Valve Panel 3RPC Valve Panel 3 UX15 HO_A Level 8 43.Valve Panel 3/Gas Dist. Rack 42-5U Gas Dist. Rack 42-5UX15 HS_US Level 8 43.Gas Dist. Rack 42-5/Valve Panel 3RPC Valve Panel 3 UX15 HO_A Level 8 44.Valve Panel 3/Gas Dist. Rack 42-5U Gas Dist. Rack 42-5UX15 HS_US Level 8 44.Gas Dist. Rack 42-5/Valve Panel 3RPC Valve Panel 3 UX15 HO_A Level 8 45.Valve Panel 3/Gas Dist. Rack 43-3U Gas Dist. Rack 43-3UX15 HS_US Level 1 45.Gas Dist. Rack 43-3/Valve Panel 3RPC Valve Panel 3 UX15 HO_A Level 8 46.Valve Panel 3/Gas Dist. Rack 43-3U Gas Dist. Rack 43-3UX15 HS_US Level 1 46.Gas Dist. Rack 43-3/Valve Panel 3RPC Valve Panel 3 UX15 HO_A Level 8 47.Valve Panel 3/Gas Dist. Rack 43-3U Gas Dist. Rack 43-3UX15 HS_US Level 1 47.Gas Dist. Rack 43-3/Valve Panel 3RPC Valve Panel 3 UX15 HO_A Level 8 48.Valve Panel 3/Gas Dist. Rack 43-3U Gas Dist. Rack 43-3UX15 HS_US Level 1 48.Gas Dist. Rack 43-3/Valve Panel 3RPC Valve Panel 3 UX15 HO_A Level 8 49.Valve Panel 3/Gas Dist. Rack 43-3U Gas Dist. Rack 43-3UX15 HS_US Level 1 49.Gas Dist. Rack 43-3/Valve Panel 3RPC Valve Panel 3 UX15 HO_A Level 8 50.Valve Panel 3/Gas Dist. Rack 43-2U Gas Dist. Rack 43-2UX15 HS_US Level 4 50.Gas Dist. Rack 43-2/Valve Panel 3RPC Valve Panel 3 UX15 HO_A Level 8 51.Valve Panel 3/Gas Dist. Rack 43-2U Gas Dist. Rack 43-2UX15 HS_US Level 4 51.Gas Dist. Rack 43-2/Valve Panel 3RPC Valve Panel 3 UX15 HO_A Level 8 52.Valve Panel 3/Gas Dist. Rack 43-2U Gas Dist. Rack 43-2UX15 HS_US Level 4 52.Gas Dist. Rack 43-2/Valve Panel 3RPC Valve Panel 3 UX15 HO_A Level 8 53.Valve Panel 3/Gas Dist. Rack 43-2U Gas Dist. Rack 43-2UX15 HS_US Level 4 53.Gas Dist. Rack 43-2/Valve Panel 3

S. Pavis

Page 4: Cable Layouts, Connectors for the LHC GAS SYSTEMS GAS COORDINATION MEETING, OCTOBER 2005 PH / DT1 GS

October 20th, 2005 Mar 4

Cable Schedule

Sub Det.

Source Source Location Source Ident. LabelSource

Connector Type

Destination Destination Location Dest. Ident. Label

Destination

Connector Type

DescriptionCable/

Connector Schematic

Cable type/sizeSCEM.No/Ref.No.

Diamete

r

Length

1 RPC RPC Cont. Rack SGX Building 1.PB to RPC Cont. Rack E RPC Cont. Rack USA 15 Gas Room 1.PB from RPC Cont. RackE Profibus DP Cable 6 1 twisted pair04.21.60.020.48.0

2 RPC RPC Cont. Rack SGX Building 2.CB to RPC Cont. Rack B RPC Cont. Rack USA 15 Gas Room 2.CB from RPC Cont. RackB CANBus Cable 4 1 twisted pair04.21.60.420.57.0

3 RPC RPC Cont. Rack SGX Building 3.CB to RPC Cont. Rack B RPC Cont. Rack USA 15 Gas Room 3.CB from RPC Cont. RackB CANBus Cable 4 1 twisted pair04.21.60.420.57.0

4 RPC RPC Cont. Rack USA 15 Gas Room 4.CB to Gas Dist. Rack 42-5 B Gas Dist. Rack 42-5 UX15 HS_US Level 84.CB from RPC Cont. RackC CANBus Cable 2 1 twisted pair04.21.60.420.57.0

5 RPC Gas Dist. Rack 42-5 UX15 HS_US Level 85.CB to Gas Dist. Rack 42-2 C Gas Dist. Rack 42-2 UX15 HS_US Level 75.CB from Gas Dist. Rack 42-5C CANBus Cable 3 1 twisted pair04.21.60.420.57.0

6 RPC Gas Dist. Rack 42-2 UX15 HS_US Level 76.CB to Gas Dist. Rack 43-2 C Gas Dist. Rack 43-2 UX15 HS_US Level 46.CB from Gas Dist. Rack 42-2C CANBus Cable 3 1 twisted pair04.21.60.420.57.0

7 RPC Gas Dist. Rack 43-2 UX15 HS_US Level 47.CB to Gas Dist. Rack 43-3 C Gas Dist. Rack 43-3 UX15 HS_US Level 17.CB from Gas Dist. Rack 43-2C CANBus Cable 3 1 twisted pair04.21.60.420.57.0

8 RPC Gas Dist. Rack 43-3 UX15 HS_US Level 18.CB to Gas Dist. Rack 43-5 C Gas Dist. Rack 43-5 UX15 HS_US Level 08.CB from Gas Dist. Rack 43-3C CANBus Cable 3 1 twisted pair04.21.60.420.57.0

9 RPC RPC Cont. Rack USA 15 Gas Room 9.CB to Gas Dist. Rack 43-5 B Gas Dist. Rack 43-5 UX15 HS_US Level 09.CB from RPC Cont. RackC CANBus Cable 2 1 twisted pair04.21.60.420.57.0

10 RPC RPC Cont. Rack USA 15 Gas Room 10.PB_PA to Reg. Valve Pos RackF Reg. Valve Pos Rack USA (Position to be determined)10.PB_PA from RPC Cont. RackG Profibus PA Cable 7 1 twisted pair04.21.60.300.98.0

11 RPC RPC Cont. Rack USA 15 Gas Room 11.PB_PA to Reg. Valve Pos RackF Reg. Valve Pos Rack USA (Position to be determined)11.PB_PA from RPC Cont. RackG Profibus PA Cable 7 1 twisted pair04.21.60.300.98.0

12 RPC Reg. Valve Pos.Rack USA (Position to be determined)12.CV in Gas Dist. Rack 43-5 T Gas Dist. Rack 43-5 UX15 HS_US Level 012.CV from Reg. Valve Pos.RackT Signal Cable 13 5 pair 04.21.52.120.811.0

13 RPC Reg. Valve Pos.Rack USA (Position to be determined)13.CV in Gas Dist. Rack 42-5 T Gas Dist. Rack 42-5 UX15 HS_US Level 813.CV from Reg. Valve Pos.RackT Signal Cable 13 5 pair 04.21.52.120.811.0

14 RPC Reg. Valve Pos.Rack USA (Position to be determined)14.CV in Gas Dist. Rack 43-3 T Gas Dist. Rack 43-3 UX15 HS_US Level 114.CV from Reg. Valve Pos.RackT Signal Cable 13 5 pair 04.21.52.120.811.0

15 RPC Reg. Valve Pos.Rack USA (Position to be determined)15.CV in Gas Dist. Rack 43-2 T Gas Dist. Rack 43-2 UX15 HS_US Level 415.CV from Reg. Valve Pos.RackT Signal Cable 13 5 pair 04.21.52.120.811.0

16 RPC Reg. Valve Pos.Rack USA (Position to be determined)16.CV in Gas Dist. Rack 42-2 T Gas Dist. Rack 42-2 UX15 HS_US Level 716.CV from Reg. Valve Pos.RackT Signal Cable 13 5 pair 04.21.52.120.811.0

17 RPC RPC SB Cont. Rack SGX Building 17.VR to RPC Cont. Rack P RPC Cont. Rack USA 15 Gas Room 17.VR from RPC SB Cont. RackQ Voltage Reference for CanBus11 1 pair 04.21.52.100.27.0

18 RPC RPC Cont. Rack USA 15 Gas Room 18.Power to Gas Dist. Rack 43-5M Gas Dist. Rack 43-5 UX15 HS_US Level 018.Power from RPC Cont. RackN 3 x 15VDC Power supply to C.F.M (ELMB)10 3 pair 04.21.52.110.010.0

19 RPC RPC Cont. Rack USA 15 Gas Room 19.Power to Gas Dist. Rack 42-5M Gas Dist. Rack 42-5 UX15 HS_US Level 819.Power from RPC Cont. RackN 3 x 15VDC Power supply to C.F.M (ELMB)10 3 pair 04.21.52.110.010.0

20 RPC RPC Cont. Rack USA 15 Gas Room 20.Power to Gas Dist. Rack 43-3M Gas Dist. Rack 43-3 UX15 HS_US Level 120.Power from RPC Cont. RackN 3 x 15VDC Power supply to C.F.M (ELMB)10 3 pair 04.21.52.110.010.0

21 RPC RPC Cont. Rack USA 15 Gas Room 21.Power to Gas Dist. Rack 43-2M Gas Dist. Rack 43-2 UX15 HS_US Level 421.Power from RPC Cont. RackN 3 x 15VDC Power supply to C.F.M (ELMB)10 3 pair 04.21.52.110.010.0

22 RPC RPC Cont. Rack USA 15 Gas Room 22.Power to Gas Dist. Rack 42-2M Gas Dist. Rack 42-2 UX15 HS_US Level 722.Power from RPC Cont. RackN 3 x 15VDC Power supply to C.F.M (ELMB)10 3 pair 04.21.52.110.010.0

Experiment Personnel to

work out shortest

route and reconfigure

as necessary

Source

Rack Id.Location = SG, US, UX

Source Ident. Label = Unique ID, sticker on cableSource Connector Type

DestinationInformation about each

cable type

DescriptionRef. to a schematic drawing

Cable typeSCEM

Diameter, length

Page 5: Cable Layouts, Connectors for the LHC GAS SYSTEMS GAS COORDINATION MEETING, OCTOBER 2005 PH / DT1 GS

October 20th, 2005 Mar 5

New release

• The new Cable Schedule document contains the information for all connectors

• It is accompanied by a Cable/Connector schematics document

• Any line is characterized by:

character - number - character

Connector at source Cable Type Connector at destination

Page 6: Cable Layouts, Connectors for the LHC GAS SYSTEMS GAS COORDINATION MEETING, OCTOBER 2005 PH / DT1 GS

October 20th, 2005 Mar 6

Cable/Connector SchematicsEx. Power from Control Rack in US to Distribution Rack in UX

M 10 N

Page 7: Cable Layouts, Connectors for the LHC GAS SYSTEMS GAS COORDINATION MEETING, OCTOBER 2005 PH / DT1 GS

October 20th, 2005 Mar 7

Cable/Connector SchematicsEx. CanBus US - UX

B 2 C

Page 8: Cable Layouts, Connectors for the LHC GAS SYSTEMS GAS COORDINATION MEETING, OCTOBER 2005 PH / DT1 GS

October 20th, 2005 Mar 8

Reminder of some Target Dates

Cables installed & tested

Installation Milestones (1 month after)

ALICE Jan 06Start Commissioning of

Single Path systems

ATLAS Dec 06Multi-channel

commissioning (RPC)

CMS / TOTEM May 06Start installation of gas

systems

LHCb May 06Start installation of gas

systems

Page 9: Cable Layouts, Connectors for the LHC GAS SYSTEMS GAS COORDINATION MEETING, OCTOBER 2005 PH / DT1 GS

October 20th, 2005 Mar 9

Assembly & Test of connectors: Time Estimates

30’ 10’ 10’

24VDC Pilot Signals for Valves

20’ 20’ 10’ 10’

Page 10: Cable Layouts, Connectors for the LHC GAS SYSTEMS GAS COORDINATION MEETING, OCTOBER 2005 PH / DT1 GS

October 20th, 2005 Mar 10

Global Time Estimates## TRT XeTRT Xe Cont. Rack SGX Building 65.PB to TRT Xe Cont. RackTRT Xe Cont. Rack USA 15 Gas Room 65.PB from TRT Xe Cont. RackProfibus DP Cable 1 1 twisted pair04.21.60.020.48.0 10 10

## TRT XeTRT Xe Cont. Rack SGX Building 66.CB to TRT Xe Cont. RackTRT Xe Cont. Rack USA 15 Gas Room 66.CB from TRT Xe Cont. RackCANBus Cable 2 1 twisted pair04.21.60.420.57.0 20 30

## TRT XeTRT Xe Cont. Rack SGX Building 67.CB to TRT Xe Cont. RackTRT Xe Cont. Rack USA 15 Gas Room 67.CB from TRT Xe Cont. RackCANBus Cable 2 1 twisted pair04.21.60.420.57.0 20 30

## TRT XeTRT Xe Cont. Rack USA 15 Gas Room 68.CB to Gas Dist. Rack 34-2Gas Dist. Rack 34-2 UX15 HS_US Level 7 68.CB from TRT Xe Cont. RackCANBus Cable 3 1 twisted pair04.21.60.420.57.0 30 20

## TRT XeTRT Xe Cont. Rack USA 15 Gas Room 69.CB to Gas Dist. Rack 38-2Gas Dist. Rack 38-2 UX15 HS_US Level 7 69.CB from TRT Xe Cont. RackCANBus Cable 3 1 twisted pair04.21.60.420.57.0 30 20

## TRT XeGas Dist. Rack 34-2 UX15 HS_US Level 7 70.CB to Gas Dist. Rack 37-2Gas Dist. Rack 37-2 UX15 HS_US Level 7 70.CB from Gas Dist. Rack 34-2CANBus Cable 4 1 twisted pair04.21.60.420.57.0 20 20

## TRT XeGas Dist. Rack 37-2 UX15 HS_US Level 7 71.CB to Gas Dist. Rack 38-2Gas Dist. Rack 38-2 UX15 HS_US Level 7 71.CB from Gas Dist. Rack 37-2CANBus Cable 4 1 twisted pair04.21.60.420.57.0 20 20

## TRT XeTRT Xe Cont. Rack USA 15 Gas Room 72.PB_PA to Reg. Valve Pos RackReg. Valve Pos Rack USA (Position to be determined)72.PB_PA from TRT Xe Cont. RackProfibus PA Cable 5 1 twisted pair04.21.60.300.98.0 20 20

## TRT XeTRT Xe Cont. Rack USA 15 Gas Room 73.PB_PA to Reg. Valve Pos RackReg. Valve Pos Rack USA (Position to be determined)73.PB_PA from TRT Xe Cont. RackProfibus PA Cable 5 1 twisted pair04.21.60.300.98.0 20 20

## TRT XeReg. Valve Pos.Rack USA (Position to be determined)74.CV in Gas Dist. Rack 34-2Gas Dist. Rack 34-2 UX15 HS_US Level 7 74.CV from Reg. Valve Pos.RackSignal Cable 6 5 pair 04.21.52.120.811.0 0 0

## TRT XeReg. Valve Pos.Rack USA (Position to be determined)75.CV in Gas Dist. Rack 37-2Gas Dist. Rack 37-2 UX15 HS_US Level 7 75.CV from Reg. Valve Pos.RackSignal Cable 6 5 pair 04.21.52.120.811.0 0 0

## TRT XeReg. Valve Pos.Rack USA (Position to be determined)76.CV in Gas Dist. Rack 38-2Gas Dist. Rack 38-2 UX15 HS_US Level 7 76.CV from Reg. Valve Pos.RackSignal Cable 6 5 pair 04.21.52.120.811.0 0 0

## TRT XeTRT Xe Cont. Rack SGX Building 77.VR to TRT Xe Cont. RackTRT Xe Cont. Rack USA 15 Gas Room 77.VR from TRT Xe Cont. RackVoltage Reference for CanBus7 1 pair 04.21.52.100.27.0 10 10

## TRT XeTRT Xe Cont. Rack USA 15 Gas Room 78.Power to Gas Dist. Rack 34-2Gas Dist. Rack 34-2 UX15 HS_US Level 7 78.Power from TRT Xe Cont. Rack3 x 15VDC Power supply to C.F.M (ELMB)8 3 pair 04.21.52.110.010.0 10 10

## TRT XeTRT Xe Cont. Rack USA 15 Gas Room 79.Power to Gas Dist. Rack 37-2Gas Dist. Rack 37-2 UX15 HS_US Level 7 79.Power from TRT Xe Cont. Rack3 x 15VDC Power supply to C.F.M (ELMB)8 3 pair 04.21.52.110.010.0 10 10

## TRT XeTRT Xe Cont. Rack USA 15 Gas Room 80.Power to Gas Dist. Rack 38-2Gas Dist. Rack 38-2 UX15 HS_US Level 7 80.Power from TRT Xe Cont. Rack3 x 15VDC Power supply to C.F.M (ELMB)8 3 pair 04.21.52.110.010.0 10 10

## TRT XeTRT Xe Cont. Rack USA 15 Gas Room 81.PTs in Gas Dist. Rack 34-2Gas Dist. Rack 34-2 UX15 HS_US Level 7 81.PTs to TRT Xe Cont. RackPressure Transmitters 9 6 pair 04.21.51.112.211.0 15 15

## TRT XeTRT Xe Cont. Rack USA 15 Gas Room 82.PTs in Gas Dist. Rack 37-2Gas Dist. Rack 37-2 UX15 HS_US Level 7 82.PTs to TRT Xe Cont. RackPressure Transmitters 9 6 pair 04.21.51.112.211.0 15 15

## TRT XeTRT Xe Cont. Rack USA 15 Gas Room 83.PTs in Gas Dist. Rack 38-2Gas Dist. Rack 38-2 UX15 HS_US Level 7 83.PTs to TRT Xe Cont. RackPressure Transmitters 9 6 pair 04.21.51.112.211.0 15 15

## TRT XeTRT Xe Cont. Rack USA 15 Gas Room 84.Signals to Valve Panel 3Valve Panel 3 UX15 HO_A Level 8 84.Signals from TRT Xe Cont. Rack24VDC Pilot Signals for Valves10 25 Core 04.21.51.125.714.6 20 20

## TRT XeValve Panel 3 UX15 HO_A Level 8 85.Valve Panel 3/Gas Dist. Rack 34-2Gas Dist. Rack 34-2 UX15 HS_US Level 7 85.Gas Dist. Rack 34-2/Valve Panel 3Pneumatic Signal 12 6/4mm Pneumatic Line01.0505.0020 (see note)9.5 2 2

## TRT XeValve Panel 3 UX15 HO_A Level 8 86.Valve Panel 3/Gas Dist. Rack 34-2Gas Dist. Rack 34-2 UX15 HS_US Level 7 86.Gas Dist. Rack 34-2/Valve Panel 3Pneumatic Signal 12 6/4mm Pneumatic Line01.0505.0020 (see note)9.5 2 2

## TRT XeValve Panel 3 UX15 HO_A Level 8 87.Valve Panel 3/Gas Dist. Rack 34-2Gas Dist. Rack 34-2 UX15 HS_US Level 7 87.Gas Dist. Rack 34-2/Valve Panel 3Pneumatic Signal 12 6/4mm Pneumatic Line01.0505.0020 (see note)9.5 2 2

## TRT XeValve Panel 3 UX15 HO_A Level 8 88.Valve Panel 3/Gas Dist. Rack 34-2Gas Dist. Rack 34-2 UX15 HS_US Level 7 88.Gas Dist. Rack 34-2/Valve Panel 3Pneumatic Signal 12 6/4mm Pneumatic Line01.0505.0020 (see note)9.5 2 2

## TRT XeValve Panel 3 UX15 HO_A Level 8 89.Valve Panel 3/Gas Dist. Rack 34-2Gas Dist. Rack 34-2 UX15 HS_US Level 7 89.Gas Dist. Rack 34-2/Valve Panel 3Pneumatic Signal 12 6/4mm Pneumatic Line01.0505.0020 (see note)9.5 2 2

## TRT XeValve Panel 3 UX15 HO_A Level 8 90.Valve Panel 3/Gas Dist. Rack 37-2Gas Dist. Rack 37-2 UX15 HS_US Level 7 90.Gas Dist. Rack 37-2/Valve Panel 3Pneumatic Signal 12 6/4mm Pneumatic Line01.0505.0020 (see note)9.5 2 2

## TRT XeValve Panel 3 UX15 HO_A Level 8 91.Valve Panel 3/Gas Dist. Rack 37-2Gas Dist. Rack 37-2 UX15 HS_US Level 7 91.Gas Dist. Rack 37-2/Valve Panel 3Pneumatic Signal 12 6/4mm Pneumatic Line01.0505.0020 (see note)9.5 2 2

## TRT XeValve Panel 3 UX15 HO_A Level 8 92.Valve Panel 3/Gas Dist. Rack 37-2Gas Dist. Rack 37-2 UX15 HS_US Level 7 92.Gas Dist. Rack 37-2/Valve Panel 3Pneumatic Signal 12 6/4mm Pneumatic Line01.0505.0020 (see note)9.5 2 2

## TRT XeValve Panel 3 UX15 HO_A Level 8 93.Valve Panel 3/Gas Dist. Rack 37-2Gas Dist. Rack 37-2 UX15 HS_US Level 7 93.Gas Dist. Rack 37-2/Valve Panel 3Pneumatic Signal 12 6/4mm Pneumatic Line01.0505.0020 (see note)9.5 2 2

## TRT XeValve Panel 3 UX15 HO_A Level 8 94.Valve Panel 3/Gas Dist. Rack 37-2Gas Dist. Rack 37-2 UX15 HS_US Level 7 94.Gas Dist. Rack 37-2/Valve Panel 3Pneumatic Signal 12 6/4mm Pneumatic Line01.0505.0020 (see note)9.5 2 2

## TRT XeValve Panel 3 UX15 HO_A Level 8 95.Valve Panel 3/Gas Dist. Rack 38-2Gas Dist. Rack 38-2 UX15 HS_US Level 7 95.Gas Dist. Rack 38-2/Valve Panel 3Pneumatic Signal 12 6/4mm Pneumatic Line01.0505.0020 (see note)9.5 2 2

## TRT XeValve Panel 3 UX15 HO_A Level 8 96.Valve Panel 3/Gas Dist. Rack 38-2Gas Dist. Rack 38-2 UX15 HS_US Level 7 96.Gas Dist. Rack 38-2/Valve Panel 3Pneumatic Signal 12 6/4mm Pneumatic Line01.0505.0020 (see note)9.5 2 2

## TRT XeValve Panel 3 UX15 HO_A Level 8 97.Valve Panel 3/Gas Dist. Rack 38-2Gas Dist. Rack 38-2 UX15 HS_US Level 7 97.Gas Dist. Rack 38-2/Valve Panel 3Pneumatic Signal 12 6/4mm Pneumatic Line01.0505.0020 (see note)9.5 2 2

## TRT XeValve Panel 3 UX15 HO_A Level 8 98.Valve Panel 3/Gas Dist. Rack 38-2Gas Dist. Rack 38-2 UX15 HS_US Level 7 98.Gas Dist. Rack 38-2/Valve Panel 3Pneumatic Signal 12 6/4mm Pneumatic Line01.0505.0020 (see note)9.5 2 2

## TRT XeValve Panel 3 UX15 HO_A Level 8 99.Valve Panel 3/Gas Dist. Rack 38-2Gas Dist. Rack 38-2 UX15 HS_US Level 7 99.Gas Dist. Rack 38-2/Valve Panel 3Pneumatic Signal 12 6/4mm Pneumatic Line01.0505.0020 (see note)9.5 2 2

## TRT XeTRT Xe Cont. Rack USA 15 Gas Room 100.AV in Gas Dist. Rack 34-2Gas Dist. Rack 34-2 UX15 HS_US Level 7 100.AV to TRT Xe Cont. RackPiezzo Analysis Valve 13 2 pair 04.21.52.104.88.5 10 10

## TRT XeTRT Xe Cont. Rack USA 15 Gas Room 101.AV in Gas Dist. Rack 37-2Gas Dist. Rack 37-2 UX15 HS_US Level 7 101.AV to TRT Xe Cont. RackPiezzo Analysis Valve 13 2 pair 04.21.52.104.88.5 10 10

## TRT XeTRT Xe Cont. Rack USA 15 Gas Room 102.AV in Gas Dist. Rack 38-2Gas Dist. Rack 38-2 UX15 HS_US Level 7 102.AV to TRT Xe Cont. RackPiezzo Analysis Valve 13 2 pair 04.21.52.104.88.5 10 10

TRT Xe Cont. Rack SGX Building 60 0 60 12 60 132 198 3.3

TRT Xe Cont. Rack USA 15 Gas Room 225 80 305 61 60 426 639 10.65

Gas Dist. Rack 34-2 UX15 HS_US Level 7 20 55 75 15 60 150 225 3.75

Gas Dist. Rack 37-2 UX15 HS_US Level 7 20 55 75 15 60 150 225 3.75

Gas Dist. Rack 38-2 UX15 HS_US Level 7 0 75 75 15 60 150 225 3.75

Reg. Valve Pos.Rack USA (Position to be determined) 0 40 40 8 60 108 162 2.7

Valve Panel 3 UX15 HO_A Level 8 0 20 20 4 60 84 126 2.1

P.L. Valve Panel 3 UX15 HO_A Level 8 30 0 30 6 60 96 144 2.4

P.L. Gas Dist. Rack 34-2 UX15 HS_US Level 7 0 10 10 2 60 72 108 1.8

P.L. Gas Dist. Rack 37-2 UX15 HS_US Level 7 0 10 10 2 60 72 108 1.8

P.L. Gas Dist. Rack 38-2 UX15 HS_US Level 7 0 10 10 2 60 72 108 1.8

Cross Check TOTAL 355 355 710 142 60 912 1368 22.8

2424 3636 60.6

Std. Cable Schedule with estimates for each connector type

Info grouped by rack type

Page 11: Cable Layouts, Connectors for the LHC GAS SYSTEMS GAS COORDINATION MEETING, OCTOBER 2005 PH / DT1 GS

October 20th, 2005 Mar 11

Cable/Connector Assembly Time per Rack is Calculated as:

• Assembly time of connectors

• Test time: 20% of assembly time

• Preparation time / Rack: 60’

Page 12: Cable Layouts, Connectors for the LHC GAS SYSTEMS GAS COORDINATION MEETING, OCTOBER 2005 PH / DT1 GS

October 20th, 2005 Mar 12

Assembly Time (min) / Experiment

0

1000

2000

3000

4000

5000

6000

7000

ALICE TPCALICE TRD

ALICE TRACK CPC

ALICE HMPIDALICE TRIG.ALICE CPVALICE PMDALICE TOF

ALICE SPAREATLAS CSC

ATLAS IDATLAS MDTATLAS RPCATLAS TGCATLAS TRT

CMS DTCMS RPCCMS CSCTOTEM GEMTOTEM CSCLHCb MWPC

LHCb OTLHCb RICH1LHCb RICH2

Preparation (60'/rack)

Test time (20% of assembly)

Assembly of connectors

ALICE ATLAS CMS TOT LHCb

Page 13: Cable Layouts, Connectors for the LHC GAS SYSTEMS GAS COORDINATION MEETING, OCTOBER 2005 PH / DT1 GS

October 20th, 2005 Mar 13

Typical Figures, adding some safety (50% on top of previous totals)

System Rack TypeAssembly & test

(hours)

Small Single Path Systems Control Rack SG 2.7

Control Rack US 3 - 5

Std Closed loop Systems Control Rack SG 3

Control Rack US 10

Distribution 4

Large Closed Loop Systems Control Rack SG 3

Control Rack US 15 - 30

Distribution 4

Pneumatic Lines 15 - 60

Page 14: Cable Layouts, Connectors for the LHC GAS SYSTEMS GAS COORDINATION MEETING, OCTOBER 2005 PH / DT1 GS

October 20th, 2005 Mar 14

Cable/Connectors Installation

0

5

10

15

20

25

30

35

40

45

ALICE ATLAS CMS LHCb TOTEM

Time (days) Optical fibres not included

Patch panels not included

Installation in ATLAS has to be finished by Dec 05

Page 15: Cable Layouts, Connectors for the LHC GAS SYSTEMS GAS COORDINATION MEETING, OCTOBER 2005 PH / DT1 GS

October 20th, 2005 Mar 15

Next steps

• Take into account previous figures to plan procurement, installation of your cables and connectors