DESCRIPTION
Capital Facility Spill Summary East Providence, RI August 31- Present. CAPT Verne Gifford Jr. Sector Commander Sector Southeastern New England. CAPITAL TANK FARM/FACILITY. EPA. USCG. SITE OF SPILL. PIPELINE. OUTFALL LOCATED BENEATH I-195 BRIDGE. PIPELINE. USCG. EPA. PIER TERMINAL. - PowerPoint PPT PresentationTRANSCRIPT
Capital Facility Spill SummaryEast Providence, RI August 31- Present
CAPT Verne Gifford Jr.Sector Commander
Sector Southeastern New England
PIER TERMINALPIER TERMINAL
OUTFALL LOCATED BENEATH I-195 BRIDGEOUTFALL LOCATED BENEATH I-195 BRIDGE
SITE OF SPILLSITE OF SPILL
PIPELINEPIPELINE
PIPELINEPIPELINE
EPA
USCG
USCG EPA
CAPITAL TANK FARM/FACILITYCAPITAL TANK FARM/FACILITY
Capital Terminal Facility and EPA/USCG OSC Boundary
Oil loss while pipeline under pressure of oil transfer from barge to tank farm. Barge pumps ran approx 5 minutes.
Spray zone
Spray zone
Command PostCommand Post
Staging AreaStaging Area
Railroad track
Railroad track
Ruptured pipeline
Ruptured pipeline
500 ft of containment boom(precautionary measure)
500 ft of containment boom(precautionary measure)
Affected area from CG Auxiliary over flight. East Providence Fire Department clearing Valley Street while
Railroad Tracks
Valley Street
Pooled product once transfer operations secured
Railroad TracksValley Street
Product recovery begun.
12 Feet
Break in pipeline exposed and prepared for temporary repairs.
Department of Public WorksCity Storm Drain Schematics
Affected OutfallAffected Outfall
Spill SiteSpill Site
Affected Storm DrainsAffected Storm Drains
Approximately 50 gallons of product entered the water by way of a storm drain.
Outfall under bridge
I-195 Eastbound
Marina at Houlihan’s Tavern
Storm drain outfall located below the I-195 bridge.
Valley Street storm drain outfall
Containment and absorbent boom at the Valley Streetoutfall.
Dresser coupling
Recovery well
Second recovery well 70’ from break
Seekonk River approx 140’ w
Temporary repair during pipe pigging and adjacent recoverywell.
Summary• Total volume spilled was unknown until volume required to
repack pipeline was determined. Total spill (not accounting for amount recovered) estimated at about 68K gallons.
• Mass balance of oil loss, recovery, and remaining in the environment being finalized and agreed to by UC.
• Recovery wells in place and ground water contamination plume being mapped by RP’s contractors.
• No further sheening from Valley Street outfall. Migration of oil in ground water has not resulted in a sheen in the river.
• Moving from emergency response (Unified Command) to long term remediation by RI DEM.