capability i commercial case studies€¦ · act landscaping + nursery t 02 6262 6456 email...
TRANSCRIPT
ACT landscaping + nursery t 02 6262 6456 email [email protected]
NSW farm + nurseries
postal address
t 02 6492 7242
PO Box 799 Bega NSW 2550
website
QA/EMS/WHS ACT certified
www.plantsandlandscapes.com.au
ISO 9001:2008 / ISO 14001:2004 / AS 4801:2001
ACT 2013
ACT Professional Woman of 2016
ACT 2012
provincial plants and landscapes
capability I commercial case studies
provincial plants and landscapes project capability I case studies
2 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
Major Plant Supply 5 - 7
New Estates and Subdivisions 8 - 14
Revegetation and Rehabilitation 15 - 24
Wetlands and Water Quality Ponds 25 - 32
Playgrounds and Parks 33 - 39
Commercial Landscaping I Public Spaces 40 - 50
3 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
Projects List for Case Studies
major plant supply
Majura Parkway - (600,000 plants) Canberra Light Rail – 12kms Gungahlin to Civic ACT (1.8 million plants)
new estates and subdivisions
Brindabella Estate 1 and Estate 2, West Macgregor ACT Ginninderra Estate, Ginninderra ACT Broadview Estate, Ngunnawal, ACT Forde Estate I maintenance, Forde ACT Dunlop Parkside Estate, Dunlop ACT Franklin Stonebridge Estate, Franklin ACT
revegetation and rehabilitation
Barrer restoration, Molonglo (NES Plan), ACT ACT Healthy Waterways UM001, Molonglo River rehabilitation, ACT Transgrid substation, Williamsdale NSW Enlarged Cotter Dam (ECD) plant trials + ECD stage 2, Cotter ACT Tidbinbilla Nature Reserve, Tidbinbilla ACT Molonglo NES Plan Pink tailed worm lizard habitat restoration, ACT Golden Sunmoth Habitat Restoration, Macgregor ACT Gungahlin Drive extension and wetlands (GDE) ACT Edwin lands, Queanbeyan NSW Patch K habitat restoration, Molonglo (NES plan) ACT Boco Rock Windfarm, Nimmitabel NSW
wetlands and water quality ponds
ACT Healthy Waterways, 9 projects, various sites, ACT; Kingston Foreshore ‘Eco pond’ and Wetlands, Kingston ACT Eastern Valley Way Water Quality Pond, Belconnen ACT Tidbinbilla Nature Reserve Wetlands, Tidbinbilla ACT Jacka water quality control, Jacka ACT Brindabella Estate water quality ponds, West Macgregor ACT
playgrounds and parks
Moncrieff Community Recreational Irrigated Park (CRIP), Moncrieff ACT Boundless, Commonwealth Park ACT Brindabella Estate stage 1A, 1B, 2A, 2B and E1 5 playgrounds, West Macgregor ACT Brindabella Estate 2 stage 5 playground, West Macgregor ACT Broadview Estate stage 3 and 8 playgrounds, Ngunnawal ACT Iterra Grove playground, Ngunnawal ACT
4 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
commercial developments and public spaces
Canberra Islamic Centre, Monash ACT Canberra Light Rail (Metro) Trial Landscape, Mitchell ACT Canberra Avenue Centenary Tree planting, QBN and Fyshwick ACT Bonner Open Space, Bonner ACT Swedish Embassy, Yarralumla ACT Van Lang Village Multi units Harrison, ACT Jacka Parkside and Creekside Multi Units, Jacka ACT Canberra Avenue Transitway, Fyshwick ACT Monaro Highway Duplication and Canberra Avenue Transitway, Fyshwick ACT Nexus Multi units, Harrison ACT Horizon Multi Units, Coombs ACT Murrumbateman Carpark, NSW
www.plantsandlandscapes.com.au I [email protected] I 0425 727 616
5 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
Major Plant Supply
Production Nursery 1
6 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
major plant supply
Project Name Majura Parkway, Majura / Pialligo ACT – 600,000 plants
Project type Seed collection, plant propagation and supply Completion date + duration Completed: June 2016 / Duration: 2 years
Project description
Grow to order and supply endemic grasses, forbs, shrubs and trees specified by the landscape design. Supply of Lomandra ‘verday’, Provincial’s own PBR plant
Project Value $875, 000 Qty of plants supplied 600,000 Project location Majura Parkway, ACT Client Complete Turf Landscaping Client contact (referee) Michael Waring - 0414 239 441; [email protected] Liquidated damages +
Current litigation NIL
Environmental management +
Safety Record No accidents or incidents; No environmental management issues
Provincial personnel Lisa Roberts: Project Manager, David Charlton: Nursery Director
7 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
major plant supply
Project Name Canberra Light Rail (Canberra Metro) Gungahlin to Civic ACT
1, 800, 000 plants
Project type Seed collection, plant propagation and supply Completion date + duration April 2017 - Current
Project description
Grow to order and supply endemic grasses, forbs, shrubs and trees specified by the landscape design. Consultation on plant species and supply
Project Value $2, 400, 000 Qty of plants supplied 1, 800 000 Project location Gungahlin to Civic ACT Client Canberra Metro Client contact (referee) Patrick Giltrap - 0414 491 007; [email protected] Liquidated damages +
Current litigation NIL
Environmental management +
Safety Record No accidents or incidents; No environmental management issues
Provincial personnel Lisa Roberts: Project Manager, David Charlton: Nursery Director
8 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
new estates and subdivisions
Brindabella Estate 1 West M
acgregor ACT
9 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
new estates and subdivisions
Project Name Brindabella Estate 1, West Macgregor ACT
(incl. Golden sun moth habitat conservation and water quality control ponds) Project type Plant supply, Hard and Soft Landscaping, Maintenance Completion date + duration Completed: 2013 / Duration: 3 years
Project description
Principal contractor on new subdivision landscape works including all landscape construction, plant supply, softscaping and hardscaping as required - 813 dwellings landscaped, 5 stand alone Multi Unit complexes landscaped, public and open spaces, verges, construction of 3 parks and playgrounds, restoration of remnant tree areas, dryland grassing, construction of 5 bio – retention / water quality ponds, restoration of Golden Sun Moth habitat and extended maintenance. Canberra’s 1st native grass verged subdivision - this project stands alone in its use of local plant species, appropriate site preparation and reduced maintenance requirements.
Project Value $4,500 000 Qty of plants supplied 80,000 Project location West MacGregor, Canberra Client Village Building Company / CEC #19 Client contact (referee) Daniel Collings - 6242 3400; [email protected] Liquidated damages +
Current litigation NIL
Environmental management
+ Safety Record No accidents or incidents; No environmental management issues
Provincial Personnel Lisa Roberts: Project Manager, David Charlton: Nursery Director, Justin Hurley-Ley: Landscape Manager, Megan Brady: Quality Manager
10 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
new estates and subdivisions
Project Name Ginninderra Estate, Belconnen ACT
Project type Plant supply, Hard and Soft Landscaping, Maintenance Completion date + duration Completed: June 2019 / Duration: 1 year
Project description
Ginninderra Estate has 350 dwellings across 20 hectares of land with views spanning to the Brindabella Mountains. Principal contractor on new subdivision landscape works including all landscape construction, plant supply, softscaping and hardscaping as required - public and open spaces and verges, dryland grassing, edging and granite.
Project Value $300, 000 Qty of plants supplied 5, 000 Project location Belconnen, ACT Client Canberra Contractors Client contact (referee) Daniel Hill - 0433 407 237; [email protected] Liquidated damages +
Current litigation NIL
Environmental management
+ Safety Record No accidents or incidents; No environmental management issues
Provincial Personnel Lisa Roberts: Project Manager, David Charlton: Nursery Director, Justin Hurley-Ley: Landscape Manager, Megan Brady: Quality Manager
11 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
new estates and subdivisions
Project Name Brindabella Estate 2, West Macgregor ACT (incl. water quality control ponds)
Project type Plant supply, Hard and Soft Landscaping, Maintenance
Completion date + duration Completed: November 2015 / Duration: 3 years
Project description
Principal contractor on new subdivision landscape works including all landscape construction, plant supply, softscaping and hardscaping as required - 547 dwellings landscaped, public and open spaces, verges, construction of 3 parks and playgrounds, restoration of remnant tree areas, dryland grassing, 3 bio – retention / water quality ponds and extended maintenance.
Project Value $3,500 000
Qty of plants supplied 85,000 Project location West Macgregor, Canberra Client Village Building Company / CEC #22 Client contact (referee) Greg Garner - 6242 3400; [email protected] Liquidated damages +
Current litigation NIL
Environmental management
+ Safety Record No accidents or incidents; No environmental management issues
Provincial personnel Lisa Roberts: Project Manager, David Charlton: Nursery Director. Justin Hurley-Ley: Operations Manager, Luke Powell: Landscape Manager, Megan Brady: Quality Manager
12 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
new estates and subdivisions
Project Name
Broadview Estate, Ngunnawal ACT
Project type Plant supply, Hard and Soft Landscaping, Maintenance Completion date + duration Current: Duration: 3 years
Project description
Principal contractor on new subdivision landscape works including all plant supply, softscaping and hardscaping as required - 556 dwellings, all public and open spaces, dryland grassing, verges, 3 playgrounds, restoration of remnant tree areas, dryland grassing, 2 bio – retention / water quality ponds and maintenance.
Project Value $1, 500 000 Qty of plants supplied 40,000 Project location Ngunnawal, Canberra Client Village Building Company / Canberra Estates Consortium #30 Client contact (referee) Greg Garner - 6242 3400; [email protected] Liquidated damages +
Current litigation NIL
Environmental management +
Safety Record No accidents or incidents; No environmental management issues
Provincial personnel Lisa Roberts: Project Manager, David Charlton: Nursery Director. Justin Hurley-Ley: Operations Manager, Luke Powell: Landscape Manager, Megan Brady: Quality Manager
13 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
new estates and subdivisions
Project Name
Forde Estate Soft-scape and Maintenance, Forde ACT
Project type Plant supply, Softscape and Maintenance Completion date + duration Completed: June 2014 / Duration: 18 months
Project description
Landscape works, plant supply, installation and extended maintenance. Preparation of estate for handover to TAMS asset acceptance
Project Value $540,000 Qty of plants supplied 20,000 Project location Forde, Canberra Client Canberra Investment Corporation (CIC) / Forde Developments Client contact (referee) Chris Daly - 6230 0800; [email protected] Liquidated damages +
Current litigation NIL
Environmental management +
Safety Record No accidents or incidents; No environmental management issues
Provincial personnel Lisa Roberts: Project Manager, David Charlton: Nursery Director, Justin Hurley-Ley: Landscape Manager, Megan Brady: Quality Manager
Project Name
Dunlop Parkside, Dunlop ACT
Project type Plant supply, Hard and Soft Landscaping, Maintenance Completion date + duration Completed: 2015 / Duration: 2 years
Project description
Principal contractor on new subdivision landscape works including all plant supply, softscaping and hardscaping as required - public and open spaces, verges, dryland grassing and maintenance.
Project Value $600, 000 Qty of plants supplied 5000 Project location Franklin ACT Client Village Building Company Client contact (referee) Mark Azzopardi - 6242 3400; [email protected] Liquidated damages +
Current litigation NIL
Environmental management +
Safety Record No accidents or incidents; No environmental management issues
Provincial personnel Lisa Roberts: Project Manager, David Charlton: Nursery Director, Justin Hurley-Ley: Landscape Manager, Megan Brady: Quality Manager
14 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
new estates and subdivisions
Project Name
Franklin Stonebridge Estate, Franklin ACT
Project type Plant supply, Hard and Soft Landscaping, Maintenance Completion date + duration Completed: 2014 / Duration: 2 years
Project description
Principal contractor on new subdivision landscape works including all plant supply, softscaping and hardscaping as required - public and open spaces, verges, dryland grassing and maintenance.
Project Value $600, 000 Qty of plants supplied 5000 Project location Franklin ACT Client Village Building Company Client contact (referee) Mark Azzopardi - 6242 3400; [email protected] Liquidated damages +
Current litigation NIL
Environmental management +
Safety Record No accidents or incidents; No environmental management issues
Provincial personnel Lisa Roberts: Project Manager, David Charlton: Nursery Director, Justin Hurley-Ley: Landscape Manager, Megan Brady: Quality Manager
15 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
Revegetation and Rehabilitation
Tidbinbilla Nature R
eserve
16 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
revegetation and rehabilitation
Project Name Barrer Restoration, ACT
Project completion date and
duration
2 Year project ending June 2019
Project description
The Barrer restoration project aims to restore and enhance 60 hectares of exotic pine plantation, native woodland and grassland habitat through the propagation and installation of endemic flora, collection and spreading of endemic seed and follow up maintenance for three years.
Project Value $710,000 Quantity of plants supplied 50 000+ Project location Molonglo River Reserve Client organisation ACT Government Procurement & Capital Works Client contact person (referee) Darren le Roux - 0450 629 601; [email protected] Liquidated damages +
Current litigation NIL
Environmental management +
Safety No accidents or incidents; No environmental management issues
Provincial personnel Lisa Roberts: Project Manager, David Charlton: Nursery Director, Luke Powell: Landscape Manager; Scott Macgregor Fraser: Landscape and Environmental Services Supervisor, Hugh Bailey and Brandon Dean: Site Supervisor’s
17 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
revegetation and rehabilitation
Project Name ACT Healthy Waterways, UM001, Molonglo River Rehabilitation, ACT
Project type Waterway rehabilitation, plant propagation and supply, integrated pest management, extended maintenance over 2 years, rock chutes in gullies
Completion date + duration Commenced December 2018 - Current / Duration 60 months
Project description
This major rehabilitation project over 4.5km of the Molonglo River involves the restoration of the Molonglo River located from the Northern edge of Oaks Estate, under Pialligo Avenue and up to Sutton Road. The restoration will include revegetation along the river and the four major gullies, weed control and the installation of grade control structures to stabilise the four gullies to prevent further sedimentation. This important site encompasses areas of ecological, heritage and aboriginal significance. Significantly, there are EPBC listed plant communities present that require careful management (White Box - Yellow Box - Blakely's Gum grassy woodlands and derived grasslands), 3 weeds of National significance (WONS) and Aboriginal Corroboree grounds
Works encompass: a massive 2000 hours weed control of multiple invasive species and Integrated Pest Management for rabbit control; Civil rock chutes for erosion control in 4 Gullies; 4.5Km of stock proof fencing and rabbit proof netting installation; Seed collection, supply and installation of 92, 0000 + local plants and extended maintenance for 2 years following revegetation
Project Value $3, 000, 000 92, 000 Project location Molonglo River ACT / NSW Client Construction Control Australia P/L for ACT Govt Client contact (referee) Wade Liu - 0447 041 352; [email protected] Liquidated damages +
Current litigation NIL
Environmental management +
Safety Record No accidents or incidents; No environmental management issues
Provincial personnel
Lisa Roberts: Project Manager, David Charlton: Nursery Director, Luke Powell: Landscape Manager; Scott Macgregor Fraser: Landscape and Environmental Services Supervisor, Hugh Bailey and Brandon Dean: Site Supervisor’s
18 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
revegetation and rehabilitation
Project Name Williamsdale Trans-Grid Electrical Substation Revegetation
Project type Seed collection, direct seeding, Plant supply, Revegetation, Maintenance Completion date + duration Completed: November 2012 / Duration: 12 months
Project description
Endangered Ecological Community Restoration – Seed collection, grow plants to order and supply endemic grasses, forbs, shrubs and trees, specified by the landscape design. Revegetation of surrounding disturbed areas and maintenance. Development of landscape management plans for endangered ecological community
Project Value $210,000 Qty of plants supplied 120,000 Project location Williamsdale NSW Client Downer EDI Engineering / Downer Australia Client contact (referee) Ricky Bridge - 9879 8512; [email protected] Liquidated damages +
Current litigation NIL
Environmental management +
Safety Record No accidents or incidents; No environmental management issues
Provincial personnel Lisa Roberts: Project Manager, David Charlton: Nursery Director, Justin Hurley-Ley: Landscape Supervisor, Megan Brady: Project Administrator
19 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
revegetation and rehabilitation
Project Name
Enlarged Cotter Dam Rehabilitation + ECD Biodiversity Offset
Plantings and Enlarged Cotter Dam (ECD) plant trials + ECD stage 2
Project type Seed Collection, Plant supply and installation, Maintenance Completion date + duration Completed: October 2014 / Duration: 12 months
Project description
Restoration and revegetation project at Cotter Dam + Biodiversity Offset plantings. Site preparation, supply and install local species and maintain. Plant locally endemic trees and shrub species to areas disturbed during the construction phase of the Enlargement of the Cotter Dam project, maintenance for 12 months with a 90% survival rate. In conjunction with an offset project to rehabilitate and enhance the surrounding landscape by installing endemic tree and shrub species throughout the existing vegetation.
Project Value $115,000 Qty of plants supplied 3, 500 Project location Cotter Dam Client Bulk Water Alliance Client contact (referee) John Turville - 6175 2400; [email protected] Liquidated damages +
Current litigation NIL
Environmental management +
Safety Record No accidents or incidents; No environmental management issues
Provincial personnel Lisa Roberts: Project Manager, David Charlton: Nursery Director, Justin Hurley-Ley: Landscape Supervisor, Megan Brady: Project Administrator, Hugh Bailey: Site Supervisor
20 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
revegetation and rehabilitation
Project Name Tidbinbilla Nature Reserve Revegetation and Wetlands, Tidbinbilla
Project type Plant supply and Revegetation, Wetlands Creation Completion date + duration Completed: 2010
Project description
Forest, grassland and wetland rehabilitation post-ACT fires. Supply and plant
Project Value $200,000 Qty of plants supplied 120, 000 Project location Tidbinbilla, ACT Client IQON Client contact (referee) Helen Badger - 6282 5977; [email protected] Liquidated damages +
Current litigation NIL
Environmental management +
Safety Record No accidents or incidents; No environmental management issues
Provincial personnel Lisa Roberts: Project Manager, David Charlton: Nursery Director, Justin Hurley-Ley: Landscape Supervisor, Megan Brady: Project Administrator
21 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
revegetation and rehabilitation
Project Name Molonglo NES Plan Pink-tailed Worm-lizard habitat restoration
Project type Provenance seed collection, propagation and plant supply Completion date + duration Complete: April 2015 / Duration: 5 months
Project description
Provenance seed collection, propagation and plant supply
Project Value $35,000 Qty of plants supplied 44,750 Project location Molonglo Valley Client ACT Government, Parks and Conservation (PCS) - Territory and Municipal Services Directorate Client contact (referee) Richard Milner - 0478 407 617; [email protected] Liquidated damages +
Current litigation NIL
Environmental management +
Safety Record No accidents or incidents; No environmental management issues
Provincial personnel
Lisa Roberts: Project Manager, David Charlton: Nursery Director, Luke Powell: Landscape Manager; Scott Macgregor Fraser: Landscape and Environmental Services Supervisor, Hugh Bailey and Brandon Dean: Site Supervisor’s
Project Name Golden Sunmoth Habitat Restoration
Project type Plant supply, Revegetation, Maintenance Completion date + duration Complete: March 2015 / Duration: 5 months
Project description
Site preparation, planting and seeding of food and habitat grass species to enhance the habitat of the critically endangered Golden Sun moth (Synemon plana) within a recognised remnant population area as part of a development offset.
Project Value $20,000 Qty of plants supplied 1,000 Project location Goulburn Client Anglican Diocese of Canberra & Goulburn Client contact (referee) Point Project Management - 6248 0811 Liquidated damages +
Current litigation NIL
Environmental management +
Safety Record No accidents or incidents; No environmental management issues
Provincial personnel
Lisa Roberts: Project Manager, David Charlton: Nursery Director, Justin Hurley-Ley: Landscape Supervisor, Megan Brady: Project Administrator, Scott Macgregor Fraser, Hugh Bailey and Brandon Dean: Site Supervisor’s
22 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
revegetation and rehabilitation
Project Name Gungahlin Drive Highway extension revegetation, ACT
Project type Seed collection, Plant supply and installation, Maintenance Completion date + duration Completed: 2011 / Duration: 9 months
Project description
Construction site and roadside rehabilitation. Grow to order and supply endemic grasses, forbs, shrubs and trees specified by the landscape design.
Project Value $400,000 Qty of plants supplied 300,000 Project location Gungahlin, ACT Client CLC Landscaping (formerly CSP) Client contact (referee) Karen Brien - 6248 8800 Liquidated damages +
Current litigation NIL
Environmental management +
Safety Record No accidents or incidents; No environmental management issues
Provincial personnel Lisa Roberts: Project Manager, David Charlton: Nursery Director, Justin Hurley-Ley: Landscape Supervisor, Megan Brady: Project Administrator
23 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
revegetation and rehabilitation
Project Name Edwin Lands Roadside Rehabilitation, Queanbeyan NSW
Project type Plant supply and installation, Maintenance Completion date + duration Completed: June 2015 / Duration: 3 months
Project description
Supply and plant a 3km median strip with Lomandra ‘verday’ (Provincial’s own PBR plant) and rehabilitate disturbed roadside with endemic grass, forb, shrub and tree species.
Project Value $20,000 Qty of plants supplied 5000 Project location Edwin Lands parkway, Queanbeyan NSW Client CLC Landscaping / Queanbeyan City Council Client contact (referee) Karen Brien - 6248 8800 Liquidated damages +
Current litigation NIL
Environmental management +
Safety Record No accidents or incidents; No environmental management issues
Provincial personnel Lisa Roberts: Project Manager, David Charlton: Nursery Director, Justin Hurley-Ley: Landscape Supervisor, Megan Brady: Project Administrator, Hugh Bailey and Brandon Dean: Site Supervisor’s
24 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
revegetation and rehabilitation
Project Name Patch K Restoration
Project type Provenance seed collection, propagation and plant supply, revegetation, extended maintenance Completion date + duration Completed: June 2016 / Duration: 15 months
Project description
Restoration to enhance Pink-Tail Worm-Lizard habitat and sympathetic fire hazard reduction. Supply, plant and maintenance. As part of a study into habitat enhancement of the Pink-Tail Worm lizard (Aprasia parapulchella). Provincial sourced local seed from the Molonglo River corridor, propagated the planted and installed them to design, amongst spread rocky debris typical of the worm lizard’s habitat. Ongoing maintenance is being carried out to ensure the establishment and persistence of the grassland habitat for a 12 month period
Project Value $136,000 Qty of plants / seed supplied 45,000 plants / 150kgs native seed Project location Molonglo River Reserve Client ACT Government Procurement & Capital Works Client contact (referee) Katherine Ashley - 6205 7646; [email protected] Liquidated damages +
Current litigation NIL
Environmental management +
Safety Record No accidents or incidents; No environmental management issues
Provincial personnel
Lisa Roberts: Project Manager, David Charlton: Nursery Director, Luke Powell: Landscape Manager; Scott Macgregor Fraser: Landscape and Environmental Services Supervisor, Hugh Bailey and Brandon Dean: Site Supervisor’s
25 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
Wetlands and Water Quality Ponds
Eastlake Water Q
uality Ponds
26 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
wetlands and water quality ponds
Project Name ACT Healthy Waterways, Asset FW019, Jerrabomberra Creek,
Narrabundah ACT
Project type Waterway rehabilitation, soft-scaping, plant propagation and supply, maintenance Completion date + duration December 2018 - Current
Project description
This project forms part of the waterway rehabilitation works along the Molonglo River corridor and its associated tributaries from the downstream extent of Molonglo Gorge Nature Reserve to Oaks End Road and the Queanbeyan River from the ACT border to the confluence with the Molonglo River. These works are designed to provide both surface water quality improvement and to improve visual aesthetics through an increased diversity of native vegetation and reduction in weed species This project includes topsoiling, dryland grassing and BSM, mulching, supply and installation of 15,000m2 of Coir Jute Erosion Control matting, plant supply and installation, boulders, rock seating and furniture installation and maintenance
Project Value $220,000 Project location Jerrabomberra Creek, Narrabundah ACT Client HUON Client contact (referee) Mathanraj Theivakularatnam - 0437 229 290; [email protected] Liquidated damages +
Current litigation NIL
Environmental management +
Safety Record No accidents or incidents; No environmental management issues
Provincial personnel
Lisa Roberts: Project Manager, David Charlton: Nursery Director, Luke Powell: Landscape Manager; Scott Macgregor Fraser: Landscape and Environmental Services Supervisor, Hugh Bailey and Brandon Dean: Site Supervisor’s
27 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
wetlands and water quality ponds
Project Name ACT Healthy Waterways, Landscape Packages 3, 4 and 7, Multiple
Sites, ACT
Project type Waterway rehabilitation and Wetlands Creation, soft-scaping, plant propagation and supply, maintenance
Completion date + duration September 2018 - Current
Project description
This project forms part of the waterway rehabilitation works along the Molonglo River corridor and its associated tributaries from the downstream extent of Molonglo Gorge Nature Reserve to Oaks End Road and the Queanbeyan River from the ACT border to the confluence with the Molonglo River. These works are designed to provide both surface water quality improvement and to improve visual aesthetics through an increased diversity of native vegetation and reduction in weed species
These projects include topsoiling, dryland grassing and BSM, mulching, supply and installation of plants and maintenance
Project Value $600, 000 Project location Multiple Locations ACT Client BMD Client contact (referee) Darren Wakely - 0417 759 104; [email protected] Liquidated damages +
Current litigation NIL
Environmental management +
Safety Record No accidents or incidents; No environmental management issues
Provincial personnel
Lisa Roberts: Project Manager, David Charlton: Nursery Director, Luke Powell: Landscape Manager; Scott Macgregor Fraser: Landscape and Environmental Services Supervisor, Hugh Bailey and Brandon Dean: Site Supervisor’s
28 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
wetlands and water quality ponds
Project Name Kingston Foreshore ‘Eco pond’ and Wetlands, Kingston ACT
Project type Seed Collection, Plant Supply and installation, Maintenance Completion date + duration Completed: August 2013 / Duration: 1 month (original works 2009 of 6 months duration)
Project description
Original works included supply and planting all wetlands species for the ponds that collect storm water from the Kingston area. The second stage of works was remedial – to carry out corrective landscaping on the Kingston Foreshore ‘Eco pond’ including the re-planting the pond to the landscape design
Project Value $30,000 Qty of plants supplied 10000 Project location Kingston, ACT Client BMD / ABLE Landscaping Client contact (referee) Michael Filardo - 0438 781 802; [email protected] Liquidated damages +
Current litigation NIL
Environmental management +
Safety Record No accidents or incidents; No environmental management issues
Provincial personnel Lisa Roberts: Project Manager, David Charlton: Nursery Director, Justin Hurley-Ley: Landscape Supervisor, Megan Brady: Project Administrator
29 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
wetlands and water quality ponds
Project Name Eastern Valley Way Water Quality Ponds, Belconnen ACT
Project type Wetlands creation, Plant supply and installation, maintenance Completion date + duration Completed: March 2013 / Duration: 3 months
Project description
Supply and plant to the wetland landscape design (submerged, emergent, marginal, lower bank and dryland species) and provide consultation on maintenance and hydrology regimes required for the establishment of the wetland.
Project Value $75,000 Qty of plants supplied 5,000 Project location Belconnen, ACT Client Glascott Landscape & Civil Client contact (referee) Gabor - 6262 8544; [email protected] Liquidated damages +
Current litigation NIL
Environmental management +
Safety Record No accidents or incidents; No environmental management issues
Provincial personnel Lisa Roberts: Project Manager, David Charlton: Nursery Director, Justin Hurley-Ley: Landscape Supervisor, Megan Brady: Project Administrator
30 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
wetlands and water quality ponds
Project Name Tidbinbilla Nature Reserve Wetlands, Tidbinbilla ACT
Project type Wetlands creation, Plant supply and installation, maintenance Completion date + duration Completed: 2010
Project description
Wetland rehabilitation and creation post-ACT fires. Supply and plant
Project Value $100,000 Qty of plants supplied 50,000 Project location Tidbinbilla, ACT Client IQON Client contact (referee) Helen Badger - 6282 5977; [email protected] Liquidated damages +
Current litigation NIL
Environmental management +
Safety Record No accidents or incidents; No environmental management issues
Provincial personnel Lisa Roberts: Project Manager, David Charlton: Nursery Director, Justin Hurley-Ley: Landscape Supervisor, Megan Brady: Project Administrator
31 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
wetlands and water quality ponds
Project Name Jacka Water Quality Management, Jacka ACT
Project type Water Quality and wetlands creation, Plant supply and installation, maintenance Completion date + duration Completed: March 2014 / Duration: 3 months
Project description
Supply and plant to the water quality pond wetland landscape design (submerged, emergent, marginal, lower bank and dryland species) and provide consultation on maintenance and hydrology regimes required for the establishment of the wetland.
Project Value $150,000 Qty of plants supplied 10,000 Project location Jacka ACT Client Able Landscaping Liquidated damages +
Current litigation NIL
Environmental management +
Safety Record No accidents or incidents; No environmental management issues
Provincial personnel Lisa Roberts: Project Manager, David Charlton: Nursery Director, Justin Hurley-Ley: Landscape Supervisor, Megan Brady: Project Administrator
32 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
wetlands and water quality ponds
Project Name Brindabella Estate water quality ponds x 6, West MacGregor ACT
Project type Plant supply and installation, softscape, maintenance Completion date + duration Completed: 2015 / Duration: 3-6 months each.
Project description
Supply and plant to the landscape design and maintain until established the 6 water quality ponds, design to capture and filter water runoff from the MacGregor Estate.
Project Value $400,000 Qty of plants supplied 8000 Project location Macgregor, ACT Client Village Building Company Client contact (referee) Greg Garner - 6242 3400; [email protected] Liquidated damages +
Current litigation NIL
Environmental management +
Safety Record No accidents or incidents; No environmental management issues
Provincial personnel
Lisa Roberts: Project Manager, David Charlton: Nursery Director, Luke Powell: Landscape Manager; Scott Macgregor Fraser: Landscape and Environmental Services Supervisor, Hugh Bailey and Brandon Dean: Site Supervisor’s
33 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
playgrounds and parks
Moncrieff C
omm
unity Recreation Park
34 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
playgrounds and parks
Project Name CRIP – Community Recreation Irrigated Park, Moncrieff ACT
Project type Park and Playground - Hard and soft-scaping, Maintenance Completion date + duration Completed: June 2018 / Duration: 9 months
Project description All elements of soft-scaping, dryland grassing and BSM, plant supply and installation, advanced trees installation, irrigation installation management, maintenance
Project Value $235, 000 Project location Moncrieff, ACT Client Canberra Contractors Client contact (referee) Scott Regan - 0433 679 535; [email protected] Liquidated damages +
Current litigation NIL
Environmental management +
Safety Record No accidents or incidents; No environmental management issues
Provincial personnel
Lisa Roberts: Project Manager, David Charlton: Nursery Director, Luke Powell: Landscape Manager; Scott Macgregor Fraser: Landscape and Environmental Services Supervisor, Hugh Bailey and Brandon Dean: Site Supervisor’s
35 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
playgrounds and parks
Project Name
Boundless playground, Centennial Park ACT
Project type Supply and install plants Completion date + duration Completed: May 2015 / Duration: 9 months
Project description
Supply and plant the Boundless Playground as per landscape design
Project Value $71,000 Qty of plants supplied 2,000 Project location Centennial Park, ACT Client Boundless Inc Client contact (referee) Ken Williams - 6207 6119; [email protected] Liquidated damages +
Current litigation NIL
Environmental management +
Safety Record No accidents or incidents; No environmental management issues
Provincial personnel Lisa Roberts: Project Manager, David Charlton: Nursery Director, Justin Hurley-Ley: Landscape Supervisor, Megan Brady: Project Administrator
36 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
playgrounds and parks
Project Name Brindabella Estate 1 and 2 playgrounds stages 1A, 1B, 2A, 2B, 5, West
MacGregor ACT Project type Plant supply, Construct Playgrounds, Maintain Completion date + duration Completed: May 2016 / Duration: 1 year each
Project description
Supply all materials and construct playgrounds as per design, ensuring compliance with the Australian Standard (AS1924) for playgrounds and playground equipment, and providing all supporting comprehensive quality assurance and ITP documentation. Supply and plant the surrounding areas as per the landscape design.
Project Value $1, 200 000 Qty of plants supplied 10,000 Project location West MacGregor ACT Client Village Building Company Client contact (referee) Greg Garner - 6242 3400; [email protected] Liquidated damages +
Current litigation NIL
Environmental management +
Safety Record No accidents or incidents; No environmental management issues
Provincial personnel Lisa Roberts: Project Manager, David Charlton: Nursery Director, Justin Hurley-Ley: Landscape Supervisor, Megan Brady: Project Administrator
37 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
playgrounds and parks
Project Name Brindabella Estate 1 stage 5 Natural Playground, West Macgregor
Project type Plant supply, Construct Playgrounds, Maintain Completion date + duration Completed: May 2016 / Duration: 1 year
Project description
Supply all materials and construct Natural Playground as per design, ensuring compliance with the Australian Standard (AS1924) for playgrounds and playground equipment, and providing all supporting comprehensive quality assurance and ITP documentation. Supply and plant the surrounding areas as per the landscape design and undertake drainage works, open space dryland grassing and remnant tree area rehabilitation.
Project Value $500, 000 Qty of plants supplied 3,000 Project location West MacGregor ACT Client Village Building Company Client contact (referee) Greg Garner - 6242 3400; [email protected] Liquidated damages +
Current litigation NIL
Environmental management +
Safety Record No accidents or incidents; No environmental management issues
Provincial personnel Lisa Roberts: Project Manager, David Charlton: Nursery Director, Justin Hurley-Ley: Landscape Supervisor, Megan Brady: Project Administrator
38 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
playgrounds and parks
Project Name Broadview Estate playgrounds stage 3 and 8, Ngunnawal ACT
Project type Plant supply, Construct Playgrounds, Maintain Completion date + duration Completed July 2016 / Duration: 1.5 years
Project description
Supply all materials and construct playgrounds as per design ensuring compliance with the Australian Standard (AS1924) for playgrounds and playground equipment, and providing all supporting comprehensive quality assurance and ITP documentation. Supply and plant the surrounding areas as per the landscape design.
Project Value $500, 000 Qty of plants supplied 3000 Project location Ngunnawal ACT Client Village Building Company Client contact (referee) Greg Garner - 6242 3400; [email protected] Liquidated damages +
Current litigation NIL
Environmental management +
Safety Record No accidents or incidents; No environmental management issues
Provincial personnel Lisa Roberts: Project Manager, David Charlton: Nursery Director. Justin Hurley-Ley: Operations Manager, Luke Powell: Landscape Manager, Megan Brady: Quality Manager
39 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
playgrounds and parks
Project Name Iterra Grove playground, Ngunnawal ACT
Project type Plant supply, Construct Playgrounds, Maintain Completion date + duration Completed Dec 2015 / Duration: 1 year
Project description
Supply all materials and construct playgrounds as per design ensuring compliance with the Australian Standard (AS1924) for playgrounds and playground equipment, and providing all supporting comprehensive quality assurance and ITP documentation. Supply and plant the surrounding areas as per the landscape design.
Project Value $130, 000 Qty of plants supplied 1000 Project location Ngunnawal ACT Client Village Building Company Client contact (referee) Greg Garner - 6242 3400; [email protected] Liquidated damages +
Current litigation NIL
Environmental management +
Safety Record No accidents or incidents; No environmental management issues
Provincial personnel Lisa Roberts: Project Manager, David Charlton: Nursery Director. Justin Hurley-Ley: Operations Manager, Luke Powell: Landscape Manager, Megan Brady: Quality Manager
40 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
commercial developments and public spaces
Section 88 City W
alk Civic AC
T
41 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
commercial developments + public spaces
Project Name Canberra Islamic Centre, Monash ACT
Project type Commercial landscaping - Hard and softscaping, plant supply and maintenance Completion date + duration Completed: May / Duration: 6 months
Project description
All elements of soft and hard scaping including Paving, Edging, Balance Beam, Logs, Rocks, Furniture, Turf, Irrigation Installation and Maintenance
Project Value $120,000 Project location Monash, ACT Client ABA Construction Managers Client contact (referee) Kelvin Guo - 6242 3200; [email protected] Liquidated damages +
Current litigation NIL
Environmental management +
Safety Record No accidents or incidents; No environmental management issues
Provincial personnel Lisa Roberts: Project Manager, David Charlton: Nursery Director, Luke Powell: Landscape Manager; Scott Macgregor Fraser: Landscape and Environmental Services Supervisor
42 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
commercial developments + public spaces
Project Name
Canberra Light Rail (Canberra Metro) Trial Landscaping, Mitchell
Project type Softscaping, Plant Supply and Installation, Monitoring and Reporting Completion date + duration November 2017 - July 2018; Duration 7 months
Project description
Grow to order and supply endemic grasses, forbs, shrubs and trees specified by the landscape design. Install species as per Landscape Specifications to test outcome on broader project. Consultation on plant species and supply and reporting on outcome of Trial Plots
Project Value $65,000 Project location Mitchell, ACT Client Canberra Metro Client contact (referee) Patrick Giltrap - 0414 491 007; [email protected] Liquidated damages +
Current litigation NIL
Environmental management +
Safety Record No accidents or incidents; No environmental management issues
Provincial personnel Lisa Roberts: Project Manager, David Charlton: Nursery Director
43 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
commercial developments + public spaces
Project Name Centenary Tree Planting Canberra Avenue, Fyshwick ACT
Project type Tree supply, installation, maintenance Completion date + duration Completed: September 2015 / Duration: 18 months
Project description
Carry out amenity planting of Oak trees between Canberra and Queanbeyan as part of the centenary celebrations. Scope: supply and plant 230 Oak trees.
Project Value $32, 000 Qty of plants supplied 230 Project location Canberra Avenue, between Queanbeyan and Canberra Client ACT Government: Urban Treescapes Client contact (referee) Luke Bulkeley - 6207 7158; [email protected] Liquidated damages +
Current litigation NIL
Environmental management +
Safety Record No accidents or incidents; No environmental management issues
Provincial personnel Lisa Roberts: Project Manager, David Charlton: Nursery Director, Justin Hurley-Ley: Landscape Supervisor, Megan Brady: Project Administrator
Project Name Bonner Ridgeline Open Space, Bonner ACT
Project type Plant supply, installation, maintenance Completion date + duration Completed: May 2015 / Duration: 6 months Project description Supply and install Eucalypt species to Bonner open space ridgeline. Project Value $92, 000 Qty of plants supplied 2,000 Project location Bonner ACT Client RAM Constructions Client contact (referee) Anthony O’Brien - [email protected] Liquidated damages +
Current litigation NIL
Environmental management +
Safety Record No accidents or incidents; No environmental management issues
Provincial personnel Lisa Roberts: Project Manager, David Charlton: Nursery Director, Justin Hurley-Ley: Landscape Supervisor, Megan Brady: Project Administrator
44 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
commercial developments + public spaces
Project Name Swedish Embassy, Yarralumla ACT
Project type Paving Completion date + duration Completed: September 2015 / Duration: 3 months
Project description
Supply and install sandstone as part of the refurbishment works associated with the Swedish Embassy upgrade. Terrace works included paving, wall cladding, treads and risers and wall capping.
Project Value $37,000 Project location Swedish Embassy, ACT Client Project Coordination Client contact (referee) Simon Bessey - 62851555; [email protected] Liquidated damages +
Current litigation NIL
Environmental management +
Safety Record No accidents or incidents; No environmental management issues
Provincial personnel Lisa Roberts: Project Manager, David Charlton: Nursery Director. Justin Hurley-Ley: Operations Manager, Luke Powell: Landscape Manager, Scott Macgregor – Fraser, Landscape Supervisor
45 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
commercial developments + public spaces
Project Name Nirvana Van Lang Village Multi units, Harrison ACT
Project type Plant supply, Softscaping, Maintenance Completion date + duration Completed: October 2014 / Duration: 6 months
Project description
Carry out landscaping during construction to the Nirvana Van Lang Multi Units as per the landscape design including a 13 week maintenance period.
Project Value $118,000 Qty of plants supplied 2,000 Project location Harrison ACT Client Village Housing Client contact (referee) Mark Azzopardi - 6242 3400; [email protected] Liquidated damages +
Current litigation NIL
Environmental management +
Safety Record No accidents or incidents; No environmental management issues
Provincial personnel Lisa Roberts: Project Manager, David Charlton: Nursery Director. Justin Hurley-Ley: Operations Manager, Luke Powell: Landscape Manager, Scott Macgregor – Fraser, Landscape Supervisor
46 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
commercial developments + public spaces
Project Name Jacka Parkside, Jacka Creekside and Jacka Aspect, Jacka ACT
Project type Plant supply, Softscaping, Maintenance Completion date + duration Completed: June 2015 / Duration: 6 months each
Project description
Carry out landscaping during construction to the Jacka Multi Units as per the landscape design including a 13 week maintenance period. Scope: Construct landscape to design including supply and plant, dryland grassing, compacted granite and bollarding.
Project Value $300,000 Qty of plants supplied 4,500 Project location Jacka, ACT Client Village Housing Client contact (referee) Mark Azzopardi - 6242 3400; [email protected] Liquidated damages +
Current litigation NIL
Environmental management +
Safety Record No accidents or incidents; No environmental management issues
Provincial personnel Lisa Roberts: Project Manager, David Charlton: Nursery Director. Justin Hurley-Ley: Operations Manager, Luke Powell: Landscape Manager, Megan Brady: Quality Manager
47 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
commercial developments + public spaces
Project Name Canberra Avenue Tree Planting, Fyshwick ACT
Project type Tree supply, installation, maintenance Completion date + duration Completed: September 2015 / Duration: 2 years
Project description
Bare root street tree planting and extended 12 months maintenance
Project Value $32,000 Qty of plants supplied 230 Project location Fyshwick ACT and Queanbeyan NSW Client TAMS / Urban Treescapes Client contact (referee) Johanna Wallner - (02) 6205 8678; [email protected] Liquidated damages +
Current litigation NIL
Environmental management +
Safety Record No accidents or incidents; No environmental management issues
Provincial personnel Lisa Roberts: Project Manager, David Charlton: Nursery Director, Justin Hurley-Ley: Landscape Supervisor, Megan Brady: Project Administrator
Project Name
Monaro Highway Duplication and Canberra Ave Transitway,
Fyshwick ACT
Project type Tree and plant supply and installation, softscape, grassing, maintenance Completion date + duration Complete: April 2015 / Duration: 12 months
Project description
Tree planting, tree planting, dryland grassing and general landscaping including 13 week consolidation period work along Canberra Avenue. Create landscapes as per design. This project involved a significant ‘make good’ element, rectifying damage caused by civil construction.
Project Value $345,000 Qty of plants supplied 3, 000 Project location Fyshwick Monaro Highway, ACT Client BMD Client contact (referee) Michael Filardo - 0438 781802; [email protected] Liquidated damages +
Current litigation NIL
Environmental management +
Safety Record No accidents or incidents; No environmental management issues
Provincial personnel Lisa Roberts: Project Manager, David Charlton: Nursery Director, Justin Hurley-Ley: Landscape Supervisor, Megan Brady: Project Administrator
48 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
commercial developments + public spaces
Project Name Nexus Multi units, Harrison ACT
Project type Plant supply, Softscaping, Hardscaping, Maintenance Completion date + duration Completed: February 2015 / Duration: 6 months.
Project description
Carry out landscaping during construction to the Nexus Multi Units as per the landscape design including a 13 week maintenance period. Scope: construct landscape to design including supply and plant, dryland grassing, planter boxes and garden edging.
Project Value $105,000 Qty of plants supplied 1,500 Project location Harrison, ACT Client Village Housing Client contact (referee) Mark Azzopardi - 6242 3400; [email protected] Liquidated damages +
Current litigation NIL
Environmental management +
Safety Record No accidents or incidents; No environmental management issues
Provincial personnel Lisa Roberts: Project Manager, David Charlton: Nursery Director. Justin Hurley-Ley: Operations Manager, Luke Powell: Landscape Manager, Megan Brady: Quality Manager
49 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
commercial developments + public spaces
Project Name Horizon Multi units, Coombs ACT
Project type Plant supply, Softscaping, Hardscaping, Maintenance Completion date + duration Completed: June 2016 / Duration: 1 month.
Project description
Carry out landscaping during construction to the Nexus Multi Units as per the landscape design including a 13 week maintenance period. Scope: construct landscape to design including supply and plant, dryland grassing, garden edging.
Project Value $230,000 Qty of plants supplied 2,000 Project location Coombs, ACT Client Village Housing Client contact (referee) Nick Gray - 6242 3400; [email protected] Liquidated damages +
Current litigation NIL
Environmental management +
Safety Record No accidents or incidents; No environmental management issues
Provincial personnel Lisa Roberts: Project Manager, David Charlton: Nursery Director. Justin Hurley-Ley: Operations Manager, Luke Powell: Landscape Manager, Megan Brady: Quality Manager
50 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
commercial developments + public spaces
Project Name Murrumbateman Carpark
Project type Softscape; Tree Planting; Dryland Grassing; Maintenance Completion date + duration Completed: June 2018 / Duration: 4 months
Project description Undertake site preparation, grassing, plant supply and tree planting and maintenance as stage 1 works pre-commencement of Subdivision
Project Value $50,000 Project location Murrumbateman NSW Client HUON Client contact (referee) Bojan Knezevic - 0417 764 971; [email protected] Liquidated damages +
Current litigation NIL
Environmental management +
Safety Record No accidents or incidents; No environmental management issues
Provincial personnel
Lisa Roberts: Project Manager, David Charlton: Nursery Director, Luke Powell: Landscape Manager; Scott Macgregor Fraser: Landscape and Environmental Services Supervisor, Hugh Bailey and Brandon Dean: Site Supervisor’s
51 new estates + subdivisions commercial + residential landscapes revegetation + wetlands creation design + consult maintenance plants
www.plantsandlandscapes.com.au I [email protected] I 0425 727 616