18/06/2012 1 Cost effective data centre: How uOttawa leveraged a relocation to deliver a modernized data centre Joel Breton Paul Mercier University of Ottawa 1 Agenda 1. uOttawa Facts 2. Previous Data Centre 3. Relocation Process 4. Challenges 5. New and improved Data Centre 6. Accomplishments 7. Questions? 2

Upload: lydang

Post on 16-Mar-2018

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CANHEIT- Data Center - 02-G - University of · PDF filecabling • Was preventing ... DS4800 ServerA ServerB ServerC DS5020 DS5100 DS5300 University of Ottawa 28. ... Microsoft PowerPoint

18/06/2012

1

Cost effective data centre: How uOttawa leveraged a

relocation to deliver a modernized data centre

Joel Breton

Paul Mercier

University of Ottawa 1

Agenda

1. uOttawa Facts

2. Previous Data Centre

3. Relocation Process

4. Challenges

5. New and improved Data Centre

6. Accomplishments

7. Questions?

2

Page 2: CANHEIT- Data Center - 02-G - University of · PDF filecabling • Was preventing ... DS4800 ServerA ServerB ServerC DS5020 DS5100 DS5300 University of Ottawa 28. ... Microsoft PowerPoint

18/06/2012

2

uOttawa Facts

• World’s largest bilingual university (French/English)

• Located in Ottawa, Ontario

• 40,000+ students

• 250 undergraduate programs and 200 graduate programs in 10 faculties

• One of Canada’s top 10 research universities

• Over 5,100 staff members

• 280 IT staff in central IT (CCS) and in faculties and services (50-50 split)

3

Out with the Old, In with the New

4

Page 3: CANHEIT- Data Center - 02-G - University of · PDF filecabling • Was preventing ... DS4800 ServerA ServerB ServerC DS5020 DS5100 DS5300 University of Ottawa 28. ... Microsoft PowerPoint

18/06/2012

3

Previous Floor Plan

5

Some pictures…

6

Page 4: CANHEIT- Data Center - 02-G - University of · PDF filecabling • Was preventing ... DS4800 ServerA ServerB ServerC DS5020 DS5100 DS5300 University of Ottawa 28. ... Microsoft PowerPoint

18/06/2012

4

Power and Cooling• No Hot/Cold aisles concept

• UPS at Maximum Capacity

• No Power resiliency

• No standard way of distributing power

• Old equipment (Liebert, MGE, etc.)

• Weak Documentation on power

distribution (diagrams, labels, etc.)

7

Summer 2010 – It was HOT…

8

Page 5: CANHEIT- Data Center - 02-G - University of · PDF filecabling • Was preventing ... DS4800 ServerA ServerB ServerC DS5020 DS5100 DS5300 University of Ottawa 28. ... Microsoft PowerPoint

18/06/2012

5

Cable Distribution and Rack Location

• Years of technology changes

• No importance was given to the upkeep of the

cabling

• Was preventing good airflow and cooling

distribution

9University of Ottawa

Physical Server Access

• No standards for Remote Access to servers

• Multiple KVM and Console

• Incomplete Management Network

10University of Ottawa

Page 6: CANHEIT- Data Center - 02-G - University of · PDF filecabling • Was preventing ... DS4800 ServerA ServerB ServerC DS5020 DS5100 DS5300 University of Ottawa 28. ... Microsoft PowerPoint

18/06/2012

6

Networking

• Switches random location

• Distinct group for network and storage area

network

• No Central IP Management

• Maximum 1 Gbps

11University of Ottawa

Storage Area Network (SAN)

FastT 700 DS4800 DS5020 DS5100 EMC FCBR

Switch00 Switch01 NT1A NT1B Switch04 Switch05 Switch06 Switch07

BC07 BC07

BC01 BC02 BC04 BC05 Switch02 Switch03 BC06

12University of Ottawa

Page 7: CANHEIT- Data Center - 02-G - University of · PDF filecabling • Was preventing ... DS4800 ServerA ServerB ServerC DS5020 DS5100 DS5300 University of Ottawa 28. ... Microsoft PowerPoint

18/06/2012

7

Storage Area Network (SAN)

Storage Cabinet Server Cabinet

13University of Ottawa

Storage

• Distributed randomly

• Lack of technical expertise, documentation

and standards.

• Unable to retire Legacy

• No structure

• No tiered strategy

14University of Ottawa

Page 8: CANHEIT- Data Center - 02-G - University of · PDF filecabling • Was preventing ... DS4800 ServerA ServerB ServerC DS5020 DS5100 DS5300 University of Ottawa 28. ... Microsoft PowerPoint

18/06/2012

8

Strategy for the New Data Centre

• Address critical weaknesses: power and

cooling, capacity, scalability, sustainability, etc.

• Improve the efficiency and the reliability of

the Data Centre by modernizing the

equipment and by retiring legacy

15

Planning

• Multiple iterations of the floor plan to optimize

space and usage

• Hiring of a dedicated Project Manager

• Documentation and Inventory

• Server Virtualization

• Storage Virtualization

• Network Infrastructure

• Fabric Design & Renewal

16

Page 9: CANHEIT- Data Center - 02-G - University of · PDF filecabling • Was preventing ... DS4800 ServerA ServerB ServerC DS5020 DS5100 DS5300 University of Ottawa 28. ... Microsoft PowerPoint

18/06/2012

9

Relocation Process

• Server Relocation

• Storage Relocation

• Network/Fabric

Relocation

• Mainframe Relocation

• Change Management

• Defined Responsibilities

• Pilot the process

• Control Centre

• Check List

17

Challenges during the move

• Building still under construction

• Organizational issues: roles and staffing,

physical location of staff, multiple re-orgs

before and during the move.

• Operational issues

• Technical issues with fabric/SAN, load

balancers, etc.

• Process issues. Ex: forgot to turn on a server.

18

Page 10: CANHEIT- Data Center - 02-G - University of · PDF filecabling • Was preventing ... DS4800 ServerA ServerB ServerC DS5020 DS5100 DS5300 University of Ottawa 28. ... Microsoft PowerPoint

18/06/2012

10

New Building

19

Floor Plan of New Data Centre

20

Page 11: CANHEIT- Data Center - 02-G - University of · PDF filecabling • Was preventing ... DS4800 ServerA ServerB ServerC DS5020 DS5100 DS5300 University of Ottawa 28. ... Microsoft PowerPoint

18/06/2012

11

Hot Aisle Containment System

(HACS)

21

HACS.MOV

Power and Cooling

• Based on APC InfraStruxure

• Capacity of 500 kW, redundant

• Under-the-floor power distribution

• In-Rack Power resiliency (A/B Design)

• Current UPS Battery Time: ~110 minutes

• In-Row Chilled Water Cooling based on existing Campus

infrastructure, with redundant chillers for the building

• Cooling pipes are hidden under the floor to prevent leak

damages

22

Page 12: CANHEIT- Data Center - 02-G - University of · PDF filecabling • Was preventing ... DS4800 ServerA ServerB ServerC DS5020 DS5100 DS5300 University of Ottawa 28. ... Microsoft PowerPoint

18/06/2012

12

Top of Rack and Middle of Row

Cable Distribution

23University of Ottawa

Patch Panels

24

Page 13: CANHEIT- Data Center - 02-G - University of · PDF filecabling • Was preventing ... DS4800 ServerA ServerB ServerC DS5020 DS5100 DS5300 University of Ottawa 28. ... Microsoft PowerPoint

18/06/2012

13

Server Access

• IP KVMs to replace all local and KVM consoles

• End or Row Console Access

• Remote Access for geographically dispersed

staff

25University of Ottawa

Servers• Virtualization of servers

• Increased density of racks and servers

• FCoE implementation for virtual hosts

0

200

400

600

800

2008 2009 2010 2011 2012

Number of Virtual Servers

26University of Ottawa

Page 14: CANHEIT- Data Center - 02-G - University of · PDF filecabling • Was preventing ... DS4800 ServerA ServerB ServerC DS5020 DS5100 DS5300 University of Ottawa 28. ... Microsoft PowerPoint

18/06/2012

14

Networking

27University of Ottawa

Improved SAN

Edge Edge

Core Core

Edge Edge Edge Edge Edge Edge

DS4800

ServerA ServerB ServerC

DS5020 DS5100 DS5300

28University of Ottawa

Page 15: CANHEIT- Data Center - 02-G - University of · PDF filecabling • Was preventing ... DS4800 ServerA ServerB ServerC DS5020 DS5100 DS5300 University of Ottawa 28. ... Microsoft PowerPoint

18/06/2012

15

Storage Improvement

• Storage Physical Layout

• Storage Virtualization

– Thin provisioning

– Legacy retirement

– Storage tiers

• Storage growth

29University of Ottawa

Accomplishments

• More then 15,000 hours of labour

• Over three years for the planning, building of the

new data centre and execution of the move

• Documentation of existing infrastructure

– Labelling of all assets, including cables

– CMDB in service-now

• Cable Distribution

– 6 km of fibre

– 6 km of ethernet

30University of Ottawa

Page 16: CANHEIT- Data Center - 02-G - University of · PDF filecabling • Was preventing ... DS4800 ServerA ServerB ServerC DS5020 DS5100 DS5300 University of Ottawa 28. ... Microsoft PowerPoint

18/06/2012

16

Some Pictures

31

Some Pictures

32

Page 17: CANHEIT- Data Center - 02-G - University of · PDF filecabling • Was preventing ... DS4800 ServerA ServerB ServerC DS5020 DS5100 DS5300 University of Ottawa 28. ... Microsoft PowerPoint

18/06/2012

17

Overall: Success

• Energy Recycling: up to 80% of the heat generated by the

equipment is recuperated to heat up the building during

Winter months

• Energy Savings (power and cooling): from spending $700 per

year for a physical server to $20 for a virtual one

• Increased efficiency in the use of electricity

• Reduced data centre floor space

• Increased efficiency of data centre assets

• Standardized Infrastructure Architecture

33University of Ottawa

Lessons Learned

• Start virtualization as early as possible and virtualize

everything you can

• Start small, for testing

• Ensure Commitment throughout the organization

• Communication

• Involve all stakeholders early in the process

• Some things can and will go wrong. Ex: switch failure

• Minimize changes happening during the move.

34

Page 18: CANHEIT- Data Center - 02-G - University of · PDF filecabling • Was preventing ... DS4800 ServerA ServerB ServerC DS5020 DS5100 DS5300 University of Ottawa 28. ... Microsoft PowerPoint

18/06/2012

18

Next Challenges

• Foundation for the Cloud

• Disaster Recovery & Business continuity

• Co-location option

35

Questions?

Joel Breton

[email protected]

(613)562-5800 x4192

Paul Mercier

[email protected]

(613)562-5800 x3947

University of Ottawa 36