capability & experience profile - l&t-sargent & lundy limited · brief profile -...
TRANSCRIPT
Capability & Experience Profile
L&T-Sargent & Lundy Limited
L&T- Knowledge City, N H No.8
Vadodara - 390 019, Gujarat, India
Tel No.:+ 91 265-245 6000/6001 Fax No.: + 91 265-245 6300
www.lntsnl.com
1
Brief Profile - L&T-Sargent & Lundy
L&T-SARGENT & LUNDY LIMITED
L&T-Sargent & Lundy Limited is a joint venture between Larsen & Toubro, India and Sargent & Lundy L.L.C., USA. Established in 1995, it provides consultancy and engineering design services in the field of Power and affiliated sectors. With a professional staff consisting about 450 engineers and designers, it has grown from strength to strength in gathering extensive experience in the power plant engineering and consulting assignments. The company’s value system is guided by the Vision and Mission statements which are an integral part of its work culture and ethos.
VISION
To become a leading integrated engineering solutions provider in the global power sector, continuously creating value for our stakeholders
MISSION
Be responsive to customer needs, delivering optimal solutions and value-added services
Ensure sustainable growth and professional excellence using state-of-the-art technology, process-driven approaches, eco-friendly solutions and IT enabled tools
Foster a culture of mutual trust, respect, teamwork, continuous learning, innovation, challenge and employee empowerment to provide a growth-oriented workplace
Adhere to fair, transparent and ethical practices in interactions with all stakeholders, in keeping the tenets of good corporate citizenship
Remain flexible and agile, continually adapting to the changing business environment
2
Brief Profile - L&T-Sargent & Lundy
ORGANIZATION BRIEF
L&T - Sargent & Lundy Limited (L&T-S&L) - born of the shared vision of two world - class companies - Larsen & Toubro Limited (India) & Sargent & Lundy L.L.C.(Chicago, USA).
Larsen & Toubro Limited (L&T) is over USD 21 billion technology, engineering, construction, manufacturing and financial services conglomerate, with global operations. L&T’s commitment to customer service and concern for product quality has enabled the company to acquire market leadership in most of its major business lines.
Sargent & Lundy L.L.C. (S&L) Chicago is acknowledged as a premier force in power industry worldwide. S&L has been providing Engineering and Construction Management Services for over 125 years. S&L has designed over 1102 Electrical Generating units representing approximately 1,57,409 MW of capacity of Power Plants, which includes combined cycle power plants, gas based, coal based projects, nuclear power plants and renewable energy power plants.
L&T-S&L provides a complete range of engineering and design of power plants from concept to commissioning of open/simple cycle plants, combined cycle plants, cogeneration plants, coal based plants - both subcritical and supercritical technology and associated fields. L&T-S&L has also expanded its horizons in the Renewable (Solar/Wind/Biomass) Energy, Renovation & Modernization and Transmission & Distribution space.
Since inception, L&T-S&L has engineered numerous prestigious power projects in India and abroad. Its experience includes overseas projects carried out in USA, Saudi Arabia, Kuwait, Oman, UAE, Qatar, Jordan, China, Thailand, Malaysia, Indonesia, Sri Lanka, Bangladesh, Nigeria, Central America, Algeria, Morocco, Mozambique, Kenya ,Turkmenistan and many others. L&T-S&L has provided engineering services to esteemed customers like Doosan, HDEC, GS-E&C, Al-Toukhi, Alghanim, Ronesans, Siemens, Radicon Gulf, SSEM, AJEC, Arabian Bemco, Sadelmi Power, Jubail Energy, Dubal, Yamama Cement, Toshiba, YTL, Mitsui, Sembcorp, General Electric, Adani Power, Vedanta, NTPC, BHEL, GDF Suez, Fortum, KPMG, Orange Power, SBI, ICICI, PFC, REC, IDFC to name a few.
3
Brief Profile - L&T-Sargent & Lundy
PORTFOLIO OF SERVICES OFFERED
L&T-S&L offers a gamut of services from concept to commissioning of power plants both in Indian and International markets. It operates under roles such as:
EPC Contractor’s Engineer Owner’s Engineer Lender’s Engineer Special Engineering services
Services offered through above roles are as under: Site selection Conceptual design Technology evaluation and selection Project feasibility study Detailed project report Tender specification Technical bid evaluation Vendor drawing review Statutory clearance assistance Pre-bid proposal Engineering Basic engineering Detail engineering Procurement assistance Project Management and Co-ordination Field Engineering Services Inspection and expediting Support for pre and post commissioning Technical Support for Performance Guarantee Testing Project Document Review Project Progress Review Project O&M Review Due-Diligence Services Special Studies like Efficiency improvement, reduction of greenhouse gas
emission Power Sector Reforms and other associated studies Repowering and modernization studies O&M Advisory Services
4
Brief Profile - L&T-Sargent & Lundy
Transmission and Distribution Services: Single Line & Protection Diagram Design Calculation Layout engineering, Grounding, Lightning & Lighting Raceway design Vendor drawing Review Interconnection Cable schedule
Power System Studies: Load Flow & Voltage regulation Steady state & dynamic motor starting study Short Circuit Transient Stability Relay co-ordination & Protection system study Switching & Lightning surge analysis Insulation Co-ordination study Harmonic Analysis Power Evacuation study
PROFESSIONAL STRENGTH
L&T-S&L has presently an overall strength about 450 professionals dedicated to consultancy services in the field of Power Plant engineering and Power Sector in general, based at Vadodara, Gujarat, India. Our professionals have extensive experience in successful delivery of various prestigious power projects. Our strength is further enhanced with the application of state of the art software as well as various in-house developed softwares deployed for engineering projects.
5
Brief Profile - L&T-Sargent & Lundy
CONTACT INFORMATION
Head Office
Contact
L&T – Sargent & Lundy Limited 6th Floor, East Block -1 Gate No. 1, L&T Knowledge City NH 8, Between Ajwa- Waghodia Crossing Vadodara-390019, Gujarat, INDIA Tel: +91 265 245 6000 /6001 www.lntsnl.com
Business Development Tel: +91-265-244-5457 +91-265-244-5322 Email: [email protected]
5
Brief Profile - L&T-Sargent & Lundy
CONTACT INFORMATION
Head Office
Contact
L&T – Sargent & Lundy Limited 6th Floor, East Block -1 Gate No. 1, L&T Knowledge City NH 8, Between Ajwa- Waghodia Crossing Vadodara-390019, Gujarat, INDIA Tel: +91 265 245 6000 /6001 www.lntsnl.com
Business Development Tel: +91-265-244-5457 +91-265-244-5322 Email: [email protected]
Experience Profile
Thermal Energy Projects
1
Experience Profile
CONTENTS
THERMAL PROJECTS ........................................................................................... 2
BASIC & DETAIL ENGINEERING SERVICES – INTERNATIONAL PROJECTS .................. 2
BASIC & DETAIL ENGINEERING SERVICES – DOMESTIC PROJECTS ........................... 8
OWNER’S ENGINEERING SERVICES .................................................................... 12
FEASIBILITY AND DETAIL PROJECT REPORTS ....................................................... 15
LENDER’S ENGINEERING SERVICES .................................................................... 19
INDEPENDENT ENGINEERING / DUE DILIGENCE SERVICES/TECHNO-ECONOMIC VIABILITY STUDIES ........................................................................................... 21
O&M ADVISORY AND PROJECT MANAGEMENT SERVICES ................................... 26
SITE COMMISSIONING SUPPORT SERVICES ........................................................ 27
POWER SYSTEM STUDIES.................................................................................. 29
TRANSMISSION & DISTRIBUTION ASSIGNMENTS ............................................... 35
RENOVATION & MODERNIZATION SERVICES ..................................................... 39
SPECIAL ENGINEERING SERVICES ....................................................................... 42
POWER SECTOR REFORM ASSIGNMENTS ........................................................... 47
2
Experience Profile
International Projects
L&T-Sargent & Lundy has extensive international exposure to designing and engineering of power plants with customers like Sargent & Lundy, Larsen & Toubro, Arabian Bemco, Al-Toukhi, Doosan, General Electric, Toshiba to name a few. L&T-S&L has offered a variety of services from basic and detail engineering to commissioning support in the international market.
THERMAL PROJECTS
BASIC & DETAIL ENGINEERING SERVICES – INTERNATIONAL PROJECTS
PROJECTS UNDER EXECUTION
CUSTOMER PROJECT DETAILS YOC
Al- Toukhi Company and Industry & Trading & Contracting
Pre-bid Engineering for Hofuf Cement Factory combined cycle power plant, Saudi Arabia
2020
Alghanim International General Trading & Contracting Co. WLL
2x15 MW CPP of Al-Sahawa Cement Company LLC, Oman (Pre-bid Engineering) 2020
China Datang Technology & Engineering Company (CDTE)
1x800 MW GSECL Wanakbori thermal power plant FGD, Gujarat 2023
Confidential 130 MW Confidential Simple Cycle Power Project, Qatar 2020
Sargent & Lundy , USA Confidential Modernization project, USA 2020
Sargent & Lundy , USA Confidential SWRO Project, UAE 2021
Sargent & Lundy , USA 150 MW Repowering Project Slovenia 2020
Hyundai Engineering & Construction Co. Limited
8x20 MW Mobile Simple Cycle Power Plant, Algeria 2020
Sargent & Lundy, USA Piping support for Genesis Alkali Granger Optimization Project 2020
3
Experience Profile
PROJECTS UNDER EXECUTION
CUSTOMER PROJECT DETAILS YOC
Sargent & Lundy , USA Preparation and Pipe Drawing Support Services for Imperial Oil's Strathcona Refinery Cogeneration Project, Canada
2020
Ronesans Endustri Tesisleri Insaat Sanayi Ve Ticaret A.S.
432 MW Zerger Simple Cycle Power Plant project , Turkmenistan 2021
Alghanim International General Trading & Contracting Co. WLL
300 MW Duqm Integrated Power and Water Plant, Oman 2022
Hyunson Engineering & Construction Co. Ltd., Algeria
8x20 MW Mobile Simple Cycle Power Plant, Algeria 2020
L&T, India/ Samsung C&T, S. Korea
400 MW Bibiyana South Combined Cycle Power Project, Bangladesh 2020
BISHO Infra Projects Ltd (Shapoorji Pallonji Group Company)
220 MW Dual Fuel Bhola Combined Cycle Power Project Bangladesh (Civil & Structural works)
2020
Global Infra FZCO (Shapoorji Pallonji Company)
220 MW Dual Fuel Bhola Combined Cycle Power Project, Bangladesh(Mechanical , Electrical And C&I supply)
2020
L&T Chiyoda Limited , India/Farabi Petrochemical Company, Saudi Arabia
Services for Instrumentation Package, Non-Process & Process building and HVAC engineering Services for Farabi Project, KSA
2022
SkipperSeil Limited 26 MW Calabar Power Plant Project, Nigeria
2020
Alghanim International General Trading & Contracting Co. WLL, Kuwait
750 MW Sabiya-3 CCGT, Kuwait 2020
Alghanim International General Trading & Contracting Co. WLL, Kuwait
250 MW Sabiya-1 CCGT, Kuwait (Add-on) 2020
L&T, India / Marubeni, Japan 400 MW Bibiyana-III Combined Cycle Power Project, Bangladesh
2020
PROJECTS COMPLETED
4
Experience Profile
CUSTOMER PROJECT DETAILS YOC
Alghanim International General Trading & Contracting Co. WLL
40 MW upgradation of Existing Gas Turbine at Oman Cement Company (SAOG),Oman (Pre-Bid Engineering)
2019
Confidential Conversion of Simple Cycle Extension II & III to Combined Cycle Power Plant, Saudi Arabia
2018
Alghanim International General Trading & Contracting Co. WLL, Kuwait
500 MW Sabiya-2 SCPP, Kuwait 2018
SK E&C , S. Korea / Sargent & Lundy , USA
2x150 MW PACO Coal fired Power Project in Panama, Central America
2018
L&T Construction – Water & Solar , Qatar
Al-Shamal Sewage Treatment Works (STW), Qatar
2018
Sadelmi Power, Saudi Arabia 130 MW QAPCO Expansion Power Project, Qatar
2018
Alghanim International General Trading & Contracting Co. WLL, Kuwait
320 MW +/- 10 % Albagair Open Cycle Power Plant, Sudan (Pre bid engineering services)
2018
L&T, India / NWPGCL, Bangladesh
360 MW Bheramara Combined Cycle Power Project , Bangladesh
2017
L&T, India / BPDB, Bangladesh
225 MW Sikalbaha Combined Cycle Power Project , Bangladesh
2017
Alghanim International General Trading & Contracting Co. WLL, Kuwait
El-Mahmoudia Add on Combined Cycle Project, Egypt (Pre-Bid Engineering)
2016
Alghanim International General Trading & Contracting Co. WLL, Kuwait
Ataqa Add on Combined Cycle Project, Egypt (Pre-Bid Engineering)
2016
Alghanim International General Trading & Contracting Co. WLL, Kuwait
750 MW Sabiya-3 CCPP, Kuwait (Pre-bid Engineering)
2016
Sembcorp Project Engineering Company, Singapore
500 MW Java Bali -3 CCPP, Indonesia (Pre-bid Engineering)
2016
Calik Energy, Turkey 2x450 MW Turakurgan CCPP, Uzbekistan (Pre-bid Engineering)
2016
5
Experience Profile
PROJECTS COMPLETED
CUSTOMER PROJECT DETAILS YOC
Hyundai Engg & Construction Co. Ltd., S. Korea
Hamriyah Phase III Expansion Project - Two Add-On + 1CC Power Block, UAE (Pre-bid Engineering)
2016
Alghanim International, Kuwait
192 MW West Qurna-2 Simple Cycle Power Plant at Iraq (Pre bid Engineering)
2016
GS-E&C, S. Korea 1400 MW Supercritical Power project in North Africa (Pre bid Engineering)
2016
Alghanim International, Kuwait
500 MW (each) Sabiya and Az-zour SCPPs, Kuwait
2015
GS Engineering & Construction, South Korea
2x152 MW Moatize coal based IPP Project at Mozambique, Africa (LNTP)
2015
Samsung C&T, S. Korea / Sargent & Lundy , USA
4000 MW Qurayyah IPP Ph-I & II Combined Cycle Power Project , Saudi Arabia
2014
Arabian Bemco, Saudi Arabia / Sargent & Lundy, USA
Conversion into 3190 MW Qurayyah Combined Cycle Power Plant, Saudi Arabia
2014
International Free Co. (Shamara Group), Jordan
500 MW Sabiya Simple Cycle Power Plant at Kuwait (Pre bid Engineering)
2014
Alghanim International, Kuwait
450 MW CCPP Power Project in Middle East (Pre bid Engineering)
2014
POSCO Engg Co, S. Korea 400 MW Single Shaft based CCPP project (Pre bid Engineering)
2014
GMR Energy Limited 250 MW Combined Cycle Power Plant in Myanmar (Pre-bid Engineering & Site Assistance)
2014
Daleel Petroleum/ L&T Electromech LLC, Oman
15 MW Daleel Power Generation & Distribution facility project Ph-II, Oman
2012
DOOSAN, S. Korea 1x700 MW Supercritical Thermal Power Project, Thailand
2012
Hyundai Engg & Construction Co. Ltd., S. Korea
Reinforcement of Qurayat Power Plant Project, Saudi Arabia (Pre-bid Engineering)
2010
Toshiba, Japan National Integrated Power Projects (NIPP) - 564.37 MW Calaba SCPP, 451.4 MW Ihovbor SCPP and 451.49 MW Sapele SCPP, Niger- Delta, Nigeria (BOP)
2010
6
Experience Profile
PROJECTS COMPLETED
CUSTOMER PROJECT DETAILS YOC
Sargent & Lundy, USA 494 MW Riverside Repowering Project, Minnesota, Minneapolis, USA
2009
Arabian Bemco, Saudi Arabia / Sargent & Lundy, USA
1890 MW Qurayyah Simple Cycle Power Plant, Saudi Arabia
2009
DOOSAN, Korea 370 MW Amman East Combined Cycle Power Plant, Jordan
2009
Al-Toukhi, Saudi Arabia 2x60 MW Reinforcement of Wadi Al Dawasir Power Plant for Saudi Electricity Company, Saudi Arabia
2009
Arabian Bemco, Saudi Arabia Riyadh Power Plant No.9 Ext. III (Block F) Tank Farm Project , Riyadh, Saudi Arabia
2008
Al-Toukhi, Saudi Arabia 250 MW Jazan Power Plant Extension Project, Jazan, Saudi Arabia (Mechanical & Elec works)
2008
Al-Toukhi, Saudi Arabia 60-80 MW Tihama Power Plant, Tihama, Saudi Arabia (Mechanical & Elec works)
2008
Al-Toukhi, Saudi Arabia 4x120 MW SCPP Riyadh Power plant PP8 Ext-III Simple Cycle (4x7FA), Riyadh, Saudi Arabia
2008
L&T- Chiyoda, India BA Energy’s Heartland Project, USA 2008
L&T, India/ Dhofar Power Co., Oman
255 MW Salalah Open Cycle Power Project, Oman
2007
Oman Refinery Co., Oman 2x17 MW and 100 TPH Co-generation Plant, Oman (FEED services)
2005
General Electric/ Sargent & Lundy, USA
1x500 MW Charles Poletti Combined Cycle Power Plant, New York, USA
2005
General Electric/ Sargent & Lundy, USA
1x500 MW Dresden Energy Facility Combined Cycle Power Project, Ohio, USA
2005
Pec-Tech, Singapore / Sargent & Lundy, USA
2x400 MW Xiamen Combined Cycle Power Plant Power, China
2005
General Electric/ Sargent & Lundy, USA
2x500 MW Fairless Combined Cycle Power Plant, Pennsylvania, USA
2004
L&T, India / Sojitz Kelanitissa (Private) Limited (Erst. AES
1x168.1 MW Sojitz Kelanitissa (Private) Limited Combined Cycle Power Project , Sri
2003
7
Experience Profile
PROJECTS COMPLETED
CUSTOMER PROJECT DETAILS YOC
Kelanitissa), Sri Lanka Lanka
General Electric/ Sargent & Lundy, USA
1x500 MW Possumpoint, Combined Cycle Power Plant, Virginia, USA
2003
General Electric/ Sargent & Lundy, USA
1x500 MW Combined Cycle Power Plant and 1x330 MW Simple Cycle Power Plant at John S Rainey, South Carolina, USA
2001
8
Experience Profile
BASIC & DETAIL ENGINEERING SERVICES – DOMESTIC PROJECTS
PROJECTS UNDER EXECUTION
CUSTOMER PROJECT DETAILS YOC
Larsen & Toubro Limited (L&T)
4X500 MW NTPC Vindhyachal Thermal Power Project FGD system (Electrical package )
2023
L&T- MHI Boilers Pvt Ltd, India
2x660 MW Khurja Supercritical TPP (Civil, Mechanical and Electrical works SG package), Uttar Pradesh, India
2023
Larsen & Toubro Limited (L&T)
2x660 MW Supercritical Thermal Power Project at Buxar, Bihar
2023
Larsen & Toubro Limited (L&T)
4X500 MW NTPC Vindhyachal Thermal Power Project FGD system (Civil & Structural Engineering works )
2021
ISGEC/NTPC, India 2x800 MW Supercritical Thermal Power Project FGD system at Gadarwara , Madhya Pradesh, India (Mechanical & Structural and Civil Engineering works)
2021
Alstom Bharat Forge Power Private Limited, India
3x660 MW Supercritical Thermal Power Project at Ghatampur, Uttar Pradesh, India (STG Island)
2020
L&T- MHI Boilers Pvt Ltd, India
3x660 MW Supercritical Thermal Power Project at Ghatampur, Uttar Pradesh, India (Civil, Structural and Architectural works in SG Area and Construction Power package)
2020
L&T Heavy Engineering , India
2x660 MW (each) Obra & Jawaharpur STPP, Uttar Pradesh, India (Piping Design of Feedwater system)
2020
Domestic Projects L&T-Sargent & Lundy has executed numerous domestic projects for Larsen and Toubro, Lanco Group, NTPC , MPPGCL, GPPC, BHEL, ADANI, NCC, IL&FS, PFC, REC, SBI, IDFC and many more. It has delivered services ranging from Detail engineering, Owners engineering, Lenders engineering, Technical due diligence, Feasibility studies and Special engineering studies.
9
Experience Profile
PROJECTS UNDER EXECUTION
CUSTOMER PROJECT DETAILS YOC
L&T/ NTPC, India 2x660 MW Ultra Supercritical Thermal Power Project in Khargone district of Madhya Pradesh, India
2020
PROJECTS COMPLETED
CUSTOMER PROJECT DETAILS YOC
L&T/ MPPGCL, India 2x660 MW Supercritical Thermal Power Project at Shree Singaji TPP (Stage-II), Malwa, MP , India
2019
L&T/ RRVUNL, India 2x660 MW Chhabra Supercritical Thermal Power Project, Rajasthan, India
2019
NCC, India 2x660 MW Krishnapatnam STPP, Andhra Pradesh, India (BOP + BTG Civil)
2018
*Lanco Infratech, India 2x660 MW Lanco Amarkantak Thermal Power Project, Chhattisgarh, India (BOP + BTG Mechanical)
2017
*Lanco Infratech, India 2x660 MW Lanco Babandh Thermal Power Project, Orissa, India (BOP + BTG Mechanical, Electrical and C&I Engineering Services)
2017
*Lanco Infratech, India 2x660 MW Lanco Vidarbha Thermal Power Project, Maharashtra, India (BOP + BTG Mechanical)
2017
*Lanco Infratech, India 1x660 MW Tangedco Ennore Expansion TPP, Tamil Nadu, India (STG Civil)
2017
L&T/ MAHAGENCO, India 3x660 MW Koradi Thermal Power Station Expansion Project, Nagpur, India
2017
L&T / APPDCL, India 2x800 MW Sri Damodaram Sanjeevaiah Super Critical Thermal Power Project at Krishnapattnam, AP, India (Steam Turbine & Generator Island)
2015
L&T/ Jaiprakash Power Ventures (JPVL), India
2x660 MW Jaypee Nigrie Super Thermal Coal based Power Project, Madhya Pradesh, India (Steam Turbine & Generator Island)
2015
10
Experience Profile
PROJECTS COMPLETED
CUSTOMER PROJECT DETAILS YOC
L&T-MHPS Boilers / NTPC, India
2x660 MW NTPC Tanda Unit 5& 6 Super Thermal Coal based Power Project, Uttar Pradesh, India (Power Cycle Piping, MRHS & Compression system)
2015
L&T-MHPS Boilers / Jaiprakash Power Ventures (JPVL), India
2x660 MW Jaypee Nigrie Super Thermal Coal based Power Project, Madhya Pradesh, India (Boiler & Auxiliaries Island)
2015
L&T/ D B Power, India 2x600 MW Coal based Power Project, Chhattisgarh, India (BOP and BTG Civil)
2015
L&T/ Nabha Power, India 2x700 MW Rajpura Super-Thermal Power Project, Punjab, India
2014
L&T/ GSECL, India 375 MW Dhuvaran Phase III Combined Cycle Power project in Gujarat, India
2014
Lanco Infratech, India 2x660 MW Moser Baer Power Project, Annupur, Madhya Pradesh, India (Electrical Engineering Services)
2014
Lanco Infratech, India 2x660 MW Lanco Babandh Thermal Power Project, Orissa, India (Electrical Engineering Services)
2017
Jhabua Power, India 2x600 MW Jhabua Thermal Power Project at Seoni, MP, India (Chimney Design services)
2010
Thermax, India 2x150 MW CFBC Boiler based Thermal Power Plant at Krishnapattnam, AP, India (Mechanical & Electrical Works)
2011
L&T/ GMR Rajahmundry Energy, India
2x384 MW GMR Rajahmundry Energy Combined Cycle Power Project (Vemagiri – Phase II), Andhra Pradesh, India
2012
L&T- Water Process Technology SBU / DVC, India
2x500 MW Mejia Phase-II, Unit 1&2, Coal-based Thermal Power Project, Durgapur, WB, India (Water System)
2011
L&T/ IOCL, India 238.35 MW Co-gen Power Plant of IOCL Panipat Naphtha Cracker Project (PNCP) at Panipat, Haryana, India
2010
Indiabulls Power, India 5x270 MW Thermal power station, Amravati, Maharashtra, India (Chimney
2010
11
Experience Profile
PROJECTS COMPLETED
CUSTOMER PROJECT DETAILS YOC
Design services)
Lanco Infratech, India 2x660 MW Lanco Babandh Thermal Power project in Orissa, India (Chimney Design services)
2017
Lanco Infratech, India 2x660 MW Lanco Vidarbha Thermal Power Project in Maharashtra, India (Chimney Design services)
2017
L&T-Construction-EDRC, India
Coal Handling Plant of Adani Power, Tiroda, India
2010
Indiabulls Realtech, India 5x270 MW Thermal power station at Nasik, Maharashtra, India (Chimney Design services)
2010
Zelan Projects, Malaysia 2x300 MW Lanco Amarkantak Mega Thermal Power Station at Pathadi, Chhattisgarh, India (BOP)
2010
BHEL, India 210 MW Amarkantak Coal Based Thermal Power Plant, Madhya Pradesh, India
2010
L&T/ KEOPL, India 445 MW Konaseema Combined Cycle Power Plant, Andhra Pradesh, India
2010
BHEL, India 2x250 MW Korba East Thermal Power Plant, Korba, Chhattisgarh, India
2008
L&T/ VPGL, India 388.5 MW Vemagiri CCPP, Andhra Pradesh, India
2006
L&T/ Delhi Vidhyut Board, India
330 MW Pragati Combined Cycle Power Project, Delhi, India
2003
L&T/ Usha Martin, India 25 MW Coal Based Captive Power Plant, Jamshedpur, Jharkhand, India
2001
L&T-GTFB / HPL Cogeneration, India
116 MW Haldia Combined Cycle Co-Generation Power Plant, Haldia, West Bengal, India
2000
Gujarat Cement Works, India
50 MW Liquid Fuel Based Captive Combined Cycle Power Plant, Pipavav, Gujarat, India
2000
L&T-GTFB / IPCL, India 2x45 MW IPCL Co-generation Power Plant, Gandhar, Gujarat, India
1999
Renusagar Power 77 MW Regenerative system Renusagar 1998
12
Experience Profile
PROJECTS COMPLETED
CUSTOMER PROJECT DETAILS YOC
Company/ L&T-PPED, India Thermal Power Station, India
L&T/ Awarpur Cement Works, India
2x23 MW Coal Based Captive Power Plant, Awarpur, Maharashtra, India
1998
Bhilai Power Supply Co., Madhya Pradesh, India
2x287 MW Coal Based Thermal Power Plant at Bhilai, Madhya Pradesh, India
-
* Projects currently on hold
OWNER’S ENGINEERING SERVICES
PROJECTS UNDER EXECUTION
CUSTOMER PROJECT DETAILS YOC
Nuclear Power Corporation Of India Limited, India
Engineering Services For Review of BOP & Switch Yard EPC Works For KKNPP 3&4, Tamil Nadu, India
2022
Jindal Investimentos S.A., Mozambique
1x150 MW Chirodzi Thermal Power Project in Mozambique
2019
PROJECTS COMPLETED
CUSTOMER PROJECT NAME YOC
Nexif Energy Management Pte, Singapore
Min. Functional Specs preparation for 90 MW Combined Cycle Power Plant in Thailand
2020
Lanco Vidarbha Thermal Power, India
2x660 MW Vidarbha Thermal Power Project, Vidarbha, Maharashtra, India
2017
Dubai Aluminium (DUBAL), UAE
Supervision of execution and project management services for 5 frame 9BE HRSGs at 2350 MW Captive Power Plant
2017
Lanco Amarkantak Power Private, India
2x660 MW Amarkantak Thermal Power Project, Korba, Chhattisgarh, India
2017
Madhya Pradesh Power Generating, India
2x600 MW Malwa Coal based Thermal Power Project, Khandwa, MP, India
2014
13
Experience Profile
PROJECTS COMPLETED
CUSTOMER PROJECT NAME YOC
CESC, India 2x660 MW Dhenkanal STPP Power Project, Dhenkanal, Orissa, India (Preparation of EPC Spec)
2016
NTPC, India 3x660 MW Barh Supercritical Thermal Power Plant, Barh, Bihar, India (Architectural, Civil & Structural Engineering Services)
2017
NTPC, India 3x500 MW Aravali, Haryana and 2x500 MW NTECL, Ennore Tamil Nadu Coal-based Thermal Power Projects, India (Architectural, Civil & Structural Engineering Services)
2011
International Atlas Energy Sdn. Bhd, Malaysia
Relocation of existing equipment and space planning for CCPP conversion for 790 MW SCCP plant
2014
Dubai Aluminium (DUBAL), UAE
Consultancy service for preparation of TIAC specifications
2013
Dubai Aluminium (DUBAL), UAE
2350 MW Gas based Captive Power Plant (Frame 9BE Gas Turbine Optimization /Upgradation Project)
2012
Lanco Anpara Power, India
2x600 MW Anpara “C” TPS Extension, Uttar Pradesh, India
2012
Gujarat Alkalies & Chemicals, India
100MW + 60 TPH Combined Cycle Cogeneration Power Project at GACL’s Dahej Complex, India (Preparation of EPC Spec )
2010
Thermal Powertech, India
2x660 MW Coal Based power project, Krishnapatnam, AP, India (Preparation of EPC Spec )
2015
Damodar Valley Corp., Durgapur, India
2x500 MW Durgapur Thermal Power Station, West Bengal, India
2012
Torrent Power, India Coal Handling Plant for the Thermal Power stations in Sabarmati, Gujarat, India
2008
NTPC, India 1x210 MW Feroze Gandhi Unchahar Coal Based Stage III, Thermal Power Project, UP, India (Main Plant & Other Civil Works)
2005
TATA Chemicals, India 200 TPH CFBC Boiler at Mithapur, Gujarat, India
2005
14
Experience Profile
PROJECTS COMPLETED
CUSTOMER PROJECT NAME YOC
Sargent & Lundy, USA 1x250 MW Neyveli Zero Unit TPS of ST CMS at Neyveli, Tamil Nadu, India
2002
Sargent & Lundy, USA / Tanir Bavi Power, India
200 MW Naphtha Based CCPP, Barge Mounted Power Plant at Mangalore, Karnataka, India
2001
15
Experience Profile
FEASIBILITY AND DETAIL PROJECT REPORTS
CUSTOMER PROJECT DETAILS
Essar Oil (UK) Limited Feasibility Study of CHP Project- Stage 1 at Stanlow Manufacturing Complex, UK
India Power Corporation (Haldia) Limited
Detailed Project Preparation for Tuticorin Distribution Project, India
Torrent Power Limited Pre-feasibility for re-engineering of steam & Water Cycle at DGEN CCPP, India
GSPC Pipavav Power Company Ltd
Load Feasibility Study for Reduction of Technical Minimum Load Capacity of GSEG’s 1x351.43 MW CCPP & GPPC’s 2x351.43 MW CCPP, Gujarat
Nexif Energy Rayong Co. Ltd
Feasibility Study for Open/Simple cycle operation for SIPCO-II project, Thailand
L&T - Technology Services Ltd, India
Feasibility Study of upgradation of Material Handling facility for HZL, India
Nabha Power Limited, India
Feasibility study of retrofitting the Topping Desuperheater, Punjab , India
Dhariwal Infrastructure Limited, India
Feasibility Study of Operating life of 2x300 MW DIL, Maharashtra, India
Trinity Natural Gas Private Ltd., India
Detailed Project Preparation for 250MW CCPP at Khurja Uttar Pradesh, India
Lanco Infratech, India Feasibility study for implementation of MoEF norms in 1x660 MW Ennore TPP, India
Bharat Aluminium Company Limited, India
DPR for R&M/LE of 4 x 67.5 MW, Korba Coal Fired TPP, Chhattisgarh, India
Lanco Infratech, India Cost optimization study for Amarkantak, Babandh & Vidarbha projects, India
ESI Eurosilo BV, The Netherlands
Feasibility study on Eurosilo vis-à-vis conventional CHP system for a 2x660MW Thermal Power project in West Bengal, India
AJEC, Saudi Arabia Option Evaluation Study at Saudi Cement Company (SCC) Hofuf Plant, Saudi Arabia
PT Abhaya, Indonesia Pre-Feasibility Study for Ultra Supercritical Coal based Power Plant at Panjang Island, Banten, Indonesia
Yamama Cement, Saudi Arabia
Feasibility Study of 150 MW Gas Engine Based Captive Power Plant at Yamama Cement Factory, Saudi Arabia
16
Experience Profile
CUSTOMER PROJECT DETAILS
GACL, India Technical Feasibility to relocate 90 MW Captive Power Plant of Dahej, Gujarat, India
Essar Power, India Technical Feasibility for 500 MW Bhander Power Project & 515 MW Essar Power Project at Hazira, Gujarat, India
Fortum India Detailed Project Report for Combined Heat and Power Plant (CHP) at Waluj MIDC, Maharashtra, India
CESC, India Pre-Feasibility Study for 2x660 MW coal based power project at Dhenkanal, Odisha, India
Ranhill Power SDN BHD, Malaysia
Abridged Feasibility Report (AFR) for 2x660 MW Kemaman TPP , India
Sokeo Power, India Detailed Project Report for 2x60 MW Coal fired Power Project at Orissa, India
Shree Siddhi Enertech , India
Techno-Economic Feasibility Report for 2x660 MW Coal fired Power project in Banswara, Rajasthan, India
Moser Baer Power & Infrastructure, India
Detailed Project Report for 2x660 MW Coal fired Power Project at Annupur, M.P, India
Nana Layja Power, India
Detailed Project Report for 2000 MW Combined Cycle Power Project in , Gujarat, India
Valecha Infrastructures, India
Detailed Project Report for 500 MW Coal fired Power Project in M.P, India
IL&FS Energy Development, India
Detailed Project Report for 4000 MW Supercritical Coal fired Power Project in Kutch, Gujarat, India
GSPC Pipavav Power, India
Detailed Project Report for Repowering and Conversion from Coal based power stations to Gas based power stations of total 13 units of Gandhinagar (3x210 MW & 2x120 MW), Sikka (2x120 MW) and Dhuvaran (4x63.4 MW & 2x140 MW), India
L&T-Thermal Power Project Development Group, India
Detailed Project Report for 2100 MW ( 2x700 MW Phase 1 and 1x700 MW, Phase 2) coal based Thermal Power Project at Jasidih, Jharkhand, India
L&T-SAIL JV, India Pre-feasibility study for 2x840MW Thermal Power Project , Orissa, India
Thermal Powertech, India
Detailed Project Report for 3x660 MW Coal based Supercritical TPP at Krishnapatnam, India
L&T-Thermal Power Development Group, India
Detailed Project Report for 2x840 MW Coal based Thermal Power Project at Dhamra in Orissa, India
17
Experience Profile
CUSTOMER PROJECT DETAILS
L&T-Thermal Power Development Group, India
Detailed Project Report for 60 MW NOCL CCPP at Cuddalore in Tamil Nadu, India
Finolex Infrastructure, India
Detailed Project Report for 2x660 MW Coal based Supercritical Independent Power Project at Ratnagiri, India
AES Chhattisgarh Energy, India
Configuration Study & Detail Project Report for 1200 MW +/- 20% AES Chattisgarh Energy Coal Fired Project, India
BLA Industries, India Feasibility Study for 17 MW Waste heat recovery based power plant in India
Gujarat Electricity Board, India
Detailed Feasibility Report for 250/500 MW Detailed Feasibility Study for additional unit at Ukai TPS, India
GVK Industries, India Detailed Project Report for 2x300 MW coal based TPS at Goindwal Sahib, Punjab, India
Gujarat Alkalies & Chemicals, India
Detailed Project Report for 200+/-40 MW Gas Based Combined Cycle Power Plant at Dahej, Gujarat, India
Gujarat Gas Company, India
Technical Feasibility Report for 100 – 125 MW/ 50-75 MW 2 nos. Captive Power Plants based on Gas Engine/Gas Turbine at different locations in South Gujarat, India
Gujarat State Electricity, India
Feasibility Study for 300/500 MW Capacity addition of coal/gas based Power Plant at UKAI Thermal Power Station, Gujarat, India
Essar Power, India Review of pre-feasibility report for 2x300 MW Thermal power plant in Indonesia
Patni Projects (P), India
Feasibility and Detailed Project Report for 230 MW Gas Based Combined Cycle Power Plant , Gujarat, India
Reliance Salgaocar Power, India
Detailed Feasibility Report for 69 MW Technology selection for Expansion of Existing Power Plant capacity 48 MW to 69 MW
Essar Power, India Feasibility Report for 515 MW Utilization of spare capacity of steam turbine at CCPP including specification of the boiler (AFBC), India
BEAIL, Bharuch, India Feasibility Report for 5 MW Technology selection for installing captive power plant at Bharuch, India
Gujarat Electricity Board, India
Detailed Project Report for 1x250 MW Imported Coal Based TPS at Kandla, Gujarat, India
18
Experience Profile
CUSTOMER PROJECT DETAILS
Tamil Nadu Electricity Board, India
Detailed Project Report for 100 MW Combined Cycle Power Plant at Perungulam, India
Gujarat Positra Port Infrastructure, India
Feasibility Report for 260 MW Captive Combined Cycle Power Plant at SEZ, Positra Gujarat, India
Brown Kraft Paper Technologies , India
Pre-Feasibility Report for 5 MW Bagasse based thermal power station at Sirkek Paper Mills, India
Tamil Nadu Electricity Board, India
Detailed Project Report for 100 MW Combined Cycle Power Plant at Kovilkalappam, India
Kontek Abbadi Sdn.Bhd., Malaysia
Detailed Project Report for 4x250 MW Coal Based Thermal Power Plant At Chamalapura, Karnataka, India
Snehalata Power , India
Detailed Project Report for 100 MW Combined Cycle Power Plant at Vemagiri, A.P, India
Gujarat Electricity Board, India
Feasibility Report for 3x125MW & 1x250MW Lignite based TPS Alternate Imported Coal based TPS at Kandla, India
Essar Steels, India Detailed Project Report for 60 MW Power Plant based on Waste Heat Recovery from EAF / HBI, India
Essar Steels, India Detailed Project Report for 200 MW Corex / Imported Coal fired Thermal Power Station, India
K. E. I. Energy, India Detailed Project Report for 150 MW Combined Cycle Power Plant at Bijapur – Karnataka, India
Hassan Power Project (Consortium of L&T & KBDL), India
Detailed Project Report for 200 MW Combined Cycle Power Plant at Hassan ,Karnataka, India
Gujarat Electricity Board, India
Detailed Feasibility Report for 100 MW Combined Cycle Power Plant at Dhuvaran, India
Indian Power Projects Company, India
Detailed Project Report for 2000 MW Combined Cycle Power Plant at Vembar, Tamil Nadu, India
Gujarat State Electricity, India
Feasibility Report for 210 MW Coal Based Gandhinagar Extension Unit – 5 Thermal Power Station, India
Gujarat Power Corp., India
Detailed Project Report for 200 MW Solar chimney power project, India
19
Experience Profile
LENDER’S ENGINEERING SERVICES
CUSTOMER PROJECT DETAILS
State Bank of India, India 2x600 MW D B Power TPP Project Cost vetting, Chhattisgarh
State Bank of India, India 2x600 MW D B Power TPP FGD, Chhattisgarh
Yes Bank, India 10.0 MTPA Coal Beneficiation Plant in Odisha for Global Coal and Mining Private Limited
Infrastructure Development Company Limited (IDCOL), Bangladesh
100 MW HFO Fired Power Plant at Chittagong
Sumitomo Mitsui Banking Corporation
300 MW HFO Fired Gazipur II Combined Cycle power plant, Bangladesh for Summit Gazipur II Power Limited
State Bank of India, India 1200 MW coal based TPP in Chhattisgarh, India Infrastructure Development Company Limited (IDCOL), Bangladesh
149 MW Dual fuel Power Plant , Bangladesh (Ace Alliance Power Limited)
State Bank of India, India Preservation Status report for Simhapuri Energy Ltd
State Bank of India, India 400kV Multi Circuit Line & 400kV DC line Transmission Projects of KPTCL, Karnataka, India
International Finance Corporation
400 MW Combined Cycle Power Project at Sirajganj, Bangladesh
IDBI Bank Limited, India 30MW coal based TPP in Telengana, India
Rural Electrification Corporation (REC), India
300MW (Phase-1) TPP of Meenakshi Energy in Andhra Pradesh, India
State Bank of India 185 MW & 300 MW Thermal Power Projects of Bhushan Energy, Dhenkanal, Odisha, India
ICICI Bank, India 2x300 MW Haldia Power Project of CESC at East Medinipur, West Bengal, India
Power Finance Corporation (PFC), India
700 MW ( 2 x 350) Ph-II Coal based TPP of KVK Nilachal Energy in Cuttack, Orissa
Rural Electrification Corporation (REC), India
60 MW coal fired power project of Sri Maa Mahamaya Power in Andhra Pradesh, India
Rural Electrification Corporation (REC), India
600 MW coal based Thermal power station of Meenakshi Energy at Nellore, AP, India
20
Experience Profile
CUSTOMER PROJECT DETAILS
Axis Bank, India 600 MW Jhabua Thermal Power Project of Avantha Group, at Seoni, Madhya Pradesh.
Rural Electrification Corporation (REC), India
45 MW of coal based Thermal power station of Facor Power at Orissa, India
Power Finance Corporation (PFC), India
300 MW Ph-I Coal based TPP of KVK Nilachal Energy in Cuttack, Orissa
PPN Power Generating Co., India
330 MW CCPP at Nagapattanam, Tamil Nadu, India
Rural Electrification Corporation (REC), India
4x25 MW captive thermal power project of Prakash Ind. at Champa, Chhattisgarh
L&T Infrastructure Finance, India
40 MW and 165 TPH Coal based power expansion project of Ballarpur Industries, Maharashtra, India
Power Finance Corporation, India
77 MW Cogeneration Power Plant of Essar Oil Refinery Vadinar, Jamnagar, Gujarat, India
State Bank of India, India 2x250 MW coal based power plant for Bhavnagar Energy Company Ltd., Bhavnagar, Gujarat, India
ICICI Bank, India 63.5 MW TPS at Gummidipoondi of Tamil Nadu Chemical Products, India
Industrial Development Bank of India
SLPP, Surat for IDBI along with Sargent & Lundy, USA
Canara Bank, India 197 MW captive power project of Bhushan Steel Limited, India
L&T Infrastructure Finance, India
21.54 & 6.12 MW Gas based Power Projects of MMS Steel in Tamil Nadu, India
HDFC, India 202.5 MW Gas fired Power Project of Industrial Energy Ltd (IEL), Kalinganagar, Orissa, India
Jubail Energy Company, KSA
250 MW SADAF Co-Generation Power Project, Kingdom of Saudi Arabia (KSA)
State Bank of India 2x270 MW Coal based IPP of Adhunik Power, Jharkhand India
L&T Infrastructure Finance, India
300 MW Thermal Power Project of Bhushan Energy, Denkanal, Orissa, India
Axis Bank, India 185 MW Thermal Power Project of Bhushan Energy, Denkanal, Odisha, India
State Bank of India
2x600 MW coal fired power project of Jindal Power at Raigarh, Chhattisgarh, India
Axis Bank, India 1x600 MW TPS of Jhabua Power, Seoni, Madhya Pradesh, India
21
Experience Profile
CUSTOMER PROJECT DETAILS
Shirpur Power Pvt. Ltd. / SBI Capital Markets Limited, India
2x150 MW coal fired power project of Shirpur Power, Dhule, Maharashtra, India
Asian Development Bank, Manila, Philippines
450 MW Meghnaghat Combined-Cycle Project at Bangladesh for ADB along with Sargent & Lundy, USA
International Finance Corporation, USA
330 MW AES Project at Haripur, Bangladesh for IFC along with Sargent & Lundy, USA
International Finance Corporation, USA
75 MW Kipevu II Project, Kenya for IFC along with Sargent & Lundy, USA
INDEPENDENT ENGINEERING / DUE DILIGENCE SERVICES/TECHNO-ECONOMIC VIABILITY STUDIES
CUSTOMER PROJECT DETAILS
Lanco Amarkantak Power Limited (LAPL)
Technical Due Diligence Services for Unit 1 & 2 and Condition Assessment & Cost to Complete for Units 3 & 4 of Lanco Amarkantak, Madhya Pradesh
IDBI BANK LTD Techno-Economic Viability Study for 3x350 MW coal based plant, Odissa (GMR Kamalanga Energy Ltd.)
State Bank of India, India
Techno-Economic Viability Study for 63 MW coal based plant in Tamil Nadu, India (Cauvery Power Generation Chennai Pvt. Ltd.)
ArcellorMittal S.A. , Luxembeourg
Technical Due Diligence Services for 2x600 MW thermal Power Project, India
IDBI Bank Limited Techno-Economic Viability Study for 2x384 MW CCPP, Andhra Pradesh, India (GMR Rajahmundry Energy Limited)
State Bank of India, India
Technical Due Diligence Services for 3x660 MW Prayagraj Power Project, Uttar Pradesh (Prayagraj Power generation Company Limited)
*Power Finance Corporation Limited, India
Techno-Economic Viability Study for 1350 MW Phase –I TPS, Amravati, Maharashtra (RattanIndia Power Limited)
Hiranmaye Energy Limited
Techno-Economic Viability Study for 2x150 MW Plant, Haldia, West Bengal, India (Hiranmaye Energy Limited)
22
Experience Profile
CUSTOMER PROJECT DETAILS
CDPQ Infrastructures Asia Pte. Ltd., Singapore
Technical Due Diligence Services for CLP Jhajjar coal based power plant (Haryana)& Paghuthan (Gujarat) CCPP project, India (CLP India Private Limited)
National Investment and Infrastructure Fund
Techno-Economic Viability Study Services for 3x660 MW Prayajganj TPP, Prayagraj Power generation Company Limited (Jaypee Group))
State Bank of India, India
Techno-Economic Viability Study for 2x250 MW Lignite Power Plant, Bhavnagar, Gujarat, India (Bhavnagar Energy Company Limited)
Osho Resources India Private Limited, India
Technical Due Diligence for 650 MW Coal based Thermal Power Plant TPP
Punjab National Bank, India
Techno-Economic Viability Study for 2x150 MW TPP, Tamil Nadu, India (Ind Barath Thermal Power Limited)
*Power Finance Corporation Limited, India
Techno-Economic Viability Study for 1350 MW Phase –I TPS, Nashik, Maharashtra (RattanIndia Power Limited)
IDBI Capital/ IndusInd Bank, India
Technical Due Diligence Sub-consultancy services for GMR & Ind-Barath power plants ( NLC M&A)
*Axis Bank, India Techno-Economic Viability Study for 1x600 MW TPS, Madhya Pradesh (Jhabua Power Limited)
*Rural Electrification Corporation Limited
Techno-Economic Viability Study & Facilitating approval of proposal from IEC of a coal based Power Project in UP (State Power Generation Company)
L&T Infrastructure Finance Company Limited
Technical Due Diligence of 2x600 MW Operational TPP Chhattisgarh, India
*State Bank of India, India
Techno-Economic Viability Study for 3x660 MW STPP Uttar Pradesh , India (Prayagraj Power generation Company Limited (Jaypee Group))
State Bank of India, India
Techno-Economic Viability Study for 6x660 MW pit head UMPP Madhya Pradesh, India (Sasan Power Limited)
*State Bank of India, India
Techno-Economic Viability Study for 2x150 MW and 1x185 MW TPP Orissa, India ( Bhushan Energy Limited)
*State Bank of India, India
Techno-Economic Viability study for 2x600 MW coal based TPP at Angul, Orissa (Jindal India Thermal Power Plant Limited)
23
Experience Profile
CUSTOMER PROJECT DETAILS
*State Bank of India, India
Techno-Economic Viability study for 4x150 MW coal based TPP in Nellore, Tamil Nadu (Simhapuri Energy Limited)
*State Bank of India, India
Techno-Economic Viability study for 2x600 MW TPP at Tuticorin, Tamil Nadu (Coastal Energen Pvt Ltd.)
*SBI Capital Markets Limited, India
Techno-Economic Viability study for 2x225MW CCPP, Uttarakhand (Sravanthi Energy Private Limited)
*State Bank of India, India
Techno-Economic Viability Study for 2x600 MW Power Plant in Anuppur, Madhya Pradesh, India (MB Power (Madhya Pradesh) Ltd.)
*Axis Bank, India Techno-Economic Viability study for 5x270MW TPP Nashik, Maharashtra, India (RattanIndia)
*Jindal Power Limited, India
Techno-Economic Viability Study for 2x55 MW TPP at Raigarh, Chhattisgarh and 6x135 MW TPP at Angul, Orissa, India
*State Bank of India, India
Techno-Economic Viability Study for 300 MW (Phase-1) TPP, Nellore, Andhra Pradesh (Meenakshi Energy Pvt. Ltd.)
*State Bank of India, India
Techno-Economic Viability Study for 2x270 MW Power Plant at Jamshedpur, Jharkhand (Adhunik Power & Natural Resources Ltd. (APNRL)
Nexif Energy Management Pte Ltd, Singapore
Technical Due Diligence for 220 MW CCPP Barge Mounted Power Plant, Karnataka, India
Nexif Energy Management Pte Ltd, Singapore
Technical Due Diligence services for a Greenfield Coal Fired Project in Philippines
CDPQ, Canada Technical Due Diligence for 600 MW Thermal Power Project in Madhya Pradesh
Essar Oil (UK) Limited, United Kingdom (UK)
Technical Due Diligence of Co-generation Power Plant at Chester, UK
Essar Power, India Technical Due Diligence for 2x135 MW TPP at Hazira, Gujarat and 4x30 MW TPP at Paradeep, Orissa, India
Mitsui & Co. Ltd, Japan Technical Advisory Services for Barge Mounted CCPP at Kakinada, Andhra Pradesh, India
24
Experience Profile
CUSTOMER PROJECT DETAILS
KPMG, India Technical Due Diligence of Power Generation Assets being considered for acquisition by M/s NTPC
YTL Power International Berhad, Malaysia
Technical Due Diligence Services for a proposed investment in 2x660 MW greenfield project in India
GDF Suez, India Technical Due Diligence of a combined cycle power plant in Tripura, India
Dhariwal Infrastructure (R P Sanjiv Goenka Group) India
Independent Engineers Certification for Commissioning of Unit-1 & 2 of 2x300 MW Power Plant at Chandrapur, Maharashtra, India
State Bank of India, India
Technical Due Diligence of 63 MW Thermal Power Project of SV Power (KVK Group) Korba, Chhattisgarh, India
GIPCL, Gujarat Independent Comprehensive Assessment to Achievement Operational Excellence for 4x125 MW Lignite based power plant, Surat, India
CNC Energy Infra, India Project Management Consultancy (PMC) Services for 2x660 MW Thermal Power Project in Andhra Pradesh, India
KKR Holdings Mauritius
Technical Due Diligence services for Jhabua Power 600 MW Thermal Power Project at Seoni, MP, India
Blackstone Advisors India (Blackstone)
Technical due diligence study for the pit head based 2x525 MW coal based Power Project of Monnet Power in Orissa
PTC India Financial Services (PFS), India
Technical Due Diligence for : - 16 MW Gas based project Machilipatnam Kondapalli, AP -21 MW Diesel based power project, Kasargod, Kerala -28 MW Gas based project, Nagapatnam, Tamil Nadu
BTU MPC Hold Co./ Standard Chartered PLC, Singapore
Technical Due Diligence for 238 MW Lanco Kondapalli CCGT and 119 MW CCPP Lanco Aban Units, Andhra Pradesh, India
CRISIL Financial Services, India
Technical Due Diligence for 2x500 MW Nagarjuna port, Tamil Nadu, India
Dabhol Power Corp., Mumbai, India
Performance Testing Support Services for 738 MW, Phase II Enron CCPP, India
KPMG, India Due Diligence for 156 MW CCPP at Hazira of GSPCL, India
25
Experience Profile
CUSTOMER PROJECT DETAILS
ICICI Bank, Mumbai, India
Due Diligence for 2x289 MW Thermal Power Station in Bina, M.P for ICICI along with S&L, USA
GSECL , Baroda, India Independent Engineers Services for Gandhinagar Unit 5 & Wankbori Unit 7 Monthly Progress Report, Submitted to IDBI
Essar Power, Hazira, India
Technical Support to S&L, USA for Due Diligence Report on Bhander (342MW), Vadinar (77MW), Hazira (515MW) Power Projects.
Grasim Industries, Bhopal, MP, India
Due Diligence Report on Environmental Review for Bina 2x289 MW TPS (Phase 1 completed and waiting for NTP for Phase 2) along with S&L, USA
GMR Vasavi, Mumbai, India
Due Diligence for GMR Vasavi’s Project – 4x50 MW DG based Power Plant at Basin Bridge along with S&L, USA
MMS Steel & Power Private Limited, India
Technical Due Diligence for 3 plants of KVK Energy
GIPCL, Baroda, India Independent Engineer Services for Financial Institution for GIPCL’s Surat Lignite Power Project at Mangrol, Gujarat, India
(*TEV Studies under the Flexible Restructuring Scheme of Reserve Bank of India)
26
Experience Profile
O&M ADVISORY AND PROJECT MANAGEMENT SERVICES
CUSTOMER PROJECT DETAILS
State Bank of India PMC Services for 3x660 MW Prayagraj TPP, Uttar Pradesh (Prayagraj Power Generation Co Ltd)
Rural Electrification Corporation Limited (REC), India
PMC services for 2x800MW Adani Godda Project, Jharkhand (Adani Power (Jharkhand) Limited)
Axis Bank, India O&M Advisory Services for 1x600 MW TPP, Madhya Pradesh, India (Jhabua Power Limited)
Rural Electrification Corporation Limited (REC), India
PMC Assignment of 350MW TPP, Odisha, India ( Ind Bharath Utkal Project)
Punjab National Bank, India
PMC services for 2x600 MW operating TPP, Odisha, India (Jindal India Thermal Power Ltd)
Power Finance Corporation Limited, India
O&M Advisory cum PMC Services of 6x600 MW TPS, Chhattisgarh, India (KSK Mahanadi Power Company Limited)
Rural Electrification Corporation Limited (REC), India
PMC & LE services for 1x150 MW Nagai Coal based TPP, Tamil Nadu, India (Nagai Power Private Limited)
State Bank of India, India
PMC services for 2x150 MW operating TPP, Maharashtra, India (Shirpur Power Pvt Ltd)
Rural Electrification Corporation Limited (REC), India
PMC services for 2x350MW coal based TPP , Andhra Pradesh, India (Meenakshi Energy Private Limited)
State Bank of India, India
O&M Advisory services for 2x600 MW, Madhya Pradesh, India (MB Power ( Madhya Pradesh) Limited)
State Bank of India, India
O&M Advisory Services for 2x270 MW TPP in Jharkhand, India (Adhunik Power Limited)
Azure Power India Pvt. Ltd. / IL&FS Financial Services Limited, India
Project Management Consultancy (PMC) Services for 2x350MW coal based TPP of Meenakshi Energy , Andhra Pradesh, India
27
Experience Profile
SITE COMMISSIONING SUPPORT SERVICES
CUSTOMER PROJECT DETAILS
BISHO Infra Projects Ltd
Commissioning support services for 220 MW Dual Fuel Bhola CCPP, Bangladesh
Odisha Power Generation Corporation Limited, India
Consultancy for providing commissioning manpower for 2x660 MW OPGC TPP, Odisha, India
ÇALIK ENERJI FZE, Turkey
Commissioning Support for Mary 3 CCPP, Turkmenistan
Al-Toukhi, Saudi Arabia
Commissioning support services for Hail CCPP conversion power plant project, Saudi Arabia
Larsen & Toubro, India
Engineering site support activities for 400 MW Bibiyana III CCPP , Bangladesh
Larsen & Toubro, India
BoP commissioning support services at 2x660 MW RRVUNL Chhabra STPP site, India
Lanco Infratech, India
Site support services for 2x600 MW Power Plant in Anuppur, Madhya Pradesh, India
Dubai Aluminium (DUBAL), UAE
Site Supervision services for PMC services for HRSGs at 2350 MW Captive Power Plant, UAE
Larsen & Toubro, India
BTG commissioning support services at 2x660 MW Shree Singaji TPP Stage-II site, India
Larsen & Toubro, India
Commissioning support services for Klongluang Utilities Project, Thailand
Alghanim International, Kuwait
Engineering support services for 500 MW Sabiya 2 OCGT, Kuwait
Larsen & Toubro, India
Commissioning support services for 2x660 MW NTPC Khargone STPP, India
Larsen & Toubro, India
Engineering support services for 225 MW Sikalbaha CCPP, Bangladesh
Alghanim International, Kuwait
Engineering support services for 500 MW (each) Sabiya and Az-zour SCPPs, Kuwait
28
Experience Profile
CUSTOMER PROJECT DETAILS
Larsen & Toubro – Water International, Qatar
Engineering support services for Al-Shamal Sewage Treatment Works (STW), Qatar
Larsen & Toubro, India
Site support services for 2x700 MW Rajpura STPP, India
Larsen & Toubro, India
Engineering support services for 2x660 MW Jaypee Nigree STPP, India
Larsen & Toubro, India
Site support services for 2x660 MW Koradi TPP, India
Larsen & Toubro (Oman) LLC
Commissioning support services for IWPP and SFZ Grid Station ,Oman
National contracting Co. Ltd, KSA
Commissioning support services for Confidential CCPP conversion project, KSA
Al Hassan Engineering Co., Oman
Commissioning support services for Amal Power project for PDO, Oman
Sokeo Power, India Site Supervision Services for 2x300MW, SPGCL Thermal Power Project, Raigarh, Chattisgarh, India
Sokeo Power Inc., USA
Site Supervision Services for 2x350 MW Ind-Barath Thermal Power Project in Orissa, India
29
Experience Profile
POWER SYSTEM STUDIES
CUSTOMER PROJECT DETAILS
Al-Toukhi Company for Industry, Trading & Contracting
Insulation Coordination Study (ICS) for 380/132/33kV BSP (Phase-1) SS of Modon Waad Al-Shamal project, Saudi Arabia
Thermax Limited, India System Stability Studies for 2X65 MW Captive Power Plant of GNAL (GACL-NALCO), Gujarat
Al-Jazirah Engineers & Consultants, Saudi Arabia
Insulation co-ordination Study 132/18.8kV System associated to Shuqaiq 3- IWP, Saudi Arabia
Al-Jazirah Engineers & Consultants, Saudi Arabia
Insulation co-ordination Study for 115KV/34.5V/13.8KV 13M Substation, Saudi Arabia
Al-Jazirah Engineers & Consultants, Saudi Arabia
Insulation co-ordination Study for 9046: Remal BSP, Saudi Arabia
Al-Jazirah Engineers & Consultants
Insulation co-ordination study for Expansion of Qassim-2 BSP (9025) 380/132/13.8kv SS, Saudi Arabia
Thermax Limited, India Power System Study for 2x25MW Power Plant of RCF at Trombay, India
Thermax Limited, India Power System Studies for 1x20 MW GTG based power plant for NFL Bhatinda project, India
Thermax Limited, India Power System Studies for 1x20 MW GTG based power plant for NFL Panipat project, India
Thermax Limited, India Power System Studies for 1x20 MW GTG based power plant for NFL Nangal project, India
Al-Jazirah Engineers & Consultants, Saudi Arabia
Insulation Co-ordination Study - 230/132/13.8KV Sub-100 for Rastanura Refinery Clean Fuels Project, Saudi Arabia
Bhilosa Industries Pvt Ltd., India
Consultancy for Root Cause Analysis on trip incidents of Rakholi Plant and trip incidents & system study at Naroli Plant, India
Bhilosa Industries Pvt Ltd., India
Power System Studies and Relay Coordination for Naroli Polyester Complex Phase-III
30
Experience Profile
CUSTOMER PROJECT DETAILS
Larsen & Toubro Limited, EAIC - Control & Automation BU
System Study Services for Martabe HFO Power Station Project, Indonesia
Almana Engineering & Contracting Co
Power System Study for Upgrade of Sewerage Treatment Plant at Dukhan, Qatar
Bhilosa Industries Pvt Ltd., India
Load flow study of DNHPDCL network at 220 kV level
AJEC, Saudi Arabia Insulation co-ordination & NGR Sizing study for 380/132/13.8 kV Airport Housing Substation, Saudi Arabia
Bhilosa Industries Pvt Ltd (BIPL), India
Relay Co- ordination study of 220 kV Substation for BIPL Naroli CP site, India
SSEM, Saudi Arabia Technical consultancy services for Relay Setting for Qurayat Power Plant Extension-III, Saudi Arabia
Radicon Gulf, Saudi Arabia
Insulation co-ordination study of 380/110/13.8kV Ashbailyah Substation, Saudi Arabia
Radicon Gulf, Saudi Arabia
Insulation co-ordination study of 380/110 kV AL-Khaldiya Substation, Saudi Arabia
Siemens, India Insulation co-ordination study of 220 kV GIS/AIS System for Reliance J3 project, Jamnagar, India
SSEM/AJEC, Saudi Arabia
Electrical System Study of 380/110/13.8kV AL-ADEL Substation, covering Insulation co-ordination study including TOV, lightning surge, switching surge, VFTO and Transferred surge Calculation & Ferro resonance
SSEM/AJEC, Saudi Arabia
Short circuit calculation of 380 kV and 132 kV Bisha Substation and Insulation co-ordination study including, TOV, lightning surge, switching surge, VFTO and Ferro-resonance
IOCL, India
Consultancy services to IOCL for Load Flow Study, Short Circuit Analysis, Relay Co- ordination Study, Reactive Power Compensation Study, Harmonic Analysis, Transient Stability and Load Shedding Analysis at Panipat, Haryana, India
31
Experience Profile
CUSTOMER PROJECT DETAILS
Alok Industries, India
Earthing System, Protection Application, Harmonic Analysis and Power System Study for Relay Setting, Relay Co-ordination from 220 kV LILO Station to 415 Volt System
L&T- Power / D B Power, Chhattisgarh, India
2x600 MW Coal based Power Project, Chhattisgarh, India (BOP and BTG Civil) Load Flow Study, Short Circuit Analysis, Motor Starting Study, Relay Co- ordination Study and Insulation Coordination Study
L&T- Power / MAHAGENCO, Maharashtra, India
3x660 MW Koradi Coal based Thermal Power Station. Load Flow Study, Short Circuit Analysis, Motor Starting Study, Relay Co- ordination Study, Transient Stability Study and Insulation Coordination Study
L&T/ Nabha Power, India
2x700 MW Rajpura Super Thermal Power Station, Punjab, India Load Flow Study, Short Circuit Analysis, Motor Starting Study, Transient Stability Study and Insulation Coordination Study
Arabian Bemco, Saudi Arabia/ Sargent & Lundy, USA
Conversion of Qurayyah Open Cycle Power Plant to CCPP Load Flow Study, Short Circuit Analysis, Motor Starting Study and Relay Co- ordination Study
DOOSAN, Korea 1x700 MW Super Critical Thermal Power Project, Thailand Load Flow Study, Short Circuit Analysis, Motor Starting Study, Relay Co- ordination Study and Insulation Coordination Study
L&T/ GMR Rajahmundry Energy, Andhra Pradesh, India
2x383.8 MW GMR Rajahmundry Energy Combined Cycle Power Project, AP, India Load flow study, Short Circuit Analysis, Motor Starting Voltage Drop Studies
Thermax (Power Division), India
2x150MW Thermal Power Plant at Krishnapatnam, AP, India Load Flow Study, Short Circuit Analysis, Motor Starting Study, Relay Co- ordination Study and Insulation Coordination Study
32
Experience Profile
CUSTOMER PROJECT DETAILS
Arabian Bemco, Saudi Arabia/ Sargent & Lundy, USA
2000 MW Simple Cycle Qurayyah Power Plant Relay Co-ordination and Protections System Study
DOOSAN, Korea 216 MW Taweelah A10 Power and Desalination Project, UAE Load Flow Study, Short Circuit Analysis, Motor Starting Study, Relay Co- ordination Study and Insulation Coordination Study, Dynamic & Transient Stability, EMTP-SSR Studies, Harmonic Analysis
DOOSAN, Korea 370 MW Amman East Combined Cycle Power Plant Load Flow Study, Short Circuit Analysis, Motor Starting Study, Relay Co- ordination Study and Insulation Coordination Study
Mirant Mid-Atlantic, USA
Morgantown SCR Project Unit. Relay Setting Calculations and Coordination Study
Al-Toukhi, Saudi Arabia Tihama Power Plant Extension Project, Saudi Arabia Switching Surge Analysis at 132kV side of GT, Load Flow Study, Short Circuit Analysis, Motor Starting Study, Relay Co-ordination Study
Arabian Bemco Co., Saudi Arabia
PP9- Tank Farm Project, Saudi Arabia , Load Flow and Relay Coordination Study
Pratt & Whitney Power Systems, USA
Generator Protection Setting review
Indian Oil Corporation, (EIL)/ L&T
194 MW IOCL Panipat Cogen Power Project Short Circuit Study, Load Flow Study, Motor Starting Study, Dynamic and Transient Stability Studies, Harmonic Analysis, Reactive Power Compensation Studies, Protection Co-ordination Study
Al-Toukhi, Saudi Arabia 250 MW Jazan Power Plant Extension Project, Saudi Arabia Load Flow Study, Short Circuit Analysis, Motor Starting Study, Relay Co- ordination Study
EXCEL Energy, USA/ Sargent & Lundy, USA
468 MW Riverside Generating Plant, Minnesota, USA Load Flow Study, Short Circuit Analysis, Motor Starting Study
33
Experience Profile
CUSTOMER PROJECT DETAILS
Sargent & Lundy, USA 250 MW PEC-TECH, LNG Plant, Indonesia Transient Stability Studies
GE Hydro, Australia Banimboola Hydroelectric Project Study Motor Starting Analysis and Relay Coordination Study
Doosan, S. Korea / Sohar Power Company, Oman
585 MW Sohar Water and Power Project in Oman Load flow study, Short Circuit Analysis, Relay co-ordination, Electro-magnetic Transient Study
Toshiba, Japan Calabar Power Station, Ihovbor Power Station & Sapele Power Station, Nigeria Load Flow Study, Short Circuit Analysis, Motor Starting Study, Relay Co- ordination Study
Qatar Petroleum, Qatar Dukhan Fields of Qatar Petroleum Relay Co-ordination and System Study
L&T/ VPGL, Andhra Pradesh, India
388.5 MW Vemagiri CCPP, Andhra Pradesh, India Load flow Study, Short Circuit Analysis, Motor Starting Voltage Drop Studies
L&T/ KEOPL, Andhra Pradesh, India
445 MW Konaseema CCPP in Andhra Pradesh, India Short Circuit Analysis, Motor Starting, Voltage Drop Studies
L&T-GTFB / HPL Cogeneration, India
116 MW Haldia CCCPP, West Bengal Load Flow Study, Short Circuit Analysis, Motor Starting Voltage Drop
Sargent & Lundy, USA / STI Guna India
330 MW STI Guna Power TPS Load Flow Study
Grasim Industries, India 2x289 MW Bina Power TPS Load Flow Study
DFID, Great Britain/ Sargent & Lundy, USA
Andhra Pradesh Power Sector Reform , Load Flow Study , Stability Study, Short Circuit Study, Recommended for Static VAR Compensation and Reactive Compensation
L&T/ Gujarat Cement Works, India
53 MW Pipavav CCPP, Gujarat -Load Flow Study, Short Circuit Analysis, Motor Starting Voltage Drop Study
34
Experience Profile
CUSTOMER PROJECT DETAILS
L&T/Sojitz Kelanitissa (Private) Limited (Erst. AES Kelanitissa) , Sri Lanka
1x168.1 MW Sojitz Kelanitissa (Private) Limited (Erst. AES Kelanitissa) CCPP in Sri Lanka - Load Flow Study, Short Circuit Analysis, Motor Starting Voltage Drop, Relay Co-ordination Study
35
Experience Profile
TRANSMISSION & DISTRIBUTION ASSIGNMENTS
CUSTOMER PROJECT DETAILS
L&T Construction (PT&D), India
Proposal Engineering Services for Mobile Substation Project in Ethiopia
CLP India Private Limited, India
Technical Due Diligence for Transmission Line & Substation, India
L&T Construction (PT&D), India
Proposal Engineering Services for 18 Nos. 220/132/33 kV AIS SS, Tunisia
L&T Construction (PT&D), India
Pre-Bid Engineering Services for 18 Nos. 220/132/33kV AIS SS, Tunisia
L&T Construction (PT&D), India
Proposal Engineering Services for 132kV Kole-Gulu-Nebbi-Arua Transmission Line, Uganda
L&T Construction (PT&D), India
Pre-Bid Engineering Services for 2 Nos. 400/220/33kV Outdoor AIS SS, Mozambique
L&T Construction (PT&D), India
Pre-Bid Engineering for Al Nahdah 220kV GIS Project, Egypt
Gujarat State Fertilizers & Chemicals Ltd., India
Owner’s Engineering Services for 132 KV Switchyard and Substation, India
L&T Construction (PT&D), India
Detailed Engineering Services for Mekele & Dallol Substation, Ethiopia
L&T Construction (PT&D), India
Secondary Engineering Services for Qatar Phase 13 substation, Qatar
L&T Construction (PT&D), India
Proposal Engineering Services for 230/115 kV Phang Khon Substation, Thailand
Bhilosa Industries Pvt Ltd, India
Basic & Detailed Engineering Services for 66/11 kV Switchyard , India
L&T Construction (PT&D), India
Pre-Bid Engineering Services for SG Merah and SG Maaw S/S, Egypt
L&T Construction (PT&D), India
Prebid Engineering for 500/220/66/11kV Zagazig Substation
L&T Construction (PT&D), India
Proposal Engineering Services for El-Eqtsadiya 500/220/66/22 kV GIS substation, Egypt
L&T Construction (PT&D), India
Proposal Engineering Services for West Dameita 500/220/22kV GIS Substation, Egypt
L&T Construction (PT&D), India
Proposal Engineering Services for El-Hamawdiya 500/220/66/11 kV GIS substation
36
Experience Profile
CUSTOMER PROJECT DETAILS
L&T Construction (PT&D), India
Proposal Engineering Services for 220/66/22kV Substation of Canal Sugar Co., Egypt
Al-Jazirah Engineers & Consultants, Saudi Arabia
Detailed Engineering Services for 380/132/13.8 kV New Switching Station , Saudi Arabia
NRSS XXXVI Transmission Limited/ ICICI Bank, India
Lender’s engineering services for 400 kV Double Circuit 167.4 km long Transmission line, India
L&T-Hydrocarbon / PDO Detail engineering of extension of existing 132kV AIS Switchyard for Y3DC project.
Warora-Kurnool Transmission Limited/ YES Bank Ltd, India
Lender’s engineering services for Transmission project of Essel Group, India
North Karanpura Tranco Ltd., India
Lender’s engineering services for Development of transmission lines for NKTL, India
Bhilosa Industries Pvt Ltd, India
Owner’s Engineering services for 66 /11 KV switchyard, Naroli plant, Silvassa, India
Alghanim International, Kuwait
Pre-bid engineering of 1500MW Solar Park having 5 nos. of 400kV Substation in Kuwait.
SSEM/AJEC, Saudi Arabia Consultancy service for Modification works at Yanbu-3 and Madinah BSP, Saudi Arabia
Alghanim International, Kuwait
- Review Engineering of 400kV GIS for 750MW Sabiya-3 Combined Cycle Project. This is one of the largest GIS in Middle East region with bus Rating of 6000A, 80kA for 3 sec with 26 bays.
- Details engineering for Civil and Structural design of 400kV GIS.
- Details engineering for HVAC and Fire Protection system design for 400kV GIS.
- Details engineering for Electrical packages i.e. Lighting, Grounding, Lightning Protection.
Grasim Industries Limited, India
Review Engg of 66/6.6 KV Substation for Birla Cellulose Process Plant, India
EGEC, Qatar Detail Engineering of 33/11KV S/S Qatar
Larsen & Toubro Limited, EAIC - Control & Automation BU
Engineering Support for 132/33/0.433kV Substation Package, Talaipalli
L&T/NTPC, India Proposal Engineering support for 400kV Transmission Line
37
Experience Profile
CUSTOMER PROJECT DETAILS
SEPCO III / Indonesia Proposal Engineering support for 500kV Transmission Line
L & T -/EBG Electrical Systems & Equipment (ESE- EAIC)
Detail Engineering of 220 kV switchyard for 125 MW TPP in Senegal
Alghanim International, Kuwait
Review Engineering of 400kV GIS modification work for 250MW Sabiya-1 Combined Cycle Conversion Project.
Alghanim International, Kuwait
Review Engineering of 400kV GIS Extension work for 500MW Sabiya-2 Open Cycle Project.
AJEC, Saudi Arabia Detail Engineering for construction of 380kV underground cables for Dubha Power plant
Bhilosa Industries Pvt Ltd, India
Basic Engineering of 220kV substation and Consultancy for Insulation and Coordination study for 220 kV and 66kV Electrical System for BIPL Naroli CP site, India
L&T / RRVUNL, India Review Engineering of 400kV AIS Switchyard of 2 x 660MW Chhabra STPP, Rajasthan
L&T/ MPPGCL, India Detail Engineering of 400kV AIS Switchyard of 2x660 MW Shree Singaji TPP (Stage-II), Malwa, MP
Al-Toukhi/AJEC, Saudi Arabia
Detail Engineering of Al-Waha 380/110/13.8kV GIS BSP in Saudi Arabia
SSEM/AJEC, Saudi Arabia Detail Engineering of New Aziziyah 380/132/33/13.8 kV GIS BSP in Saudi Arabia
Al-Toukhi/AJEC, Saudi Arabia
Detail Engineering of Riyadh Metro 380/132/33kV GIS BSP in Saudi Arabia
Al-Toukhi/AJEC, Saudi Arabia
Detail Engineering of Al-Jilah 380/132/33kV GIS BSP in Saudi Arabia
SSEM/AJEC, Saudi Arabia Detail Engineering of Al-Kharj 380/132/33/13.8kV GIS BSP in Saudi Arabia
SSEM/AJEC, Saudi Arabia Detail Engineering of As-Safa 380/132/13.8kV GIS BSP in Saudi Arabia
SSEM/AJEC, Saudi Arabia Detail Engineering of Sultana 380/132/13.8kV GIS BSP in Saudi Arabia
Mother Dairy, India Review of calculations, SLDs, protections, Vendor drawings, Schematics etc. of 66KV AIS Substation
Lanco Vidarbha Thermal Power, India
Review of calculations, SLDs, protections, Vendor drawings, Schematics etc. 765kV AIS Switchyard for 2x 660 MW Lanco Vidharbha
38
Experience Profile
CUSTOMER PROJECT DETAILS
Madhya Pradesh Power Generating Company, India
Review of calculations, SLDs, protections, Vendor drawings, Schematics etc. 400kV & 220kV Switchyard for 2x600 MW Malwa TPS
Lanco Anpara Power, India
Owner’s Engineering of 765kV & 400kV AIS Switchyard of 2x600 MW Anpara “C” TPS
Lanco Amarkantak Power, India
Review of Detailed engineering of 400kV AIS Switchyard of 2x300 MW Lanco Amarkantak TPS
L&T/ IOCL, Panipat Basic & Detailed engineering of 33kV GIS of 2x45 MW IPCL Co-generation Power Plant
DOOSAN, Korea Basic & Detailed engineering of 245kV GIS extension of 1x700 MW TPS for Doosan, Korea
Gujarat Cement Works, India
220kV AIS Switchyard of 50 MW Liquid Fuel Based CCPP, Pipavav
L&T/ Nabha Power, India Vendor drawing review of 400KV AIS Switchyard of 2x660 MW Rajpura TPS
L&T/ GSECL, India Vendor drawing review of 220kV AIS Switchyard of 375 MW Dhuvaran CCPP
L&T/ D B Power, India Vendor drawing review of 400kV AIS Switchyard of 2x600 MW DB Power TPS
Thermax, India Vendor drawing review of 400kV AIS switchyard of 2x150 MW TPS at Krishnapattnam for Thermax
L&T/ GMR Rajahmundry Energy, India
Vendor drawing review of 400kV AIS Switchyard of 2x383.8 MW GMR Rajahmundry Energy CCPP
L&T/ KEOPL, India Vendor drawing review of 400kV AIS Switchyard of 445 MW Konaseema CCPP.
L&T/ VPGL, India Vendor drawing review of 400kV AIS Switchyard of 388.5 MW Vemagiri CCPP.
39
Experience Profile
RENOVATION & MODERNIZATION SERVICES
CUSTOMER PROJECT DETAILS
Tata Chemicals Ltd. RLA of CEHP-2 Boiler, Mithapur unit, Gujarat
Ashapura Perfoclay Ltd. Boiler RLA for 3 nos, Bhuj, Gujarat
Gujarat State Fertilizers & Chemicals Ltd. RLA of Process boiler at Amm-III Plant, Gujarat
Vishal Fabrics Limited RLA of Water Tube type boiler of 20 TPH, Ahmedabad, Gujarat
Welspun India Limited RLA of 4 Nos. of Boilers at Welspun, Kutch, Gujarat
Shree Bhavani Fabricators & Engineers RLA of 135 TPH CFBC Boiler at Veraval, Gujarat
GE Power India Limited RLA of Steam & Water Drum at RIL Vadodara, Gujarat
Shree Bhavani Fabricators & Engineers
CA-RLA of 42 TPH AFBC boiler at Vardhman Acrylics Limited, Gujarat
Reliance Industries Limited RLA of HRSG-2 at RIL Patalganga, Maharashtra
Jindal Saw Limited (IPU-CEMENT-COKE) RLA test of two boilers, Kutch
Reliance Industries Limited RLA study for Boiler C at RIL Patalganga, Maharashtra
Gujarat State Electricity Corporation Ltd
RLA of 200 MW Turbine at Ukai and Wanakbori TPS, Gujarat
Reliance Industries Limited RLA services for Reliance Nagothane, Maharashtra
Global Energy Pvt. Ltd. RLA Study of 5MW Biomass Based Power Plant, Karnataka
Hindalco Industries Limited (Renusagar Power Division)
RLA Study of Two (2) Nos. 92.5 MVA Generator Transformer
Gujarat State Electricity Corporation Ltd RLA for 2 boilers of 210 MW WTPS, Gujarat
Shree Bhavani Fabricators & Engineers
CA-RLA of 2x50 TPH CFBC boiler at Grasim Industries, Veraval, Gujarat
40
Experience Profile
CUSTOMER PROJECT DETAILS
JAGUAR OVERSEAS LIMITED R&M for 2x30 MW Harare-II Coal PP, Africa
Shree Bhavani Fabricators & Engineers
RLA study of WHRB-1 boiler, PFBC-1 boiler and PFBC-2 boiler, Gandhidham, Gujarat
NTPC Limited, India RLA of critical pipings, hangers and supports in 3 X 200 MW NTPC Korba Stage-I, Chhattisgarh
First National Company for Operation & Maintenance Services LLC
RLA of 445 MW CCPP Salalah 2 IPP in Oman
Tata Chemicals Limited, India
RLA of HPB-4 Boiler at Tata Chemicals Mithapur, Gujarat, India
Reliance Industries Limited, India
RLA services for HRSG 2 & 3 of CPP-2 plant at RIL Dahej, Gujarat, India
Gujarat State Electricity Corp. Ltd., India RLA of 75 MW Boiler at KLTPS Plant, Gujarat, India
NTPC GE Power Services Pvt. Ltd, India
Stress Analysis study of critical piping systems for 2x210 MW NTPC Dadri, Uttar Pradesh, India
NTPC GE Power Services Pvt. Ltd, India
Stress Analysis study of critical piping systems for 2x210 MW NTPC Unchahar, Uttar Pradesh, India
NTPC GE Power Services Pvt. Ltd, India
Stress Analysis study of critical piping systems for 3x200 MW NTPC Farakka, West Bengal ,India
NTPC GE Power Services Pvt. Ltd, India
Stress Analysis study of critical piping systems for 3x200 MW NTPC Ramagundam, Telangana ,India
IRC Engineering Services India Pvt. Ltd.
Stress Analysis of 6x210 MW NTPC Vindhyanchal STPP, 2x500 MW NTPC Rihand STP and 2x500 MW NTPC Shaktinagar STP, India
Reliance Industries Limited, India RLA of UB-1 Boiler of CPP Plant at Dahej, Gujarat, India
Reliance Industries Limited, India
RLA of four furnaces at RIL Nagothane Manufacturing Complex, Maharashtra, India
Reliance Industries Limited, India
RLA of 50V01, 50R01 IBR Loop & Connected Lines in EO/EG at RIL, Nagothane, Maharashtra, India
41
Experience Profile
CUSTOMER PROJECT DETAILS
Reliance Industries Limited, India RLA of UB-2 Boiler of CPP Plant at Dahej, Gujarat, India
NTPC Alstom Power Services Pvt. Ltd, India
Civil Design Consultancy along with NDT test work for Steam Turbine at Ramagundam Super Thermal Power Station
JK Paper Ltd, India 35 & 50 TPH processed boilers RLA and Condition Assessment of at Unit CPM, Tapi, Gujarat, India
Sai Wardha Power Ltd (KSK Group), India
4x135 MW SWPL TPP RLA, Condition Assessment & Performance Audit / Energy Audit, Warora, Maharashtra, India
GIPCL, India 4x125MW SLPP Performance Audit, Residual Life Assessment and Steam Path Audit for Unit-1 of Steam Turbin, Mangrol, Gujarat, India
Raj West Power (JSW Group), India
8x135 MW Lignite Base Power Plant RLA for Condensing Cooling Water (CCW) Pipe, Barmer, Rajasthan, India
KSK Group, India 1x135 MW VSLP TPP at Chhattisgarh & 2x43 MW ACPCPL TPP, Rajasthan RLA and Condition assessment study
Gujarat Electricity Board, India
2x70 MW Lignite TPP RLA of Unit 1 & 2 , Kutch, Gujarat, India
Tamil Nadu Electricity Board , India
2x60 MW & 1x110 MW Units TPS Complete Refurbishment Engineering and Condition Assessment, Ennore, Chennai, Tamil Nadu ,India
Gujarat Electricity Board, India, India
120 MW each Ukai TPS Units 1 & 2, Complete Refurbishment Engineering and Condition Assessment, Gujarat, India
Gujarat Electricity Board, India, India
210 MW Boilers and Auxiliaries of Wanakbori Power Plant, Unit I- VI, Orissa, India
Damodar Valley Corporation (DVC), India
3x50 MW Bokaro ‘A’ station Unit 1,2,3in Orissa; 1x140 MW Durgapur station Unit-3 & 1x140 MW Chandrapura station Unit-2 in West Bengal , Residual Life assessment of TG auxiliaries, Balance of Plant equipment for Mechanical, Electrical and C&I system, India
RCF Thal, India RLA for 3 nos of Boilers in Steam Generating Plant
KRIBHCO, Hazira, Gujarat, India RLA for 1 Boiler
IFFCO, Kalol, Gujarat, RLA study of Waste Heat Boiler and Steam Lines at IFFCO
42
Experience Profile
CUSTOMER PROJECT DETAILS
India Kalol unit
Gujarat Electricity Board, India
32 MW Boiler and Auxiliaries RLA, Field investigation, Preparation and submission of study report.
Gujarat Electricity Board, India
Consultancy Service for Feasibility of Installing optimal capacity of coal or gas based unit at Ukai TPS, India
Tamil Nadu Chemical Products Limited , India
63.783 MW Coal based TPS, Unburnt Carbon Optimization Study of Fly Ash and Bottom Ash
GIPCL, India 160 MW CCPP , Performance Testing Services, Vadodara, India
Ahmedabad Electricity, India
Improvement in Existing Ash Disposal / Management System at Sabarmati TPS
Gujarat State Electricity Corporation, India
Contracts / Agreement, Fuel Supply, O&M, Construction, Sharing of common facilities between GSECL and GEB.
SPECIAL ENGINEERING SERVICES
CUSTOMER PROJECT DETAILS
GE Power India Ltd. Engineering Services for Slip ring cooling system and Brush Dust
Larsen & Toubro Limited Review of Architectural Drawings & Specs. for pipeline project of KOC
Port Adelaide Energy Pty Ltd. (Nexif)
Technical Study and Optimization of AOHP Power Plant, Adelaide, Australia
ISGEC Heavy Engineering Ltd
Wind Tunnel Study-2X800 MW NTPC Gadarwara , India
Nexif Energy Management Pte Ltd, Singapore
Consultancy Services for SIPCO-II CCPP, Thailand
Edelweiss Asset Reconstruction Company Limited
Periodic Review of Essar Gp. Power plants (2x135 MW Essar Power Hazira, 2x60 MW Essar Power Orissa and 500 MW Bhander Power Project)
Sargent & Lundy, USA Tower Testing for the DCRT Ten West Link project
Gujarat Narmada Valley Fertilizers & Chemicals Ltd
Failure Analysis of Tube at Dahej Complex, Gujarat
43
Experience Profile
CUSTOMER PROJECT DETAILS
Arabian Bemco Contracting Company
Plant Manuals for Qurayyah CCPP Extension 1 Block 6 Project, Saudi Arabia
Sargent & Lundy, USA Engineering Services for PLS-Tower modeling Work
L&T Hydrocarbon Engineering Limited
Deputation of engineers for Saudi Aramco Project
Odisha Power Generation Corporation Limited
Consulting services for Performance Testing for Main Plant and Balance of Plant of 2x660 MW OPGC II STPP, Odisha
Alghanim International General Trading & Contracting Co. WLL
Technical Training for DPC Engineers for DIPWP, Oman
Gujarat Mineral Development Corporation Ltd.
Consultancy services for pre-contract activities & selection of new O&M operator 2x125 MW Akrimota TPS, Gujarat
GE Power India Limited Engineering Services BOP systems for Hydro Projects
Hindalco Industries Limited (Renusagar Power Division)
On Line Partial Discharge Testing Of Transformer
Adani Power Limited Condition assessment of Thermal Power plant
Pragati Power Corporation Ltd., India
Consultancy services for PG Test of BOP, Pragati III, Bawana
Larsen & Toubro Limited Heat Cycle Design Study for Buxar, Lara & Singrauli TPP, India
L&T Heavy Engineering, India
Structural Analysis for HEML Loop Reactor Package at Bhatinda, India
Industrial Energy Ltd, India Preparation of Cost Validation report for Industrial Energy Ltd, India
GS Engineering & Construction Corporation
Parts Data Package and SAP data list for PP12
Sargent & Lundy LLC Electrical Design Support for Gloucester 75 MW power plant
First National Company for Operation & Maintenance Services
Services for Single point of failure (SPOF) study for Salah 2 CCPP, Oman
Sojitz Kelanitissa (Private) Limited, Sri Lanka
Root Cause Analysis for Steam Turbine Rotor Crack, Sri Lanka
44
Experience Profile
CUSTOMER PROJECT DETAILS
The Durgapur Projects Limited (A Govt. of West Bengal Enterprise)
Engagement of Consultant for construction of 2nd Fly Ash (FA) Silo, Durgapur, West Bengal, India
Talwandi Sabo Power Limited
Design of divider bund in Ash Dyke, Punjab, India
L&T - Hazira (HED), India Piping Design of Feedwater system-2x800 MW Telangana & 3x660 MW Ghatampur, India
L&T Hydrocarbon Engineering Limited, India
Preparation of Fabrication Drawings for IOCL Bongaigaon
Larsen & Toubro-Electrical & Automation, India
Preparation of MFS for the EPC contract-INS Eksila
L&T Construction, India/ KNPC , Kuwait
Support to validate and verify design of Air Duct
CALIK ENERJI SAN. TIC. A.S., Turkey
Satellite Process Engineer Support
NTPC GE Power Services Pvt. Ltd, India
Stress Analysis at NTPC Ramagundam Site
Talwandi Sabo Power Limited, India
Feasibility Study & Detailed Engineering for Water Reservoir
GE Power India Ltd., India Design of pipe type heat exchanger cooling water system for 4 x 250 MW Tehri PSP Hydro plant, Uttarakhand, India
Haryana Power Generation Corporation, India
Improvement in Cooling Towers Efficiency at DCRTPP, Yamunanagar, Uttar Pradesh, India
SembCorp Salalah Power & Water Company SAOG
Civil Consultancy Services for Sembcorp Salalah Power & Water Plant, Oman
Al-Toukhi, Saudi Arabia Detailed Design of NWC pump station
Emirates Global Aluminum PJSC
GTX Demineralization Plant RCFA Review
Bhander Power (Essar), India
Techno-Commercial Specs for Dismantling, Packing & Storage of 500 MW Bhander CCPP, India
Nexif Energy, Singapore Consultancy for 220 MW CCPP at Kadda, Bijapur, Bangladesh
Jhajar Power Limited, India
Consultancy for Water Spray System in Ash Dyke for Jhajjar TPP at Jhajjar, Haryana, India
45
Experience Profile
CUSTOMER PROJECT DETAILS
GMR Kamalanga Energy Limited, India
Consultancy for root cause analysis of PA Fan (2B) blade failure for 3x350 MW TPP at Kamalanga, Orissa, India
Gayatri Projects Ltd (GPL), India
Consultancy for Scope Interpretation of GPL contract for TPCIL 2x660 MW TPP at Krishnapatnam, AP, India
Sesa Sterlite (Vedanta Group), India
Consultancy Services for Design of Ash Dyke for 9x135 MW coal-based Captive Power Plant, Jharsuguda, Orissa, India
Adani Power Dahej, India Study of CW system for proposed 4x660 MW Thermal Power Project at Dahej, Gujarat, India
Sterlite Energy (Vedanta Group), India
Consultancy Services for interconnection of CW pumps at 9x135 MW coal-based Captive Power Plant, Jharsuguda, Orissa, India
Alstom, India Design & Engineering of Pipe type heat exchanger for cooling water for Tehri Pump Storage Plant (4x250 MW), India
Tata Power, India Water System Study at Tata Power Company, Haldia Plant, India
DOOSAN, Korea HAZOP study for HVAC system at JBL-M station, UAE
Jubail Energy Company, Saudi Arabia
Hazop Study for 250 MW Sadaf Co-Generation Power Plant, NPC n Saudi Arabia
Alghanim International, Kuwait Configuration Study for 5xGE 9FA GT 2 Nos. IWPP
L&T- Infra, India Training and Orientation of Power Plant
DOOSAN, Korea Hazop Study for 1120 MW Mong Duong-2 Thermal Power Project in Vietnam
Adani Power, India Consulting Engineering for 660 MW Unit of Mundra Power station
Jhajjar Power (CLP), India Performance Testing Support for 2x660 MW Jhajjar Power Project
DOOSAN, Korea Power Plant familiarization and Technical Training for Combined Cycle Power Project in Jebel Ali, Dubai
Adani Power, India Conduct study of Cooling Water System for 4x330MW & 5x660MW Mundra TPP, Gujarat
46
Experience Profile
CUSTOMER PROJECT DETAILS
Confidential Engineering and Documentation Service for a Project in Middle East
DOOSAN, Korea Hazop Study, Jebel Ali Project, Dubai
Essar Power, India Heat Rate Improvement Study for 515 MW Naphtha based Combined Cycle Power Plant
Doosan, S. Korea / Sohar Power Company, Oman
585 MW CCPP Sohar Water and Power Project in Oman C&I detail engineering services, Power system studies, Preparation of Commissioning and Testing Manuals, Assistance in PG Testing & Preparation of Report
Central Electricity Authority (CEA) / Tata Energy Research Institute, India
Complete project brief of Global Environment Facility for three thermal power stations viz. 6x210 MW Kolaghat TPS, 3 x 60 MW Faridabad TPS and 6 x 210 GGSSTP Ropar under GEF/UNDP funded assignment titled “Stabilizing of Green House Gas Emissions from Indian Power Sector through Renovation & Modernization of Thermal Power Stations
West Power, Jaipur, India Vetting of DPR for 2x300 MW Kapurdi Power Project in Rajasthan
GMR Vemagiri, India Selection of Configuration and performance optimization for 370 MW CCPP
Sargent & Lundy, USA Feasibility Study for Fuel Supply for GVK Power Ratlam 120 MW DG based Power Plant
L&T – HARP, India DHDS Unit HPCL Vizag & CRL Cochin, Technical Support in evaluating technical offers for various packages.
Larsen & Toubro, GR. X, Calcutta
Detailed Design of Material Handling System of L&T Cement Plant at Tadipatri, A.P. Detailed Engineering of NTPC Simhadri Coal Handling plant
Gujarat State Electricity Corporation, India
Contracts / Agreement, Fuel Supply, O&M, Construction, Sharing of common facilities between GSECL and GEB.
L&T, IPP Group, India Site Selection Studies in Andhra Pradesh
Westinghouse Electric Corporation, USA Report on compliance with Indian Codes and Standards
L & T, Group-XI, India C&I Engineering support for Nuclear Fuel Complex
47
Experience Profile
POWER SECTOR REFORM ASSIGNMENTS
CUSTOMER PROJECT DETAILS
SBI Capital Markets, India
Technical Advisory services for perspective plan of project development of 1000-1200 MW coal fired Thermal Power Project of Chhattisgarh State Electricity Board (CSEB)
DFID, Great Britain Institutional Strengthening and Human Resources Development for consortium led by Arthur Anderson, USA for Andhra Pradesh Power Sector Reform
DFID, Great Britain Corporatization, Commercialisation, Distribution & Privatisation for consortium led by Arthur Anderson, USA for Haryana State Electricity Board Reform
Central Electricity Board, Mauritius
Power Sector Reform in Mauritius for consortium led by Arthur Anderson, USA.
Gujarat Electricity Regulatory Commission, India
Technical assistance for preparation of State Grid Code, Distribution Code, Safety Regulations
Experience Profile Renewable Energy Projects
1
Experience Profile
CONTENTS
RENEWABLE ENERGY PROJECTS .......................................................................... 2
WIND PROJECTS ................................................................................................ 2
OWNER’S ENGINEERING SERVICES ...................................................................... 2
PROJECT MANAGEMENT SERVICES ...................................................................... 3
LENDER’S ENGINEERING SERVICES ...................................................................... 4
CONSULTANCY SERVICES .................................................................................. 14
SOLAR/BIOMASS ENERGY PROJECTS ................................................................. 15
DETAILED ENGINEERING SERVICES .................................................................... 15
OWNER’S ENGINEERING SERVICES .................................................................... 15
PROJECT MANAGEMENT SERVICES .................................................................... 16
LENDER’S ENGINEERING SERVICES .................................................................... 17
CONSULTANCY SERVICES .................................................................................. 26
2
Experience Profile
RENEWABLE ENERGY PROJECTS
WIND PROJECTS
OWNER’S ENGINEERING SERVICES
CUSTOMER PROJECT DETAILS NO. OF WTG & MAKE, CAPACITY
Sprng Vaayu Urja Private Limited
OE Services for 300 MW under construction Wind Power Project in Madhya Pradesh
136 Gamesa make G122, 2.2 MW WTGs
Vivid Solarie Energy Private Limited (VSEPL)/ L&T Infrastructure Finance, India
OE services for 252 MW Wind power project in Tamil Nadu, India
126 Vestas make V120-2.0 MW WTGs
Sprng Energy Private Limited
OE services for 300 MW under construction Wind Project, Tamil Nadu, India
100 Nordex make 3 MW AW140 WTGs
Sprng Energy Private Limited
OE Services for 197.5 MW under construction Wind Power Project, Gujarat, India
79 Envision make 2.5 MW WTGs
Orange Renewable Power Private Limited
OE Services for 200 MW under construction Wind Power Project, Tamil Nadu, India
100 Gamesa make G114, 2.0 MW WTGs
Ecoren Energy India Private Limited
OE Services for 25.3 MW under construction Wind Power Project at Nelakota, Tamil Nadu, India
11 GE make 2.3 MW WTGs
3
Experience Profile
PROJECT MANAGEMENT SERVICES
CUSTOMER PROJECT DETAILS NO. OF WTG & MAKE, CAPACITY
Kutch Windfarm Development Private Limited / REC, India
PMA Services for 50.6 MW Wind Power Project at Kutch, Gujarat
23 Gamesa make G122, 2.2 MW
WTGs
Adani Renewable Energy (TN) Limited/ REC Limited
PMA services for 151.8 MW Wind Power Project in Kutch, Gujarat -
L&T Infrastructure Finance Company/ Vivid Solaire Energy Private Limited (Engie Gp))
PMC Services for 252 MW Greenfield Wind Power Project, Tamil Nadu, India
126 Vestas make V120-2.0 MW WTGs
Mytrah Vayu Sabarmati Private Limited / L&T Infrastructure Finance Company
PMC Services for 252 MW greenfield Wind Project, Tamil Nadu, India
105 GE make 2.4 MW WTGs
Jath Wind Energy Private Limited/ L&T Infrastructure Finance Company
PMC Services for 30 MW operational Wind Power Project in Maharashtra, India
15 INOX Wind make WT 2000 DF, 2.0 MW WTGs
Orange Powergen EPCM Services for 50 MW operational Wind Power Project at Bercha, Madhya Pradesh, India
25 Gamesa make G97, 2.0 MW WTGs
Orange Powergen EPCM Services for 200 MW operational Wind Power Project at Sangli, Maharashtra, India
100 Gamesa make G97, 2.0 MW WTGs
4
Experience Profile
LENDER’S ENGINEERING SERVICES
CUSTOMER PROJECT DETAILS NO. OF WTG, MAKE & CAPACITY
Watsun Infrabuild Pvt. Ltd./State Bank of India, India
126 MW under construction Wind Power plant in Bhuj, Gujarat
-
Ostro Renewables Private Limited (Renew Gp) / Guarantco Ltd, UK
25.6 MW Ostro Renewables Private Limited, Rajasthan 60 MW Ostro Mahawind Power Private Limited, Karnataka 14.4 MW ReNew Wind Energy (Jadeswar) Private Limited (RWEJPL), Rajasthan
32 Windworld make WWIL 0.8 MW WTG 30 Gamesa make 2.0 MW WTGs 18 Windworld make WWIL 0.8 MW WTG
Renew Wind Energy AP 2 Private Limited/L&T Infrastructure Finance Company
400 MW Wind Power Project in Gujarat, India
120 GE make 2.5-132 WTGs 48 Suzlon make SG122 2.1 MW WTGs
Renew Vayu Urja Private Limited/ L&T Infrastructure Finance, India
76 MW operational Wind Power Project at Maharashtra, India
38 Gamesa make G114 -2.0 MW WTGs
Torrent Solargen Limited/ICICI Bank
126 MW under construction wind Project in Maharashtra, India
62 Gamesa make G114 -2.0 MW WTGs
Jodhpur Wind Farms Pvt. Ltd. (Torrent Power) / State Bank of India
60 MW under construction wind projects in Karnataka
30 Gamesa make G97 -2.0 MW WTGs
Latur Renewable Pvt. Ltd. (Torrent Power) / State Bank of India
60 MW under construction wind projects in Karnataka
30 Gamesa make G97 -2.0 MW WTGs
Industrial Finance Corporation in India (IFCI) Limited/ ReNew Wind Energy (AP) Private Limited
40 MW under construction Wind Power Project in Karnataka
20 Gamesa make G97 -2.0 MW WTGs
5
Experience Profile
CUSTOMER PROJECT DETAILS NO. OF WTG, MAKE & CAPACITY
Vivid Solarie Energy Private Limited (VSEPL)/ L&T Infrastructure Finance, India
252 MW under construction Wind power project in Tamil Nadu, India
126 Vestas make V120-2.0 MW WTGs
Molagavalli Renewable Private Limited/ Catalyst Trusteeship Limited, India
46 MW operational Wind Power Project in Andhra Pradesh, India
23 Gamesa make G97 -2.0 MW WTGs
Wind World Wind Farms Ltd./ Yes Bank , India
24.2 MW operational Wind project in Karnataka, India
29 WWIL make 600 kW E40 WTGs 4 WWIL make 800 kW E53 WTGs
Renew Wind Energy AP 2 Private Limited/ L&T Infrastructure Finance Company
400MW under construction Wind Power Project in Andhra Pradesh, India
120 GE make 2.5-132 WTGs 48 Suzlon make SG122 2.1 MW WTGs
Renew Vayu Urja Pvt Ltd/ GuarantCo, UK
103.10 MW operational Wind Projects in Andhra Pradesh, India
12 Gamesa G97-2.0 MW WTGs 20 Gamesa G114-2.0 MW T106 WTGs 23 GE make 1.7 MW WTGs
Energon RJ Wind Power Pvt. Ltd./ L&T Infrastructure Finance, India
108 MW operational Wind Project in Madhya Pradesh, India
54 Gamesa make G97-2.0 MW WTGs
Energon KN Wind Power Pvt. Ltd./ L&T Infrastructure Finance, India
46 MW operational Wind Project in Karnataka, India
23 Vestas make V110 2.0 MW WTGs
Energon Power Resources Private Limited (Vena Energy Power Resource Pvt. Ltd. )/ L&T Infrastructure Finance, India
154 MW operational Wind Project in Andhra Pradesh, India
77 Gamesa make G97-2.0 MW WTGs
6
Experience Profile
CUSTOMER PROJECT DETAILS NO. OF WTG, MAKE & CAPACITY
Vayuputhra Energy Private Limited/L&T Infrastructure Finance, India
20 MW under construction Wind Power Project, Andhra Pradesh, India
10 Gamesa make G90-2.0 MW WTGs
Guttaseema Wind Energy Company Pvt. Ltd. (Greenko Gp.)/ L&T Infrastructure Finance, India
80 MW under construction Wind Power Project, Andhra Pradesh, India
40 Gamesa make G97-2.0 MW WTGs
Kanak Renewables Limited & Rajat Renewable Limited (ReNew Gp.)/Yes Bank
60MW operational Wind Project, Rajasthan
75 E53 Enercon 800kW WTGs
Ostro Jaisalmer Private Limited (ReNew Gp)/Yes Bank
50.4 MW operational Wind Power Project, Rajasthan
24 Suzlon make S-97, 2.1 MW WTGs
Ostro Anantapur Private Limited (ReNew Gp)/Yes Bank
100 MW operational Wind Power Project, Andhra Pradesh, India
33 Gamesa make G97-2.0 MW WTGs
Ostro Urja Wind Private Limited (ReNew Gp)/Yes Bank
66 MW operational Wind Power Project, Madhya Pradesh, India
33 Gamesa make G97-2.0 MW WTGs
Ostro Madhya Wind Private Limited (ReNew Gp)/Yes Bank
92 MW operational Wind Power Project, Madhya Pradesh, India
46 Inox make DF-2000-RD100, 2.0 MW WTGs
AVP Powerinfra Private Limited (ReNew Gp)/Yes Bank
27.3 MW operational Wind Power Project, Madhya Pradesh, India
13 Suzlon make S-97, 2.1 MW WTGs
Badoni Power Private Limited (ReNew Gp)/Yes Bank
29.4 MW operational Wind Power Project, Madhya Pradesh, India
7 Suzlon make S111, 2.1 MW WTGs 7 Suzlon make S97, 2.1 MW WTGs
7
Experience Profile
CUSTOMER PROJECT DETAILS NO. OF WTG, MAKE & CAPACITY
Sprng ALT Energy Private Limited /Piramal Capital
197.5 MW under construction Wind Power Project, Gujarat, India
79 Envision make 2.5 MW WTGs
Mytra Vayu Tungabhadra/ Power Finance Corporation Limited
148.9 MW under construction wind power project, Andhra Pradesh, India
47 GE make 1.7MW WTGs 30 GE make 2.3MW WTGs
Inox Wind Infrastructures Services Ltd./State Bank of India
150 MW under construction Wind power project, Gujarat
75 Inox make, 2.0 MW WTGs
Axis Wind Farms (Rayalaseema) Private Limited / L&T Infrastructure Finance, India
105 MW under construction Wind Power Project, Andhra Pradesh, India
50 Suzlon make S-97, 2.1 MW WTGs
Kanak Renewables Limited (ReNew Energy)/Yes Bank
46.2 MW operational Wind Project in Karnataka, India
22 Suzlon make S111-90m WTGs
Rajat Renewables Limited (ReNew Energy)/Yes Bank
50.4 MW Wind Project in Karnataka, India
24 Suzlon make S97-120m WTGs
Panama Wind Energy Godawari Private Limited / L&T Infrastructure Finance, India
80 MW operational Wind Project, Maharashtra, India
40 Gamesa make G97-2.0 MW WTGs
ReNew Wind Energy (Rajasthan One) Private Limited /Catalyst Trusteeship Limited
30MW Operational Wind Project, Rajasthan, India
15 Inox make WT2000DF, 2.0 MW WTGs
Bothe Wind Farms Limited / Power Finance Corporation Limited
199.7 MW wind project Maharashtra, India
40 Vestas make V-100, 2.0 MW WTGs 57 Suzlon make S-97, 2.1 MW WTGs
8
Experience Profile
CUSTOMER PROJECT DETAILS NO. OF WTG, MAKE & CAPACITY
Watsun Infrabuild Pvt Ltd/ L&T Infrastructure Finance Company and State Bank of India
150MW U/c wind project in Tamil Nadu, India
75 Vestas make V100 2.0 MW WTGs
Mytrah Vayu (Sabarmati) Private Limited/ L&T Infrastructure Finance Company
252 MW UC Wind project in Tamil Nadu, India
105 GE make 2.4 MW WTGs
Green Infra Wind Energy Ltd. (Sembcorp Group)/Bank of Baroda
84 MW greenfield Wind Farm Project in Gujarat, India
42 INOX make WT2000DF/113, 2.0 MW WTGs
Sun Photo Voltaic Energy India Private Limited/ L&T Infrastructure Finance Company
78 MW Wind Power Project in Karnataka, India
26 Acciona make 3 MW WTGs
Mytrah Vayu (Indravati) Pvt. Ltd. / Yes Bank
155.4 MW wind operational projects in Andhra Pradesh and Rajasthan, India
74 Suzlon make S-97 90m -2.1 MW WTGs
ReNew Power Ventures Pvt. Limited / Yes bank
50 MW Amba-1 Project, Madhya Pradesh, India
25 Gamesa make G114 - 2.0MW WTGs
Green Infra Wind Solutions Limited/ PTC India Financial Services Ltd
49.5 MW Wind Power Project in Andhra Pradesh, India
33 Regen Vensys 87 1.5 MW WTGs
Renew Power Venture Pvt. Ltd/ Kotak Mahindra Bank
80 MW Wind project in Sadla, Gujarat, India
40 INOX make WT2000DF/113, 2.0 MW WTGs
Mytrah Vayu (Godavari) Pvt Ltd/ L&T Infrastructure Finance Company
100.8 MW Wind Power Project, Telangana, India
47 Suzlon make S11X, 2.10 MW WTGs 1 Suzlon make S97, 2.10 MW WTGs
Axis Wind Farms (Anantapur) Private Limited / L&T Infrastructure Finance Company
105 MW Wind Power Project at Anantapur, AP
21 Suzlon make S11X, 2.10 MW WTGs
9
Experience Profile
CUSTOMER PROJECT DETAILS NO. OF WTG, MAKE & CAPACITY
Hero Future Energies Pvt. Limited/ Kotak Mahindra Bank
120MW Wind Project in Andhra Pradesh, India
60 Gamesa make G114 2 MW WTGs
ReNew Wind Energy (Rajasthan) Private Limited/ L&T Infrastructure Finance Company
18 MW Wind Power Project in M.P. , India
12 Regen VENSYS 87 1.5 MW WTGs
Fujin Wind Parks Pvt. Ltd/ Tata Cleantech Capital Limited
46 MW wind power project at Kadapa, Andhra Pradesh, India
20 GE make 2.3MW WTGs
Helios Infratech Pvt Ltd/ IndusInd Bank Limited
100.8MW wind power project in Andhra Pradesh, India
48 Suzlon make S97, 2.10 MW WTGs
Narmada Wind Energy Pvt. Ltd.
50MW wind power project in Gujarat, India
25 Gamesa make G97, 2.0 MW WTGs
Mytrah Vayu (Tungabhadra) Pvt. Ltd./ IDFC Bank Ltd
148.9 MW wind power project at Aspiri, Kurnool, Andhra Pradesh, India
47 GE make 1.7MW WTGs 30 GE make 2.3MW WTGs
Renew Wind Energy (Sipla) Private Limited/ Asian Development Bank
110MW wind power project in Karnataka, India
25 Suzlon make S97, 2.10 MW WTGs 30 Gamesa make G97 , 2.0 MW WTGs
Renew Wind Energy (Shivpur) Private Limited Axis Bank, India
44.1MW wind power project in Andhra Pradesh, India
21 Suzlon make S97, 2.10 MW WTGs
Saipuram Wind Energies Pvt. Ltd. (Greenko Group), India/IDFC Bank
199 MW wind in Andhra Pradesh, India
50 Suzlon make S97, 2.10 MW WTGs 47 Gamesa make G114 , 2.0 MW WTGs
Green Infra Wind Power Generation Co. Ltd., India
84 MW Wind farm in Karnataka , India
42 Gamesa make G114, 2.0 MW WTGs
Devarahipparigi Wind Power Private Ltd /IL&FS, India
100 MW Wind Power project in Karnataka, India
50 Gamesa make G114, 2.0 MW WTGs
10
Experience Profile
CUSTOMER PROJECT DETAILS NO. OF WTG, MAKE & CAPACITY
Axis Wind Farms (MPR Dam) Pvt. Ltd / Yes Bank Ltd., India
100 MW Wind Power project in Andhra Pradesh, India
50 Gamesa make G114, 2.0 MW WTGs
PTC India Financial Services, India / Ushdev International Limited
25.6 MW Wind Power project in Karnataka, India
32 Wind World make WW53, 800 kW WTGs
ReNew Power / IL&FS Financial Services
44.1 MW wind power project, Andhra Pradesh, India
21 Suzlon make S97, 2.10 MW WTGs
Mytrah Vayu / L&T Infrastructure Finance, India
101.4 MW Wind Power Project in Andhra Pradesh, India
30 GE make, 1.7 MW WTGs 24 Suzlon make S97, 2.10 MW WTGs
Energon / L&T Infrastructure Finance, India
108 MW Wind Power Project in Madhya Pradesh, India
54 Gamesa make G97, 2.0 MW WTGs
ReNew Power /L&T Infrastructure Finance, India
23.1 MW Wind Power Project at Welturi, Maharashtra, India
11 Suzlon make S97, 2.10 MW WTGs
Mytrah Energy / State Bank of India
10.4 MW Burgula Ext Wind Power Project in Andhra Pradesh, India
13 Wind World make WW53, 800 kW WTGs
NSL Renewable/L&T Infrastructure Finance, India
34.5 MW & 37.5 MW Wind Power Projects at Satara, Maharashtra, India
48 REGEN make VENSYS 87, 1.5 MW WTGs
Greenko Group / L&T Infrastructure Finance, India
34 MW Wind Power Project at Bijapur, Karnataka, India
17 Gamesa make G97, 2.0 MW WTGs
ZR Renewable Energy/ PTC India Financial Services
16 MW Wind Power Project at Ananthapur, Andhra Pradesh, India
8 Inox make WT2000DF93/80, 2.0 MW WTGs
Lalpur Wind Energy Private Limited
Technical Consultancy Services for 38.4 Wind Power Project in Rajasthan, India
Enercon India make E-53, 800 kW WTGs
Sun Edison / L&T Infrastructure Finance, India
2x24 MW Wind Power Project at Andhra Pradesh, India
24 Gamesa make G97, 2.0 MW WTGs
11
Experience Profile
CUSTOMER PROJECT DETAILS NO. OF WTG, MAKE & CAPACITY
Energon Soleq India/ L&T Infrastructure Finance, India
50 MW Wind Power Project at Patan, Gujarat, India
25 Gamesa make G97, 2.0 MW WTGs
Mytrah Vayu (Godavari)/ IDFC, India
98.7 MW Wind Power Project at Nazeerabad, Telangana, India
47 Suzlon make S97, 2.10 MW WTGs
Bothe Windfarm Development Pvt. Ltd. /Yes Bank, India
199.7 MW Wind based Power Project at Satara, Maharashtra, India
40 Vestas make V-100, 2.0 MW WTGs 57 Suzlon make S-97, 2.1 MW WTGs
Vyshali Energy (Greenko Group)/ Axis Bank, India
100 MW Wind Power Project at Bijapur, Karnataka, India
50 Gamesa make G97, 2.0 MW WTGs
Mytrah Vayu (Gujarat)/ Bank of Maharashtra, India
50.4 MW Wind Power Project at Anjanadi, Maharashtra, India
24 Suzlon make S97, 2.10 MW WTGs
Renew Wind Energy (Rajasthan) Private Limited / L&T Infrastructure Finance, India
30 MW Wind Power Project at Sangli, Maharashtra, India
20 REGEN make VENSYS 87, 1.5 MW WTGs
Renew Wind Energy (Rajkot) Private Ltd / L&T Infrastructure Finance, India
45 MW Wind Power Project at Vaspet, Maharashtra, India
30 REGEN make VENSYS 87, 1.5 MW WTGs
Animala Wind Power (Greenko Group) /L&T Infrastructure Finance, India
60 MW Wind Power Project at Kadapa, Andhra Pradesh, India
30 Gamesa make G97, 2.0 MW WTGs
Renew Wind Energy (Karnataka) Pvt Ltd / L&T Infrastructure Finance, India
40 MW Wind Power Project at Jogihali, Karnataka, India
50 Wind World make WW 53, 800 kW WTGs
Energon MP Wind Power / L&T Infrastructure Finance, India
26 MW Wind Power Project at Madhya Pradesh, India
13 Gamesa make G97, 2.0 MW WTGs
Energon Soleq Power Resources /L&T Infrastructure Finance, India
100 MW Wind Power Project at AP, India
50 Gamesa make G97, 2.0 MW WTGs
Continuum Energy (IFC Funded Project)
170 MW Wind Power Project at Ratlam, MP (2 sites, DJEPL & UUPPL) , India
85 Inox make WT2000DF100, 2.0 MW WTGs
12
Experience Profile
CUSTOMER PROJECT DETAILS NO. OF WTG, MAKE & CAPACITY
Rayalaseema Wind Energy (Greenko Group) /Tata Cleantech Capital, India
10 MW Wind Power Project of at Anantapur, Andhra Pradesh, India
5 Gamesa make G97, 2.0 MW WTGs
Tanot Wind (Greenko Group) / IL&FS Financial Services , India
Phase-I (60 MW) of the 120 MW Wind Power Project near Jaisalmer, Rajasthan, India
30 Gamesa make G97, 2.0 MW WTGs
Welspun Energy / State Bank of India
126 MW Wind Power Project at Pratapgarh, Rajasthan, India
40 GE make XLE, 1.6 MW WTGs & 31 Gamesa make G97, 2.0 MW WTGs
ReNew Power/ PTC India Financial Services, India
50.4 MW Wind Power Project at Jaisalmer, Rajasthan
63 Wind World make WW-53, 800 kW WTGs
Clean Wind Power (Hero Group)/ State Bank of India
74 MW Wind Power Project at Sangli, Maharashtra, India
37 Inox Wind make WT 2000 DF, 2.0 MW WTGs
Mytrah Energy / State Bank of India
137.7 MW wind power project in Karnataka and Andhra Pradesh, India
162 Gamesa make G58, 850 kW WTGs
PTC India Financial Services, India
34.50 MW (Tulip Renewable) and 35.20 MW (Orchid Renewable) Wind Power Projects in Tamil Nadu, India
23 Suzlon make S82 WTGs of various capacities
Mangalore Energies (Greenko Group)/ IL&FS Financial Services , India
15 MW Wind Power Project at Bijapur, Karnataka, India
10 REGEN make VENSYS 87, 1.5 MW WTGs
Rayala Wind Power (Greenko Group)/ IDFC, India
50 MW Wind Power Project at Anantapur, Andhra Pradesh, India
25 Gamesa make G97, 2.0 MW WTGs
Tata Power Renewable Energy / State Bank of India
32 MW Wind Power Project at Satara, Maharashtra, India
16 Kenersys make K- 82, 2.0 MW WTGs
ReNew Power (AP) /State Bank of India
18 MW Wind Power Project at Chikodi, Belgaum, Karnataka
9 Gamesa make G97, 2.0 MW WTGs
13
Experience Profile
CUSTOMER PROJECT DETAILS NO. OF WTG, MAKE & CAPACITY
ReNew Power / Yes Bank, India
50.4 MW wind project of, at Tadas Karnataka, India
63 Enercon make E-53, 800 kW WTGs
ReNew Power / PTC India Financial Services, India
28 MW Wind Power Project of at Satara, Maharashtra
14 Kenersys make K- 82, 2.0 MW WTGs
ReNew Energy / L&T Infrastructure Finance, India
50.4 MW Wind Energy Project of at Beed, Maharashtra, India
24 Suzlon make S-97, 2.1 MW WTGs
Bothe Windfarm Development/ State Bank of India
199.7 MW Wind Power project in Satara, Maharashtra, India
40 Vestas make V-100, 2.0 MW WTGs
57 Suzlon make S-97, 2.1 MW WTGs
Rayala Wind power (Greenko Group)/ IDFC, India
101.2 MW Wind Power Project in Anantapur, AP, India
32 GE make 1.6xle, 1.6 MW WTGs
25 Gamesa G-97, 2.0 MW WTGs
Fortune Five Hydel Projects Private Limited (Greenko Group)/ Oriental Bank of Commerce, India
101.2 MW Wind Power Project in Bijapur, Karnataka, India
32 GE make 1.6xle 1.6 MW WTGs
25 Gamesa G-97, 2.0 MW WTGs
Ratnagiri Wind Power Projects(Greenko Group)/ IDFC, India
65.6 MW Wind farm power project of in Satara district, Maharashtra, India
41 GE make 1.6xle, 1.6 MW WTGs
AES Saurashtra /IDFC, India 39.2 MW Wind farm power project at Gujarat, India
49 Enercon India make E-53, 800 kW WTGs
14
Experience Profile
CONSULTANCY SERVICES
CUSTOMER PROJECT DETAILS NO. OF WTG & MAKE, CAPACITY
State Bank of India Consultancy Services for conducting TEV Study for Suzlon Energy Limited-The Group
-
Continuum Wind Energy/Watsun Infrabuild Private Limited
TEV/DD Report for re-finance purpose for 150 MW wind power project in Tamil Nadu, India
-
ReNew Wind Energy (Rajasthan One) Private Limited /Catalyst Trusteeship Limited
Technical Due Diligence for 40 MW operational Wind Power Project, Madhya Pradesh, India
20 INOX make WT2000DF, 2.0 MW WTGs
Narmada Wind Energy Private Limited /Catalyst Trusteeship Limited
Technical Due Diligence for 50 MW operational Wind Power Project, Gujarat, India
25 Gamesa G97 2.0MW WTGs
Narmada Wind Energy Private Limited /Catalyst Trusteeship Limited
Technical Due Diligence for 8 MW operational Wind Power Project, Madhya Pradesh, India
4 Gamesa G97 2.0MW WTGs
IL&FS, India
Due Diligence for 10 Wind farm Projects located in Rajasthan, Gujarat, Maharashtra, Madhya Pradesh, Tamil Nadu and Andhra Pradesh
Enercon India make E-53, 800 kW WTGs
International Finance Corporation, USA
Creating Power evacuation systems of proposed 587 MW wind energy projects by Enercon India to be installed in Karnataka and Rajasthan, India
Enercon India make E-53, 800 kW WTGs
Lalpur Wind Energy Private Limited
Technical Consultancy Services for 38.4 Wind Power Project in Rajasthan
Enercon India make E-53, 800 kW WTGs
15
Experience Profile
SOLAR/BIOMASS ENERGY PROJECTS
DETAILED ENGINEERING SERVICES
CUSTOMER PROJECT DETAILS
Pan India Infraprojects Private Limited (Essel Saurya Urja Company of Rajasthan Limited)
750 MW Rajasthan under construction solar park for BOP systems (Utility Area, Water supply project & distribution package), Rajasthan, India
SOLAIREDIRECT GLOBAL OPERATIONS SA, KSA
NADEC 30 MW Solar PV Plant, Kingdom of Saudi Arabia
Tata Power Solar Systems Limited 100 MW GIPCL (Raghanesda Ultra Mega Solar Park) Solar Power Project, Gujarat, India (Civil Works)
OWNER’S ENGINEERING SERVICES
CUSTOMER PROJECT DETAILS
GS Engineering & Construction Corp.
Owner’s Engineering services for Zakarpattia -1 & 2 PV Solar IPP Projects, Ukraine
Dynasty Oil & Gas Private Limited Owner’s Engineering services for 10 MW Solar PV project in Afghanistan
JAGUAR OVERSEAS LIMITED Owner’s Engineering services for 20 MW Solar PV project in Maharashtra, India
Photon Sunbeam Pvt. Ltd.(Photon Surya Group)
Owner’s Engineering services for 50 MW Solar PV project in Punjab, India
AGV Solar Power Project Pvt Ltd Owner’s Engineer services for 2 MW canal based solar PV project
16
Experience Profile
PROJECT MANAGEMENT SERVICES
CUSTOMER PROJECT DETAILS
Azure Power Forty Three Private Limited / L&T Infrastructure Finance Company, India
PMC Services for 600 MW under construction Solar Power Project, Rajasthan
Mytrah Aakash Power Private Limited
PMC for 50 MW (66.12 MW DC) operational solar project, Nalgonda, India
REC Limited, India PMA Services for 300 MW Solar PV Project, Rajasthan (ACME Dhaulpur Powertech Private Limited)
L&T Infrastructure Finance Company
PMC Services for 100 MW Solar PV Project, Tamil Nadu (Tirunveli Solar Project Private Limited (Rays Power))
Pan India Infraprojects Private Limited (Essel Infra) / L&T Infrastructure Finance Company
PMC services for 40 MW UP Koraun Urja Pvt. Ltd Solar PV Project, Uttar Pradesh, India
Pan India Infraprojects Private Limited (Essel Infra)
PMC services for 40 MW Mehrauni 1 Solar Project, Uttar Pradesh, India
Pan India Infraprojects Private Limited (Essel Infra)
PMC services for under construction 40MW and 20MW Solar PV projects, Maharashtra, India
SEI Aditi Power Pvt Ltd (SunEdison Group) / L&T Infrastructure Finance Company
PMC Services for 60 MW solar project of Ltd in Karnataka, India
17
Experience Profile
LENDER’S ENGINEERING SERVICES
CUSTOMER PROJECT DETAILS
Ostro Renewables Private Limited (Renew Gp) / Guarantco Ltd, UK
20 MW operational solar project (Shreyas Solarfarms Limited), Rajasthan
10 MW operational solar project (Aalok Solarfarms Limited), Rajasthan
10 MW operational solar project (Abha Solarfarms Limited), Rajasthan
20 MW operational solar project (Heramba Renewables Limited), Rajasthan
Azure Power Forty One Pvt. Ltd. / Export Development Canada (EDC), Société Générale (SocGen), France & MUFG Bank Limited, Japan
300 MW Under Construction Solar PV Project at Bhadla, Rajasthan, India
Electro Solaire Private Limited (Engie Gp.)
200 MW Solar Project of GUVNL Raghanesda, Gujarat, India
Avaada Sunrise Energy Pvt. Ltd. / State Bank of India
300 MW under construction Solar PV Project in Sundernagar, Gujarat, India
GSBPL-GUJARAT-PROJECTS/Adani Green
250 MW GUVNL under construction Solar Project, Kutch, Gujarat
Mahindra Susten Pvt. Ltd./HDFC Bank
60 MW AC operational Solar project in Rajasthan, India
Confidential 60 MW Under Construction Solar Plant, Bangladesh
Azure Power Forty Three Private Limited / L&T Infrastructure Finance Company
600 MW Under Construction Solar Power Plant in Rajasthan, India
18
Experience Profile
CUSTOMER PROJECT DETAILS
Cleansolar Renewable Energy Pvt. Ltd. / HDFC Bank 30 MW (AC) operational solar project
SEI Ravikiran Energy Private Limited/ L&T Infra Debt Fund Limited
30 MW solar under construction Project in Madhya Pradesh, India
SEI Solarvana Power Private Limited/ L&T Infra Debt Fund Limited
30 MW solar under construction Project in Madhya Pradesh, India
SEI Renewable Energy Private Limited/ L&T Infra Debt Fund Limited
30 MW solar under construction Project in Madhya Pradesh, India
SEI Sooraj Renewable Energy Private Limited/ L&T Infra Debt Fund Limited
30 MW solar under construction Project in Madhya Pradesh, India
SEI Jyotiswaroop Power Private Limited/ L&T Infra Debt Fund Limited
30 MW under construction solar Project in Madhya Pradesh, India
SEI SUNSHINE POWER PRIVATE LIMITED/ L&T Infra Debt Fund Limited
30 MW s under construction solar Project in Madhya Pradesh, India
Azure Power Forty Private Limited / REC, India
PMA Services for 90MW Solar Power Project in Assam
Mytrah Aakash Power Private Limited / L&T Infra Debt Fund Limited
66.12 MW DC Solar Project in Andhra Pradesh, India
19
Experience Profile
CUSTOMER PROJECT DETAILS
Clean Solar Power (Jodhpur) Private Limited/ Hero Future Energies Private Limited/IFC
250 MW under construction solar power project, Rajasthan, India
Shapoorji Pallonji Infrastructure Capital Company / L&T Infra Debt Fund Limited
100 MW (BoP) operational Solar PV Project, Telangana, India
Renew Solar Power Pvt. Ltd. / REC, India
250 MW under construction solar power project, Rajasthan, India
Shapoorji Pallonji Infrastructure Capital Company / L&T Infra Debt Fund Limited
34 MW (BoP) operational Solar PV Project, Telangana, India
Shapoorji Pallonji Infrastructure Capital Company / L&T Infra Debt Fund Limited
50 MW (BoP) operational Solar PV Project, Rajasthan, India
Watsun Infrabuild Private Limited/ State Bank of India 77 MW Solar Project, Tamil Nadu, India
Sprng Agnitra Private Limited/ L&T Infrastructure Finance Company
250 MW under construction Solar Power Project at Ananthapuram Ultra Mega Solar Park (AUMSP), Andhra Pradesh, India
ReNew Group (Ostro Assets)/ Yes Bank
50 MW operational Solar Power Project in Telengana, India (Prathamesh Solarfarms Limited)
Tirunveli Solar Project Private Limited/ L&T Infrastructure Finance Company
100 MW solar Power Project in Tamil Nadu, India
Universal Saur Urja Pvt. Ltd. (Sindicatum Gp.)/ L&T Infrastructure Finance Company
30 MW each operational solar PV projects in Rajasthan and Uttar Pradesh, India
20
Experience Profile
CUSTOMER PROJECT DETAILS
Adyah Solar Energy Private Limited (ReNew Energy)/ L&T Infrastructure Finance Company
300 MW Solar Projects at Pavagada Solar Park, Karnataka, India
Prathamesh Solarfarms Limited(ReNew Gp)/Yes Bank
50 MW Operational Solar Power Project in Telengana, India
L&T IDFC/Axis Bank / Greenko Gp. 89 MW AC (102.15 MW DC) solar PV project BOP assessment, Telangana & Andhra Pradesh, India
Azure Power Forty Four Pvt Ltd/ State Bank of India
26MW Rooftop Solar Power Project for Indian Railways, India
Lexicon Vanijya Private limited (ReNew Wind Energy) /Catalyst Trusteeship Limited
10MW Solar PV Project in Rajasthan, India
Sungold Energy Private Limited (ReNew Wind Energy) /Catalyst Trusteeship Limited
5MW Solar PV Project in Rajasthan, India
Star Solar Power Private Limited (ReNew Wind Energy) /Catalyst Trusteeship Limited
5MW Solar PV Project in Rajasthan, India
Symphony Vyapaar Private Limited (ReNew Wind Energy) /Catalyst Trusteeship Limited
10MW Solar PV Project, Rajasthan, India
Vishvarupa Solar Power Limited (Greenko group)
10MW Solar Under-Const. Project, Telangana, India
Clean Max Power Projects Private Limited/ L&T Infrastructure Finance Company
30 MW operational solar PV project, Tamil Nadu, India
Refex Energy Limited/IndusInd Bank 50 MW Solar Power plant, South India
Today Green Energy Pvt. Ltd/ IndusInd Bank Limited 50 MW Solar Power plant in Rajasthan, India
21
Experience Profile
CUSTOMER PROJECT DETAILS
Pan India Infraprojects Private Limited, India/ L&T Infrastructure Finance Company
40 MW Solar PV Project in Odisha, India
Asian Hotels West Limited/ PTC India Financial Services Limited, India
1MW Solar PV Project, Maharashtra, India
Dakshin Odisha Urja Private Limited/Vento Power & Energy Limited (Essel infra Group) / L&T Infrastructure Finance Company
Lender Independent Engineer and PMC Services for 2x40MW Solar Project, Odisha, India
KVK Bio Energy Pvt. Ltd./L&T Infrastructure Finance Company Limited
15 MW Operational Biomass Plant, Chhattisgarh, India
Sadipali Solar Private Limited (IBC Solar group)/ L&T Infrastructure Finance Company
20 MW solar PV, Odisha, India
OPG Energy Pvt. Ltd./ L&T Infrastructure Finance Company 5 MW Operational Project, Rajasthan, India
Swiss Park Vanijya Pvt. Ltd/ L&T Infrastructure Finance Company
5 MW Operational Solar PV Project , Rajasthan, India
Clean Solar Power (Tumkur) Private Limited/ Adiyta Birla Finance
9x20MW Solar PV Project, Karnataka, India
Fermi Solarfarms Pvt Ltd. (Canadian Solar)/ L&T Infrastructure Finance Company
80 MW (AC) Solar PV Power Project, Maharashtra, India
UP Sarila Urja Pvt. Ltd. (Essel Infra Group)/ L&T Infrastructure Finance Company
40MW Solar PV project , Uttar Pradesh, India
MH Parbhani Power Pvt. Ltd. (Essel Infra Group)/ L&T Infrastructure Finance Company
40 MW Solar PV Project , Maharashtra, India
22
Experience Profile
CUSTOMER PROJECT DETAILS
Flexirural Urja Jalgaon Ltd. (Essel Infra Group)/ L&T Infrastructure Finance Company
20 MW Solar PV Project , Maharashtra, India
Energon Soleq Ravi India Power Resources Private Limited/ L&T Infrastructure Finance Company
100MW Solar PV Project BOP, Karnataka, India
Yarrow Infrastructure Private Limited (RattanIndia Solar Group)/ L&T Infrastructure Finance Company
50 MW Solar PV Project in Karnataka, India
Vishvarupa Solar Power Limited (Greenko Group)/Yes Bank
10 MW Solar Under-Const. Project ,Telangana, India
Achintya Solar Power Limited (Greenko Group)/Yes Bank
20 MW Solar Under-Const. Project, Telangana, India
Grinibhrit Solar Power Limited (Greenko Group)/Yes Bank
10 MW Solar Under-Const. Project, Telangana, India
Suvarchas Solar Power Limited (Greenko Group)/Yes Bank
10 MW Solar Under-Const. Project, Telangana, India
UP Koraun Urja Pvt. Ltd.(Essel Group)/ L&T Infrastructure Finance Company
40 MW Solar PV Project, Uttar Pradesh, India
UP Mehrauni I (Essel Group)/ L&T Infrastructure Finance Company 40 MW Solar PV Project, Uttar Pradesh, India
UP Mehrauni II (Essel Group)/ L&T Infrastructure Finance Company 40MW Solar PV Project, Uttar Pradesh, India
Krishna Windfarms Developers Private Limited/ L&T Infrastructure Finance Company
10MW Solar PV Project, Maharashtra, India
Arinsun Clean Energy Private Limited (Sprng Energy group) / IFC
250 MW Solar PV Plant in Rewa, Madhya Pradesh, India
23
Experience Profile
CUSTOMER PROJECT DETAILS
IDFC Alternatives Limited/ IndusInd Bank & L&T Infra Debt Fund Limited
Balance of Plant assessment for Solar Assets of 190 MW Capacity across 7 locations in Telangana & AP, India
Saurya Urja Company of Rajasthan Limited (SUCRL)/ State Bank of India Project Finance SBU
1000 MW Solar Park in Rajasthan, India
Greenko Group/Yes Bank 50MW Solar PV Project in Telangana, India
Clean Solar Power (Gulbarga) Private Limited (Hero Futures Energies group)/ L&T Infrastructure Finance Company
200MW Solar PV Project in Karnataka, India
SEI Arushi Pvt. Ltd.(Greenko Group)/ L&T Infrastructure Finance Company
30 MW (AC) Solar Power Project in AP, India
Rain Coke Limited / L&T Infrastructure Finance Company 22MW (AC) Solar Power Project in AP, India
SEI Green Flash Pvt Ltd. (Greenko Group)/ L&T Infrastructure Finance Company
30 MW AC Solar Power project in AP, India
Haridwar Solar Projects Pvt. Ltd/ IndusInd bank 20MW Solar Project in Uttarakhand, India
Bhagwanpur Solar Projects Pvt. Ltd/ IndusInd Bank 5MW Solar Project in Uttarakhand, India
Bindookhadak Solar Projects Pvt. Ltd / IndusInd Bank 5MW Solar Project in Uttarakhand, India
Jilesh Power Pvt. Ltd. (Greenko Group)/ PTC India Financial Services Ltd
45 MW Solar Project in Telangana, India
RattanIndia Solar 2 Private Limited/ PTC India Financial Services Ltd
50MW Solar PV Project in UP, India
24
Experience Profile
CUSTOMER PROJECT DETAILS
Yarrow Infrastructure Private Limited (RattanIndia Solar Group)/ PTC India Financial Services Ltd
70MW Solar PV Project in Rajasthan, India
Adani Green Energy (UP) Limited/ L&T Infrastructure Finance Company
240MW Solar PV Project in Karnataka, India
NVR Mahasolar Pvt. Ltd. (Atha Group)/ PTC India Financial Services Limited
50MW Solar PV Project in Maharashtra, India
Pan India Infra projects Private Limited (Essel Group)/ L&T Infrastructure Finance Company
65 MW Solar Power Projects in Karnataka, India
Enviro Solaire Pvt. Ltd. (Solairedirect Group)/ L&T Infrastructure Finance Company
75MW Solar Power Project in UP, India
Ballupur Solar Power Projects Pvt. Ltd/ Indusind Bank Limited 10MW Solar Project in Uttarakhand, India
Shakumbhari Solar Power Projects Pvt. Ltd / Indusind Bank Limited 10MW Solar PV Project at Uttarakhand, India
Chudiala Solar Power Projects Pvt. Ltd / Indusind Bank Limited 10MW Solar Project in Uttarakhand, India
Energon Soleq India Power Resources/ L&T Infrastructure Finance Company
100 MW Solar Plant in Telengana , India
Ostro Energy Private Limited/ L&T Infrastructure Finance Company 50MW Solar PV Project in Telengana, India
Azure Power India Pvt. Ltd. / IL&FS Financial Services
100MW Solar PV Project in Andhra Pradesh, India
PTC India Financial Services Limited 51 MW Solar Project in Madhya Pradesh, India
Azure Power India Pvt. Ltd/L&T Infrastructure Finance Company
Balance of Plants for 28 MW Solar Project, Punjab , India
25
Experience Profile
CUSTOMER PROJECT DETAILS
Sai Maithili (KSK group)/ L&T Infrastructure Finance, India
10 MW Operational Solar Power Plant, Rajasthan , India
Green Urja Pvt. Ltd./PTC India Financial Services Limited 30MW Solar PV project, Uttar Pradesh, India
Earth Solar Power Pvt. Ltd./ PTC India Financial Services, India 5 MW Solar PV Power Project , Telangana, India
Rain Coke Limited / L&T Infrastructure Finance Company 22 MW Solar PV Project, Andhra Pradesh, India
Sun Edison / L&T Infrastructure Finance, India 30 MW Solar PV Project, Andhra Pradesh, India
Bhoruka Power/ L&T Infrastructure Finance, India 20 MW Solar PV Project , Karnataka, India
Sun Edison / L&T Infrastructure Finance, India 50 MW Solar Power Project, Tamil Nadu, India
Shining Sun Power/ PTC India Financial Services, India 10 MW Solar PV Project, Telangana, India
Purshotam Rays Power / PTC India Financial Services, India
7 MW Solar Rooftop Project at DMRC in Delhi, India
ACME group/ PTC India Financial Services, India 25 MW Solar PV Project in Bihar, India
Welspun Energy / Bank of Baroda, India
200 MW Solar PV Project at Panchampatti, Iyyermalai & Kayathar sites in Tamil Nadu, India
Sun Edison/ L&T Infrastructure Finance, India 2x30 MW Solar PV Projects at Karnataka, India
Crescent Power / ICICI Bank, India 15 MW Solar PV project , Tamil Nadu, India
L&T Infrastructure Finance, India Power evacuation system of 2x10 MW Solar PV Projects, Andhra Pradesh, India
Welspun Energy / State Bank of India 100 MW Solar PV Project, Tamil Nadu, India
Focal Group / L&T Infrastructure Finance, India
2x10 MW Solar PV Projects, Madhya Pradesh, India
26
Experience Profile
CUSTOMER PROJECT DETAILS
Hanjer Green Power / L&T Infrastructure Finance, India
15 MW RDF (Residual Derived fuel) based Power Plant , Gujarat, India,
CONSULTANCY SERVICES
CUSTOMER PROJECT DETAILS
Cargo Solar Power (Gujarat) Private Limited
Feasibility report for 25MW CSP project with 9Hrs of Thermal Storage , Kutch ,Gujarat
Dakshin Odisha Urja Private Limited/ L&T Financial Services
Design of drainage system for 40 MW Padampur Solar PV Plant, Orissa
Vento Power & Energy Limited/ L&T Financial Services
Design of drainage system for 40 MW Kesinga-1 Solar PV plant, Orissa
HDFC Bank Assessment of the PVsyst report for 145 MW Sirsa and 75 MW Bhiwani Solar PV projects (Ananth Solar Power Maharashtra Private Limited (Amplus Solar))
Fermi Solarfarms Pvt Ltd. BOP Due Diligence for 80MW operational solar project, Maharashtra
GS Engineering & Construction Corp. Technical Training Program on Solar PV Projects
Redan Infrastructure Private Limited/ L&T Financial Services
Due Diligence Services for Industrial Waste based Power Plant, India
Saurya Urja Company of Rajasthan Limited
Technical audit for 500 MW (RHS) of 1000 MW Bhadla - III Solar Park, Rajasthan, India
Alghanim International General Trading & Contracting Co. WLL
Consultancy services for Evaluation report of Solar PV manufacturers
Seamless Energy International Bankable DPR for Solar PV Project in Ghana
Alghanim International General Trading & Contracting Co. WLL
Pre-Bid Engineering Support for 1500 MW Al-Dibdibah Solar Project for KNPC, Kuwait
27
Experience Profile
CUSTOMER PROJECT DETAILS
Phelan Energy Group Limited, India
Pre-Bid Engineering Support for 100MW Solar PV Project, Bahrain
Phelan Energy Group Limited, India
Pre-Bid Engineering Support for 30MW Solar PV Project, KSA
Saurya Urja Company of Rajasthan Limited (SUCRL) Independent verification for 500 MW Solar Park
Dynasty Oil & Gas Pvt. Ltd., India
Preparation of EPC Specifications for 10 MW (AC) Solar power plant, Afghanistan
TEP Solar (India) Clean Energy Partners LLC
Energy Yield Assessment for 25 MW Solar PV Project, Chandrak Solar Park, Gujarat, India
Alghanim International General Trading & Contracting Co. WLL
Engineering Support for 1.2 MW Solar Carport PV project for KISR
Harsha Abakus Solar Pvt. Ltd.
Power System Study for Roof Top Solar Project at IOCL Panipat
Cargo Solar Power (Gujarat) Pvt. Ltd. Energy Yield Assessment for 25 MW CSP Project
Sai Maithili (KSK group)/ L&T Infrastructure Finance, India
Technical Consultancy Services for 10 MW Solar Project in Rajasthan, India
Hero Future Energies Pvt. Limited, India
Energy Yield Assessment for 13 no. of Solar PV projects, India
ReNew Solar Pvt. Limited Detailed Project Report for 220 MW Solar PV projects in Karnataka
L&T Infrastructure Finance, India
Technical Due Diligence of 15 MW Biomass plant at Tirunelveli, Tamil Nadu, India
National Power Company Feasibility study for 500KW to 1MW on Roof Top Solar Project
Entegra / L&T Construction, India
Pre-bid Engineering support for 10 MW Solar Thermal Project, Rajasthan
Gujarat Power Corp., India Detailed Project Report for 200 MW Solar chimney power project in Kuchh, Gujarat
Energon Corporation – Sri Lanka
Detailed Project Report for 108 MW Solar Chimney Power Project in Rajasthan
State Bank of India Techno-economic viability consultancy for 25 MW Solar Thermal Power Project, Kutch, Gujarat, India
Brown Kraft Paper Technologies, India
Pre-Feasibility Report for 5 MW Bagasse based thermal power station at Sirkek Paper Mills
28
Experience Profile
CUSTOMER PROJECT DETAILS
International Finance Corporation, USA
Feasibility Study of the SPV Plot in Chila Bazaar Bangladesh
Panasonic India Technical Development Support Services in Renewable Energy
IT Capabilities
1
Information Technology @ L&T-Sargent & Lundy
INFORMATION SYSTEMS
At L&T-Sargent & Lundy, Information Technology (IT) plays an important role in offering value- added services to our customers. In L&T-S&L, IT infrastructure includes the latest technology for servers, workstations and communication facilities. Our in-house IT team keeps track of the latest software and products in the market and provides timely custom-made solution to the end-users.
CONCURRENT ENGINEERING
L&T-S&L is connected to the parent company Sargent & LundyLLC, Chicago through International Private Leased Circuit (IPLC) to facilitate concurrent engineering between the two offices. Concurrent Engineering is a novel concept wherein L&T-S&L design office can work together in the same projects with Sargent & Lundy at the same time with the help of distributed servers and replication. This helps project teams to overcome the geographical barriers and difference in time zones, thereby enabling round-the-clock engineering.
ENGINEERING SOFTWARE DEPLOYED
Plant Design System (PLADES) PLADES, developed by Sargent & LundyLLC, is an integrated project management, engineering and design automation system for all aspects of power plant design, analysis, optimization and 3D modeling. This system builds accuracy and completeness of information into the engineering deliverables and generates reports for project management, preliminary design, system engineering and physical design. All project information is stored in a central database to be shared by projects teams. The project database, coupled with graphic model, is also the foundation for visualization and interference resolution, which greatly enables the physical design activity. Major capabilities of PLADES are as follows: Piping & Instrumentation Diagram (P&ID) Piping Stress analysis Piping Model Equipment Model Structural Model Electrical Raceway Model Master schematics Cable Routing Interference Checking Generation of Composite drawings
2
Information Technology @ L&T-Sargent & Lundy
Benefits of PLADES: All disciplines work on single server-based platform Consistent and current plant design Central Design Database from where BOQ of all commodities are extracted 3D model which eliminates inter-discipline mismatch in physical drawings Automatic interference check
Snapshot of PLADES Capabilities
A variety of commercially available software other than PLADES are also used at L&T-S&L. Some of the major software used are:
Intergraph PDS is a commercially available application suite equivalent to PLADES. It is a comprehensive, intelligent computer aided design & engineering (CAD/CAE) application for the process & power industries. It
3
Information Technology @ L&T-Sargent & Lundy
consists of 2D & 3D modules that correspond to engineering tasks in the plant design workflow
GATECYCLE by GE performs detailed steady-state design and off-design analysis of a wide variety of energy systems in one integrated package. The software gives designers the power to model a plant's design-point operation as well as understand and predict changes in a plant's performance with changing loads, ambient conditions and equipment degradation for combined-cycle, cogeneration, conventional coal and fluidized-bed power plants. It includes complex equipment models to design and analyze more advanced cycles, including major portions of IGCC plants, nuclear steam cycles and advanced gas-turbine designs.
CAESAR is a complete pipe stress analysis software program that allow quick and accurate analysis of piping systems subjected to weight, pressure, thermal, seismic and other static and dynamic loads. The software incorporates a wide range of capabilities, from numerous piping codes, to expansion joint, valve & flange and structural data bases, to structural and buried pipe modeling, to equipment and vessel nozzle evaluation, to spectrum and time history analysis. Besides the evaluation of a piping system’s response to thermal, deadweight and pressure loads, CAESAR II analyzes the effects of wind, support settlement, seismic loads and wave loads. Nonlinear effects such as support lift off, gap closure and friction are also included. CAESAR II also selects the proper springs for supporting systems with large vertical deflections. Dynamic analysis capabilities include modal, harmonic, response spectrum and time history analysis.
ETAP or Electrical Transient Analyzer Program is a fully graphical electrical transient analyzer program used for electrical power system modeling, design, analysis, optimization, control and operation. It is used for conducting following studies:
Load flow analysis
Short circuit studies
Motor starting studies
Transient stability studies
Harmonic Analysis
SAFE – Slab Analysis by Finite Element Method is a tool for designing concrete floor and foundation systems. From framing layout all the way through to detail drawing production, SAFE integrates every aspect of the engineering design process. Slabs or foundations of any shape with edges shaped with circular and spline curves can be modeled.
With SAFE, Post-tensioning may be included in both slabs and beams to balance a percentage of the self-weight. Suspended slabs can include flat,
4
Information Technology @ L&T-Sargent & Lundy
two-way, waffle, and ribbed framing systems. Models can have columns, braces, walls, and ramps connected from the floors above and below. Walls can be modeled as either straight or curved.
STAAD – Structural Analysis and Design is comprehensive structural software that addresses all aspects of structural engineering - model development, analysis, design, verification and visualization. STAAD features state-of-the-art user interface, visualisation tools, powerful analysis and design engines with advanced finite element (FEM) and dynamic analysis capabilities.
SAP – Structural Analysis Program is a general-purpose finite element analysis program that can be used from a simple small 2D static frame analysis to a large complex 3D nonlinear dynamic analysis. Complex Models can be generated and meshed with powerful built in templates. Integrated design code features can automatically generate wind, wave, bridge, and seismic loads with comprehensive automatic steel and concrete design code checks per US, Canadian and international design standards. Advanced analytical techniques allow for step-by-step large deformation analysis, Eigen and Ritz analyses based on stiffness of nonlinear cases, catenary cable analysis, material nonlinear analysis with fiber hinges, multi-layered nonlinear shell element, buckling analysis, progressive collapse analysis, energy methods for drift control, velocity-dependent dampers, base isolators, support plasticity and nonlinear segmental construction analysis. Nonlinear analyses can be static and/or time history, with options for FNA nonlinear time history dynamic analysis and direct integration.
I-SKETCH is a pipe sketching application used for generating piping isometrics Based on ISOGEN® technology, the key features are as below:
• Enables sketching of piping systems • Generation of isometric drawings • Includes templates for production of check, fabrication, and erection-
type drawings • Insertion of gaskets, flanges, and bolts • Includes standard ANSI and DIN catalogs • Generates a variety of reports, including bills of materials, welding,
and cut pipe length lists
FRAMEWORKS is a powerful structural modeling and drawing tool with
internationally recognized steel section libraries
5
Information Technology @ L&T-Sargent & Lundy
AFT ARROW is a fluid dynamic simulation tool used to calculate pressure drop and flow distribution in gas piping and ducting systems. Designed for compressible flow systems containing:
• Steam • Compressed air • Chemical and petrochemical process gases • Natural gas transport
AFT Arrow is particularly useful for: • Pipe and Duct Sizing • Relief valve sizing and system calculations • Compressor and Fan sizing and Selection • Control Valve sizing and Selection • Simulating System operation and component interaction • Choked Flow calculations • Evaluating pipe insulation and heat transfer in pipes and heat
exchangers • Troubleshooting existing systems to determine the cause of
operational problems Auto grid Pro is a used for the analysis of the effectiveness of grounding
installations. It computes the resistance of any grounding system, earth potentials anywhere inside or outside the installation and the ground potential rise of the grid and of nearby buried metallic structures. It also computes the expected touch and step voltages around the installations, and indicate the regions where safe limits are exceeded. It accounts for complex soil structures and for the presence of transmission or distribution lines or cables connected to the grid.
Primavera Primavera by Oracle is a well-accepted tool in the project Industry capable of planning and managing projects of any size with varying levels of complexity. Projects with thousands of activities can be planned and monitored easily using this tool. It provides executives with a real-time view of the project performance and equips project participants the power and flexibility to effectively execute projects. With such kind of data management, real-time analysis and reporting becomes easier for the workforce enabling faster decision making. A very comprehensive project management toolset for the effective management of projects, it provides the ability to plan and resource multi-level projects using an enterprise project structure. The tools integrated within the package make it easier to handle and track large projects.
6
Information Technology @ L&T-Sargent & Lundy
Oracle Primavera enables users to: • Effectively resource, plan and track multiple projects within timelines. • Use shared resources and review and adjust resource loading across
multiple projects. • Plan and schedule complex projects and programmes of up to 100,000
activities. • Group projects together for easier project viewing and navigation
using Project Portfolios. • Use criteria to track potential problems with projects using the
Thresholds tool. • Add and track expenses against activities. • Add Work Products and Documents against Projects, WBS elements or
activities. • Use workload graphs to track overloads and view resource profiling
across multiple projects. • Easily import and export from Primavera and other formats. • Easily export schedules to Primavera Risk Analysis (Pertmaster) to
perform schedule and risk analysis, and feed three point estimates back into Primavera Project Management schedules.
• Perform what-if analysis and investigate alternative plans.
Integrated Business Operations and Management Information System (IBOMIS) - L&T-S&L has its own in-house developed ERP system. The Integrated Business Operations and Management Information System provides information regarding the projects, sales and resources.
Knowledge and Information Management System (KIMS) - An in-house developed tool used to capture and assimilate the tacit and explicit knowledge of the organization. It provides the Right Information to The Right person at the Right Time.
Vendor Drawing Review Record (VDRR) - An in-house developed tool to report the Vendor Drawing status.
Training management System (TMS) - An in-house developed tool to plan and monitor organizational training.
Quality management System (QMS) – A part of KIMS, this is a repository of the Quality Manual and Standard Operating procedures along with all work processes. This system also tracks the work process qualification status of employees and maintains the competency details.
Project Profiles
Project Profiles - L&T-Sargent & Lundy
1
D O ME S T I C P R O J E CT S – C O M P LETED
Name of Project: 90 MW IPCL Co-Generation Power Plant Gandhar, Gujarat, India
Owner: Indian Petrochemicals Limited, India Client: Larsen & Toubro Limited, India Capacity: 90 MW L&T-S&L’s scope: Complete Basic and Detail engineering services Configuration: Two (2) GE make & Brush (U.K.) make LM6000 Aero-
derivative Gas Turbines Generators (GTGs) Two (2) L&T make Fresh Air Fired (FAF) Heat Recovery
Steam Generators (HRSG) Key Technical Features: GTGs of capacity 45.03 MW output each with water
injection at site design conditions HRSG of Deltak (U.S.A.) design with supplementary
/auxiliary firing with integral deaerator & Induced Draft fan. The steam is generated at two pressure levels viz. High Pressure (HP) steam for export to IPCL & Low Pressure (LP) steam for Vapour Absorption Chiller units.
Fuel : The primary fuel for the Gas Turbines is Naphtha with HSD as the startup fuel.
HRSG is designed to fire Naphtha under supplementary / auxiliary firing mode
Both GTG and HRSG firing system have been modified for Natural gas as primary fuel
Year of commissioning: 1999
Project Profiles - L&T-Sargent & Lundy
2
Name of Project: 116 MW Haldia Combined Cycle Co-Generation Power Plant, Haldia, West Bengal, India
Owner: HPL Cogeneration Ltd., Haldia, India Client: Larsen & Toubro Limited, India Capacity: 116 MW L&T-S&L’s scope: Complete Basic and Detail engineering services Configuration: Two (2) Frame 6551B EGT make Gas Turbine
Generators (GTGs) One (1) ABB make Condensing Steam Turbine
Generator (CSTG) One (1) ABB make Steam Turbine Generator (BPSTG) Two (2) L&T make Heat Recovery Steam Generators
(HRSG) Two (2) Mitsui make Auxiliary Boilers
Key Technical Features: GTG of capacity 35.5 MW each with steam injection at site design conditions
Condensing STG of capacity 33 MW each Back Pressure STG of capacity 16 MW each maximum
output with one internally controlled extraction and one externally controlled extraction
HRSG with duct firing with steam generation at two pressure levels
Auxiliary Boilers of capacity 120 TPH each at SHP steam pressure and temperature
Fuel : Gas turbines are primarily fired with Naphtha. HSD is used for startup and shutdown
HRSG at exhaust of each GT is provided with supplementary firing with naphtha and fuel gas
Auxiliary Boilers are fired with naphtha, fuel gas and cracked liquid fuel
Year of commissioning: 2000
Project Profiles - L&T-Sargent & Lundy
3
Name of Project: 50 MW CCPP Pipavav Power Plant, Kovaya, Gujarat, India
Owner/Client: Gujarat Cement Works, Pipavav, India
Capacity: 50 MW L&T-S&L’s scope: Complete Basic and Detail engineering services Configuration: One (1) EGT make Frame 6B Gas Turbine Generator
(GTG) of 35 MW capacity One (1) L&T make Heat Recovery Steam Generator
(HRSG) One (1) Alstom make Steam Turbine Generator (STG)
of 18.5 MW capacity Fuel : Gas turbines are primarily fired with Naphtha. HSD is
used for startup and shutdown HRSG at exhaust of GTG is provided with provision for
auxiliary firing with naphtha when the GTG is down Year of commissioning: 2000
Project Profiles - L&T-Sargent & Lundy
4
Name of Project: 220 MW CCPP Tanir Bavi Barge Mounted Power Plant , Tanir Bavi, Mangalore, Karnataka, India
Owner: Tanir Bavi Power Limited, India Client: Sargent & Lundy, USA Capacity: 220 MW L&T-S&L’s scope: Owner’s engineering services for on-shore and off-shore
facilities Configuration: Four (4) IHI- Japan make LM6000PC Gas Turbine
Generators (GTGs) Four (4) Heat Recovery Steam Generators (HRSGs)
supplied by Innovative Steam Technologies Ltd., Canada One (1) Steam Turbine Generator (STG) supplied by ABB
ENS make, Czech Republic
Key Technical Features:
GTGs using water injection for NOx control HRSGs were dual pressure type once through STG was condensing non-reheat type Fuel supply connection, controls, electrical switchgear,
inlet air chilling equipment, black start diesel generator and transformers
Fuel : Naphtha as primary fuel and high speed diesel oil as start-up & shutdown fuel
Year of commissioning:
2001
Project Profiles - L&T-Sargent & Lundy
5
Name of Project: 330 MW CCPP DVB Pragati, Delhi, India
Owner:
Delhi Vidhyut Board, India
Client:
Larsen & Toubro Limited, India
Capacity:
330 MW
L&T-S&L’s scope:
Complete Basic and Detail engineering services Configuration:
Two (2) BHEL make Frame 9E Gas Turbine of 104 MW
capacity Two (2) BHEL make Heat Recovery Steam Generators
(HRSG) One (1) BHEL make Steam Turbine Generator (STG) of
115 MW capacity
Fuel :
Primary fuel -Natural Gas, Secondary Fuel – Naphtha & HSD
Year of commissioning:
2003
Project Profiles - L&T-Sargent & Lundy
6
Name of Project: 445 MW Konaseema Combined Cycle Power Plant at Devarapalli, Andhra Pradesh, India
Owner: Konaseema Gas Power Limited (erstwhile Konaseema EPS Oakwell Power Limited), India
Client: Larsen & Toubro Limited, India Capacity: 445 MW L&T-S&L’s scope: Complete Basic and Detail Engineering
Site Support Services Configuration: Two (2) Siemens make V 94.2 Gas Turbines Generators
(GTGs) Two (2) L&T make Heat Recovery Steam Generators
(HRSGs) One (1) LMZ make Steam Turbine Generator(STG)
Key Technical Features:
GTGs of capacity 139.43 MW each , using natural gas as primary fuel with dry low NOx burners for emission control
HRSGs having triple pressure, natural circulation with integral Deaerator
STG with Horizontal split of capacity 155.5 MW downward exhaust with combined IP & LP steam injection straight condensing
Two pass, single shell divided water box type Axial Condenser
Fuel : Natural Gas Year of commissioning:
2010
Project Profiles - L&T-Sargent & Lundy
7
Name of Project: 2x300 MW Lanco Amarkantak Mega Thermal Power Station at Pathadi, Chhattisgarh, India
Owner: Lanco Amarkantak Power Private Limited, India Client: Zelan Projects Private Limited, Malaysia Capacity: 2x300 MW L&T-S&L’s scope: Complete Detail engineering services of all BOP Mechanical
systems Configuration: Two (2) Dongfang Electric, (China) make Boilers
Two (2) Dongfang Electric, (China) make Steam Turbine Generators (STGs)
Key Technical Features:
Boilers having drum type, natural circulation with two pass with single reheat of capacity 1025 T/hr, 17.45 MPA and 540oC
STGs of capacity 300 MW each with tandem compound, single reheat, regenerative, condensing, multi-cylinder design and combined HP-IP and separate LP casing
Fuel : Coal Year of commissioning: 2010
Project Profiles - L&T-Sargent & Lundy
8
Name of Project: 238.35 MW + 228 TPH IOCL Panipat Naphtha Cracker Project (PNCP) Captive Co-Generation Power Plant at Panipat, Haryana, India
Owner: Indian Oil Corporation Limited , India Client: Larsen & Toubro Limited, India Capacity: 238.35 MW + 228 TPH L&T-S&L’s scope: Complete Basic and Detail Engineering Configuration: Five (5) Hitachi make H-25 Gas Turbines Generators
(GTGs) + Provision for One (1) future GTG Five (5) L&T make Heat Recovery Steam Generators +
Provision for One (1) future HRSG Two (2) Ansaldo make Utility Boilers (UB’s) + Provision
for One (1) future UB Three (3) BHEL make EHNK - 50/90-B1 Steam Turbine
Generators (STGs) + Provision for One (1) future STG Key Technical Features: GTG capacity 25. 6 MW each
STG capacity 36.8 MW each Utility boilers of 406.5 TPH each Multifuel capability viz. Blended Fuel Oil (for UB), HSD
( for GT/HRSG) & RLNG (for UB, GT, HRSG) Multi pressure level steam system with floating
header concept and cascading bypass Capable to supply steam to process even in case of
equipment upset conditions and blackouts 100% common Deaerator, day tanks for HSD (for GTG
and HRSG) and blended Fuel Oil (for UB) and their forwarding pumps, Liquefied Natural Gas (LNG) conditioning skid, stacks and online stack monitoring system
Fuel : Natural Gas Year of commissioning: 2010
Project Profiles - L&T-Sargent & Lundy
9
Name of Project: 1x388.5 MW Phase-I & 2x384 MW Phase- II Combined Cycle Power Plant at Vemagiri, Andhra Pradesh, India
Owner: GMR Rajahmundry Energy Limited, India Client: Larsen & Toubro Limited, India Capacity: 1x388.5 MW & 2x384 MW L&T-S&L’s scope: Complete Basic and Detail Engineering Configuration: Three (3) GE make PG9351FA Gas Turbine Generators
Three (3) L&T make Heat Recovery Steam Generators Three (3) Alstom make Axial Steam Turbine Generators
Key Technical Features: GTG of capacity 232.54 MW (Phase-I) and 239.6 MW (Phase-II) using natural gas as primary fuel with dry low NOx burners for emission control
STG with capacity 155.96 MW (Phase-I) and 144.2 MW (Phase-II) each having 2 cylinder with combined HP / IP casing and separate LP casing
HRSGs having triple pressure, duct fired, reheat, vertical type CMI design. One of the largest HRSGs made in India
Two pass, single shell divided water box type axial Condenser
Back to back Induced draft L&T make cooling tower with common CW pump
Combined GTG/STG building for each unit Combined electrical and control building for each unit
Fuel : Natural Gas Year of commissioning: Phase-I 2006 & Phase-II 2012
Project Profiles - L&T-Sargent & Lundy
10
Name of Project: 2x600 MW Anpara ‘C’ Thermal Power Station Extension,
Sonebhadra, Uttar Pradesh, India
Owner/Client: Lanco Anpara Power Limited, India
Capacity: 2x600 MW
L&T-S&L’s scope: Complete Owners Engineering including DPR, Technical Spec preparation, Review Engg, Commissioning, Testing and PG Tests and Inspection Services
Configuration: Two (2) Dongfang Electric, China make Boilers Two (2) Dongfang Electric, China make Steam Turbine
Generators (STGs)
Key Technical Features: Subcritical Boiler with vertical water walls, simpler in construction, lower pressure drop and lower slag deposition. It adopts membrane tubes to ensure the furnace tightness.
STG of capacity 600 MW with tandem - compound arrangement, condensing reheat turbine designed for high operating efficiency and maximum reliability
STG Auxiliaries like BFP, CEP, DMCW Pump, Vacuum Pumps, Heat-Exchangers etc.
Deaerator, HP (3 nos.) and LP (4 nos.) Heaters Water cooled condenser with closed circuit cooling
system Balance of Plant including Coal Handling, Ash Handling,
Water System, HVAC, Fire Fighting, Fuel Oil System etc. Electro Static Precipitators with bag filters Induced Draft Cooling Tower (two per unit) Twin Flue Chimney
Fuel : Indian Coal
Year of commissioning: Unit#1- December 2011, Unit#2- January 2012
Project Profiles - L&T-Sargent & Lundy
11
Name of Project: 2x500 MW DVC Durgapur Thermal Power Station, West
Bengal, India
Owner/Client: Damodar Valley Corporation, India
Capacity: 2x500 MW L&T-S&L’s scope:
Review of Detail Project Report Short listing of EPC Vendors Preparation of Detailed EPC Technical Specification Preparation of Bid Document Technical Bids Evaluation Preparation of Contract Document Contract Finalization
Configuration: Two (2) BHEL make Boilers
Two (2) BHEL make Steam Turbine Generators
Fuel : Coal
Year of commissioning:
2012
Project Profiles - L&T-Sargent & Lundy
12
Name of Project: 2x700 MW Rajpura Coal Based Super-Thermal Power Project , Punjab, India
Owner: Nabha Power Limited, India
Client: Larsen & Toubro Limited, India
Capacity: 2x700 MW (Supercritical)
L&T-S&L’s scope: Complete Basic and Detail engineering for EPC of entire plant
Configuration: Two (2) L&T-MHPS make Boilers Two (2) L&T-MHPS Steam Turbine Generators (STGs)
Key Technical Features: Supercritical Boilers with vertical water walls and internal rifle tubes. Furnace designed for lower slag deposition and lower NOx fuel firing system.
STG of capacity 700 MW each having one combined HP/IP and two (2) LP cylinders, tandem -compound quadruple exhaust, condensing reheat turbine designed for high operating efficiency and maximum reliability
STG auxiliaries like Boiler Feed Pumps (BFP), Condensate Extraction Pump (CEP), DM cooling water pumps, Vacuum pumps, heat-exchangers etc.
Deaerator , HP/LP Heaters and Condensers are dual pressure once through type having divided water box
Balance of Plant including coal handling, ash handling, water system, HVAC, firefighting, fuel oil system etc.
State-of-the-art Electro Static Precipitators with high efficiency
General Civil works including raw water reservoir and ash pond
Natural draft cooling tower Twin flue stack
Fuel : Indian Coal
Year of commissioning: 2014
Project Profiles - L&T-Sargent & Lundy
13
Name of Project:
375 MW Dhuvaran Phase III Combined Cycle Power Project, Gujarat, India
Owner: Gujarat State Electricity Corporation Limited (GSECL), India
Client: Larsen & Toubro Limited, India
Capacity: 375 MW
L&T-S&L’s scope:
Complete Basic and Detail engineering for EPC of entire plant
Configuration: One (1) Siemens make Single Shaft Turbine Train (SCC5 4000F SS)
Key Technical Features:
Natural circulation Vertical HRSG by L&T Siemens SGT5-4000F Gas Turbine of capacity 245 MW GT/ST common generator rated 471 MVA, 20 kV Siemens SST5-3000 Steam Turbine of capacity 130 MW with two
cylinder (HP,IP-LP) axial exhaust STG auxiliaries like Boiler Feed Pumps (BFP), Condensate
Extraction Pump (CEP), DM cooling water pumps, Vacuum pumps, Heat-exchangers etc.
By-Pass Deaerator and axial Condensers having divided water box Single EOT capacity of 370 Tonne is installed in power block
building – One of India’s largest single EOT crane in power plant Balance of Plant including water system with RO facilities, HVAC,
firefighting, fuel Gas system etc. Generator transformer – 3 phase unit, 20/235 kV, 471 MVA one of
the largest 3-phase generator transformers in India Power evacuation by 220 kV outdoor switchyard – 2M+1T, 7 bays Switchyard control and operation by SCADA ETP-RO plant & Induced draft cooling tower by L&T General Civil works for complete plant
Fuel : Natural Gas
Year of commissioning
2014
Project Profiles - L&T-Sargent & Lundy
14
Name of Project: 2x600 MW Shree Singaji Thermal Power Plant, Malwa, Madhya
Pradesh, India Owner/Client: Madhya Pradesh Power Generation Co-operation Limited
(MPPGCL), India
Capacity: 2x600 MW L&T-S&L’s scope:
Complete Owners Engineering including Technical Spec preparation, Bid Evaluation , Contract Finalization, Review Engg, Commissioning, Testing and PG Tests and Inspection Services and Field Engineering Support
Configuration:
Two (2) BHEL make Boilers Two (2) BHEL make Steam Turbine Generators (STGs) Balance of Plant by L&T Power
Key Technical Features:
Subcritical drum boilers with vertical water walls, natural circulation, two pass and single reheat capacity of 1975 T/hr, 178 Kg/cm2 (g) and 540 oC; simpler to construct, lower pressure drop and lower slag deposition
STG of capacity 600 MW with tandem-compound arrangement, condensing reheat turbine designed for high operating efficiency and maximum reliability
STG auxiliaries like Boiler Feed Pumps (BFP), Condensate Extraction Pump (CEP), DM Cooling Water Pumps, Vacuum Pumps, Heat Exchangers etc
Deaerator, HP (2 nos.) and LP (3 nos.) Heaters Water cooled condenser with closed circuit cooling system Balance of Plant including Coal Handling, Ash Handling, Water
System, HVAC, Fire-fighting, Fuel Oil System etc. ESPs, NDCTs and Twin Flue Chimney HP Steam Pressure & Temperature: 170 Bar (a);537 oC HRH Steam Pressure & Temperature: 40.51 Bar (a);537 oC Power Evacuation : 220 kV & 400 kV Switchyard
Fuel : Coal
Year of commissioning:
2014
Project Profiles - L&T-Sargent & Lundy
15
Name of Project: 2x660 MW Coal based Power Plant, Krishnapatnam, India
Owner/Client:
Thermal Powertech Limited, India
Capacity:
2x660 MW
L&T-S&L’s scope:
Preparation of Detailed Project Report for complete plant Preparation of Detailed EPC Technical Specification for
Balance of Plant Assistance for discussions with BTG vendor (Harbin) in
China
Configuration:
Two (2) Dongfang make Supercritical Boilers and Steam
Turbines
Fuel :
Coal
Year of commissioning:
2015
Project Profiles - L&T-Sargent & Lundy
16
Name of Project: 2x660 MW Jaypee Nigrie Super Thermal Coal Based Power Project at Nigrie, M.P, India
Owner: Jaiprakash Power Ventures Limited (JPVL), India
Client: Larsen & Toubro Limited, India with L&T-MHPS Boilers Pvt. Limited, India
Capacity: 2x660 MW (Supercritical)
L&T-S&L’s scope:
Complete Basic and Detail engineering services of Boiler and STG Island and its auxiliaries including critical piping, excluding civil and structural design
Configuration: Two (2) L&T-MHPS make Supercritical Boilers Two (2) L&T-MHPS make Steam Turbine Generators (STGs)
Key Technical Features:
Supercritical Boilers with vertical water walls with internal rifle tubes simpler in construction, lower pressure drop and lower slag deposition.
STG of capacity 660 MW each consists of one combined HP/IP and two (2) LP cylinders, tandem –compound quadruple exhaust, condensing reheat type designed for high operating efficiency and maximum reliability
TG auxiliaries like BFP, CEP, DM CW pump, Vacuum pumps, Heat-exchangers etc.
Deaerator with stork design, HP/LP Heaters L&T make dual pressure once through type Condensers
having divided water box
Fuel : Indian Coal
Year of commissioning:
2015
Project Profiles - L&T-Sargent & Lundy
17
Name of Project: 2x600 MW Coal based Power Project, Chhattisgarh, India
Owner: D B Power Limited, India
Client: Larsen & Toubro Limited, India
Capacity: 2x600 MW
L&T-S&L’s scope: Complete Basic and Detail engineering services for BOP and BTG Civil Electrical – Except GT, UT, ST, UAT, SAT, IPBD, Boiler, Generator & its Auxiliaries all other equipment for BTG and entire BOP
Configuration: 2x600 MW Sub Critical boilers by BHEL
Key Technical Features:
Coal Handling Plant 2x2000 TPH Belt Conveying System 4x1200 TPH Crusher 4x1200 TPH Vibrating Grizzly Feeder Reversible Stacker Cum Reclaimer, Stacking Capacity
2000TPH, Reclaiming Capacity 1800TPH Ash Handling Plant
6x87 TPH jet pumping arrangement for each unit Bottom Ash Handling System
6x64 TPH Fly Ash Vacuum Conveying System for each unit 6x64 TPH wetting unit and collecting tank system 3x128 TPH Fly Ash Pressure Conveying System for each unit
Water Treatment Plant 3x90 TPH DM Plant with UF Unit 2x245 kg/hr, 2x10 kg/hr, 2x25 kg/hr Gas Chlorination Unit 3x800 m3/hr Hydrogen Cycle Based CPU Unit
Other Auxiliaries 6 Nos. Screw Compressor with HOC type ADP 2x10N m3/hr Hydrogen Generation Plant 2 Nos. NDCT each of 81400 m3/hr capacity 7 Nos. CW pumps each of 27800 m3/hr capacity 275 meters height twin flue cone RCC Chimney
Fuel : Indian Coal
Year of commissioning:
2015
Project Profiles - L&T-Sargent & Lundy
18
Name of Project: 2x800 MW Sri Damodaram Sanjeevaiah Thermal Power Plant at Krishnapatnam, Andhra Pradesh, India
Owner: Andhra Pradesh Power Development Company Limited, India
Client: Larsen & Toubro Limited, India
Capacity: 2x800 MW (Supercritical)
L&T-S&L’s scope: Complete Basic and Detail engineering services of STG Island including auxiliaries and critical piping
Review of basic and detail engineering documents by Sargent & Lundy, USA
Configuration: Two (2) L&T-MHPS make Steam Turbine Generators (STGs)
Key Technical Features: STG of capacity 800 MW; each consists of one combined HP/IP and two (2) LP cylinders, tandem – compound, quadruple exhaust, condensing reheat turbine designed for high operating efficiency and maximum reliability
Main Steam Parameters: 242 bar (a); 565 Deg C Hot Reheat Parameters: 54.6 bar(a); 593 Deg C
Fuel : Indian washed coal & imported coal in 70:30 ratio
Year of commissioning: 2015
Project Profiles - L&T-Sargent & Lundy
19
Name of Project: 3x660 MW Koradi Thermal Power Station Expansion Project, Nagpur, India
Owner: Maharashtra State Power Generation Co. Ltd. (Mahagenco), India
Client: Larsen & Toubro Limited, India
Capacity: 3x660 MW (Supercritical)
L&T-S&L’s scope: Complete Basic and Detail engineering for the BTG Island with related auxiliaries and extended BOP
Configuration: Three (3) L&T-MHPS make Boilers Three (3) L&T-MHPS make Steam Turbine Generators
(STGs)
Key Technical Features:
Supercritical Boilers with vertical water walls and internal rifle tubes simpler in construction having lower pressure drop. Furnace designed for lower slag deposition and lower NOx fuel firing system
STG of capacity 660 MW each consists of one combined HP/IP and two (2) LP cylinders, tandem –compound quadruple exhaust, condensing reheat turbine designed for high operating efficiency and maximum reliability
STG auxiliaries like Boiler Feed Pumps (BFP), Condensate Extraction Pump (CEP), DM cooling water pumps, Vacuum pumps, heat-exchangers etc.
Deaerator with stork design, HP/LP Heaters L&T make dual pressure once through type Condensers
having divided water box Concrete volute type cooling water pumps HVAC system, fire fighting system, fuel oil system etc.
Fuel : Indian Coal
Year of commissioning:
2017
Project Profiles - L&T-Sargent & Lundy
20
Name of Project: 2x660 MW Nellore Super Critical Thermal Power Project, Andhra Pradesh, India
Owner NCC Power Projects Limited, Hyderabad, A.P.
Client: NCC Limited, Hyderabad, A.P.
Capacity: 2x660 MW
L&T-S&L’s scope: Complete Basic and Detail engineering services for BOP - Mechanical, Electrical & CNI, BTG - Civil (except for TG foundation), Design of 275 m high twin flue RCC Chimney and review engineering of BOP Civil
Configuration:
2x660 MW Supercritical Boiler, Turbine and Generator supplied by Harbin, China
Key Technical Features:
Coal Handling Plant 2x1800 TPH Belt Conveying System 4x1800 TPH Crusher 4x1800 TPH Vibrating Grizzly Feeder Stacker Cum Reclaimer: Stacking Capacity 3600TPH,
Reclaiming Capacity 1800TPH Ash Handling Plant
2x65 TPH scrapper chain conveyor arrangement for each unit Bottom Ash Handling System
247 TPH Fly Ash single stage pressure Conveying System for each unit
3x206 TPH HCSD system for bottom ash and fly ash. 2 Nos. of 2000T RCC Fly Ash Silos, 1 No 900T bottom ash silo
Water Treatment Plant 2x1200m3/hr pre-treatment plant 4x138m3/hr RO-I units 2x45m3/hr RO-II units 2x90m3/hr Mixed Bed unit 4x60kg/hr Sea water Electrolyzer
Major BOP Electrical Equipment 3x 1 phase, 260 MVA Generator Transformer Two winding UT and Three winding ST 160 kA,24000 A GCB and 24000 A Main IPBD
11 and 3.3 kV Switchgear,40 kA for 3 sec Other Major Auxiliaries
5 Nos. Screw Compressors (35Nm3/min) with HOC type ADP
Project Profiles - L&T-Sargent & Lundy
21
2 Nos. NDCT each of 80000 m3/hr capacity 4 Nos. CW pumps each of 40000 m3/hr capacity 275 meters height twin flue RCC Chimney
Fuel : Blended coal (Indian and Imported coal in ratio of 70:30)
Year of commissioning:
2016
Project Profiles - L&T-Sargent & Lundy
22
Name of Project: 2x660 MW Chhabra Supercritical Thermal Power Project, Rajasthan, India
Owner: Rajasthan Rajya Vidyut Utpadan Nigam Limited, India (RRVUNL)
Client: Larsen & Toubro Limited, India
Capacity: 2x660 MW (Supercritical)
L&T-S&L’s scope: Complete Basic and Detail engineering for the entire EPC of the project
Configuration: Two (2) L&T-MHPS make Boilers Two (2) L&T-MHPS make Steam Turbine Generators (STGs)
Key Technical Features:
Supercritical Boilers with vertical water walls and internal rifle tubes simpler in construction having lower pressure drop. Furnace designed for lower slag deposition and lower NOx fuel firing system
STG of capacity 660 MW each consists of one combined HP/IP and two (2) LP cylinders, tandem –compound quadruple exhaust, condensing reheat turbine designed for high operating efficiency and maximum reliability
STG auxiliaries like Boiler Feed Pumps (BFP), Condensate Extraction Pump (CEP), DM cooling water pumps, Vacuum pumps, heat-exchangers etc.
Deaerator with stork design, HP/LP Heaters L&T make dual pressure once through type Condensers
having divided water box Metallic casing type cooling water and auxiliary cooling water
pumps Two (2) L&T Make 185 m high Natural Draft Cooling Tower 275 m High twin flue brick chimney Complete Balance of Plant viz. HVAC system, firefighting
system, fuel oil system, ash handling system, coal handling system, water system, compressed air, mill reject system, Electro-chlorination, tanks, hydrogen generation plant etc.
Fuel : Blended coal (Indian and Imported coal in ratio of 70:30)
Year of commissioning:
2017
Project Profiles - L&T-Sargent & Lundy
23
Name of Project:
2x660 MW Lanco Vidarbha Thermal Power Project, Unit#1 & 2, Maharashtra, India
Owner/Client:
Lanco Vidarbha Power Limited, India
Capacity:
2x660 MW
L&T-S&L’s scope:
Review Engineering Consultancy Service for BTG and BOP Mechanical Packages:
Configuration:
Two (2) Dongfang Electric, China make Boilers Two (2) HTC, China make Steam Turbine Generators
(STG)
Key Technical Features:
STG with spiral wall & inclined water wall tubing Steam Generator to be direct pulverized coal fired, top
supported, single reheat, radiant, dry bottom, with balance draft furnace and shall be suitable for outdoor installation
STG Auxiliaries like BFP, CEP, DMCW Pump, Vacuum Pumps, Heat-Exchangers etc.
Deaerator, HP, IP & LP Heaters, Fans Water cooled condenser are with closed circuit cooling
system having IDCT (two IDCT per unit) Balance of Plant including Coal Handling, Ash Handling,
Water System, HVAC, Fire Fighting, Fuel Oil System etc. Electro Static Precipitators Induced Draft Cooling Tower Twin Flue Chimney General Civil works
Fuel :
Indian Coal
Year of commissioning:
COD of Unit#1- 2017
Project Profiles - L&T-Sargent & Lundy
24
Name of Project:
2x660 MW Shree Singaji Thermal Power Project (Stage-II), Malwa, Madhya Pradesh , India
Owner: Madhya Pradesh Power Generating Co. Ltd, India (MPPGCL)
Client: Larsen & Toubro Limited, India
Capacity: 2x660 MW (Supercritical)
L&T-S&L’s scope:
Complete Basic and Detail engineering for the entire EPC of the project
Configuration: Two (2) L&T-MHPS make Boilers Two (2) L&T-MHPS make Steam Turbine Generators (STGs)
Key Technical Features:
Supercritical, Single Reheat, Once through, Balance Draft, PF Fired Boilers with vertical water walls and internal rifle tubes simpler in construction having lower pressure drop. Furnace designed for lower slag deposition and lower NOx fuel firing system
STG of capacity 660 MW (247Kg/cm2(a)/565/593 configuration) each consists of one combined HP/IP and two (2) LP cylinders, tandem –compound quadruple exhaust, condensing reheat turbine designed for high operating efficiency and maximum reliability
STG auxiliaries like Boiler Feed Pumps (BFP), Condensate Extraction Pump (CEP), Condensate Polishing Unit, LP Heater Drain Pump, DM cooling water pumps, Vacuum pumps, heat- exchangers etc.
Deaerator, LP Heaters & Single Train HP Heaters with Topping Desuperheater
L&T make dual pressure once through type Condensers having divided water box
Metallic casing type cooling water and auxiliary cooling water pumps
Two (2) Natural Draft Cooling Tower 275 m High twin flue chimney Complete Balance of Plant viz. Raw water intake system, HVAC
system, firefighting system, fuel oil system, ash handling system, coal handling system, water treatment system, Cooling water system, Effluent treatment system, compressed air, mill reject system, Gas-chlorination, tanks, hydrogen generation plant etc.
Fuel : Blended coal (Indian and Imported coal in ratio of 70:30)
Year of commissioning:
2018
Project Profiles - L&T-Sargent & Lundy
25
Name of Project:
2x660 MW Lanco Amarkantak Thermal Power Project, Unit#3 & 4 at Korba, Chhattisgarh, India
Owner/Client: Lanco Amarkantak Power Limited, India
Capacity: 2x660 MW L&T-S&L’s scope:
Review Engineering Consultancy Service for BTG and BOP Mechanical Packages:
Configuration: Two (2) Dongfang Electric, China make Boilers Two (2) HTC, China make Steam Turbine Generators (STGs)
Key Technical Features:
The Steam Generator having two pass type with spiral wall inclined water wall tubing.
The Steam Generator of direct pulverized coal fired, top supported, single reheat, radiant, dry bottom, with balance draft furnace suitable for outdoor installation.
The evaporator of Steam Generator suitable for variable pressure operation from sub critical to supercritical pressure range.
Two (2) Units of 660 MW Supercritical Steam Turbine with integral auxiliaries and steams designed for high operating efficiency and maximum reliability.
STG Auxiliaries like BFP, CEP, DMCW Pump, Vacuum Pumps, Heat-Exchangers etc.
Deaerator, HP, IP & LP Heaters, Fans Water cooled condenser are with closed circuit cooling system
having IDCT (two IDCT per unit) Balance of Plant including Coal Handling, Ash Handling, Water
System, HVAC, Fire Fighting, Fuel Oil System etc. Electro Static Precipitators Induced Draft Cooling Tower Twin Flue Chimney General Civil works
Fuel : Indian Coal
Year of commissioning:
COD of Unit#3- 2016
Project Profiles - L&T-Sargent & Lundy
26
Name of Project: 2x660 MW Lanco Babandh Thermal Power Project, Unit#1 & 2 Orissa, India
Owner/Client: Lanco Babandh Power Limited, India Capacity: 2x660 MW L&T-S&L’s scope:
Review Engineering Consultancy Service for BTG and BOP Mechanical Packages
Details Engineering Consultancy Services for Electrical and C&I Configuration: Two (2) Dongfang Electric, China make Boilers
Two (2) HTC, China make Steam Turbine Generators (STGs) Key Technical Features:
Steam Generator of two pass type using spiral wall inclined water wall tubing.
Steam Generator of direct pulverized coal fired, top supported, single reheat, radiant, dry bottom, with balance draft furnace for outdoor installation. The evaporator of Steam Generator should be suitable for variable pressure operation from sub critical to supercritical pressure range.
Two (2) Units of 660 MW Supercritical Steam Turbine with integral auxiliaries and steams designed for high operating efficiency and maximum reliability.
STG Auxiliaries like BFP, CEP, DMCW Pump, Vacuum Pumps, Heat-Exchangers etc.
Deaerator, HP, IP & LP Heaters, Fans Water cooled condenser are with closed circuit cooling system
having IDCT (two IDCT per unit) Balance of Plant including Coal Handling, Ash Handling, Water
System, HVAC, Fire Fighting, Fuel Oil System etc. Electro Static Precipitators Induced Draft Cooling Tower Twin Flue Chimney General Civil works
Fuel : Indian Coal Year of commissioning:
COD of Unit#1- 2017
Project Profiles - L&T-Sargent & Lundy
27
PROJECTS -UNDER EXECUTION
Name of Project:
3x200 MW Korba (Stage-I) Super Thermal Power Station, Korba, Chhattisgarh.
Owner
NTPC Limited Client:
NTPC Limited
Capacity:
600 MW L&T-S&L’s scope:
Conducting RLA of Critical Pipings, Hangers and Supports in all three Units of NTPC Korba Stage-I (3x200 MW)
Configuration:
3x200 MW
Key Technical Features:
Pre shut down activities like Supply & erection of temporary scaffoldings & access platforms, placement of NDT equipment, metallographic equipment, etc.
Visual inspection of piping systems, hot & cold readings of hangers etc.
Removal of thermal insulation material as specified from piping systems and disposal / deposit of the same as specified by site.
Complete residual life assessment analysis and condition assessment of piping systems.
Supply of new & unused thermal insulation material along with Aluminium cladding and accessories etc. and installation of the same on piping systems.
Dismantling of scaffolding and removing it from site. Submission of reports on Residual life assessment of
critical piping carried out with recommendations (including for replacement of existing piping components, if any) for expected life extension of the said piping systems by another 20 years.
Proposed Bill of quantity for pipes, Bends & Fittings, Hangers & supports, snubbers etc. for replacement based on residual life assessment study.
Fuel :
Coal
Year of commissioning:
Scheduled 2020
Project Profiles - L&T-Sargent & Lundy
28
Name of Project: 2x660 MW Ultra Super Critical Power Plant in Khargone, Madhya Pradesh, India
Owner: NTPC Ltd, India Client: Larsen & Toubro Limited, India
Capacity: 2x660 MW (Ultra Supercritical) L&T-S&L’s scope: Complete Basic and Detail engineering for the entire EPC project Configuration: Two (2) L&T-MHPS make Boilers with side mill arrangement
Two (2) L&T-MHPS make Steam Turbine Generators (STGs) Key Technical Features:
Supercritical, Single Reheat, Once through, Balance Draft, PF Fired Boilers with vertical water walls and internal rifle tubes simpler in construction having lower pressure drop. Furnace designed for lower slag deposition and lower NOx fuel firing system
STG of capacity 660 MW (270 kg/cm²(a) / 600°C configuration) each consists of one HP, one IP and two (2) LP cylinders, tandem – compound quadruple exhaust, condensing reheat turbine designed for high operating efficiency and maximum reliability
STG auxiliaries like Boiler Feed Pumps (BFP), Condensate Extraction Pump (CEP), Condensate Polishing Unit, LP Heater Drain Pump, DM cooling water pumps, Vacuum pumps, heat- exchangers etc.
Deaerator, LP Heaters (5 Nos.) & Double Train of HP Heaters (3 Nos.) with Topping Desuperheater
Dual pressure once through type Condensers having divided water box
Metallic casing type cooling water pumps Two (2) Induced Draft Cooling Tower 275 m High twin flue chimney. Solar Panels on the roof of selected buildings Complete Balance of Plant viz. Raw water intake system, HVAC
system, firefighting system, fuel oil system, ash handling system, coal handling system, water treatment system, Cooling water system, Effluent treatment system, compressed air, mill reject system, Gas-chlorination, tanks, hydrogen generation plant etc.
Fuel : Blended coal (Indian and Imported coal in ratio of 70:30) Year of commissioning: Scheduled 2020
Project Profiles - L&T-Sargent & Lundy
29
I NT ERNATIONAL P ROJECT S - CO MP L ET E D
Name of Project: Conversion of Simple Cycle Extension II & III to Combined Cycle Power Plant, Kingdom of Saudi Arabia
Owner: Confidential
Client: Confidential
Capacity: 1110 MW (Approx.)
L&T-S&L’s scope: Complete Detail Engineering of combined cycle conversion work (Mechanical, Electrical, Civil and I&C) including relocation work of existing open cycle system
Configuration: Combined Cycle Power Plant consisting of Three blocks, each with: Four (4) GE make 7001EA Gas Turbine Generators
(GTGs) (Existing) Four (4) CMI make Heat Recovery Steam Generators
(HRSGs) (Add-on) One (1) FUJI make Steam Turbine Generator (STG) (Add-
on) One (1) RCDC make Air Cooling Condenser (ACC) (Add-
on) Key Technical Features:
Twelve (12) GE 7001EA GTGs of capacity 59 MW each Twelve (12) Unfired, Dual Pressure, Vertical Type HRSGs Three (3) Dual Pressure STGs of capacity 130 MW each,
condensing STs designed for indoor installation and for the use with an Air Cooled Condenser
Fuel : Fuel Oil
Year of commissioning:
2017
Project Profiles - L&T-Sargent & Lundy
30
Name of Project: 1x500 MW CCPP & 1x330 MW SCPP John S. Rainey Generating Station at South Carolina, USA
Owner: Santee Cooper, USA
Client: General Electric International Inc./ Sargent & Lundy, USA
Capacity: 1x500 MW CCPP and 1x330 MW SCPP
L&T-S&L’s scope: Detail engineering services
Configuration: Two (2) GE make PG 7241FA Gas Turbines Generators (GTGs)
Two (2) NEM Holland make Heat Recovery Steam Generators (HRSGs)
One (1) GE make Steam Turbine Generators (STGs)
Key Technical Features:
GTGs of 169 MW capacity each with dry low NOx burners for emission control
HRSGs triple pressure, unfired, reheat, natural circulation type
STGs of capacity 190 MW each having two (2) cylinder with combined HP / IP casing
Two pass, single shell divided water box deaerating type condenser
Fuel : Natural Gas
Year of commissioning:
2001
Project Profiles - L&T-Sargent & Lundy
31
Name of Project: 1x500 MW CCPP Possum Point at Virginia, USA
Owner: Virginia Electric & Power Company, USA
Client: General Electric International Inc./ Sargent & Lundy, USA
Capacity: 1x500 MW
L&T-S&L’s scope: Detail engineering services
Configuration: Two (2) GE make PG7241FA Gas Turbines Generators (GTGs)
Two (2) NEM Holland make Heat Recovery Steam Generators (HRSGs)
One (1) GE make Steam Turbine Generators (STG)
Key Technical Features:
GTGs of 169 MW capacity each with dry low NOx burners for emission control
HRSGs triple pressure, unfired, reheat, natural circulation type
STG of capacity 193 MW each having two (2) cylinders with combined HP / IP casing
Two pass, single shell divided water box deaerating type condenser
Fuel : Natural Gas
Year of commissioning:
2003
Project Profiles - L&T-Sargent & Lundy
32
Name of Project: 1x168.1 MW Sojitz Kelanitissa (Private) Limited Combined Cycle Power Project at Colombo, Sri Lanka
Owner Sojitz Kelanitissa (Private) Limited, Sri Lanka (Erst. AES Kelanitissa)
Client: Larsen & Toubro Limited, India
Capacity: 1x168.1 MW
L&T-S&L’s scope: Complete Basic and Detail engineering services
Configuration: One (1) BHEL make MS 9171 E Gas Turbine Generator (GTG) One (1) L&T make Heat recovery steam generators (HRSG) One (1) BHEL make Steam turbine generator (STG)
Key Technical Features:
GTG capacity 116 MW with steam injection for emission control
HRSG is double pressure, unfired, unassisted circulation type STG of capacity 57 MW having two (2) cylinder with
combined HP / L P casing, down exhaust condensing type, with LP injection and dual extraction
Two pass, single shell divided water box type Condenser Severe space constraints made layout engineering a
challenging task Induced draft cooling tower, basin, fire water pump house
and transformers located on top of clarified water storage tank
Overhead switch yard with multi-tier arrangement of the transformer bay and switching bays
Single push button start-up and shut down Global positioning satellite synchronization for all control
systems for common time base Engineering was carried out using American and other
international codes customized to local regulatory requirements
Fuel : High Speed Diesel
Year of commissioning:
2003
Project Profiles - L&T-Sargent & Lundy
33
Name of Project:
2x500 MW CCPP Fairless Energy Facility at Pennsylvania, U.S.A
Owner:
Dominion Energy, USA
Client:
General Electric International Inc./ Sargent & Lundy, USA
Capacity:
2x500 MW
L&T-S&L’s scope:
Detail engineering services
Configuration:
Two (2) GE make PG7241FA Gas Turbines Generators (GTGs) Two (2) NEM Holland make Heat Recovery Steam Generators
(HRSGs) One (1) GE make Steam Turbine Generators (STG)
Key Technical Features:
GTGs of 169 MW capacity each with dry low NOx burners for emission control
HRSGs triple pressure, unfired, reheat, natural circulation type STG of capacity 193 MW each having two (2) cylinders with
combined HP / IP casing Two pass, single shell divided water box deaerating type
condenser Fuel :
Natural Gas
Year of commissioning:
2004
Project Profiles - L&T-Sargent & Lundy
34
Name of Project: 1x500 MW CCPP Charles Poletti at New York, USA
Owner: New York Power Authority, USA
Client: General Electric International Inc./ Sargent & Lundy, USA
Capacity: 1x500 MW
L&T-S&L’s scope: Basic and Detail Engineering for EPC of entire plant
Configuration: Two (2) GE make PG7241FA Gas Turbines Generators (GTGs)
Two (2) NEM Holland make Heat Recovery Steam Generators (HRSGs)
One (1) GE make Steam Turbine Generators (STG) One (1) Air Cooled Condenser (ACC) from Hamon
Key Technical Features:
GTGs of 169 MW capacity each with dry low NOx burners for emission control and inlet Air Chillers to operate during high ambient temperature
HRSGs triple pressure, unfired, reheat, natural circulation type with deaerating type LP drum and with Selective Catalytic Reduction (SCR) to limit NOx emission level to 2 ppm
STGs of capacity 197 MW having two (2) cylinders with combined HP / IP casing
Thirty two cell Air Cooled Condenser with deaerating Condensate tank with 100% HP, HR, and LP team bypass system
Vapor compression inlet air chilling system Unique layout with Indoor Gas Turbines with Inlet Air
Chillers and Air Cooled Condenser. The plant also has worlds’s shortest GTG pitch of only 110 ft for STAG 207 FA configuration
The plant has an extremely compact design complying with stringent requirement of New York City Codes
Fuel : Natural Gas/Distillate Liquid fuel
Year of commissioning:
2005
Project Profiles - L&T-Sargent & Lundy
35
Name of Project: 255 MW Open Cycle Power Plant at Salalah, Oman
Owner: Dhofar Power Co. S.A.O.C, Oman
Client: Larsen & Toubro Limited, India
Capacity: 255 MW
L&T-S&L’s scope: Complete Basic and Detail engineering services including integration with existing system
Integration and Modification of Transmission and Distribution System with the plant
Configuration: Six (6) GE make PG 6581 B Gas Turbine Generators (GTGs)
Two (2) Aeroderivative LM 2500 GTG
Key Technical Features:
GTGs of capacity 35 MW each Integration of existing Fr.6 GTG & Aeroderivative LM
2500 GTG New GTG and existing Fr-6 generator to have Speedtronic
mark-V control system panel to interface with New Power Station (NPS), control system and central SCADA
2x100% emergency DG sets at NPS Three (3) new 132 kV GIS New transmission and distribution facility with 132 kV
double circuit transmission system to evacuate power from NPS and 33 kV distribution system
Fuel : Natural Gas / High Speed Diesel
Year of commissioning:
2007
Project Profiles - L&T-Sargent & Lundy
36
Name of Project: 1x500 MW CCPP Dresden Energy Facility at Ohio, USA
Owner: Dominion Energy Inc., USA
Client: General Electric International Inc./ Sargent & Lundy, USA
Capacity: 1x500 MW
L&T-S&L’s scope: Detail engineering services
Configuration: Two (2) GE make PG7241FA Gas Turbines Generators (GTGs)
Two (2) NEM Holland make Heat Recovery Steam Generators (HRSGs)
One (1) GE make Steam Turbine Generators (STG)
Key Technical Features: GTGs of 169 MW capacity each with dry low NOx burners for emission control
HRSGs triple pressure, unfired, reheat, natural circulation type
STG of capacity 193 MW each having two (2) cylinders with combined HP / IP casing
Two pass, single shell divided water box deaerating type condenser
Fuel : Natural Gas
Year of commissioning: 2008
Project Profiles - L&T-Sargent & Lundy
37
Name of Project: 585 MW CCPP Sohar Power and Desalination Plant, Oman
Owner: Sohar Global Contracting & Construction Co, Oman
Client: Doosan Heavy Industries and Construction Co. Limited, Korea
Capacity: 585 MW
L&T-S&L’s scope: Detailed engineering services (C&I) Power System Study Commissioning and Testing Manuals Performance Test Procedures Site Support
Configuration: Three (3) Siemens make V94.2 Gas Turbine Generators (GTGs)
Three (3) Doosan make Heat Recovery Steam Generators (HRSGs)
One (1) Alstom make Steam Turbine Generator (STG)
Key Technical Features: Dual fired GTG of capacity 139 MW each STG of capacity 220 MW each 33 MIGD integrated desalination plant
Fuel : Natural Gas
Year of commissioning: 2008
Project Profiles - L&T-Sargent & Lundy
38
Name of Project: 4x120 MW Riyadh PP-8 Ext-III Simple Cycle Gas Based Power Project at Riyadh, Kingdom of Saudi Arabia (KSA)
Owner: Saudi Electricity Company (SEC), Kingdom of Saudi Arabia
Client: Al-Toukhi Company for Industry, Trading and Contracting (TIT), Kingdom of Saudi Arabia
Capacity: 4x120 MW
L&T-S&L’s scope: Complete Basic and Detail engineering services as per SEC Specifications
Interface engineering for interface with existing 380 kV substation
HAZOP Study
Configuration: Four (4) GE make Frame 7FA Gas Turbine Generators (GTGs) in simple cycle mode
Key Technical Features: GTG of capacity 120 MW each dual fired type Fuel gas pressure reduction skid, fuel oil system
comprising of three (3) bulk diesel oil tanks, four (4) diesel forwarding pumps with filtration systems to be located in existing fuel oil forwarding shade
Two (2) instrument air compressor and instrument air system, gas turbine building, battery room, transmission system room, fuel management skid, hydrogen plant
Fuel : Natural Gas/Fuel Oil
Year of commissioning: 2008
Project Profiles - L&T-Sargent & Lundy
39
Name of Project: 370 MW Amman East Combined Cycle Power Plant at Almanakher, Amman, Jordan
Owner: AES Jordan PSC, Jordan
Client: Doosan Heavy Industries and Construction Co. Limited, Korea
Capacity: 370 MW
L&T-S&L’s scope: Complete Basic and Detail engineering for the total plant excluding switchyard
Pre-commissioning, Commissioning and O&M Manuals
Configuration: Two (2) Ansaldo make V 94.2 Gas Turbine Generators (GTGs)
Two (2) Doosan make Heat Recovery Steam Generators (HRSGs)
One (1) SPX make Air Cooling Condenser (ACC) One (1) Fuji make axial Steam Turbine Generator (STG)
Key Technical Features: GTG of capacity 140 MW each, designed to operate on natural gas and light distillate fuel (dual fired)
HRSG with dual pressure, unfired natural circulation design
STG of capacity 140 MW All Air Cooled Systems including Air Cooled Condensers
Fuel : Natural Gas
Year of commissioning: 2009
Project Profiles - L&T-Sargent & Lundy
40
Name of Project: 2x60 MW Reinforcement of Wadi-Al-Dawasir Simple Cycle Gas Based Power Plant, Kingdom of Saudi Arabia (KSA)
Owner: Saudi Electricity Company (SEC), Kingdom of Saudi Arabia
Client: Al-Toukhi Company for Industry, Trading and Contracting (TIT), Kingdom of Saudi Arabia
Capacity: 2x60 MW
L&T-S&L’s scope: Complete Basic and Detail engineering services for Reinforcement of Wadi-Al-Dawasir Power Plant as per SEC Specifications
Coordination of Engineering work with Al-Toukhi at Riyadh office
Configuration: Two (2) GE make Frame 7EA Gas Turbine Generators (GTGs) in simple cycle mode
Key Technical Features: GTG of capacity 60 MW each Compressed Air System – Extension of Existing
Compressed service & instrument Air systems with all auxiliaries
Crude oil Treatment plant, Crude oil forwarding pump system with fuel skids, Distillate oil forwarding pumps
Water supply system - Extension of existing water line to the new plant etc.
Extension of existing Fire Protection and detection system etc.
Isolated Phase Bus duct, MV Switchgear / MCC (Including extension of existing Switchgear as required), LV switch gear, Unit Main Transformers and Unit Auxiliary Transformers, Synchronizing equipment, MV & LV Power and control cables etc.
Fuel : Crude Oil/Distillate
Year of commissioning: 2009
Project Profiles - L&T-Sargent & Lundy
41
Name of Project: National Integrated Power Projects (NIPP) - 564.37 MW Calabar SCPP at Cross River State, 451.49 MW Ihovbor SCPP at Edo State & 451.49 MW Sapele SCPP at Delta State of Niger - Delta
Owner: Niger Delta Power Holding Company, Nigeria
Client: Toshiba Plant Systems & Services Corporation, Tokyo
Capacity: 564.37 MW, 451.49 MW, 451.49 MW
L&T-S&L’s scope: Basic and Detail engineering services O&M Manuals Pre-Commissioning Manuals
Configuration: Five (5) GE make Frame 9E Gas Turbine Generators (GTGs) with BOP systems for CALABAR SCPP
Four (4) GE make Frame 9E Gas Turbine Generators (GTGs) with BOP systems for IHOVBOR SCPP
Four (4) GE make Frame 9E Gas Turbine Generators (GTGs) with BOP systems for SAPELE SCPP
Fuel : Natural Gas
Year of commissioning:
2010
Project Profiles - L&T-Sargent & Lundy
42
Name of Project: 1x700 MW Supercritical Thermal Power Project, Thailand
Owner: Confidential
Client: Doosan Heavy Industries & Construction Co. Limited, Korea
Capacity: 1x700 MW (Supercritical)
L&T-S&L’s scope: Complete Basic and Detail engineering services
Configuration: One (1) Doosan-Babcock make Supercritical Boiler One (1) GE-Doosan make Steam Turbine Generator
Key Technical Features: Supercritical Boiler – 249.7 Bar g and 568.6 deg. C with efficiency 94.04 % NCV based
STG is tandem compound, single reheat, regenerative, condensing, multi-cylinder design with combined HP-IP and separate LP casing of capacity 700 MW
Feed water system, condensate system, Condenser air extraction system, Circulating water system including intake system, water treatment system, Compressed Air system, Firefighting system, etc.
Piping system, civil structural design, electrical and C&I engineering
Fuel : Indonesian Coal
Year of commissioning: 2012
Project Profiles - L&T-Sargent & Lundy
43
Name of Project: Relocation of existing equipments and space planning for
CCPP conversion for 790 MW SCCP plant
Owner/Client: International Atlas Energy Sdn. Bhd, Malaysia
Capacity: 790 MW L&T-S&L’s scope:
Efficiency improvement by converting to CCPP Conceptual study and Configuration Study Complete Engineering for relocation of equipment, pipes
and cables, etc. Preparation of procurement specification Bill of Material (BOM) generation for the pipes, cables,
concrete and steel etc. Planning of space required for pipe rack for steam and
power cycle pipes and cables around HRSGs upto STGs Site Supervision
Configuration: Three (3) Siemens make Gas Turbines (GTs) Key Technical Features:
Three Siemens V94.3 A Gas Turbine of capacity 264 MW each
Siemens Generator rated 310 MVA, 15.75 kV Main Fuel: Natural Gas Backup Fuel: Gas Oil Unit Efficiency: Above 39% Air Cooled CCW and Lube oil Coolers
Fuel : Natural Gas
Year of commissioning:
Re-commissioned in 2013
Project Profiles - L&T-Sargent & Lundy
44
Name of Project:
3190 MW Qurayyah Combined Cycle Power Project (1890 MW SCPP + 1300 MW conversion), Kingdom of Saudi Arabia
Owner: Saudi Electricity Company (SEC), Kingdom of Saudi Arabia
Client: Consortium of Arabian Bemco & Doosan Heavy Industries/Sargent & Lundy, USA
Capacity: 3190 MW
L&T-S&L’s scope:
Basic Engineering (part) and Detail Engineering Services for the EPC of entire plant
Configuration: Combined Cycle Power Plant consisting of Five (5) blocks, each with: Three (3) GE make 7 FA Gas Turbine Generators (GTGs) Three (3) Doosan make Heat Recovery Steam Generators
(HRSGs) One (1) GE make TC2F-34.5" - LSB Steam Turbine Generator
(STG)
Key Technical Features:
Fifteen (15) GE 7 FA GTGs of capacity 126 MW each Fifteen (15) Triple Pressure, Vertical Type HRSGs Five (5 ) STGs-D11 of capacity 260 MW each Fuel Gas Compressors (6x30% capacity) Thermal Desalination Plant (3x50% capacity) Sea water once through cooling water system with intake &
outfall arrangement Hypochlorite Generation Plant (4x50% capacity) Demineralization Plant Compressed Air System Turbine Lube Oil Storage, Forwarding and Purification System Chemical Storage, Forwarding & Dosing System STG bearing oil Seal Air System Hydrogen Generation Plant Remineralization Plant Waste Water Neutralization Plant Plant Nitrogen Purging & Preservation System Fire Protection system
Fuel : Natural Gas/Fuel Oil
Year of commissioning:
2014
Project Profiles - L&T-Sargent & Lundy
45
Name of Project: 4000 MW Qurayyah Independent Power Project, Kingdom of Saudi Arabia
Owner: Hajr Electricity Production Company (HAJR), Kingdom of Saudi Arabia
Client: Samsung C& T, S Korea /Sargent Lundy, USA
Capacity: 4000 MW
L&T-S&L’s scope: Part Basic and Complete Detail Engineering Services
Configuration: Twelve (12) Siemens make (SGT6-5000F) Gas Turbines Generators (GTGs)
Twelve (12) BHI make Heat Recovery Steam Generators (HRSGs)
Six (6) Siemens make (SST6-4000) Steam Turbine Generators (STGs)
Key Technical Features:
Two (2) Units each unit having Three (3) Blocks of side-by-side
2x2x1 arrangement Dual fuel, Dry Low NOx GTGs of 229 MW rating each Two (2) pressure level condensing STGs of 226 MW rating each Horizontal HRSGs without duct firing at two pressure levels Bypass Deaerator Sea water intake system and Cooling system Electrochlorination system Desalination plant for sea water Turbine inlet chilling system Plant HVAC & Firefighting system
Fuel :
Primary Fuel: Natural Gas Back-up fuel: Diesel
Year of commissioning:
2014
Project Profiles - L&T-Sargent & Lundy
46
Name of Project: 500 MW Each Sabiya & Az Zour Simple Cycle Power Plant, Kuwait
Owner: Ministry of Electricity & Water (MEW)
Client: Alghanim International General Trading & Contracting Co. WLL, Kuwait
Capacity: 500 MW (Each)
L&T-S&L’s scope: Basic & Detail engineering services including On Site Services
Configuration: Two (2) Siemens SGT 4000 F Class Gas turbines
Key Technical Features: Two GTGs of capacity 261.85 MW at each site Design with wet compression feature
Fuel : Natural Gas
Year of commissioning: 2015
Sabiya SCPP Az-zour SCPP
Project Profiles - L&T-Sargent & Lundy
47
Name of Project: 2x150 MW PACO Power Plant, Panama, Central America
Owner: Minera Panama S.A, Central America
Client: SK Engineering & Construction Co., South Korea /Sargent Lundy, USA
Capacity: 2x150 MW
L&T-S&L’s scope: Complete Basic and Detail Engineering for EPC of entire plant
Configuration: Two (2) Seentec-Make Boilers (Subcritical) Two (2) SKODA-Make Steam Turbine Generator (STGs)
Key Technical Features:
Pulverized coal fired Subcritical Boiler 150 MW Steam Turbine Generator: tandem compound,
reheat, condensing turbine Sea water based Flue Gas Desulphurization (FGD) system for
SOx emissions control Selective Catalytic Reduction (SCR) unit under Boiler scope for
NOx emissions control Baghouse for flue gas dust collection Once through seawater based CW system Topping Desuperheater in feed water circuit enhancing cycle
efficiency Dry bottom ash handling system Thermal Desalination plant for sea water Design experience for a high rainfall zone plant (approx. 4 to 5
meters of annual average rainfall) with necessary rain-water harvesting facilities
Gas Insulated Switchyard (GIS) Twin Flue Chimney
Fuel : Coal
Year of commissioning:
2018
Project Profiles - L&T-Sargent & Lundy
48
Name of Project:
Supervision of Execution and Project Management of Replacement of HRSGs for Five (5) GE F9BE GTs and associated works, DUBAL
Owner/Client: Dubai Aluminium Limited, United Arab Emirates
Capacity: 2350 MW L&T-S&L’s scope:
Home and Site office based complete Project Management, Review, Supervision and Monitoring, Inspection and Performance testing of replacement of 5 HRSGs for 2350 MW DUBAL’s captive unit for smelter plant
Configuration: 5 GE make 9BE GTs
5 Bilfinger make HRSGS Key Technical Features:
HRSG Capacity : 228 Tons/Hr @ temperature of 212.4 0C (saturated) and pressure of 19 bar(g)
All HRSGs are connected to a common steam header. The common steam header supplies steam to two Back Pressure Steam Turbine (ST), to desalination plant and to two feed water (FW) tanks.
Fuel : Natural Gas
Year of commissioning: 2018
Project Profiles - L&T-Sargent & Lundy
49
Name of Project: Sikalbaha 225 MW+/- 10% MW Combined Cycle Power Project , Bangladesh
Owner: Bangladesh Power Development Board (BPDB)
Client: Larsen & Toubro Limited, India
Capacity: 225 MW
L&T-S&L’s scope: Complete Basic and Detail Engineering Site Support Services
Configuration: One (1) Siemens make SGT 5 2000E Gas Turbines Generators (GTGs)
One (1) L&T make Heat Recovery Steam Generators (HRSG)
One (1) Siemens make Steam Turbine Generator(STG)
Key Technical Features: GTGs of capacity 172 MW ISO , using natural gas as
primary fuel and Diesel as second fuel HRSGs having dual pressure, natural circulation Axial Flow STG, capacity 85 MW Two pass, single shell Axial Condenser Single phase transformer for both GTG and STG 50 m tall Gas Turbine Bypass stack
Fuel : Natural Gas and Diesel oil, LPG as start up fuel
Year of commissioning: 2017
Project Profiles - L&T-Sargent & Lundy
50
Name of Project: 360 MW Bheramara Combined Cycle Power Project , Bangladesh
Owner:
North West Power Generation Co. Ltd (NWPGCL), Bangladesh
Client: Larsen & Toubro Limited, India / Marubeni, Japan
Capacity: 360 MW L&T-S&L’s scope: Complete Basic and Detail Engineering
Site Support Services Configuration:
One Gas Turbine M 701F4 One MHPS Steam Turbine SRT 35.4 One CMI/L&T Heat Recovery Steam Generator (HRSG)
Key Technical Features:
CW forebay extended inside the Cooling tower basin High capacity (@ 170 M3/ Hr) Deep well water pumps for 3
COC Gas Booster Compressors in Fuel Gas Supply chain Deaerator working without pegging steam at Full load Combine Cycle Project without a GCB
Fuel :
Natural Gas
Year of commissioning:
2017
Project Profiles - L&T-Sargent & Lundy
51
Name of Project: 130 MW QAPCO Expansion Power Project, Qatar
Owner: Qatar Petrochemical Company Limited QSC (“QAPCO”)
Client: Sadelmi Power, Saudi Arabia
Capacity:
130 MW
L&T-S&L’s scope:
Complete Basic and Detail Engineering Site Support Services
Configuration and Scope of Work:
Installation of one (1) New Gas Turbine of GE - Frame V Replacement of two (2) Gas Turbines of GE - Frame V Refurbishment of Three (3) existing Gas Turbines
Key Technical Features:
Installation of two (2) new Gas Turbines on the existing foundations – assessment of existing foundations
Design of Air Intake Filter and Inlet Duct support structure of Gas Turbines
Design of Turbine Control Centre including its Structure Complete networking of six Gas Turbine control systems
and interface with DCS and F&G system of the petrochemical plant
Fuel :
Natural Gas
Year of commissioning:
2017
Project Profiles - L&T-Sargent & Lundy
52
Name of Project: 500 MW Sabiya – 2 Simple Cycle Power Plant, Kuwait
Owner: Ministry of Electricity & Water (MEW)
Client: Alghanim International General Trading & Contracting Co. WLL, Kuwait
Capacity: 500 MW
L&T-S&L’s scope: Basic & Detail engineering services including On Site Services
Configuration: Two (2) Siemens SGT 4000 F Class Gas turbines
Key Technical Features:
Two GTGs of capacity 294 MW at each Design with wet compression feature
Fuel : Natural Gas
Year of commissioning:
2018
Project Profiles - L&T-Sargent & Lundy
I N T E R N AT I O N AL P R OJ EC T S – UN D ER EX EC U T I O N
Name of Project: Bibiyana-lll 400 MW Combined Cycle Power Project, Bangladesh
Owner: Bangladesh Power Development Board (BPDB), Bangladesh
Client: Larsen & Toubro Limited, India
Capacity: 400 MW L&T-S&L’s scope:
Complete Basic and Detail engineering for the entire EPC of the project
Configuration:
One M701F Gas Turbine (GT) of 285.06 MW from Mitsubishi Hitachi Power Systems (MHPS), Japan
One Natural Circulation Horizontal Type HRSG from CMI, Belgium
One FK-H130/6.3-50-AX Steam Turbine (ST) of 133.25 MW from Fuji Electric Company, Japan
Key Technical Features:
HRSG having Dual Pressure, Natural Circulation with Integral Deaerator, Horizontal Type, CMI design
Two pass, Single Shell, Divided Water Box, Axial type water cooled Condenser
STG Auxiliaries like BFP, CEP, DM Transfer Pump, Vacuum Pumps, CCW Pumps, Plate Heat-Exchangers etc.
3 x 50% Centrifugal type Gas Booster Compressors Balance of Plant including Fuel Gas Conditioning, Water
Pretreatment Plant, DM Plant, Effluent Treatment Plant, HVAC, Fire Fighting, etc.
Inline, FRP, Film Fill Type, Induced Draft Cooling Tower alongwith vertical CW & ACW pumps
Fuel : Natural Gas Year of commissioning:
Open Cycle - 2018 Combined Cycle - 2019
56
Project Profiles - L&T-Sargent & Lundy
57
Name of Project: 250 MW Sabiya-1 CCGT, Kuwait (Add-on)
Owner: Ministry of Electricity & Water (MEW)
Client: Alghanim International General Trading & Contracting Co. WLL, Kuwait
Capacity: 250 MW
L&T-S&L’s scope: Basic & Detail engineering services including On Site Support for conversion of Open cycle Plant to Combined cycle
Configuration: Combined cycle plant of Two (2) nos. Siemens 4000F Gas Turbines (Existing) Two(2) nos. unfired HRSG (Add-on) One (1) GE make Steam Turbine Generator (Add-on)
Key Technical Features:
One Steam Turbine Generator of Capacity ~250MW with three
(3) separate HP, IP and double flow LP section Sea water cooling tower with intake & outfall arrangement Closed cooling water system including emergency cooling
system Feed water system including LP economizer circulation system Condensate system Conventional Chlorination Plant (3 x 50%) Compressed Air System (3 x 50%) Chemical Storage, Forwarding & Dosing System Waste Water Neutralization Plant Plant Nitrogen Purging & Preservation System Fire Protection system BMS controlled HVAC Plant including smoke management
Fuel : Natural Gas & Fuel Oil
Year of commissioning:
2019
:
Project Profiles - L&T-Sargent & Lundy
58
Name of Project: 750 MW Sabiya -3 CCGT Power Plant , Kuwait
Owner:
Ministry of Electricity & Water (MEW) Client: Alghanim International General Trading & Contracting Co. WLL,
Kuwait
Capacity: 750 MW
L&T-S&L’s scope:
Basic & Detail engineering services including On Site Services
Configuration:
• Two (2) Siemens make Gas Turbine (STG5-4000F) with Hydrogen Cooled Generator
• Two (2) unfired, Horizontal Natural Circulation HRSG • One (1) Siemens make Steam Turbine (SST5-5000) with
Hydrogen Cooled Generator Key Technical Features:
• Two Horizontal Type HRSG having Triple Pressure reheat, Natural Circulation with combined Deaerator
• 3 x 50% Centrifugal type Gas Booster Compressors • Two pass, Single Shell, Divided Water Box, Side type water
cooled Condenser • 40 m tall Gas Turbine Bypass stack • 400kV Gas Insulated Substation • 12 Cell Induced Draft Cooling Tower use Sea water as
cooling medium for condenser cooling. • Gas Turbine with Evaporative and Wet Compressor for
power augmentation. • STG Auxiliaries like BFP, CEP, DM Transfer Pump, Vacuum
Pumps, CCW Pumps, Shell & Tube Heat-Exchangers etc. • Balance of Plant including Fuel Gas Conditioning, Fuel Oil
unloading, Treatment, storage and forwarding, Compressed Air System, Chlorination Plant, DM Plant, Waste Water recovery Plant, HVAC, Fire Fighting, etc.
Fuel :
Natural Gas & HSD Oil
Year of commissioning:
2020
Project Profiles - L&T-Sargent & Lundy
60
Name of Project: 1x26 MW Gas based simple cycle Power Plant, Nigeria
Owner: Cross River State Investment Promotion Bureau
Client: SkipperSeil Limited
Capacity: ~26 MW
L&T-S&L’s scope: Detail engineering services Limited PMC services for Construction Supervision,
Commissioning & Start-up Activities
Configuration: Simple cycle plant of One (1) no. BHEL make Frame 5 Gas Turbine Provision for Future identical plant
Key Technical Features: Water through Borewell Fuel gas treatment system Compressed Air System Fire Protection system Power evacuation through 33kV switchyard
Fuel : Natural Gas
Year of commissioning: 2018
Project Profiles - L&T-Sargent & Lundy
61
Name of Project:
220 MW (GAS) / 212 MW (HSD) Net Combined Cycle Power Project, Bhola, Bangladesh
Owner:
Nutan Bidyut (Bangladesh) Limited
Client:
Shapoorji Pallonji - (Global Infra FZCO/ Bisho Infra Projects Limited)
Capacity:
220 MW
L&T-S&L’s scope:
Revalidation of Basic engineering and complete Detail Engineering
Site Support Services
Configuration:
Two (2) GE make Gas Turbine (GE 6F.03) with air Cooled
Generator Two (2) unfired, Horizontal Natural Circulation HRSG
One (1) GE make Steam Turbine (GE SA 249) with
condenser and associated control systems
Key Technical Features:
Duel Fuel, HSD as back up fuel, oil transport through
Waterways, unloading at on site Jetty Fuel gas pressurisation by 3 nos. Gas booster
Compressors Water intake through Pontoon on River Gas Turbines outdoor Starting with Black start DG Power evacuation through Existing Bhola #1 switchyard
Fuel :
Duel Fuel
Year of commissioning:
2020
Project Profiles - L&T-Sargent & Lundy
62
Name of Project: 400 MW Bibiyana South Combined Cycle Power Project,
Bangladesh Owner: Bangladesh Power Development Board
Client: Larsen & Toubro Limited, India / Samsung C&T, S. Korea
Capacity: 400 MW L&T-S&L’s scope: Complete Basic and Detail engineering for the entire EPC
of the project Configuration:
1-1-1 single shaft Combined Cycle 400 MW
SIEMENS SGT5-4000F Gas Turbine
SIEMENS SCC5 4000F - Steam Turbine
Key Technical Features:
Constrained plot size – 9 acres (90.08 Sq. M per MW)
Difficult Ground Condition at Project Site – ISOLUX has
done some ground improvement work but i.e. not sufficient
Difficult intake design due to shifting of river and
exorbitant silting 280 Piles have already been casted BY ISOLUX. L&T to
revalidate pile design ISOLUX has done partial basic engineering and certain
documents are not approved by BPDB. L&T to take it forward
Fuel : Natural Gas
Year of commissioning: 2020
Project Profiles - L&T-Sargent & Lundy
63
Name of Project:
8 x 20 MW Open Cycle Mobile Power Plant, Algeria
Owner:
Societe Algerienne de Production d'Electricite (SPE)
Client:
Hyunson Engineering & Construction Spa
Capacity:
160 MW
L&T-S&L’s scope:
Detail engineering for Mobile Power Plant excluding Civil
Configuration:
Eight (8) Pratt & Whitney make FT8 Gas Turbines
Key Technical Features:
8 No of Gas turbines are trailer mounted
Gas Turbines can run on both fuel oil and fuel gas
4 No. of DM Plant units are trailer mounted
8 No of Fuel oil treatment system trailer mounted
Loop –in and loop-out MV cables from generator to
Generator Transformer and MV unit switchgears
High speed bus transfer system for MV switchgear including
four incomer and bus coupler
Fuel :
Fuel Gas and Fuel Oil
Year of commissioning:
Scheduled 2020
Project Profiles - L&T-Sargent & Lundy
64
Name of Project:
Duqm Integrated Power and Water Project, Duqm Special Economic Zone, Duqm, Al Wusta, Oman
Owner: Duqm Power Company, Oman Client:
Alghanim Cobra Tedagua Sojitz Power And Water LLC
Capacity:
300 MW CCPP & 1,500 cubic meters per hour seawater reverse osmosis (RO) desalination plant
L&T-S&L’s scope:
Basic and Detail engineering services for 5 blocks of 1 GTG x 1 HRSG x 1 STG x 1 ACC Including Desalination Plan, GIS, Sea Water intake and Outfall system
Configuration:
5 Units having 1GTG (SGT-800) x 1 HRSG x 1 STG (SST-
300), ACC each SWRO - Desalination Plant Sea Water intake and Outfall system GIS
Key Technical Features:
Sea water intake (marine) point is around 1 KM inside sea from shore and outfall discharge point is 1.5 KM inside sea from shore
Desalination Plant having DAF,10 Multi Media filter, RO Membrane, Pressure Vessel, high pressure pump, Energy Recovery Device units
Electro deionization type DM plant Potable water re-mineralization plant 132 kV GIS substation with 18 bays + (4 bays for future) GTG, STG, HRSG are on open foundation. No GT and ST
building
Fuel : Gas and oil
Year of commissioning:
Starting from 2020
Project Profiles - L&T-Sargent & Lundy
65
Name of Project:
Zerger Simple Cycle Power Plant Project
Owner:
Turkmenenergo Client:
RÖNESANS ENDÜSTRİ TESİSLERİ İNŞAAT SANAYİ TİCARET A.Ş.
Capacity:
432 MW L&T-S&L’s scope:
Detailed engineering of entire project except Switchyard
Configuration:
3 nos. 144 MW MITSUBISHI HITACHI (MHPS), Model no. M701DA Gas Turbines simple cycle with bypass stack
Key Technical Features:
Project will be Serdarabat, Lebap Region, Turkmenistan Detailed engineering of all BOP facilities for Simple cycle AGRS for Flue Gas Fire Protection detailed engineering Integration with MHPS Gas Turbine and auxiliaries Integration with existing Power Plant Sports facilities (Football court, volleyball court, Sauna) Design of Auditorium for 200 people as Optional 3D Modelling by PDMS software
Fuel :
Natural Gas
Year of commissioning:
2021
Project Profiles - L&T-Sargent & Lundy
66
Name of Project: 8 x 20 MW Open Cycle Mobile Power plant, Algeria
Owner: Algerian Electricity Production Company
Client: Hyundai Engineering & Construction Co. Ltd.
Capacity: 160 MW
L&T-S&L’s scope: Basis & Detail engineering excluding Civil
Configuration: Eight (8) Pratt & Whitney make FT8 Gas Turbines
Key Technical Features:
8 nos. of trailer mounted Gas turbines
4 nos. of trailer mounted DM Plant units
8 nos. of trailer mounted Fuel oil treatment system with
large oil storage facilities
4 nos. of trailer mounted Three-winding Generator
Transformers
4 sets of 220kV equipment each comprise of 3 nos. of
trailers (one for each phase) with Circuit Breaker, CT, VT,
Isolators and associated equipment mounted on it
Individual oil and DM water piping to each GT
Fuel : Fuel Gas and Fuel Oil
Year of commissioning: Scheduled 2020
Project Profiles - L&T-Sargent & Lundy
67
Name of Project: 150 MW Repowering Project , Slovenia
Owner: ENERGETIKA LJUBLJANA d.o.o.
Client: Sargent & Lundy, USA
Capacity: 150 MW CCPP
L&T-S&L’s scope: Basic and Detail Engineering services
Configuration: 2 Siemens make GTG (SGT 800) – (50 ± 6 MWe ISO rating) 2 Siemens make HRSG x 1 Existing STG
Key Technical Features:
Connection of Steam Lines to Existing Steam Turbine #2
Two dual pressure drum type Indoor HRSGs with ancillary equipment utilizes exhaust gas from the gas turbines
Step-up transformer and auxiliary supply transformer of the gas Turbine and Auxiliary unit
Interface with Exiting utility facilities, e.g. Fuels, Water, Fire Fighting, Power Cycle System.
District Heating System 2 No. Diesel Generators for Black Start of the Gas
Turbines and for Emergency Shut Down 110 kV Cabling from GSU to Existing GIS Building Buildings for Gas Turbine gen-sets and HRSGs,
including civil installations Integration of the control systems of individual units of
PPE TOL into the existing TETOL control system Fuel : Gas and oil, Propane for Gas Turbine Ignition Year of commissioning: 2021