floor BEAM 3rd level 2bhk 3bhk floor concrete 4th level 2bhk 3bhk 5th level 2bhk 2bhk 2bhk plinth 28.26 6th level 2bhk 2bhk 2bhk 1ST 26.37 7th level 2bhk 2bhk 2nd 26.37 8th level 1bhk 3bhk 3rd 21.98 9th level 1bhk 3bhk 4th 21.98 10th level 1bhk 3bhk 5th 28.49 11th level 1bhk 3bhk 6th 28.49 12th 1bhk 3bhk 7th 28.49 13th 2bhk 8th 28.49 9th 28.49 10th 28.49 11th 28.49 12th 28.49 13th 28.49 14th 14.245 395.615 415 500 concrete area area podium floors 1791.32 27643.74 228.18 6563.6 610 habitable floors 10156.13 134824.015 968.705 36799.2 3420 plinth 855.61 1402.67 28.26 3281.8 305 46644.6 0.038404 0.59264609 0.004892 0.217734 2.89045281 0.020768 0.018343 0.03007143 0.000606 0.274481 3.51317033 2.93659 45.3176066 0.374066 2.969627 39.4222266 0.283247 footing ( 305 18300 100 10000 305 24400

Upload: swapnil-toraskar

Post on 30-Jan-2016

214 views

Category:

Documents


0 download

DESCRIPTION

calculation

TRANSCRIPT

Page 1: Calculation (Temp)

floor BEAM3rd level 2bhk 3bhk floor concrete steel4th level 2bhk 3bhk (fe415)5th level 2bhk 2bhk 2bhk plinth 28.26 855.616th level 2bhk 2bhk 2bhk 1ST 26.37 895.667th level 2bhk 2bhk 2nd 26.37 895.668th level 1bhk 3bhk 3rd 21.98 850.059th level 1bhk 3bhk 4th 21.98 850.05

10th level 1bhk 3bhk 5th 28.49 95011th level 1bhk 3bhk 6th 28.49 900

12th 1bhk 3bhk 7th 28.49 88313th 2bhk 8th 28.49 883

9th 28.49 88310th 28.49 88311th 28.49 88312th 28.49 88313th 28.49 88314th 14.245 425.025

395.615

415 500 concrete area areapodium floors 1791.32 27643.74 228.18 6563.6 610

habitable floors 10156.125 134824.015 968.705 36799.2 3420plinth 855.61 1402.67 28.26 3281.8 305

46644.60.0384036 0.59264609 0.00489190.2177342 2.89045281 0.02076780.0183432 0.03007143 0.0006059

0.274481 3.513170332.9365902 45.3176066 0.37406562.9696272 39.4222266 0.2832471

footing (305 18300100 10000305 24400

Page 2: Calculation (Temp)

SLAB COLUMNsteel floor concrete steel floor concrete steel

(fe500) (fe500) (fe500)1402.67 1ST 29.30 2514.05 521.15 97371.742087.82 2nd 29.30 2514.052087.82 3rd 21.72 2370.102428.45 4th 21.72 2370.10 steel 4152428.45 5th 21.72 2370.10

2500 6th 21.72 2370.10 3.51317032600 7th 21.72 2370.102495 8th 21.72 2370.102495 9th 21.72 2370.102495 10th 21.72 2370.102495 11th 21.72 2370.102495 12th 21.72 2370.102495 13th 21.72 2370.102495 14th 10.86 1185.05

1214.225

4.9174713

Page 3: Calculation (Temp)

Element Level

M30 M40 M50 Total Main Links Face

P8 1 0.9 0.9 76 136 0

P8 2 1.5 1.5 75 180 0

P8 3 2.52 2.52 91 222 0

P10 1 0.95 0.95 83 155 0

P10 2 1.58 1.58 81 205 0

P10 3 2.65 2.65 99 263 0

P9 1 0.99 0.99 83 159 0

P9 2 1.65 1.65 81 210 0

P9 3 2.77 2.77 99 270 0

P12 1 0.81 0.81 69 126 0

P12 2 1.35 1.35 68 152 0

P12 3 2.27 2.27 83 195 0

C175 1 0.71 0.71 62 165 0

C175 2 1.18 1.18 61 210 0

C175 3 1.98 1.98 75 250 0

C174 1 0.71 0.71 62 165 0

C174 2 1.18 1.18 61 210 0

C174 3 1.98 1.98 75 250 0

27.68

Concrete (cuM) Reinforcement (kg)

Page 4: Calculation (Temp)

Total sqM

212 4.8

255 8

313 13.44

238 4.95

286 8.25

362 13.86

242 5.1

291 8.5

369 14.28

195 4.5

220 7.5

278 12.6

227 4.5

271 7.09

325 11.98

227 4.5

271 7.22

325 12.28

4907

Reinforcement (kg)Shutteri

ng

Page 5: Calculation (Temp)

Element Level

M30 M40 M50 Total Main Links Face

C155 1 0.36 0.36 48 85 0

C155 2 0.6 0.6 48 148 0

C155 3 1.01 1.01 58 246 0

C152 1 0.36 0.36 48 85 0

C152 2 0.6 0.6 48 148 0

C152 3 1.01 1.01 58 246 0

C157 1 0.36 0.36 68 140 0

C157 2 0.6 0.6 64 244 0

C157 3 1.01 1.01 78 405 0

C156 1 0.36 0.36 42 131 0

C156 2 0.6 0.6 41 228 0

C156 3 1.01 1.01 50 379 0

P4 1 0.76 0.76 90 0 0

P4 2 1.27 1.27 88 0 0

P4 3 2.14 2.14 108 0 0

P7 1 0.76 0.76 90 0 0

P7 2 1.27 1.27 88 0 0

P7 3 2.14 2.14 108 0 0

P5 1 1.52 1.52 206 0 0

P5 2 2.53 2.53 203 0 0

P5 3 4.25 4.25 248 0 0

P6 1 2.57 2.57 172 0 0

P6 2 4.28 4.28 169 44 0

P6 3 7.18 7.18 207 55 0

P29 1 0.55 0.55 76 115 0

P29 2 0.92 0.92 75 199 0

P29 3 1.55 1.55 91 331 0

P30 1 0.55 0.55 76 115 0

P30 2 0.92 0.92 75 199 0

P30 3 1.55 1.55 91 331 0

P13 2 4.12 4.12 497 0 0

P13 3 6.92 6.92 405 0 0

P1 2 3.73 3.73 447 35 0

P1 3 6.27 6.27 363 35 0

P2 2 3.25 3.25 447 22 0

P2 3 5.45 5.45 363 33 0

P3 2 3.73 3.73 386 392 0

P3 3 6.27 6.27 314 650 0

C179 2 0.6 0.6 51 344 0

C179 3 1.01 1.01 42 573 0

C181 2 0.6 0.6 98 244 0

C181 3 1.01 1.01 78 405 0

C182 2 0.6 0.6 71 148 0

C182 3 1.01 1.01 58 246 0

89.16

Concrete (cuM) Reinforcement (kg)

Page 6: Calculation (Temp)

Total sqM

133 3.84

196 6.06

304 10.38

133 3.84

196 5.99

304 10.43

208 3.84

308 6.12

483 10.43

173 3.84

269 6.06

429 10.43

90 7.34

88 12.23

108 20.54

90 7.34

88 12.23

108 20.54

206 13.89

203 23.15

248 38.89

172 11.76

213 19.6

262 32.93

191 5.49

274 9.15

422 15.37

191 5.49

274 9.15

422 15.37

497 36.95

405 62.08

482 33.6

398 56.45

469 33.45

396 56.2

778 33.6

964 56.45

395 5.27

615 9.58

342 5.99

483 10.27

219 6.12

304 10.29

13533

Reinforcement (kg)Shutteri

ng