![Page 1: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/1.jpg)
Capital Investment Programme 2020+
Passenger Advisory Group
07 Feb 2019
![Page 2: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/2.jpg)
Agenda
Programme
Overview
Passenger
Journey
Background
and Drivers
![Page 3: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/3.jpg)
Context - Airport Growth
2008 – 2010
Annual passenger
traffic dropped by
over 5 million
23.5
20.5
18.418.8 19.1
20.2
21.7
25.0
27.9
29.6
31.532.4
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
Passen
gers
(m
illio
n)
2010 – 2013
Recovery
commences, but
slow and fragile
2014 – 2016
Surge in passenger
volumes
![Page 4: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/4.jpg)
Customer choice approaching 50 different airline product offerings
![Page 5: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/5.jpg)
Over-arching Future Traffic Assumptions
Normalised
traffic growth
Notes:
A sustained period of
moderated but stable
demand growth is expected.
Current growth rates have
subsided to mid-single digit
percentages and are
expected to reduce further in
the medium term, across the
larger European airports.
33.033.7
34.435.1
35.836.5
37.238.0
29.6
31.432.4
33.434.4
35.436.5
37.6
38.7
39.8
41.0
2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027
Passen
gers
(m
illio
n)
2.0% 2.5% 3.0%
Next Regulatory Cycle
CAGR of 3% will deliver 40 million passengers per annum as soon as 2026
![Page 6: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/6.jpg)
Daily Activity at 40 Million Passengers
6
![Page 7: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/7.jpg)
Capacity Assessment by Facility
![Page 8: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/8.jpg)
Capacity Assessment at 2020
Airfield
• Incremental runway capacity in construction
• Existing runway upgraded and life extended
• Significant taxiway enhancements progressing under PACE
and North Runway programmes
Future Status
Parking Stands
• Significant deficit in overall aircraft parking stands
• An additional 33 NBE stands required to support 40mppa busy
day schedule
• Secondary deficit in widebody/CBP enabled, bridge-served
contact stands
Terminals
• Capacity headroom currently available
• Isolated capacity deficits
• Specific deficit: US CBP facility requires significant expansion
to support 40mppa schedule activity
8
![Page 9: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/9.jpg)
What our peer European airports are investing…
*p.a.: Spend per annum
BIRMINGHAM €BN 0.6Full development project
STANSTED €BN 0.6New Arrivals building
MANCHESTER €BN 1.1Major terminal redevelopment, new stands…
HEATHROW €BN 15.6New Runway
MADRID BARAJAS €BN 1.6Major developments in T1, T2 and T4
HELSINKI €BN 1.0Major Terminal expansion
COPENHAGEN €BN 2.6New Piers & Terminal expansion
SCHIPHOL €BN 3.5New Piers & Terminal
ROME €BN 0.4 p.a.*Full redevelopment
PARIS €BN 2.4+Development of terminals
![Page 10: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/10.jpg)
Current Position….
❑ Eight consecutive years of strong growth
❑ 10 million passengers added to annual total since 2010
❑ Demand pipeline continues to be varied and strong
❑ Capacity development not a primary focus back in 2014
❑ Capex has not kept pace with realised growth
❑ Airport will operate with capacity constraints for next 4-5 years
❑ Pax welfare is not well served by a capacity constrained airport (barriers to entry)
❑ Need to develop large scale strategic infrastructure for 40m passengers per annum
❑ Majority of Tier 1 competitor airports announcing significant capex investment
(€1bn+)
![Page 11: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/11.jpg)
Government Policy and Dublin
Airport Strategy
![Page 12: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/12.jpg)
Government Policy
• Develop new routes and services,
particularly to new and emerging markets
• Ensure a high level of competition and
choice in the Irish market
• Maximise connectivity to the rest of the
world
• Maximise scale and usage of US CBP
facility
• Develop and promote Dublin as an
international hub
![Page 13: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/13.jpg)
Dublin Airport Strategic Ambition
Inspire 2025Develop 40m capacity capability by 2025
Balanced airline growth
Grow transfer traffic to c.10% of total
traffic by 2025
Grow Transatlantic network to 4th in Europe
(overtake AMS, LGW and KEF)
Maintain and support a multitude of diverse
business segments, whilst retaining top 5
position for overall passenger service quality
![Page 14: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/14.jpg)
Strategic Objectives
Maintain highly competitive airport
charges
Efficient and timely infrastructure development
Top 5 for service quality in Europe
Continue to
stimulate and
facilitate airline
growth
![Page 15: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/15.jpg)
20 1 2 2 2
46
10 9 8 86
8 7
1513
1713
1719 20
2426 26 27 27
23
3133 34 34
36 3638 38 38 38 37 37
2927
29 2826 26 25
2724
22 2321
22
2521 21 20
1817
16 17 18 17 2119 20
12
9
711
76
6
32 3
4 48
53 2 3
3 33 3
1 1 2 2
12
22
3 3 42 7
8 5
Q1 06 Q3 06 Q107 Q307 Q108 Q3 08 Q1 09 Q309 Q110 Q310 Q111 Q311 Q112 Q312 Q113 Q313 Q114 Q314 Q115 Q315 Q116 Q316 Q117 Q317 Q118 Q318
Dublin Airport Overall Satisfaction - European Airports*Airports scoring below Dublin
![Page 16: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/16.jpg)
Peak Summer 2018 CAR ResultsSOURCE: ACI
PERFORMANCE AGAINST C.A.R SQM2015 C.A.R
TARGETQ318
OVERALL SATISFACTION 3.90 4.12
COURTESY AND HELPFULNESS OF SECURITY STAFF 3.80 4.21
EASE OF FINDING YOUR WAY THROUGH THE AIRPORT 3.90 4.25
FLIGHT INFORMATION SCREENS 3.90 4.28
COURTESY AND HELPFULNESS OF ALL AIRPORT STAFF 3.80 4.33
INTERNET AND WIFI 3.10 4.03
CLEANLINESS OF WASHROOMS 3.50 3.90
COMFORT OF WAITING/GATE AREAS 3.30 3.60
CLEANLINESS OF TERMINAL 3.90 4.16
PASSING WARNING FAILING
![Page 17: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/17.jpg)
Capacity Development Plan
![Page 18: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/18.jpg)
11 Strategic Project Drivers (ranked and weighted)
Top Tier
Priority
Potential to
close airport
![Page 19: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/19.jpg)
Project Refinement
19
![Page 20: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/20.jpg)
CIP Components
20
Capital Maintenance, Information Technology,
Security and Commercial
CORE Programme
Project drivers
• Replace end of life assets
• Asset rehabilitation and life extensions
• Upgrades to latest technology
• Regulatory compliance
• Elevate safety and environmental protection
• Deliver efficiency targets
Projects well developed across the various
departments and primarily a bottom-up exercise
Strategic infrastructure developments to facilitate
growth across the business
Capacity Development Programme
Project drivers
• Develop capacity to support 40 million
passengers per annum by 2025
• Develop Dublin as a transfer hub
• Continued 100% transatlantic preclearance
• Facilitate efficient, quick-turn short-haul operations
Large scale strategic projects from Masterplan
common first step
Top Down
Bottom
Up
![Page 21: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/21.jpg)
Asset Care Deliverables
21
CORE
€520m
€60m apron and taxiway rehabilitation
€25m enhanced airfield lighting and airport electrical network
€25m Terminal 1 façade upgrade
€15m replace heavy vehicles incl snow base
Asset Care Investments
€256m
€15m life safety systems
upgrades
€18m heating, ventilation and
air conditioning upgrades
€15m airbridge upgrades and ground power
€10m sustainable
energy projects
![Page 22: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/22.jpg)
IT, Security, Commercial & Other Deliverables
22
CORE
€520m
€6m long-term carpark spaces (+2,000)
€24m expansion of T1 and T2 short-term carparks
€14m lounge refurbishments
€18m consolidated car hire centre
Remainder of CORE
Investments
€273m
€7m passenger boarding automation
€8m T1 retail upgrades
€7m IT safety and security compliance
€7m airfield optimisation
![Page 23: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/23.jpg)
Core Development Zones
23
1
CBP operation and
transfer hub
Short-haul, Point-to-Point LCC
Focus
2
Non-scheduled and
support operations
3
Airport developed under a structured, zonal plan
![Page 24: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/24.jpg)
24
• Development critical for achieving
transatlantic, transfer and CBP growth targets
• Designed to support:
o Aer Lingus growth
o Existing US carrier growth
o Potential new US carriers
o Norwegian transatlantic expansion
1. Development of new CBP enabled Pier 5, with
capacity to handle 8 NB aircraft (or 4 WB)
2. Bank of 9 new remote stands, with PBZ (can be
used for towing/staging and/or live departures)
3. Upgrade of taxiways to dual code E
4. Expansion of US CBP facility
1
2
3
4
South Apron DevelopmentTotal Estimated Cost €441m
New Pax Capacity 5mppa
![Page 25: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/25.jpg)
25
Development critical for supporting additional Ryanair based aircraft and for overall short-haul growth targets
1. Development of a new pier (3 phases). At completion, 15 new contact stands delivered. Progress phases 1 and 2 immediately
2. Construction of a new Passenger Boarding Zone on Apron 5H to support live operations across the 12 stands
3. Option to install three airbridges on Pier 1 to support wide-body operations
4. Efficient, full length dual code C North Apron taxiways, with direct access to North Runway line-up points (only 400m)
1
5
4
North Apron DevelopmentTotal Estimated Cost €200m
New Pax Capacity 5.6mppa
1
2
3
4
![Page 26: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/26.jpg)
26
Critical to unlock the 19 existing stands on the West Apron for passenger operations
1. Requirement for service vehicles and buses to underpass runway 16/34, existing taxiways and a future taxiway
2. Development of a new remote aircraft parking apron, initially with 10 stands and ultimately, enabled to support an additional 16
stands. Apron includes dedicated General Aviation parking zone and Code E Engine Test Bay
3. €50m environmental package for airfield drainage to support 40mppa activity
Unlock West ApronTotal Estimated Cost €218m
New Pax Capacity 2.1mppa
1
2
3
![Page 27: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/27.jpg)
Terminals – Focus Projects
27
• Terminal capacity not as pressing as piers, apron and airfield. Modest improvements proposed to facilitate 40mppa
Total Estimated Cost €206m
Total Pax Capacity 40mppa
1
2
Terminal 1
1. Central Search to Mezzanine
2. 2 new check-in islands
3. Refresh and enhance Baggage Reclaim
4. Upgrade Pier 3 Immigration
5. Reposition kerbside to back of Atrium
12
34
5
Terminal 2
1. Transfer baggage upgrades
2. Central Security: lane enhancements
3. Potential additional check-in desks
3
![Page 28: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/28.jpg)
28
Understanding Passenger Experience
![Page 29: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/29.jpg)
Thank you
![Page 30: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/30.jpg)
A comprehensive programme of quantitative and qualitative
research to support passenger driven decision-making
Primary Longitudinal Quantitative Studies
• Passenger Tracking: 21,000 interviews p.a.
o Provides profile information including modal choice,
demographics.
• Customer Satisfaction Monitor: 8,500 interview p.a.
o Provides detailed touchpoint satisfaction information,
e.g. satisfaction with washrooms and key driver analysis
• ACI ASQ: 3,000 interviews p.a.
o Provides peer group benchmarking for passenger
satisfaction
Monitoring and measuring the passenger experience
as an inter-connected journey, supported by processes
and service delivery
![Page 32: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/32.jpg)
Meet our extended team
Hank
+
Linda
www.designbyccd.com
Fiona Luca Hallie
+
Family
![Page 33: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/33.jpg)
Scenarios
www.designbyccd.com
Terminal 2 - Departures
1.CBP to Pier 5
2.Non-CBP to Pier 5
3.Non-CBP to Pier 5 to bus to PBZ
4.Non-CBP to Pier 5 - walk on to plane
5.CBP to Pier 3
Terminal 2 Transfer
6. Pier 3 arrival to CBP to CBP departure in Pier 3
7. Pier 4 arrival (LH) to Pier 5 to P5 PBZ (SH) or vv
Terminal 2 Arrivals
8. PBZ bus to injection point
9. Pier 5 arrival
•
Terminal 1 Departures
10.OCTB shuttle point to PBZ 5H to walk to plane
Terminal 1 Transfer
11.SH fl ight into P1M2 to departure on PBZ5H via OCTB &
transfer centre
Terminal 1 Arrivals
12. Arrive to PBZ 5H to bus to injection point (TBC)
13. P1M2 arrival joining main Pier 1 arrival
![Page 34: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/34.jpg)
Scenario Narrative
• 10 minute exercise before each
walkthrough
• Build a back story & context
• Identify use of key touchpoints
through the journey
Add individual needs
Play the Premium card
•
•
www.designbyccd.com
![Page 35: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/35.jpg)
Note taking structure
• Uses Ten Core Passenger
Experience Needs
• Focuses on strengths &weaknesses of the design
• Adds opportunities &threats to improve or break
experience
www.designbyccd.com
![Page 37: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/37.jpg)
Dwell Spaces& Movement Spaces
Space to rest
Pause with a view
Time to educate & inform
Integrate with art & culture
www.designbyccd.com
Help passenger with their expectations
Gamify for those who want that
![Page 38: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/38.jpg)
Gobeyond signage
Creative solutions to read a spaceWhere am I in the process?
www.designbyccd.com
![Page 39: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/39.jpg)
“Special” but not special
Why not special like this?First impression of how passengers are treated
www.designbyccd.com
![Page 40: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/40.jpg)
Re-think the queue
Where does my queue start?
Am I in the right one?
How long will it be?
The human touchChange to entertain or inform?
Use my time?
www.designbyccd.com
![Page 41: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/41.jpg)
Re-think thegate
Queue management - sit not stand
Carry-on worry
Countdown to board
Passenger information - where is my plane?
www.designbyccd.com
Seating for meet my needs
Destination information / themes
Focus on “belt off ding” moment
![Page 42: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/42.jpg)
Service
www.designbyccd.com
What does Dublin Airport want to be famous for?
A strategy that integrates infrastructure, place, product & service
A strategy voiced from passenger need (“I want”) rather than airport
view (“we want to”)?
![Page 43: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/43.jpg)
Arr
ive a
t A
irport
Check-in
Security
Gate
Calle
d
Arr
ive a
t G
ate
Board
Flig
ht
Travel to Airport
Check-in Security Wait for Gate Go to Gate Arrive at hold gate & Board Flight
Time
1 2 3 4 5 6
Improved and
increased
kerb set down
Improved &
expanded
parking
Improved
way-finding
Increased
circulation area
Increased &
improved
check-in
experience
F&B offering at
departures
level
New security
screening area
incorporating e-
gates, C3
technology &
full length
ATRS
Expanded departures lounge area
Improved F&B and Retail offerings
New orientation & dwell spaces on route
Expanded views of Airfield providing a sense of space
and orientation
Travellators on
long walks
F&B offering in
Piers
Travel range
(160-960m –
existing max
880m)
Improved comfort at gate
Localised f&b offerings
Pre CIP
Post
CIP
CIP proposedmeasures
We will be running a research study with UCD on this subject in order to
tangibly and objectively measure the impact on passengers
![Page 44: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/44.jpg)
![Page 45: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/45.jpg)
04.10.2018
Journey time
00:00
Terminal 1 Atrium Entrance
Passenger experience
Today
![Page 46: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/46.jpg)
04.10.2018
Clean, bright, generous and simplified atrium entrance
Welcoming and inviting signage, visible from entire forecourt
Terminal 1 New Atrium Entrance
Generous central access from drop-off forecourt
Second travellator to departures
Passenger experience
Journey time
00:00
Tomorrow
![Page 47: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/47.jpg)
04.10.2018
Journey time
00:04
Terminal 1 Entrance
Passenger experience
Today
![Page 48: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/48.jpg)
04.10.2018
Refurbished canopy
Feature “Irish Greens” on former forecourt
New entrance lobby, direct and dedicated access to check-in and security
New piazza and “Space to breathe”
Terminal 1 Entrance
Passenger experience
Journey time
00:04
TomorrowStep free, vehicles free zone creates a safer environment
![Page 49: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/49.jpg)
04.10.2018
Terminal 1 Check-in Hall
Journey time
00:06
Today
Passenger experience
![Page 50: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/50.jpg)
04.10.2018
The lobbies create increased circulation and orientation spaces in the check-in hall
Direct access to security
Clear signage to next steps of journey
New glazed entrance lobbies (similar to T2), allowing views into the terminal
Terminal 1 Check-in HallAssisted passengers welcomed like VIPs
Passenger experience
Journey time
00:06
Tomorrow
![Page 51: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/51.jpg)
04.10.2018
Terminal 1 Security
Journey time
00:25
Today
Passenger experience
![Page 52: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/52.jpg)
04.10.2018
Softer, calmer security environment to lower stress levels
Good visibility into security lanes while queuing
Bright and airy finishes will make the space feel generous
Terminal 1 Security Mezzanine
Airfield views will reassure passengers of where they are
Sign informing passengers of process and queuing times
White cladding with sleek stainless steel details will make security machines feel less “techy”
Passenger experience
Journey time
00:20
Tomorrow
![Page 53: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/53.jpg)
04.10.2018
Terminal 1 route to IDL
Journey time
00:55
Today
Passenger experience
![Page 54: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/54.jpg)
04.10.2018
Ample views towards next step of journey
Mega signage to explain next journey steps
Terminal 1 New VCC to IDLAirfield views throughout for ease of orientation
Generous, clear orientation space
Passenger experience
Journey time
00:35
Tomorrow
![Page 55: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/55.jpg)
04.10.2018
Shuttle Bus Station
Unobstructed airfield views to allow for visual connectivity with the shuttle buses
Explanation of the journey from this facility
Signage informing passengers of time to next shuttle bus
Boarding card checks at shuttle exits
Dedicated low level seating for short dwell times between shuttle pick ups
Generous and unobstructed circulation to all shuttle gates
Personal service to those who need it
Passenger experience
Journey time
00:44
Tomorrow
![Page 56: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/56.jpg)
04.10.2018
Satellite Boarding FacilityInformative and reassuring wayfinding sign
Small F&B outlets at gates for passengers convenience
“One step out onto the apron and towards the plane”
Passenger experience
Journey time
00:54
Tomorrow
Passengers are assisted throughout their journey
![Page 57: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/57.jpg)
04.10.2018
Generous ceiling height
Warm, natural finishes. Simple, calm and bright ambience
Glazed facade for orientation,
views to aircraft and buses
Pier 1 Transfers
Sign informing passengers of queuing times
Signage toward next journey point
Passenger experience
Journey time
00:47
Tomorrow
![Page 58: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/58.jpg)
04.10.2018
Airy and bright double height gate space
Small F&B outlets between gates
Full height media wall at VCC, to display
engaging and informative images
about destination (seat
belts-off moment)
Airfield views and direct access to airfield
New Pier 1Visual connection to/from arrivals corridor,
connecting different journeys
Passenger experience
Journey time
00:49
Tomorrow
![Page 59: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/59.jpg)
04.10.2018
Terminal 2 Check-in Concourse
Journey time
00:02
Today
Passenger experience
![Page 60: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/60.jpg)
04.10.2018
Terminal 2 Check-in Concourse
Improved signage to illustrate next steps
Elegant and modern self-service check-in kiosks. Increasing self-service uptake will
improve availability of space for circulation and make the hall feel more generous
PRM route clearly legible
and obvious
Journey time
00:02
Tomorrow
Passenger experience
![Page 61: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/61.jpg)
04.10.2018
US CBP LanesAirside views towards aircraft to ease orientation and
assure passengers of where they are in
their journey
At rear: information about the CBP zone
retail offer and about next step of
journey
Informative and reassuring sign to
minimise passengers stress in queue
White cladding with sleek stainless steel details will make security machines
feel less “techy”
Warm, natural finishes
Passenger experience
Journey time
00:36
Tomorrow
![Page 62: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/62.jpg)
04.10.2018
New Pier 5
F&B pod within gate
CIP product. Perforated partition gives a hint of
the warm, inviting atmosphere inside
Pre-boarding gates are not shown in this image, but
will enable passengers at gate to de-stress
Full height media wall to display engaging and informative images
about destination (seat belts-off moment)
A range of seating types that support passengers in using the space differently
Visual connectivity between Arrivals and Departures
Airside views for passengers to
orientate
Passenger experience
Journey time
0 1:0 1
Tomorrow
![Page 63: Capital Investment Programme 2020+ information screens 3.90 4.28 courtesy and helpfulness of all airport staff 3.80 4.33 internet and wifi 3.10 4.03 cleanliness of washrooms 3.50 3.90](https://reader030.vdocument.in/reader030/viewer/2022040405/5e99491b3224077a9245ed07/html5/thumbnails/63.jpg)