TRANSCRIPT
CABLE TRAY RACK INSTALLATIONS
w w w. s i e m o n . c o m
INS_100.19628.00_CTR_Basket_A_A 5/3/11 10:42 AM Page 1
Table of Contents
2
Safety Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
CTR Diagram . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4
Hardware . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5
Below Tray Installation Parallel . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
Below Tray Installation – Perpendicular . . . . . . . . . . . . . . . . . . . . . .7
Side Wall Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8
Inside Tray Installation – Parallel . . . . . . . . . . . . . . . . . . . . . . . . . . .9
Rack Bonding . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10
Notes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11
WARNING: Failure to follow this information can result in injury or death.
CAUTION: Failure to follow this information can lead to possible equipment damage.
NOTE: Clarifying information or comment.
!
i
INS_100.19628.00_CTR_Basket_A_A 5/3/11 10:42 AM Page 2
- Read and understand all instructions for proper installation and use of this product as improper use may lead to serious injury or death.- Before loading equipment on to the cable tray rack, be sure to torque all mounting hardware provided with the rack to a setting of 75in-lbs.- The maximum load capacity of the cable tray rack should not exceed:
CTR-02-01 - 9kg (20lbs)CTR-04-01 - 8kg (40lbs)CTR-06-01 - 27kg (60lbs)
- The cable tray racks are intended to be installed in accordance with all applicable requirements of the National Electrical Code (NEC) andthe local Authority Having
Jurisdiction (AHJ).- The minimum spacings between the accessories and components and the cable tray rackshall be maintained for safe operation of the equipment when installed in accordance with theNEC.
3
Safety Information
INS_100.19628.00_CTR_Basket_A_A 5/3/11 10:42 AM Page 3
CTR-04-01 Diagram
4
INS_100.19628.00_CTR_Basket_A_A 5/3/11 10:42 AM Page 4
HARDWARE
5
TOOLS REQUIRED
1/2” Socket Wrench
INS_100.19628.00_CTR_Basket_A_A 5/3/11 10:42 AM Page 5
PARALLEL – BELOW CABLE TRAY
6
Torque all hardware to 75in-lbs
INS_100.19628.00_CTR_Basket_A_A 5/3/11 10:42 AM Page 6
PERPENDICULAR – BELOW CABLE TRAY
7
Torque all hardware to 75in-lbs
INS_100.19628.00_CTR_Basket_A_A 5/3/11 10:42 AM Page 7
SIDE WALL MOUNTED
8
Torque all hardware to 75in-lbs
INS_100.19628.00_CTR_Basket_A_A 5/3/11 10:42 AM Page 8
PARALLEL – INSIDE CABLE TRAY
9
Torque all hardware to 75in-lbs
INS_100.19628.00_CTR_Basket_A_A 5/3/11 10:42 AM Page 9
RACK BONDING
1 0
INS_100.19628.00_CTR_Basket_A_A 5/3/11 10:42 AM Page 10
1 1
Notes
To assist safe installations, comply with the following:A. Do not attempt to perform this work with fewer than 2 technicians
B. Never touch uninsulated wire terminals unlessthe circuit has been disconnected.
C. Never install this device in a wet location.
D. Never install wiring during a lightning storm.
© 2
011
Sie
mon
Global HeadquartersWatertown, Connecticut USA
Tel: (1) 866-548-5814
For a complete listing of our global offices visit our web sitewww.siemon.com
Rev
.A
4/1
1
10
0-1
96
28
-00
INS_100.19628.00_CTR_Basket_A_A 5/3/11 10:42 AM Page 11