HONORABLE TONI PRECKWINKLEPRESIDENT, COOK COUNTYBOARD OF COMMISSIONERS
JOHN YONAN, P.E., SUPERINTENDENT DEPARTMENT OF TRANSPORTATION & HIGHWAYS
A project delivered by the Cook County Department of Transportation & Highways
Cancelled due to COVID-19
HONORABLE TONI PRECKWINKLEPRESIDENT, COOK COUNTYBOARD OF COMMISSIONERS
JOHN YONAN, P.E., SUPERINTENDENT DEPARTMENT OF TRANSPORTATION & HIGHWAYS
A project delivered by the Cook County Department of Transportation & Highways
3
• Purpose/Overview• Utility Council - Purpose and Requirements• Utility Relocation Process• Project Types to be Presented• Organizational Structure
• Project Presentations• Project Development Bureau• Design Bureau• Construction Bureau
• Permits Process• Q&A
AGENDA
4
Strategies and Practices for effective communication of planned highway projects that may require utility relocation:
• Delivery of a 5 year program (Multi-Year Improvement Program)
• Delivery of an annual program
• Establishment of a coordination council
ILLINOIS COMPILED STATUTE 605 ILCS 5/9-113GENERAL INFORMATION
5
ILLINOIS COMPILED STATUTE 605 ILCS 5/9-113GENERAL INFORMATION
• Utilities are required to obtain written consent (permit) from the appropriatehighway authority (County) to place facilities in public R.O.W.
• With the establishment of a utility council, the county highway authority canenforce a 90 day relocation policy.
Utility Owner’s Responsibilities:
• Any utility located along the highway shall, upon written notice by the countyhighway authority be removed, relocated, or modified by the owner at no expenseto the county highway authority when and as deemed necessary for highway orhighway safety purposes. The notice shall be given after completion of engineeringplans.
6
ILLINOIS COMPILED STATUTE 605 ILCS 5/9-113GENERAL INFORMATION
Utility Owner’s Responsibilities continued:
• If, within 90 days after receipt of such written notice, arrangements are not madesatisfactory to the County Highway Authority for such removal, relocation, ormodification, the County Highway Authority may remove, relocate, or modify andbill the owner.
• Owner may request the county engineer for a waiver of the 90 day deadline. Thecounty engineer shall make a decision concerning waiver within 10 days and maywaive the 90 day deadline if he or she makes a written finding as to the reasons forwaiving the deadline.
• If no waiver of deadline has been requested or issued by the county engineer, andno satisfactory arrangement has been made, the County Highway Authority mayfile a complaint in the Circuit Court for an emergency order.
7
TYPICAL DESIGN UTILITY COORDINATION PROCESS
Initiate Coordination at start of design process
Contact JULIE to receive the contact information for utility owners that may have facilities within the project limits
Send out location map and preliminary plans requesting marked-up plans and atlas pages showing the existing utility information with a deadline of 4 weeks
If possible, the Project Coordinator may work to minimize conflicts by adjusting proposed storm sewers, structures, etc., without compromising the design or adding significant cost or delay to the project
Step 1
Step 2
Step 3
8
TYPICAL DESIGN UTILITY COORDINATION PROCESS
If warranted, set-up a project specific Utility Coordination Meeting (to discuss project schedule, utility conflicts, utility relocation schedule, etc.)
Otherwise, conduct required coordination with individual utility owners
Final plans sent out to utility owners (90 day relocation requirement)
Utility owners initiate permits and continue to coordinate with both Design and Construction
Step 4
Step 5
Step 6
9
IMPROVEMENT PROGRAM
10
PROJECT DELIVERY ARRANGEMENTS
• MYP includes many types of project delivery arrangements: • County led design and/or construction• Partner agency led design and/or construction• Improvements partially or entirely not on County routes• Invest in Cook
• What projects are we presenting today and why? • Projects where the County is/may be leading construction – because County is
causing the need for relocations/ adjustments• Projects where County is leading design – because utility coordination will be
initiated by County
11
DEPARTMENT OF TRANSPORTATION & HIGHWAYS
Superintendent
John Yonan, P.E.
Strategic Planning
Vacant
Project Development
Tara Orbon, P.E.
Design
Noel Basquin, P.E., CFM
Administrative Fiscal Management
Pamela Mills
Construction
Holly Cichy, P.E.
Maintenance
Edward Tully
Assistant Superintendent
Jennifer (Sis) Killen, P.E., PTOE
12
THANK YOU
Adam James, P.E., CFMDrainage and Utilities [email protected]
Noel Basquin, P.E., CFMBureau Chief of [email protected]
HONORABLE TONI PRECKWINKLEPRESIDENT, COOK COUNTYBOARD OF COMMISSIONERS
JOHN YONAN, P.E., SUPERINTENDENT DEPARTMENT OF TRANSPORTATION & HIGHWAYS
A project delivered by the Cook County Department of Transportation & Highways
14
• Multi-Year Program• Invest In Cook• Preliminary Engineering
Studies* CCDOTH Led* Local Agency Partnerships
PROJECT DEVELOPMENT BUREAU
15
108th Avenue167th Street to 159th Street
Village of Orland ParkOrland Township
134th StreetHalsted Street to Marsden Drive
Village of RiverdaleCalumet Township
PRELIMINARY ENGINEERING CCDOTH LED
16
143rd Street Bridge over Tinley Creek
»Bremen Township
167th (170th) Street Bridge– over Thorn Creek
»Village of South Holland»Thornton Township
PRELIMINARY ENGINEERING CCDOTH LED
17
Buffalo Grove RoadHintz Road to St. Mary’s Parkway
»Village of Buffalo Grove»Wheeling Township
Burnham Multimodal Connector– Elevated bicycle/pedestrian bridge over the
CSS/CSX/NICTD/NS railroad tracks»Village of Burnham»Thornton Township
PRELIMINARY ENGINEERING CCDOTH LED
18
Butler DriveDoty Avenue to 130th Street
»City of Chicago»Hyde Park Township
Central RoadBarrington Road to Huntington Boulevard
»Village of Hoffman Estates»Barrington Township»Schaumburg Township
PRELIMINARY ENGINEERING CCDOTH LED
19
County Line Roadat Carriage Way Drive
Village of Burr Ridge»Lyons Township
Division Street123rd Street to 119th Street
»City of Blue Island»Calumet Township
PRELIMINARY ENGINEERING CCDOTH LED
20
East Lake Avenue Bridgeover Middle Fork of North Branch of the Chicago River
»Village of Glenview»Village of Wilmette»Northfield Township»New Trier Township
PRELIMINARY ENGINEERING CCDOTH LED
21
Kedzie Avenueat 139th Street
»Village of Robbins»Bremen Township
Kedzie Avenueat 175th Street
»Village of Hazel Crest»Bremen Township
PRELIMINARY ENGINEERING CCDOTH LED
22
Kedzie AvenueVollmer Road to 159th Street
»Village of Flossmoor»Village of Hazel Crest»Village of Homewood»City of Markham»Village of Olympia Fields
PRELIMINARY ENGINEERING CCDOTH LED
23
Lake Cook Roadat Old Hicks Road
»Village of Palatine»Palatine Township
Lehigh Avenue Bridgeover East Lake Avenue
»Village of Glenview»Northfield Township
PRELIMINARY ENGINEERING CCDOTH LED
24
Major Taylor Trail87th Street to 91st Street
»City of Chicago»Lake Township
Nerge Road at Plum Grove Road
• Village of Roselle• Village of Schaumburg• Schaumburg Township
PRELIMINARY ENGINEERING CCDOTH LED
25
Meacham Road Bridgeover Salt Creek
»Village of Schaumburg»Village of Elk Grove»Schaumburg Township
PRELIMINARY ENGINEERING CCDOTH LED
26
Plainfield RoadCounty Line Road to East Avenue
• Village of Burr Ridge• City of Countryside• Village of Indian Head Park• Village of La Grange• Village of Western Springs• Lyons Township
PRELIMINARY ENGINEERING CCDOTH LED
27
Pulaski Road159th Street to 127th Street
• Village of Alsip• Village of Crestwood• City of Markham• Village of Midlothian• Village of Robbins• Bremen Township• Worth Township
PRELIMINARY ENGINEERING CCDOTH LED
28
Quentin RoadIL 68 (Dundee Road) to Lake Cook Road
• Village of Palatine• Village of Deer Park• Palatine Township
Ridgeland Avenue at Midlothian Turnpike
• Bremen Township
PRELIMINARY ENGINEERING CCDOTH LED
29
Roberts Roadat 103rd Street
• Village of Palos Hills• Palos Township
Roselle Roadat Hartford Drive
• Village of Schaumburg• Schaumburg Township
PRELIMINARY ENGINEERING CCDOTH LED
30
Sanders RoadMilwaukee Avenue to Techny Road
• Village of Glenview• Village of Prospect Heights• Northfield Township
Sauk TrailWestern Avenue to Ashland Avenue
• Bloom Township
PRELIMINARY ENGINEERING CCDOTH LED
31
167th Street Multi-Use PathSteeplechase Parkway to 104th Avenue
»Village of Orland Park»Orland Township
Burnham Avenue Grade Separationat crossing with the CSS/CSX/NICTD/NS railroad tracks
»Village of Burnham»Thornton Township
PRELIMINARY ENGINEERING LOCAL LED
32
Crawford AvenueOakton Street to Golf Road
• Village of Northfield• New Trier Township
Happ RoadWinnetka Road to Willow Road
• Village of Northfield• New Trier Township
PRELIMINARY ENGINEERING LOCAL LED
33
Lake Avenueat Skokie Road (US 41)
• Village of Wilmette• New Trier Township
Roberts Roadat 111th Street
• City of Palos Hills• Palos Township
PRELIMINARY ENGINEERING LOCAL LED
34
Wolf Road79th Street to Plainfield Road
• Village of Indian Head Park• Village of Burr Ridge• Lyons Township
PRELIMINARY ENGINEERING LOCAL LED
35
THANK YOU
Katie Bell, P.E.Project Studies [email protected]
Tara Orbon, P.E.Bureau Chief of Project [email protected]
HONORABLE TONI PRECKWINKLEPRESIDENT, COOK COUNTYBOARD OF COMMISSIONERS
JOHN YONAN, P.E., SUPERINTENDENT DEPARTMENT OF TRANSPORTATION & HIGHWAYS
A project delivered by the Cook County Department of Transportation & Highways
37
Reconstruction
Pavement Preservation and Rehabilitation
(North & South)
DESIGN PROJECTS
38
• 1.3 miles of roadway improvements in the Village of Tinley Park.• Reconstruct the roadway to provide an urban cross section with improved
access to side streets and driveways along with closed drainage system.• Improvements to pedestrian and bicycle facilities.
RECONSTRUCTION
175th STREET – OAK PARK AVENUE TO RIDGELAND AVENUE RIDGELAND AVENUE - 175TH STREET TO OAK FOREST AVENUEOAK FOREST AVENUE - RIDGELAND AVENUE TO 1,00 FEET EAST
39
RECONSTRUCTION
0.7 miles of roadway improvements in the Village of Hoffman Estates.
• Realigning the roadway to improve sight distance and provide a better transition between the horizontal curves.
• Update the corridor to by widening the roadway to provide the clear zone and level of service.
• Proposed geometrics include 2 lanes in each direction with landscaped medians and a multi-use path.
• Urban/suburban cross section with curb and gutter and enclosed drainage system.
SHOE FACTORY ROAD – ESSEX DRIVE TO BEVERLY ROAD
40
PAVEMENT PRESERVATION AND REHABILITATION NORTH
1 Mile of roadway improvements in the Village of Buffalo Grove.• PCC pavement patching, concrete median
rehabilitation and curb and gutter replacement.
• ADA ramp improvements, signal upgrades and restoration of other appurtenant work as required.
Arlington Heights
LAKE COOK ROAD – ARLINGTON HEIGHTS TO RAUPP BOULEVARD
41
PAVEMENT PRESERVATION AND REHABILITATION NORTH
1 Mile of roadway improvements in the Village of Arlington Heights.• Grinding and overlaying of the existing
HMA pavement.• Concrete median removal and curb and
gutter replacement.• ADA ramp improvements and restoration
of other appurtenant work as required.
New
Wilke
Arlington Heights
CENTRAL AVENUE – NEW WILKE RD TO ARLINGTON HEIGHTS RD
42
PAVEMENT PRESERVATION AND REHABILITATION NORTH
0.8 Mile of roadway improvements in the Village of Schaumburg.• PCC pavement patching, concrete
median replacement and curb and gutter replacement.
• ADA ramp improvements and restoration of other appurtenant work as required.
Meacham
Martingale
SCHAUMBURG RD – MEACHAM RD TO MARTINGALE RD
43
PAVEMENT PRESERVATION AND REHABILITATION NORTH
2.4 Miles of roadway improvements in the Village of Streamwood.• PCC pavement patching, concrete
median removal and curb and gutter replacement.
• ADA ramp improvements and restoration of other appurtenant work as required.
Sutton
East
SCHAUMBURG RD – SUTTON RD TO EAST AVE
44
PAVEMENT PRESERVATION AND REHABILITATION NORTH
1.8 Miles of roadway improvements in the Village of Palatine.• Grinding and overlaying of the existing HMA
pavement, concrete median and curb and gutter replacement.
• ADA ramp improvements and restoration of other appurtenant work as required.
Roselle
Plum G
rove
EUCLID AVE – ROSELLE RD EAST TO PLUM GROVE RD
45
PAVEMENT PRESERVATION AND REHABILITATION NORTH
2.6 Miles of roadway improvements in the Village of Roselle/ Elk Grove Village.• Grinding and overlaying of the existing
HMA pavement.• PCC pavement patching and curb and
gutter replacement.• ADA ramp improvements and
restoration of other appurtenant work as required.
Roselle
Rohlwing
NERGE RD – ROSELLE RD TO ROHLWING RD
46
PAVEMENT PRESERVATION AND REHABILITATION NORTH
Palatine
Euclid
ROSELLE RD – NORTH OF EUCLID RD TO NORTH OF PALATINE RD
1.6 Miles of roadway improvements in the Village of Inverness/ Palatine.• Grinding and overlaying of the existing HMA
pavement and curb and gutter replacement.• ADA ramp improvements and restoration of
other appurtenant work as required.
47
PAVEMENT PRESERVATION AND REHABILITATION NORTH
1.1 Miles of roadway improvements in the Village of Palatine.• Grinding and overlaying of the existing
HMA pavement and curb and gutter replacement.
• ADA ramp improvements and restoration of other appurtenant work as required.
QUENTIN RD – DUNDEE RD TO LAKE COOK RD
Lake Cook
Dundee
48
PAVEMENT PRESERVATION AND REHABILITATION NORTH
3.6 Miles of roadway improvements in the Village of Hoffman Estates.• Grinding and overlaying of the existing
HMA pavement and curb and gutter replacement.
• ADA ramp improvements and restoration of other appurtenant work as required.
SHOE FACTORY RD – IVY RIDGE DR TO HIGGINS RD
Ivy Ridge
Higgins
49
PAVEMENT PRESERVATION AND REHABILITATION SOUTH
2.5 Miles of roadway improvements and traffic signal modernization in the Village of Palos Hills and Hickory Hills.• Milling and patching and edge grind with
HMA overlay. PCC pavement patching and concrete median rehabilitation.
• ADA ramp improvements, drainage improvements and restoration and replacement of curb and gutter.
Valley Drive
86 stStreet
ROBERTS ROAD – VALLEY DRIVE to 86TH ST
50
PAVEMENT PRESERVATION AND REHABILITATION SOUTH
1.8 Miles of roadway improvements in the Village of Orland Park.• Grinding and overlaying of the
existing HMA pavement.• ADA ramp improvements and
restoration of other appurtenant work as required.
104th
Will Cook
167th st – WILL COOK RD TO 104TH AVE
51
PAVEMENT PRESERVATION AND REHABILITATION SOUTH
1 Mile of roadway improvements in the Village Of Lemont/Unincorporated Cook County. • Grinding and overlaying of the
existing HMA pavement and restoration of other appurtenant work as required.
WALKER RD – SOUTH OF APPLE AVE TO MAIN ST
Apple
Main
52
PAVEMENT PRESERVATION AND REHABILITATION SOUTH
1.3 Mile of roadway improvements in the Village Of Hillside/ Berkeley. • Grinding and overlaying of the
existing HMA pavement/ ADA ramp improvements and restoration of other appurtenant work as required.
WOLF ROAD – HARRISON STREET TO ST CHARLES ROAD
St Charles
Wolf
53
THANK YOU
Helen Diana Pappas Sterr, P.E., PMP, CFMCivil Division [email protected]
Noel Basquin, P.E., CFMBureau Chief of [email protected]
HONORABLE TONI PRECKWINKLEPRESIDENT, COOK COUNTYBOARD OF COMMISSIONERS
JOHN YONAN, P.E., SUPERINTENDENT DEPARTMENT OF TRANSPORTATION & HIGHWAYS
A project delivered by the Cook County Department of Transportation & Highways
55
• OVER MFNB CHICAGO RIVER in Glenview, IL• Remove and replace existing bridge• Road rehabilitation as needed• Phase I RFQ solicitation in Fall 2020
EAST LAKE AVENUE BRIDGE
56
• OVER SALT CREEK in Schaumburg, IL• Remove and replace existing bridge• Road rehabilitation as needed• Phase I RFQ solicitation in Fall 2020
MEACHAM ROAD BRIDGE
57
LEHIGH AVENUE BRIDGE
OVER EAST LAKE AVENUE EXT in Glenview, IL
• Remove and replace existing bridge
• Phase I RFQ solicitation in Fall 2020
58
143rd STREET BRIDGE
OVER TINLEY CREEK in Oak Forest, IL
• Remove and replace existing bridge
• Road rehabilitation as needed
• Phase I RFQ solicitation in Fall 2020
59
167th (170th) STREET BRIDGE
• OVER THORN CREEK in South Holland, IL
• Remove and replace existing bridge
• Road rehabilitation as needed• Phase I RFQ solicitation in Fall 2020
60
104TH AVENUE BRIDGE
OVER CAL-SAG CHANNEL in
Unincorporated Cook County
• Structural repair of steel truss members
• Structural repair of concrete deck
• Install deck drain extensions
61
RIDGELAND AVENUE BRIDGE
OVER CAL-SAG CHANNEL in
Worth, IL
• Structural repair of steel truss members
• Structural repair of concrete deck
• Install deck drain extensions
62
CRAWFORD AVENUE BRIDGE
OVER CAL-SAG CHANNEL in Alsip, IL
• Structural repair of steel truss members
• Structural repair of concrete deck
• Install deck drain extensions
63
FRANCISCO AVENUE BRIDGE
OVER CAL-SAG CHANNEL
in Unincorporated Cook County
• Structural repair of steel truss members
• Structural repair of concrete deck
• Install deck drain extensions
64
THANK YOU
Nadir Shah, S.E.,Structural Division [email protected]
Noel Basquin, P.E., CFMBureau Chief of [email protected]
HONORABLE TONI PRECKWINKLEPRESIDENT, COOK COUNTYBOARD OF COMMISSIONERS
JOHN YONAN, P.E., SUPERINTENDENT DEPARTMENT OF TRANSPORTATION & HIGHWAYS
A project delivered by the Cook County Department of Transportation & Highways
66
Reconstruction, realignment, and widening of County Line Road
Construction to accommodate a new southbound exit ramp from I-294
Drainage Improvements Installation of retaining walls New Traffic Signals ROW acquisition Signing, pavement markings, landscaping 2020 Letting
COUNTY LINE ROAD – GRAND AVE TO NORTH AVECity of Elmhurst
67
OLD ORCHARD ROAD – WOODS DR TO SKOKIE BLVD
• Reconstruction and widening of Old Orchard Road• Storm sewer installation• Traffic signal installation at I-94 NB Ramps, Lawler
Ave, and Lavergne Ave• Lighting installation• Bridge replacement and retaining wall installation• Multi-use path construction• Acquisition of temporary easements and ROW
Village of Skokie
68
JOE ORR ROAD – TORRENCE AVE TO BURNHAM AVE
• New PCC pavement providing four 12’ travel lanes and a 16’ median
• Intersection channelization and traffic signals at Glenwood-Dyer Road and Burnham Avenue
• Storm sewer installation and detention pond construction
• Acquisition of temporary easements and right-of-way
• 2021 Letting
Village of Lynwood
69
SKOKIE VALLEY TRAIL – LAKE COOK RD TO VOLTZ RD
• Construction of a new paved bicycle trail from Lake Cook Road to Dundee Road• Construction of prefabricated steel truss bridge over Lake Cook Road• Proposed trail crossing at the signalized intersection of Dundee Road and Midway Road• Widening of existing trail from Dundee Road to Voltz Road• Realignment of the existing trail crossing at Sunset Ridge Road• 2020 Letting
Village of Northbrook
70
88th/Cork Ave – at I-294
• Construction of a southbound entrance ramp and northbound exit ramp between 88th/Cork Ave and I-294
• 88th/Cork Ave bridge widening and re-decking
• Roadway reconstruction on 88th/Cork Ave, 79th Street, Oak Grove Ave, and Archer Ave
• Relocation of Industrial Drive• Right-of-way acquisition• 2022 Letting
Village of Justice
71
BUSSE ROAD- GOLF ROAD TO CENTRAL ROAD
• Construction of an 11-foot through lane in each direction with a 12-foot center two-way left turn lane
• Construction of a 5-foot sidewalk on the west side of Busse Road
• Construction of an 8-foot shared-use path on the east side of Busse Road
• The proposed drainage includes an enclosed curb and gutter system
• 2021-2022 Letting
Village of Mount Prospect
72
131STST- PULASKI ROAD TO KEDZIE AVENUE
• Reconstruction of 131st Street to approximately 420’ east of Kedzie Avenue with one 13-foot lane in each direction.
• Curb and gutter and an enclosed drainage system.• Construction of a 10-foot shared-use-path along the south side of 131st. • At Kedzie Avenue, the existing geometrics will be revised to provide for protected
left turn channelization. • 2022 Letting, pending funding availability
Village of Alsip
73
Franklin Avenue - York Road to Runge Street
• Reconstruction and widening • New construction of a 4-lane arterial roadway
between I-490 at Franklin Ave interchange ramps and Franklin Ave
• Letting 2021
Village of Franklin Park
74
THANK YOU
Paulino Leyva, P.E.Capital Projects Division [email protected]
Noel Basquin, P.E., CFMBureau Chief of Design312-603-1595 [email protected]
HONORABLE TONI PRECKWINKLEPRESIDENT, COOK COUNTYBOARD OF COMMISSIONERS
JOHN YONAN, P.E., SUPERINTENDENT DEPARTMENT OF TRANSPORTATION & HIGHWAYS
A project delivered by the Cook County Department of Transportation & Highways
76
Reconstruction
Bridge Improvement
Pavement Preservation and Rehabilitation
Intersection Improvement
TYPES OF CONSTRUCTION IMPROVEMENTS
77
LAKE COOK ROADRAUPP BOULEVARD TO HASTINGS LANEVillages of Buffalo Grove and Wheeling
• Reconstruction and widening• Weiland Road extension• Widening and deck replacement• Bike path• Sidewalk• Traffic signal improvements• Street lighting
78
WEST LAKE AVENUE
WOLF ROAD TOLANDWEHR ROADVillages of Mount Prospect and Glenview
• HMA resurfacing• Drainage improvements
79
DEMPSTER STREET
WOLF ROAD TOELMHURST (IL 83)City of Des Plaines
• HMA resurfacing• Drainage improvements
80
LAKE COOK ROAD
OVER MIDDLE FORK NORTH BRANCH OF CHICAGO RIVERVillage of Northbrook
• Structural repair of concrete• Joint repair
Project Letting: March 2020
PROJECT SITE
81
BARTLETT ROAD
OVER POPLAR CREEKVillage of Hoffman Estates
• Structural repair of concrete• Joint repair
Project Letting: March 2020
PROJECT SITE
82
COUNTY LINE ROADI-294 RAMP TO NORTH AVENUECities of Northlake and Elmhurst
• Reconstruction and widening• Bridge improvements at US 20 over IL 64• Realignment of Frontage Road and
Northwest Avenue intersection• Construction of a new connector road• Multi-use shared path and sidewalk• Street lighting and traffic signal improvements
Project letting: Spring 2020
83
COUNTY LINE ROADGRAND AVENUE TO LAKE AVENUECity of Elmhurst• Reconstruction, realignment, and
widening of County Line Road• Construction to accommodate a new
southbound exit ramp from I-294• Drainage Improvements• Installation of retaining walls• New Traffic SignalsProject Letting: Spring 2020
84
ROBERTS ROAD
Villages of Palos Hills and Hickory Hills
• Milling and patching and edge grind with HMA overlay. PCC pavement patching and concrete median rehabilitation.
• ADA ramp improvements, drainage improvements and restoration and replacement of curb and gutter.
Project Letting: February 2020
VALLEY DRIVE to 86TH STREET
86 stStreet
Valley Drive
85
87th Street & Roberts Road Intersection
• Reconstruction, realignment, and widening of the intersection
• New multi-use path connecting existing network
• Drainage Improvements• New Traffic Signals• ROW acquisition• Signing & pavement markings
improvements• ADA Improvements• 2020 Letting• Joint County/Tollway Design• Tollway Letting
Village of Bridgeview, City of Hickory Hills, Village of Justice
86
2019 VARIOUS PAVEMENT REPAIRS
• Lake Cook Road at Portwine Road
• 8850 South Ridgeland Avenue
• 87th Street at Ridgeland Avenue
• 87th Street at Oketo Avenue
• 87th Street at 83rd Avenue
• 108th Avenue South of 153rd Street
• Central Avenue at 94th Street
• Central Avenue at 106th Street
Project Letting: Fall 2020
87
2019 VARIOUS DRAINAGE REPAIRS
• Quentin Road at Salt Creek
• Walters Avenue at Christina Lane
• Will Cook Road at Oak Hill Drive
• 171st Street at 80th Avenue
• Sunset Ridge Road North of
Shadowood Lane
• Sunset Ridge Road at Landreth Lane
• Bartlett Road at Brewster Creek
• 87th Street at Cliff Street
Project Letting: 2020
88
THANK YOU
Michael Sterr, P.E.South Area Construction Supervising [email protected]
Aaron Lebowitz, P.E.North Area Construction Supervising [email protected]
Holly Cichy, P.E.Bureau Chief of [email protected]
HONORABLE TONI PRECKWINKLEPRESIDENT, COOK COUNTYBOARD OF COMMISSIONERS
JOHN YONAN, P.E., SUPERINTENDENT DEPARTMENT OF TRANSPORTATION & HIGHWAYS
A project delivered by the Cook County Department of Transportation & Highways
90
• Office Staff: Anita Armstrong, Varrick Buckner and Utpal Gandhi, Antonio Santodomingo, Peter Myung and Octavio Padilla
• Field Staff: Terry Matthews (Supervisor), Charles Stevenson and Jovimar Viloria
PERMITS DIVISION STAFF
91
Email: [email protected]: (312) 603.1670 Address: Cook County Department of
Transportation and HighwaysPermit Office69 W. Washington Street, 24th Floor Chicago, Illinois 60602-3007
Website:https://www.cookcountyil.gov/service/construction-permits-online-payment
PERMITS DIVISION CONTACT INFORMATION
92
CONSTRUCTION / MAINTENANCE HIGHWAY PERMIT
REVISED BOND PROCESS
INSURANCE SUBMITAL PREFERENCE
ALL UTILITIES EMERGENCY REPAIR /MAINTENANCE PERMITS
COOK COUNTY TRAFFIC SIGNALS
FUTURE STREAMLINE PERMITS GOALS
93
CONSTRUCTION / MAINTENANCE HIGHWAY PERMIT
94
CONSTRUCTION / MAINTENACE PERMIT
Cook County Jurisdiction Map
Cook County DOTH Permits Web Site
Electronic Application Submittal
95
Cook County DOTH Permits Web Site
https://www.cookcountyil.gov/service/construction-permits-online-payment
96
COOK COUNTY JURISDICTION MAP / SECTION NUMBER
Link to County Jurisdictional Map on Websitehttps://maps.cookcountyil.gov/hwyjurisdiction/
97
ELECTRONIC APPLICATION SUBMITTAL
Permits requires PDF electronic submissions for all applications and supporting documents.
Applicants shall email 25MB or less submittal files to: [email protected] .
Applicants shall email an information exchange website link for submittal files larger than 25MB.
If an information exchange website link is not an option, a flash drive or CD/DVD can be mailed to Permits for submittal files larger than 25MB.
98
REVISED BOND PROCESS
99
REVISED BOND PROCESS
Permits is now emailing a pdf of the bond form in lieu of mailing out the bond form.
Permits still requires the original signed copy of the bond form and surety company attachments to be mailed.
Permits is trying to get the bond form on our website this year.
100
INSURANCE SUBMITAL PREFERENCE
101
INSURANCE SUBMITAL PREFERENCE
Permits receives approximately a thousand plus insurance submittals in the mail every year. We are trying to change the mailing culture to email.
Starting at the end of 2019, we have been contacting insurance companies to change to email.
Please ask your insurance companies to email insurance submittals to: [email protected] .
102
ALL UTILITIES EMERGENCY REPAIR /MAINTENANCE PERMITS
103
ALL UTILITIES EMERGENCY REPAIR /MAINTENANCE PERMITS
Initial Notice
Utilities: Municipalities, and Water and Sanitary Districts
Utilities All other
Pavement Breaks
104
Initial Notice
All emergencies shall be handled by the owner of the facility causing the emergency.
Notification of emergencies during work hours or after work hours shall be emailed to [email protected]
If the emergency is an immediate danger to the public and more than the owner can handle, call 911 and Cook County Maintenance's 24hr number for assistance. 708-485-7130
The owner would be responsible for all cost of the 911 and Cook County Maintenance support.
105
Utilities: Municipalities, and Water and Sanitary Districts
Initial notification shall be emailed to [email protected]
In 48hrs an Emergency Repair / Maintenance Hold Harmless Highway Permit form shall be emailed to [email protected]. The latest emergency form requires an applicant email address. This form is not on our website.
Please contact the Permits Division at [email protected] and request the latest Emergency Repair / Maintenance Hold Harmless Highway Permit form.
106
Utilities All other
Initial notification shall be emailed to [email protected]
In 48hrs typical permit application form shall be emailed to [email protected]. The permit will then be retroactively issued.
107
PAVEMENT BREAKS
The main goal is for safety, In addition, to avoid complaints about the interim temporary patch.
Maintenance of the pavement break will remain the Utility/ Municipality/ Water or Sanitary District responsibility until the permit is closed out.
Make sure final pavement patch follows IDOT patching standards for PCC or Hot Mix Asphalt pavement.
A PCC patch shall be a full lane width, An HMA patch shall be a minimum half lane patch. More details are given in the construction notes attached to every permit.
108
Cook County Traffic Signals
109
COOK COUNTY TRAFFIC SIGNALS
Review Submittals
J.U.L.I.E.
Catalog Cuts
110
Review Submittals
If the proposed work includes a Cook County Traffic Signal Modification or Installation, Cook County will require a full set of traffic signal plans. The design plans shall be designed in Micro-station format.
The plans shall include but are not limited to the existing and proposed equipment, all Right of Way, utilities, and various dimensioning.
Please contact [email protected] reach out to our Mechanical, Electrical, Landscaping and Architecture (MELA) Division to determine if existing plans are available or for an example set of plans.
111
Review Submittals Cont.
Cook County Electrical Facilities include but are not limited to traffic signals, traffic signal interconnect systems, lighting, flashing beacons for school zones and cross walks, etc.
Note: If existing plans are available the new permit plans shall be updated to current IDOT standard symbols.
Note: If a Municipality project is not on Cook County ROW but it affects far out loops for a Cook County Traffic Signal, the Village/City will need to get a permit with Cook County.
112
J.U.L.I.E.
The County is not part of J.U.L.I.E. The permit is the mechanism to get the underground Cook County Electrical Facilities located.
If there is no Maintenance of Traffic Signal Item in the permit contact the Mechanical, Electrical, Architectural and Landscaping (MELA) Division at 312-603-1730 for location of the underground traffic signal equipment or other facilities.
If there is a Maintenance of Traffic Signal Item in the permit, the IDOT approved electrical contractor on the permit will be required to do the locates of the underground traffic signal equipment.
113
FUTURE PERMITS GOALS TO STREAMLINE PERMITS
114
Future Streamline Permits Goals
Permits is trying to get the bond form on our website this year.
Switch existing Access data base to Cityworks. Cityworks has more automation. In time will eliminate Permit employee manual tasks and duplicate entries.
Get In-House Cook County Documents on the Website. For example, Special Provisions, Standards, Policies.
115
THANK YOU
Questions?
CONSTRUCTION / MAINTENANCE HIGHWAY PERMIT
REVISED BOND PROCESS
INSURANCE SUBMITAL PREFERENCE
ALL UTILITIES EMERGENCY REPAIR /MAINTENANCE PERMITS
COOK COUNTY TRAFFIC SIGNALS
FUTURE STREAMLINE PERMITS GOALS