cameron prs - crude oil dehy - desalting inquiry form (2003 users) 11-24-09[1]
TRANSCRIPT
Instructions: Fill out form and select the appropriate units “Save As” a filename you choose Send to Cameron
Crude Oil Dehydration / Desalting Inquiry Form
1
Customer Information: Customer Name:
Address:
City, State, Zip: Commercial Contact: Name:
Telephone: Alternate Number:
E-mail Technical Contact: Name:
Telephone: Alternate Number:
E-mail Inquiry Information Type of Inquiry:
Type of Delivery: Number of Copies
Proposal Due Date:
Inquiry Submittal Date:
Submitted to:
Project Location / Name:
Field Name
Oil Type(s)
Project Status:
Expected Purchase Date:
Required Delivery
Local Content Required:
Type of Installation:
Type of Application:
Type of Location
Type of Equipment
Technology:
Instructions: Fill out form and select the appropriate units “Save As” a filename you choose Send to Cameron
Crude Oil Dehydration / Desalting Inquiry Form
2
Flow Rates: Maximum Total Liquid Flow:
Maximum Oil Flow
Minimum Oil Flow
Maximum Produced Water Flow
Minimum Produced Water Flow
Maximum Gas Flow
Minimum Gas Flow Fluid Properties Oil Gravity: API
S.G. @
Dry Oil Viscosity: @ @
Produced Water S.G.: S.G. @ Produced Water Salinity: Produced Water ph: Gas Gravity: S.G. @ Standard Conditions
MW (Molecular Weight) Contaminates to be Considered
Solids Volume
Solids Type
Asphaltenes
Wax
Wax Appearance Temperature Iron Sulphide
H2S ppm
CO2 ppm
Napthanates Other
Instructions: Fill out form and select the appropriate units “Save As” a filename you choose Send to Cameron
Crude Oil Dehydration / Desalting Inquiry Form
3
Operating Conditions Inlet Temperature: max
min Operating Temperature: max
min NATCO to Recommend
Operating Pressure: max
min Desalting Applications (Required Information) Dilution / Wash Water Rate:
Dilution / Wash Water Salinity:
Dilution / Wash Water ph:
Dilution / Wash Water O2 Content: ppb (less than 5 ppb recommended)
Dilution / Wash Water Temperature: Retrofit Applications (Required Information) Purpose of Retrofit:
Vessel Size: ID x S/S
Type: Technology
Provide drawings of existing vessel Provide current operating data and performance as applicable.
Oil Rate: (bpd)
Oil Gravity: (API)
Oil Viscosity: (cp @ op. temp)
Water Rate: (bpd)
Water Gravity: (S.G. / ppm salt)
Gas Rate: (MMSCFD)
Inlet Temperature: (°F/°C)
Operating Temperature: (°F/°C)
Outlet BS&W: (% vol)
Outlet Salt: (ptb/ppm)
Wash Water Rate (bpd)
Wash Water Salinity (ppm)
Instructions: Fill out form and select the appropriate units “Save As” a filename you choose Send to Cameron
Crude Oil Dehydration / Desalting Inquiry Form
4
Design Conditions Design Pressure:
Design Temperature:
Corrosion Allowance:
MDMT: @ Performance Specifications Insoluble Water vol. % @ operating temperature (% bs&w)
Salt Content
Oil in Water estimated Material Specifications NACE MR-01-75 Vessel SA-516-70 (Carbon Steel)
Cladding / Weld Overlay
Nozzles
Internal Materials
Piping Coatings External Primer Only
Three Coat System Internal Number of Coats
Belzona Novalac Epoxy Phenolic Epoxy Coaltar Epoxy Other
Instructions: Fill out form and select the appropriate units “Save As” a filename you choose Send to Cameron
Crude Oil Dehydration / Desalting Inquiry Form
5
Scope of Work (Check all that apply) Vessel with Internals Removable Internals Sandjet / Drain System Interface Drains Mud Wash System Wave Motion Design Skid (Open Type) Skid with Deck Plate & Drip Lip Skid with Drip Pan Piping Vessel Mounted Instruments Only Valves and Instruments Ladder and Platform Internal Coating Insulation Anodes Instrument Wiring to Junction Box Local PLC Local BMS Panel Flame Arrestor for Natural Draft Gas Burner Forced Draft Burner Dual Fuel Burner Steam / Hot Oil Heating System Fuel Gas Scrubber Heat Tracing Electrostatic Power Unit Local Mounted Circuit Breaker for Power Unit Local Mounted Meter Panel Fusible Loop Deluge Piping Ex-Works Delivery–Loaded on Transport Prepared for Export Delivery to Port-FAS