Instructions: Fill out form and select the appropriate units “Save As” a filename you choose Send to Cameron Crude Oil Dehydration / Desalting Inquiry Form 1 Customer Information: Customer Name: Address: City, State, Zip: Commercial Contact: Name: Telephone: Alternate Number: E-mail Technical Contact: Name: Telephone: Alternate Number: E-mail Inquiry Information Type of Inquiry: Type of Delivery: Number of Copies Proposal Due Date: Inquiry Submittal Date: Submitted to: Project Location / Name: Field Name Oil Type(s) Project Status: Expected Purchase Date: Required Delivery Local Content Required: Type of Installation: Type of Application: Type of Location Type of Equipment Technology:

Upload: alejandramr

Post on 10-Mar-2015

90 views

Category:

Documents


1 download

TRANSCRIPT

Instructions: Fill out form and select the appropriate units “Save As” a filename you choose Send to Cameron

Crude Oil Dehydration / Desalting Inquiry Form

1

Customer Information: Customer Name:

Address:

City, State, Zip: Commercial Contact: Name:

Telephone: Alternate Number:

E-mail Technical Contact: Name:

Telephone: Alternate Number:

E-mail Inquiry Information Type of Inquiry:

Type of Delivery: Number of Copies

Proposal Due Date:

Inquiry Submittal Date:

Submitted to:

Project Location / Name:

Field Name

Oil Type(s)

Project Status:

Expected Purchase Date:

Required Delivery

Local Content Required:

Type of Installation:

Type of Application:

Type of Location

Type of Equipment

Technology:

Instructions: Fill out form and select the appropriate units “Save As” a filename you choose Send to Cameron

Crude Oil Dehydration / Desalting Inquiry Form

2

Flow Rates: Maximum Total Liquid Flow:

Maximum Oil Flow

Minimum Oil Flow

Maximum Produced Water Flow

Minimum Produced Water Flow

Maximum Gas Flow

Minimum Gas Flow Fluid Properties Oil Gravity: API

S.G. @

Dry Oil Viscosity: @ @

Produced Water S.G.: S.G. @ Produced Water Salinity: Produced Water ph: Gas Gravity: S.G. @ Standard Conditions

MW (Molecular Weight) Contaminates to be Considered

Solids Volume

Solids Type

Asphaltenes

Wax

Wax Appearance Temperature Iron Sulphide

H2S ppm

CO2 ppm

Napthanates Other

cwood
Line
cwood
Rectangle
cwood
Line

Instructions: Fill out form and select the appropriate units “Save As” a filename you choose Send to Cameron

Crude Oil Dehydration / Desalting Inquiry Form

3

Operating Conditions Inlet Temperature: max

min Operating Temperature: max

min NATCO to Recommend

Operating Pressure: max

min Desalting Applications (Required Information) Dilution / Wash Water Rate:

Dilution / Wash Water Salinity:

Dilution / Wash Water ph:

Dilution / Wash Water O2 Content: ppb (less than 5 ppb recommended)

Dilution / Wash Water Temperature: Retrofit Applications (Required Information) Purpose of Retrofit:

Vessel Size: ID x S/S

Type: Technology

Provide drawings of existing vessel Provide current operating data and performance as applicable.

Oil Rate: (bpd)

Oil Gravity: (API)

Oil Viscosity: (cp @ op. temp)

Water Rate: (bpd)

Water Gravity: (S.G. / ppm salt)

Gas Rate: (MMSCFD)

Inlet Temperature: (°F/°C)

Operating Temperature: (°F/°C)

Outlet BS&W: (% vol)

Outlet Salt: (ptb/ppm)

Wash Water Rate (bpd)

Wash Water Salinity (ppm)

Instructions: Fill out form and select the appropriate units “Save As” a filename you choose Send to Cameron

Crude Oil Dehydration / Desalting Inquiry Form

4

Design Conditions Design Pressure:

Design Temperature:

Corrosion Allowance:

MDMT: @ Performance Specifications Insoluble Water vol. % @ operating temperature (% bs&w)

Salt Content

Oil in Water estimated Material Specifications NACE MR-01-75 Vessel SA-516-70 (Carbon Steel)

Cladding / Weld Overlay

Nozzles

Internal Materials

Piping Coatings External Primer Only

Three Coat System Internal Number of Coats

Belzona Novalac Epoxy Phenolic Epoxy Coaltar Epoxy Other

Instructions: Fill out form and select the appropriate units “Save As” a filename you choose Send to Cameron

Crude Oil Dehydration / Desalting Inquiry Form

5

Scope of Work (Check all that apply) Vessel with Internals Removable Internals Sandjet / Drain System Interface Drains Mud Wash System Wave Motion Design Skid (Open Type) Skid with Deck Plate & Drip Lip Skid with Drip Pan Piping Vessel Mounted Instruments Only Valves and Instruments Ladder and Platform Internal Coating Insulation Anodes Instrument Wiring to Junction Box Local PLC Local BMS Panel Flame Arrestor for Natural Draft Gas Burner Forced Draft Burner Dual Fuel Burner Steam / Hot Oil Heating System Fuel Gas Scrubber Heat Tracing Electrostatic Power Unit Local Mounted Circuit Breaker for Power Unit Local Mounted Meter Panel Fusible Loop Deluge Piping Ex-Works Delivery–Loaded on Transport Prepared for Export Delivery to Port-FAS

Instructions: Fill out form and select the appropriate units “Save As” a filename you choose Send to Cameron

Crude Oil Dehydration / Desalting Inquiry Form

6

Other Requirements Shipping Limits: Wide X Long X High X Weight

Power Available: Sketch of Process Flow Diagram

Customer Comments / Notes