caltrans 2007 post fire erosion control efforts caltrans external advisory liaison (ceal) committee...
TRANSCRIPT
Caltrans 2007 Post Fire Erosion Control Efforts
CALTRANS EXTERNAL ADVISORY LIAISON (CEAL) COMMITTEEJULY 16, 2008
SR-78 Bandy Canyon
Routes AffectedSR-94, 78, 79, 76
I-5, 15
Hydro Seeding 12-1-2007SR-76 La Jolla Indian Reservation
Hydro Seeding 12-1-2007
SR-76 La Jolla Indian Reservation
Mud Flows SR-76 La Jolla Indian Reservation
October 2007 Fire Damage AreasRecommended quick cover seed list for hydro seeding designated areas
that do not naturally contain an adequate native seed bank for post fire recovery.
Botanical Name/Common Name PLS lbs/acre
Lotus scoparius Deer Weed 5.0
Hemizonia fasciculata Slender Tarweed 1.0
Nassela pulchra Purple Needlegrass 6.0
Lasthenia californica Dwarf Goldfields 1.0
Lupinus succulentus Arroyo Lupine 4.0
Eschscholzia californica California Poppy 2.0
Vulpia microstachys Small Fescue 5.0
I-15 Near Mission Road
2-26-08
I-15 Near Stewart Canyon Road
2-26-08
I-15 at Stewart Road
Caltrans vs. County
2-26-08
I-15 Near Mission Road3-13-08
I-15 Near Mission Road3-13-08
I-15 Near Mission Road
3-13-08
I-15 at Mission Road
3-13-08
I-15 at Mission Road
3-13-08
Expenditures for all erosion control measures and clean up following the 07 fires.
Route 15, 76, 78, 79 PACIFIC RESTORATION GROUP, INC.
$ 4,135,000
Route 94 ERRECAS, INC.
$ 1,900,000