1Feb 17, 2014#13061Prepared For:City of Richmond
CALL FOR ARTISTS
CAPSTAN SANITARY PUMP STATION PLAZA
City of Richmond
PROJECT STATISTICS
Project Name........................................Capstan Sanitary Pump Station Plaza, 8677 Capstan WayProject Owner.......................................City of RichmondPublic Art Consultant............................Durante Kreuk Ltd., Peter Kreuk: 604 684 4611Project Architects..................................Bingham and Hill (adjacent development)Project Landscape Architects..............Durante Kreuk Ltd.Project Description................................Integrate public art with a Sanitary Pump Station PlazaPublic Art Budget...................................$80,000.00Public Art Option....................................Open Call RFQPublic Art Schedule...............................Selection: June 2014; Excecution: mid 2015.
Disconnect, Peter Halley, 2012.
![Page 2: CALL FOR ARTISTS CAPSTAN SANITARY PUMP STATION PLAZA · hood by reviewing the references listed at the end of this document. Location Map Plaza Perspective Rendering Phase 1 Greenway](https://reader034.vdocument.in/reader034/viewer/2022050609/5fb0bffa194d4556f3771bf7/html5/thumbnails/2.jpg)
ARTIST CALL for CAPSTAN SANITARY PUMP STATION2
Project Overview
Art+Infrastructure
“ Our cities are networks of conduits” Peter Halley, 1985.
This project is an opportunity for an artist to create a work that will enliven a small plaza at the termination of a greenway, which will house a sanitary pump station. The pump station is supported by an Electrical Kiosk and a generator, which will be screened by an enclosure, minimal in character, and designed to permit access on both sides. The art opportunities include the plaza and the enclosure structure.
The pump station in this plaza is one of 138 in a network that moves waste to a treatment plant in Metro Vancouver. This pump station is a node in the circulation of matter, one piece that is a part of a whole, comprising a system of services which make up a nested network of structures for life support.
Artists are asked to respond to the networks and systems that knit our city together. These in-visible systems are active conduits of energy and movement, requiring constant input. They are one element of, and a greater metaphor for the way in which we create and a manage a complex inter-related system such as a city.
Plaza Perspective Rendering
![Page 3: CALL FOR ARTISTS CAPSTAN SANITARY PUMP STATION PLAZA · hood by reviewing the references listed at the end of this document. Location Map Plaza Perspective Rendering Phase 1 Greenway](https://reader034.vdocument.in/reader034/viewer/2022050609/5fb0bffa194d4556f3771bf7/html5/thumbnails/3.jpg)
ARTIST CALL for CAPSTAN SANITARY PUMP STATION3
Site Context
The plaza with the pump station will be contextualized by the development that will surround it once the neighbourhood is built out. Invited artists must familiarize themselves with the development trajectory of the neighbour-hood by reviewing the references listed at the end of this document.
Location Map
Plaza Perspective Rendering
Phase 1
Greenway
Plaza location
N
![Page 4: CALL FOR ARTISTS CAPSTAN SANITARY PUMP STATION PLAZA · hood by reviewing the references listed at the end of this document. Location Map Plaza Perspective Rendering Phase 1 Greenway](https://reader034.vdocument.in/reader034/viewer/2022050609/5fb0bffa194d4556f3771bf7/html5/thumbnails/4.jpg)
ARTIST CALL for CAPSTAN SANITARY PUMP STATION4
The plaza in will be located mid-block along Capstan Way be-tween Hazelbridge Way and Sex-smith road. As a part of a larger planned pedestrian network, it will be the entrance to a proposed greenway between Hazelbridge and Capstan and will provide a route to a proposed neighbour-hood park bordering no. 3 road.
The funding for this artwork has been provided by Pinnacle Inter-national Inc. with the ownership of the plaza transferred to the City of Richmond.
The plaza will sit astride two proper-ties, owned by two developers to be built at different times. This first phase will see the construction of the eastern side of the greenway, the pump station and the instal-lation of the art (refer to Plaza En-largment Plan, subsequent phase greyed out).
TH1A: 584.44 sq ft
TH2A: 695.72 sq ft
TH3A: 449.21 sq ft
TH1bA: 604.73 sq ft
TH2aA: 660.49 sq ft
TH5A: 560.10 sq ft
TH1c A: 538.23 sq ft
TH A: 521.77 sq ft
TH A: 521.77 sq ft
TH A: 521.77 sq ft
TH A: 521.77 sq ft
TH A: 521.77 sq ft
TH A: 521.77 sq ft
TH A: 521.77 sq ft
TH A: 521.77 sq ft
TH A: 521.77 sq ft
TH A: 521.77 sq ft
TH A: 521.77 sq ft
TH A: 521.77 sq ft
40 stalls
20 stalls
7 stalls
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
W/D W/D
W/D
F
F
F
F
F
FF
FF
F
F
FF
F
F
FF
F
F
R22'-5"R12'-7"
O/H
SECU
RITY
GATE
V-7
V-1
HC
V-8
V-11
O/H
SECU
RITY
GATE
HC
R-20
R-11
R-7
SMALLCAR
V-31 V-23
V-32
SMALLCAR
SMALLCAR
SMALLCAR
SMALLCAR
GARBAGECOMPACTOR
O/H SECURITY GATE
PEDESTRIAN PLAZA
PEDESTRIANPLAZA
V-22RECYCLINGTOTES LO
W P
ROFI
LECA
RDBD
BINHC
V-10
V-41
1:12 RAMP
1:10
RAM
P
1:10RAMP
PLANTER
R-1
1 TANDEM STALLS
SMALLCAR
HC HC
R-14 R-12
R-8
R-15
R-16
EXHAUSTP2
1:12 RAMP
1:12 RAMP
1:12
RAM
P
VISITOR ACCESS
DN20R
UP17R
STAI
R #9
LOADINGPHASE 1
RESIDENTPARKING
MAIN ELECTRICALROOM(40'-0"x17'-4")
MAINCOMM.(8'-10"x17'-4")
MAIN EMERGENCYGENERATOR(22'-0"x17'-4")
PUMPROOM(12'-0"x17'-4")
BLDG 'A'DIST.21'-6"x12'-0"
LOADING
BLDG 'B' DIST.26'-10" x 12'-0"
BLDG 'B'EMERG. DIST.26'-10" x 8'-4"
BLDG 'A'EMERG. DIST.16'-0"x11'-3"
DN
DN
DRIVEWAY
32 BIKES - CLASS 1(RESIDENTIAL)
BUILDING 'A'LOUNGE
STAIR #1STAIR #2
STAIR #3
STAIR #4
STAIR#5
C.O.VEST.
STO.C.O.VEST
DN
TOW
EREX
IT CIRC
.
DN
STAIR #7
STAI
R #6
STAIR #6
STAI
R #7
STAIR #12
STAIR #11
UP
DN
UP
ELEV.LOBBY
ELEV.LOBBY
INTERIMVEHICLE ACCESS
INTERIMRECYCLING PICK-UP18.4m x 4.26m INTERIM
RECYCLING PICK-UP
AT COMPLETION OF STAGE 2:VEHICLE ACCESS FROM SEXSMITHIS TO BE CLOSED. DRIVEWAY IS TOBE REMOVED AND NEW LANDSCAPINGAND COMMON STORAGE ROOMTO BE CONSTRUCTED.
LINE OF LEVEL 2ABOVE
OPEN TOABOVE
VISITORENTERPHONE
VISITORENTERPHONE
AT COMPLETION OF STAGE 2:ACCESS TO PERMANENT RECYCLINGTO BE PROVIDED FROM HAZELBRIDGE.INTERIM RECYCLE PICK-UP TO BE REMOVEDAND SIDEWALK AND BIKE PATH TO BECONSTRUCTED. REFER TO CIVIL.
LEVEL 2ABOVE
LINE OF L3ABOVE
INTE
RIM
SHA
RED
WAL
KWAY
5.50'
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
1.65mT.B.C.
RAMP DOWN10.0%
RAMP UP10.0%
BG 5.35
'
BG 5.35
'
BG 6.04
'
BG 5.69
'
BG 5.31
'
( 1.63
m )
( 1.84
m )
( 1.74
m )
( 1.63
m )
( 1.62
m )
( 1.63
m )
( 1.84
m )
( 1.74
m )
( 1.63
m )
( 1.62
m )
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXITEXIT
9.52'
9.52'
9.52'
9.52'
9.52'
9.52'
9.52'
9.52'
9.52'
9.52'
9.52'9.52'
9.52'
9.52'
5.17'
9.19'
9.52'
9.19' 9.19'
9.19'
9.19'9.52'
9.52'
9.52'
9.52'
7.85'
6.85'
5.17'
9.52'9.52'
5.50'5.50'
9.52'
7.52'
7.52'
9.19'
9.52'
UP17R
DN7R
DN13R
DN 7RUP 17
R
ENTERPHONE
VISITORPARKING44 STALLS
RAMP UP 4.69%
FUTURE WALLS
PUMPSTATION(C.O.R.)
PROP
ERTY
LIN
E
SETBACK LINE
6R6R6R6R
6R
6R
6R
6R
6R
6R
6R
6R
6R
6R
6R6R6R
6R
4R
4R
4R
3R
6R
UP15R
UP15R
UP15R
UP15R
UP15R
OPEN TOABOVE
UP15R
UP15R
UP15R
UP15R
UP15R
UP15R
UP15R
UP15R
UP15R
UP15R
UP15R
UP15R
UP15R
UP15R
PROPOSED PL
PROPOSED PL
6.0m
8.24m
3.0m
3.0m
3.0m
P E
D E
S T
R I A
NG
R E
E N
L I
N K
F U
T U
R E
P E
D E
S T
R I
A N
G R
E E
N L
I N
K
S I D
E W
A L
K
B
I K E
P
A T
H
B I K E P A T H
B I K E P A T H
S I D E W A L K
B I K
E
P A
T H
S I D
E W
A L
K
S I D E W A L K
B I K E P A T H
9.52'
9.52'
9.52'
9.52'9.52'
9.52'
PHASE 1
STAGE 1TOTAL: 364 STALLSLEVEL1: 61 stalls
SEXS
MIT
H RO
AD
EMERG.DISTRIBUTION(18'x8')
UP34R
UP17R
EMERG.DISTRIBUTION(18'x8')
C.S.B. PUBLIC OPEN SPACE S.R.W. 251 sq.m.
C.S.B. PUBLIC OPEN SPACE S.R.W.
C.O.VEST.
C.O.VEST.
DIN.LIV.
BATHFLEXWORK
DIN.
BATH FLEXWORK
LIV.
LOBBY
OPEN TO ABOVE
DIN.
LIV.FLEXWORK
DIN. LIV.
BATH FLEXWORK
BATH
DIN.
BATHFLEXWORK
DIN.LIV.
BATH
FLEXWORK
LIV.
DIN. LIV.
BATH FLEXWORK
DIN.
LIV.
BATH
FLEXWORK
DIN.
LIV.
BATH
FLEXWORK
DIN.LIV.
BATHFLEXWORK
DIN.
LIV.
BATH
FLEXWORK
DIN.LIV.
BATHFLEXWORK
DIN.LIV.
BATHFLEXWORK
DIN.
LIV.
BATH
FLEXWORK
DIN.
LIV.
BATH
FLEXWORK
DIN. LIV.
BATH FLEXWORK
DIN. LIV.
BATH FLEXWORK
DIN. LIV.
BATH FLEXWORK
DIN.
LIV.
BATH
FLEXWORK
KIT.KIT.
KIT.
KIT.
KIT.
KIT.
KIT.
KIT.KIT.
KIT.
KIT.
KIT.
KIT.
KIT.
KIT.
KIT.
KIT.
KIT.
KIT.
STAGE 2 (FUTURE)TOTAL: 467 STALLSLEVEL 1: 107 stalls
EXISTING PL
EXISTING PL
a
1 1 11
1
1
1
4 4
1
1
1
BUILDING 'B'
MECH
PLUMBING
SETBACK LINE
5.8EX. 88%%C GAS
SEX
SMIT
H R
OA
D
S
Ramp at 8.33%5.31
5.38
Ramp at 8.33%
Ram
p at
8.3
3%
hb
hb
hb hb hb
hb
hb
hb
hb
hb
hb
hbhbhbhb
hb
hb
hb
hb
hb
PHASE 2
PHASE 1
No
rth
Project:
Drawn by:
Checked by:
Date:
Scale:
Drawing Title:
Project No.:
Sheet No.:
of
Revisions:
no.: date: item:
Level 1 Landscape Plan
10116
AL/EM
AL
MARCH 20, 2012
1/16" = 1'- 0"
L02 09
01 26 MAR 12 ISSUED FOR DP
Durante Kreuk Ltd.102 - 1637 West 5th Avenue Vancouver BC V6J 1N5t: 604 684 4611f: 604 684 0577www.dkl.bc.ca
PINNACLE CENTRE AT CAPSTAN VILLAGE
02 19 SEP 12 ISSUED FOR REVIEW
03 04 DEC 12 TREE REPORT REVISION04 19 DEC 12 ISSUED FOR DP05 03 JAN 13 ISSUED FOR DP06 08 JAN 13 RE-ISSUED FOR DP
07 09 JAN 13 ISSUED FOR REVIEW
OFFSITE & UTILITIES DESIGN:!-Offsite layout reflects latest design as coordinated with Engineering. Engineering.!-At this time all street and pedestrian lighting shown per Civil Drawings.!-Final location for above ground kiosk and utilies are still being finalized.!-Final BC Hydro PMT location to be discussed with CoR planning. !
LIGHTING LEGEND, for specification refer to electrical drawings
Type 1 lighting - light bollard LUMEC BD8T !!Type 2 lighting - Step light!!Type 4 lighting - Light poles to CO R standard. Refer to Civil Drawings
TYPICAL TOWNHOUSE ENLARGED PLANTING PLAN!Scale: 1/8" = 1'-0"
TH2A: 695.72 sq ft
TH3A: 449.21 sq ft
TH1bA: 604.73 sq ft
TH2aA: 660.49 sq ft
TH5A: 560.10 sq ft
TH1c A: 538.23 sq ft
TH A: 521.77 sq ft
TH A: 521.77 sq ft
TH A: 521.77 sq ft
TH A: 521.77 sq ft
TH A: 521.77 sq ft
TH A: 521.77 sq ft
TH A: 521.77 sq ft
TH A: 521.77 sq ft
TH A: 521.77 sq ft
40 stalls
20 stalls
7 stalls
UP
W/D W/D
W/D
F
F
F
F
FF
FFF F
F
FF
F
F
R22'-5"R12'-7"
O/H
SECU
RITY
GATE
V-7
V-1
HC
V-8
V-11
O/H
SECU
RITY
GATE
HC
R-20
R-11
R-7
SMALLCAR
V-31 V-23
V-32
SMALLCAR
SMALLCAR
SMALLCAR
SMALLCAR
GARBAGECOMPACTOR
O/H SECURITY GATE
PEDESTRIAN PLAZA
PEDESTRIANPLAZA
V-22RECYCLINGTOTES LO
W P
ROFI
LECA
RDBD
BINHC
V-10
V-41
1:10
RAM
P
PLANTER
R-1
1 TANDEM STALLS
SMALLCAR
HC HC
R-14 R-12
R-8
R-15
R-16
1:12 RAMP
1:12
RAM
P
VISITOR ACCESS
DN20R
UP17R
STAI
R #9
LOADINGPHASE 1
RESIDENTPARKING
MAIN ELECTRICALROOM(40'-0"x17'-4")
MAINCOMM.(8'-10"x17'-4")
MAIN EMERGENCYGENERATOR(22'-0"x17'-4")
PUMPROOM(12'-0"x17'-4")
BLDG 'A'DIST.21'-6"x12'-0"
LOADING
BLDG 'B' DIST.26'-10" x 12'-0"
BLDG 'B'EMERG. DIST.26'-10" x 8'-4"
BLDG 'A'EMERG. DIST.16'-0"x11'-3"
DN
DN
DRIVEWAY
32 BIKES - CLASS 1(RESIDENTIAL)
BUILDING 'A'
STAIR #3
STAIR #4
STAIR#5
C.O.VEST.
STO.C.O.VEST
DN
TOW
EREX
IT CIRC
.
DN
STAIR #7
STAI
R #6
STAIR #6
STAI
R #7
STAIR #12
STAIR #11
UP
DN
UP
ELEV.LOBBY
ELEV.LOBBY
LINE OF LEVEL 2ABOVE
OPEN TOABOVE
VISITORENTERPHONE
VISITORENTERPHONE
LEVEL 2ABOVE
5.50'
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
RAMP DOWN10.0%
RAMP UP10.0%
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXITEXIT
9.52'
9.52'
9.52'
9.52'
9.52'
9.52'
9.52'
9.52'
9.52'
9.52'
9.52'9.52'
9.52'
9.52'
5.17'
9.52'
9.19' 9.19'
9.19'
9.52'
9.52'
9.52'
7.85'
5.17'
9.52'9.52'
5.50'5.50'
9.52'
7.52'
7.52'
9.19'
9.52'
UP17R
DN7R
DN13R
ENTERPHONE
VISITORPARKING44 STALLS
RAMP UP 4.69%
FUTURE WALLS
SETBACK LINE
6R6R6R6R
6R 6R
UP15R
UP15R
UP15R
UP15R
UP15R
OPEN TOABOVE
UP15R
UP15R
UP15R
UP15R
UP15R
UP15R
UP15R
UP15R
UP15R
UP15R
UP15R
PROPOSED PL
3.0m
S I D E W A L K
9.52'
9.52'
9.52'
9.52'9.52'
9.52'
STAGE 1TOTAL: 364 STALLSLEVEL1: 61 stalls
EMERG.DISTRIBUTION(18'x8')
UP34R
UP17R
EMERG.DISTRIBUTION(18'x8')
C.S.B. PUBLIC OPEN SPACE S.R.W.
C.O.VEST.
C.O.VEST.
DIN.
BATH FLEXWORK
LIV.
LOBBY
OPEN TO ABOVE
DIN.
LIV.FLEXWORK
DIN. LIV.
BATH FLEXWORK
BATH
DIN.
BATHFLEXWORK
DIN.LIV.
BATH
FLEXWORK
LIV.
DIN. LIV.
BATH FLEXWORK
DIN.
LIV.
BATH
FLEXWORK
DIN.
LIV.
BATH
FLEXWORK
DIN.
LIV.
BATH
FLEXWORK
DIN.
LIV.
BATH
FLEXWORK
DIN.
LIV.
BATH
FLEXWORK
DIN. LIV.
BATH FLEXWORK
DIN. LIV.
BATH FLEXWORK
DIN. LIV.
BATH FLEXWORK
DIN.
LIV.
BATH
FLEXWORK
KIT.KIT.
KIT.
KIT.
KIT.
KIT.
KIT.KIT.KIT. KIT.
KIT.
KIT.
KIT.
KIT.
KIT.
1 1 11
4 4
1
1
1
BUILDING 'B'
MECH
PLUMBING
Raised private patioUnit pavers
Private Patio 4' Evergreen privacy hedge
Street trees complete !with rain garden!to the satisfaction of C.O.R Park Department
Small multi-stem tree
CAPSTAN WAY
SEXS
MIT
H
WAY
10.0
m
Temporary phase 1 parkade !entry to be removed and!landscape installed after!completion of phase 2
Raised private patio
Street trees complete !with planted boulevard!to the satisfaction of C.O.R Park Department
Private Patio
2.5m Wide Concrete Sidewalk
2.5m Wide Asphalt Bike Path
Private Patio
Private Patio
Private PatioPrivate PatioPrivate Patio Private Patio
Future PHASE 2
PHASE 1
Shade tree
BG 5.31
' +
BG 4.95
' +
BG 5.35
' +
+ BG 6.
04'
+ BG 5.
69'
+ BG 5.
35'
Private Patio
FFE 9.52'
+ T. Bench 6.50' + el 9.19'
FFE 9.52'
FFE 9.52'
+ TW 9.25''
+ TW 7.50'
+ TW 7.50'
BG 5.30
' +
9" x 9" unit !paver walkway
Pump Station!Flush to grade
Pump Station!Electrical Kiosk
Pump Station!Genset Kiosk
Bottom of Vegetated !Slope Wall
PROPOSED PUMP STATION (C.O.R.)
Feature Stone Paving
Bollard to C.O.R. Park Specification
2ft sawcut pattern concrete paving crosssing with!1ft wide band.
18" Wide IPE Slab Wood Bench
Priv
ate
Patio
Priv
ate
Patio
Priv
ate
Patio
Priv
ate
Patio
Priv
ate
Patio
Priv
ate
Patio
Irrigation Stub Up
Lamp Standard Junction Kiosk!Per Engineering
CIP Concrete Band Feature stone paving at common entries
Note: Hose bibs shall be provided for all patios over 100 sq. ft. and for all garden plots
Typical Townhouse Enlarged Planting Plan
Stormwater Rain garden !Refer ot CIVIL DRAWINGS
12" SQ. Unit Concrete Pavers!Colour: Charcoal, Pattern: Stacked
12" SQ. Unit Concrete Pavers!Colour: Dessert Sand, Pattern: Stacked
70" Lenght Redline Backed Bench!Supplied by Landscapeforms
Prefered Hydro PMT Location
1.2m
2.5m
18" Concrete Wall
3' x 3' Granite Seating Block
BG 5.31
'
( 1.62
m )
( 1.62
m )
9.19'
4R
5R
9.19
9.19
6.96
Ramp at 8.33%5.31
Ramp at 8.33%R
amp
at 8
.33%
HB
2.8
2.0
0%
Slo
pe
FFE 2.9
+
+
1.60
2.050
3.
4m
Bre
eze
wa
y
2.
5mBr
ee
zew
ay
.7m
3m
lnlnlnlnlnlnlnln
lnlnln
nd nd
spsp
ndnd
ccccccccccccc
cccc Sc
ScScScScScScScScScScScScc
ccc Sc
Scc+
ScSc
ScScScScScScScScScScScSc
ScSc
A
A
A
spsp
lnlnln
Lpspsp
spspsp
LpLpLp
MsMsMsMs
MsMsMsMsMsMsMs
General Planting Notes: 1. All work shall meet or exceed the requirements as outlined in the latest Edition of the B.C. Landscape Standard. 2. Plant sizes and related container classes are specified according to the B.C. Landscape Standard latest Edition. For container classes #3 and smaller, plant sizes shall be as shown in the plant list and the Standard; for all other plants, both plant size and container class shall be as shown in the plant list. Specifically, when the plant list call for #5 class containers, these shall be as defined in the BCNTA (ANSI) Standard. 4. All planters and plantings under overhangs are to be irrigated.
STREET TREES - CAPSTAN WAY & SEXSMITH!REFER TO DS LEE ENGINEERING STREET TREE PLAN FOR TREE SPECIES, LOCATION AND SIZES
1.96
Genset Kiosk
Electrical Kiosk
Maintenance Service Truck (8.8m x 2.4)
+
+
Pump station access lid
Typical CoR Illuminated Notice Board on Hinge
Metal 'I' Shape Frame Trellis
PMT
The Pump Station and Adjacent Pinnacle Development
The Pump Station Plaza Enlargment Plan
![Page 5: CALL FOR ARTISTS CAPSTAN SANITARY PUMP STATION PLAZA · hood by reviewing the references listed at the end of this document. Location Map Plaza Perspective Rendering Phase 1 Greenway](https://reader034.vdocument.in/reader034/viewer/2022050609/5fb0bffa194d4556f3771bf7/html5/thumbnails/5.jpg)
ARTIST CALL for CAPSTAN SANITARY PUMP STATION5
53
ELEVATION A-A: PUMP STATION SCALE: 1:20
93
SOUTH ELEVATIONSCALE: 1:20
83
NORTH ELEVATION63 SCALE: 1:20
ELEVATION: PERFORATED METAL DOOR
C 100 x 8 welded frame
38 x 38 angled section frame c/w 32 x 6
100
2450
750
750
750
2500
4mm thck perforated galvanized steel panel
150 x 12 C channel
Metal tabs welded to inside of C channel to stop door
Metal pin hinge welded to inside of C channel
1300
1370
150 x 12 C channel
2700
Illuminated signage panel or community display board on commercial grade hinge
W250 x 25 steel section
W250 x 36 steel section
Sliding door on hanging track recessed into underside of steel section
3400 Passageway
Sliding door on hanging track recessed into underside of steel section to enclose Generator
W200 x 36 steel section
SCALE: 1:20
LED strip light affixed to back side of steel section both sides
Perforated metal panel: 4mm Ø holes on 6m centres, 3mm thck. Align perforations with pre-drilled holes in frame before securing with sheet metal bolts and washers
2850
150
Eq. Eq. Eq.Eq.
4500
20mm thck metal tab welded to sit 150mm proud of
top flange
38 x 38 x 6 angled section
4500 x 1750 x 6mm thck LEXAN Exell D Polycarbonate Sheet27
00
Roof to slope at 2% from East to West
LED strip light affixed to back side of steel section
Waterproof flexible LED strip light, inset between backside of flange and web, and continuous along top of beam Model # GS- 50NFX3 By Green Image Tech
INSIGHT Medleu VIEW Linear RGBW LED Light mounted to inside of section
Threaded 1/2" rod with washers and acorn nut on both sides
LEXAN roof beyond slope at 2% to drain
Locking pin
76 x 50 Hollow Rectangular section
lockable latch
1300
INSIGHT Medley VIEW Linear RGBW LED Light mounted on backside of beam
Welded 25mm thk. tab door stop
Pin hinge
B7 3
Nylon roller system fastened to top of rectangular section
150 x 12 C channel beyond
73
SECTION: SLIDING TRACKS AND DOORSSCALE: 1:5
20 x 5 pinch bar
25 x 25 x 5 angled section
C 100 x 8 welded frame
70mm x 6 mm flat bar hex bolt with washer
Sliding track bracket welded to inside of steel section
INSIGHT Medley VIEW Linear RGBW LED Light mounted to side of steel section using manufacturer's supplied tabs. Pre-drill holes for mounting before galvanizing
28-5-6
CITY FILE: SA 12 - 622318
DWG. No. 5 OF 19THE CURRENT CITY OF RICHMOND 'SUPPLEMENTARY SPECIFICATIONS AND CURRENT 'MASTER MUNICIPAL CONSTRUCTION DOCUMENTS (MMCD)' ANDALL MATERIALS AND CONSTRUCTION TO BE IN ACCORDANCE WITH THE
ALL ELEVATIONS ARE TO GEODETIC DATUM AND REFER TO RICHMOND BENCHMARK NUMBER:
DETAIL DRAWINGS', UNLESS OTHERWISE NOTED.
ELEVATION
NOTE:
BC GAS SERVICE RECORDS DEPARTMENT
BC GAS REQUIRES 10 DAYS NOTICE PRIOR TO THE COMMENCEMENT OF ANY WORK.
THE DEVELOPER OR CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING EXISTING LOCATION OF GAS SERVICE LINES, AND WHERE NECESSARY ARRANGE FOR THEIR RELOCATION IN ORDER TO FACILITATE INSTALLATION OF THE WORKS SHOWN ON THESE PLANS. A LIST OF SERVICE LINE LOCATIONS MAY BE OBTAINED FROM:
TELEPHONE: 293-8552
B.C. GAS SERVICES
3 of 3
622318-12-05
SHT. No.:
DATE:AS NOTED
SEC. No.:
SCALE:
DWG. No.:
6911 No. 3 ROAD RICHMOND B.C. V6Y 2C1
DS Lee
PGK
TITLE:
ENGINEER:
CHECKED:
DRAWN:
DESIGN:
DESCRIPTIONBYDATE CH.REV'N
REVISIONS
NOTES: PUMP STATION ENCLOSURE
PROVE ALL EXISTING ELEVATIONS AND LOCATIONS AND NOTIFY DS LEE ENGINEERING OF ANY DISCREPANCIES OR CONFLICTS BEFORE STARTING CONSTRUCTION.
DS Lee Project No. 10116EN
AL
3411 AND 3391 SEXSMITH ROAD
AUG 2013
PROGRESS REVIEWALEN02 AUG 20131.
SECOND SUBMISSIONALEN23 AUG 20132.
DURANTE KREUK LTD102 - 1637 WEST 5TH AVENUE VANCOUVER, BC TEL: 604-684-4611
Elevation details: Pump Station Enclosure
Art Opportunities
As an entrance to a greenway, this plaza will function as a gateway. The artwork will contribute visibility to the greenway and the park. Artists should contemplate this purpose, as well as the experience of the site from all available perspectives and speeds of travel, including its appear-ance when viewed from future residences above.
Art opportunities for the enclosure:
• The enclosure itself as an armature for the artwork• The lighting within and or around the enclosure• The sliding doors/panels hanging on tracks• Community display boardConsiderations:Invited artists are encouraged to view the pump station enclosure as an armature for an artwork, so long as it retains the design intent and and functions as detailed. Vehicular accessibility and circulation are constraints that have influenced the configuration of the enclosure, and integrat-ed artworks must also respond to them. Artists must be able to collaborate with the design team to integrate their concept into the structure. The budget for the artwork is additional to the cost of the structure.
Art opportunities in the plaza:
• Artists may propose art work within the ground planeConsiderations:Due to the need for heavy vehicle access, any works on the ground plane should be integral to the concrete paving and will need to endure heavy loads. For example, a piece made up of mosaics or embedded tiles should not be considered, as it may be damaged. Free standing works should not be considered, as vehicle access and pedestrian circulation limit the available space for this.
![Page 6: CALL FOR ARTISTS CAPSTAN SANITARY PUMP STATION PLAZA · hood by reviewing the references listed at the end of this document. Location Map Plaza Perspective Rendering Phase 1 Greenway](https://reader034.vdocument.in/reader034/viewer/2022050609/5fb0bffa194d4556f3771bf7/html5/thumbnails/6.jpg)
ARTIST CALL for CAPSTAN SANITARY PUMP STATION6
Selection Process
The selection of the artist and their art proposal will be the result of a two stage, open call. Artists will first be invited to submit qualifications, from which the selection panel will choose five artists to develop concept proposals.
The Selection Panel
A selection panel of 5 will be assembled to contribute to, and oversee the selection of an artist and their proposal. Two art professionals and one community member will be asked to participate, based on their experience in the public art realm and their familiarity with the Richmond community. They will be tasked with reviewing the submissions from the open call and creating a list of 5 artists to invite to create submissions.
Composition:
• Two art professionals• Community Member• Developer’s representative• Design professional from project team: Landscape Architect
Current, Andrea Sirois, 2012. City of Richmond Alexandra District Energy Utility Building
![Page 7: CALL FOR ARTISTS CAPSTAN SANITARY PUMP STATION PLAZA · hood by reviewing the references listed at the end of this document. Location Map Plaza Perspective Rendering Phase 1 Greenway](https://reader034.vdocument.in/reader034/viewer/2022050609/5fb0bffa194d4556f3771bf7/html5/thumbnails/7.jpg)
ARTIST CALL for CAPSTAN SANITARY PUMP STATION7
Selection Criteria
• Artist qualifications and proven capability to produce work of the highest quality;• Artist’s capacity to work in demanding environments with communities and other design professionals;• Appropriateness of the proposal to the project terms of reference and the Public Art Program goals;• Artistic merit of the proposal;• Technical feasibility
Artist Submissions* 1. Open Call RFQ credentials package:The credentials package must be limited to six letter sized pages, and submitted digitally in pdf format. It should be tailored to this project and consist of the following:
• Expression of Interest• Curriculum Vitae• Descriptions of 3 works, chosen for their relevance to this project, and
complete with images, budget information and a brief description of the process and materials (artists may use concepts which they developed for past processes but were not realized).
• References
The University, David Almejd, 2004.
Water Blessing Jane Tsong and Judith Roche, 2005-12.
![Page 8: CALL FOR ARTISTS CAPSTAN SANITARY PUMP STATION PLAZA · hood by reviewing the references listed at the end of this document. Location Map Plaza Perspective Rendering Phase 1 Greenway](https://reader034.vdocument.in/reader034/viewer/2022050609/5fb0bffa194d4556f3771bf7/html5/thumbnails/8.jpg)
ARTIST CALL for CAPSTAN SANITARY PUMP STATION8
Files under 10MB can be emailed directly, but files over this size must be sent over an online file transfer service such as Hightail or Dropbox.
Submit files by March 25, 2014 to:
Durante Kreuk Ltd.Emily [email protected]*Please note that the first RFQ submission does not require a concept
Budget
All costs are inclusive of all taxes, disbursements, and travelAvailable for art: $80,000.00Invited artists will be be given an honorarium of $1,000.00 CAD for concept development.
2. Invited Artist Concept Submissions:
Artists invited to develop concept proposals should include all imagery and documentation necessary to fully convey their concept:
• A scaled maquette or rendering of the proposed artwork• Concept statement• Material samples• Sketches and renderings as needed to convey the relationship of the
piece to its surroundings• Budget, including but not limited to material costs, artist fees, legal
fees, consultant fees, site lighting (if required)• Timeline• Maintenance considerations
Beckoning Cistern, Buster Simpson, 2003. City of Seattle.
![Page 9: CALL FOR ARTISTS CAPSTAN SANITARY PUMP STATION PLAZA · hood by reviewing the references listed at the end of this document. Location Map Plaza Perspective Rendering Phase 1 Greenway](https://reader034.vdocument.in/reader034/viewer/2022050609/5fb0bffa194d4556f3771bf7/html5/thumbnails/9.jpg)
ARTIST CALL for CAPSTAN SANITARY PUMP STATION9
References
Richmond Official Community Plan - Richmond City Centre Area PlanAvailable on the City of Richmond Website:http://www.richmond.ca/plandev/planning2/ocp/sched2.htm#citycentre
Richmond City Centre Public Art PlanAvailable on the City of Richmond Websitehttp://www.richmond.ca/culture/publicart/plans/plans.htm
Schedule
Detailed Public Art Plan .......January 2014RFQ Submission deadline.......March 25, 2014Artist Shortlist............................May 1, 2014Artist Selection.........................June 15 2014Construction ...........................mid to late 2015