capability statement - trade alliance group · 2019-01-25 · the senior project management team...
TRANSCRIPT
Capability StatementThe interior fit out & refurbishment specialists
Contents
About A1 Interiors and the A1 Team . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 02
Our Values . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 03
Facility Management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 05
- Coronation Drive . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 07
Commercial . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 09
- Toyota . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
Residential . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
- Norman Park . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15- Windsor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
Interiors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
- Transport Works . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19- Elston . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
Passive Fire . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
- Tunnel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
Environment & Waste Management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
Workplace Health & Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
Contact Us . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . back cover
“Starting out as an apprentice, then working as a supervisor, moving on to project management has
provided an ability to empathise with and understand each person and their roles in the industry.
The key to A1 Interiors success is clear, I’ve always looked to employ the best people in the industry. We have a great
team who love what they do.”Perry Richardson – Director
A1 Interiors Support
MANAGING DIRECTOR
PERRY RICHARDSON
DIRECTOR/CHIEF FINANCIAL
& OPERATING MANAGER
BILL MALONE
ACCOUNTANT
LEA YOUNG
ADMINISTRATION MANAGER
ANTHENA DIZON
PROJECT MANAGER
BEN WEBER
ESTIMATOR
DIXON VADIL
SAFETY COMPLIANCE MANAGER
BILL MALONE
CONTRACTS ADMINISTRATOR
DIXON VADIL
A1 INTERIORS LABOUR
/ SUBCONTRACTORS
CLIENT
A1 Interiors Team Structure
02 A1 Interiors Capability Statement
Our ValuesCustomer Care
We recognise our important role in ensuring the
smooth running of each project and our ultimate aim
is to make ‘our clients look good to their clients’. With
that continued commitment, our customer care is
what defines us and is what is talked about most in
the testimonials we receive from our generous clients.
Cost-Effective Solutions
In addition to their individual construction needs,
we understand that each of our clients have their
individual budget, and that requires us to work within
their pre-determined project boundaries. Our team’s
experience allows us to value engineer projects to
ensure cost-effective solutions for all clients.
Project Delivery
When we commit to a project delivery date, we are
committed to doing everything possible to overcome
any unforeseeable obstacles with ease. Our flexible
approach means we can offer tailored solutions to
each project, ensuring our clients’ vision is achieved.
03 A1 Interiors Capability Statement
04 A1 Interiors Capability Statement
Facility ManagementThe Facility Management division of A1 was
established to provide businesses a better
way to efficiently and cost-effectively
manage their ongoing building maintenance
and construction needs.
Our dedicated project management team boasts
a wealth of industry experience, and understands
the construction applications and techniques
necessary to urgently meet the needs of various
industries from shopping centres to apartment
buildings and hospitals.
This includes precise scheduling and the
overseeing all areas of repairs and install to
ensure operations continue with absolutely
minimal disruption to trade.
05 A1 Interiors Capability Statement
“I was particularly impressed with the overall handling of the project and the
professional manner of the staff”Peter Mirls, Managing Director Surf Extreme
Coronation Drive, MiltonRemove and replace storm damaged sheets to fascia & soffits.
Night shifts, council approval, fees, permits, traffic control
personnel and police supervision were required to achieve
the scope of works. A traffic plan was created and 2 lanes
of Coronation Drive were closed during the works. A 70m
truck mounted cherry picker was brought in requiring full
supervision, spotters and safety management. Allowances were
also made to reinstate the garden bed after completion.
07 A1 Interiors Capability Statement
Training and Development
We’ve achieved great success in establishing numerous apprenticeships over the past three
decades and continue to provide ongoing support in all fields required. With more than 100 staff members, we offer a range of vast opportunities, both internal and external, to further our skill set. This allows us to grow,
improve and keep up to date with our frequently changing industry. These attributes are what separates our organisation from the rest, they provide us and our business relations with the confidence in any project being of high calibre.
CommercialOur Commercial division are professional
subcontractors with proven success in working
with commercial builders to deliver projects
across a wide range of sectors that include
Government, Health, Corporate, Education,
Finance, Hospitality and Retail.
Solid construction skills and immeasurable
experience underpin our reputation for seamless
completion and a lasting positive impression.
09 A1 Interiors Capability Statement
“The site manager gave us regular progress reports and was easily able to adapt to mid project changes. The onsite team
were always courteous, efficient and very flexible with the need of our business during the construction phase”
Samantha Gulliver, Corporate Counsel Queensland Cotton
Toyota Springwood
11 A1 Interiors Capability Statement
“A1 maintained a very high quality benchmark that was the basis for the final
finish that was achieved on this project”Damien Heather, Thomas & Coffey
ResidentialWe have always been synonymous with the
highest quality residential plastering services
throughout South East Queensland. Our multiple
award winning residential division works closely
with many of the region’s most acclaimed
builders, architects and project management
companies, and we have a reputation for
consistently surpassing client expectations.
Our project managers understand each project is
unique and requires special attention to ensure the
end result is innovative, refreshing and enjoyable.
13 A1 Interiors Capability Statement
14 A1 Interiors Capability Statement
Norman ParkThis incredible residence in Norman Park was by far the most
difficult and rewarding project in our residential team’s history.
The scope of this project was to renovate and restore the
internal features without disrupting or losing the naturally
beautiful heritage feel.
Highly skilled teams were required to handle and install the
mega sized cornice. A crane was used to cater for difficult
dwelling access and to assist in the delivery and installation
of the cornice.
A1 Interiors are extremely proud to boast this project in our
portfolio, and are even more proud of the AWCI Plastering
Award 2014 this project was awarded.
15 A1 Interiors Capability Statement
WindsorThis stunning property at Windsor was an exciting challenge
for our residential team. Notoriously difficult coffered ceiling
sections were installed, together with intricate ornamental
cornice to achieve a unique and high end result. Two teams
were stationed, one on each floor, completing the project
successfully within a tight programme.
This is the second A1 Interiors project nominated for the
AWCI Plastering Awards 2015.
16 A1 Interiors Capability Statement
InteriorsWith a combined 80 years in the fit out and
refurbishment industry, our Interiors division
provides innovative project management
services that encompass every stage from
project feasibility through to procurement
and project delivery.
The senior project management team within
our Interiors division are proud to have formed
strong relationships with architects, designers,
consultants, sub-contractors and suppliers; forming
the best possible collaboration for each project.
17 A1 Interiors Capability Statement
18 A1 Interiors Capability Statement
Transport WorksTransport Works turned to A1 Interiors to transform this
Newstead office into a funky space that represented the same
energetic enthusiasm they offer to their clients when it comes
to improving transport solutions.
The A1 team drew inspiration from the clients’ involvement
in the Transport industry, and by using the raw materials of
transport packaging ‘pallets’ and industrial steel, we created an
exciting and inspirational office space.
19 A1 Interiors Capability Statement
Elston PartnersAgain, we were engaged to deliver an extremely high end
two floor fit out for the new premises of Elston Partners in
Ann Street, Fortitude Valley.
These works comprised complex lighting bulkheads and a mix
of finishes including Black Powder Coat Aluminium, Timber
Veneer and Slat Ceilings, Mirror Walls and Glass Balustrading.
Working in conjunction with Woollam Constructions to
manage tight lead times and numerous access issues, the
project was fast tracked and integrated into the base building
works. The highly coordinated works were completed on
time, with eye-catchingly beautiful end results.
This project has been nominated for the AWCI Plastering
Awards 2015, a true credit to all involved.
20 A1 Interiors Capability Statement
Passive FireA1 Passive Fire lead the industry when it comes to
robust, comprehensive and cost effective passive
fire protection. With a full suite of services including
supply, installation and certification our team can
guarantee fast, responsive and reliable solutions.
Our team’s strong technical understanding of fire
rating requirements and regulations enables us to
deliver superior quality work that meets regulatory
approval first time. This technical understanding
together with adaptable systems allows for custom
solutions on even the most complex matters.
21 A1 Interiors Capability Statement
22 A1 Interiors Capability Statement
“This project was challenging for everyone involved. The conditions inside
the Tunnel were new to most of our crew, but they handled it with ease and
delivered outstanding results day in and day out. The Legacy Way Tunnel was an exciting project to be a part of and really
showcased our potential”Brice Gifkins, Project Manager Legacy Way Tunnel
Transcity Legacy Way Tunnel
Scope of Work: Provide fire protection for the concrete
and steel structures to the cut and cover entrances, with a
Promatect H 27.5mm linings system being designed and built
to a modified hydrocarbon fire specification.
Overview: This process involved a full prototype being
designed, tested and approved. Day and night shifts including
manual handling of 90kg weighted panels were required to
achieve the scope of works. These works included more than
50,000 SS spike anchors in a 65mpa concrete. The 8m high
ceilings resulted in the works being carried out via boom and
scissor lift access only. Operating under the strictest safety
plans together with continual construction traffic meant
limited access throughout the project. The A1 Passive firm is
incredibly proud of the process and end result.
24 A1 Interiors Capability Statement
Environment & Waste Management Policy
A1 Interiors is committed to undertaking its business in a manner that recognises the importance of
environment protection and sustainability.
Our Environment and Waste Management Policy aims to meet the needs for
environmental safeguards and the adoption of environment sensitive work
practices during the construction phase of a project. It is designed to:
———
Manage environment related issues in accordance
with any client requirements, policies and procedures
———
Provide appropriate protection for the environment consistent with
the level of risk applicable to the building and construction works
———
Apply waste minimisation principles and take all practical steps to prevent
pollution and other adverse effects from our constructions works
———
Educate and train employees to continually improve awareness,
skills and knowledge of environmental issues and practices
25 A1 Interiors Capability Statement
Workplace Health & Safety
We base our Workplace Health, Safety and Rehabilitation Policy on achieving excellence through safe, secure, reliable, efficient, incident free and environmentally sound execution
— all work-related injuries and incidents are preventable.
We achieve these goals by following the Safe Management Plan (SMP), the approved site-
specific rules, and job specific Safe Work Method Statements (SWMS).
Effective management of Health, Safety and Environment (HSE) objectives requires the
commitment of all personnel involved in the work through the application of the following:
• Proactive safety
leadership by all
stakeholders
• Displaying and practicing
safe behaviours and acts
• Detailed planning
including hazard
identification, risk
assessment, effective
control of work activities,
and review of the
effectiveness of
these controls
• Safe working practices
(SWP), safe operating
procedures (SOP) which
meet or exceed HSE
legislative requirements
• Responsible supervision
of all project personnel
• Regular safety awareness
through inductions,
training, daily works
meetings, pre starts
and tool box talks
• Safety promotion during
projects to increase
awareness amongst
all personnel
• Prompt feedback on
safety concerns raised
by personnel
• Prompt incident reporting
and incident investigation
to prevent reoccurrence
• Effective risk assessment
of all plant, machinery
and work activities
• Provide effective
management,
organisation
and response in
emergency situations
• Ensuring the work team
is totally committed to
achieving our objectives
• Providing effective
injury management
and rehabilitation
for all employees
26 A1 Interiors Capability Statement
Contact Details
31 Neumann Rd CAPALABA QLD 4157
Tel 07 3823 4644 Fax 07 3823 4744
www.a1interiors.com.au
ABN 21 010 862 316 BSA No. 058 115