capital projects - university of alabama...capital projects summer 2017 3 preface the university of...

32
CAPITAL PROJECTS Summer 2017

Upload: others

Post on 30-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CAPITAL PROJECTS - University of Alabama...Capital Projects Summer 2017 3 Preface The University of Alabama has experienced massive growth over the past ten years. In 2007, enrollment

CAPITAL PROJECT SSummer 2017

Page 2: CAPITAL PROJECTS - University of Alabama...Capital Projects Summer 2017 3 Preface The University of Alabama has experienced massive growth over the past ten years. In 2007, enrollment
Page 3: CAPITAL PROJECTS - University of Alabama...Capital Projects Summer 2017 3 Preface The University of Alabama has experienced massive growth over the past ten years. In 2007, enrollment

Capital ProjectsSummer 2017

Capital Projects Summer 2017 1

Page 4: CAPITAL PROJECTS - University of Alabama...Capital Projects Summer 2017 3 Preface The University of Alabama has experienced massive growth over the past ten years. In 2007, enrollment

2 The University of Alabama

Page 5: CAPITAL PROJECTS - University of Alabama...Capital Projects Summer 2017 3 Preface The University of Alabama has experienced massive growth over the past ten years. In 2007, enrollment

Capital Projects Summer 2017 3

PrefaceThe University of Alabama has experienced massive growth over the past ten years. In 2007,

enrollment equaled 25,000 students. For the Fall 2016 semester, enrollment at The University

of Alabama reached a record high of 37,665 students.

Since 2003, The University of Alabama has accommodated this growth by constructing 98

new buildings with a total of 6,242,496 square feet. These new buildings represent a total

project value of over $1 billion. Additionally, there were 68 major renovations and additions

that resulted in 1,162,000 square feet, with a total project value of almost $500,000,000.

The University of Alabama campus now boasts a total of 1,374 acres, 297 buildings, 46 Greek

Houses, over 15,000,000 square feet of campus facilities, and 8,400 beds.

The University of Alabama’s Construction Administration Department proudly offers this

booklet showcasing the current active and planned capital projects on campus. For each

project, you’ll find architectural renderings, location maps, and an overview of the details of

the project.

Page 6: CAPITAL PROJECTS - University of Alabama...Capital Projects Summer 2017 3 Preface The University of Alabama has experienced massive growth over the past ten years. In 2007, enrollment

4 The University of Alabama

Page 7: CAPITAL PROJECTS - University of Alabama...Capital Projects Summer 2017 3 Preface The University of Alabama has experienced massive growth over the past ten years. In 2007, enrollment

Table of Contents

ACTIVE CAPITAL PROJECTS

Adapted Athletics Facility � � � � � � � � � � � � � � � � � � � � � � � � � � � � 6

H�M� Comer Renovation � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � 8

Mal Moore Dining Addition � � � � � � � � � � � � � � � � � � � � � � � � � � 10

Moody Music Building Addition � � � � � � � � � � � � � � � � � � � � � � 12

New Freshmen Residence Hall � � � � � � � � � � � � � � � � � � � � � � � � 14

Performing Arts Academic Center � � � � � � � � � � � � � � � � � � � � � 16

Tutwiler Parking Deck � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � 18

PLANNED CAPITAL PROJECTS

Bryce Park Food Service � � � � � � � � � � � � � � � � � � � � � � � � � � � � � 22

2nd Avenue Overpass � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � 24

Capital Projects Summer 2017 5

Page 8: CAPITAL PROJECTS - University of Alabama...Capital Projects Summer 2017 3 Preface The University of Alabama has experienced massive growth over the past ten years. In 2007, enrollment

Aerial View of North Campus

6 The University of Alabama

Page 9: CAPITAL PROJECTS - University of Alabama...Capital Projects Summer 2017 3 Preface The University of Alabama has experienced massive growth over the past ten years. In 2007, enrollment

Ac t i v e Capital Projects

Capital Projects Summer 2017 7

Page 10: CAPITAL PROJECTS - University of Alabama...Capital Projects Summer 2017 3 Preface The University of Alabama has experienced massive growth over the past ten years. In 2007, enrollment

Adapted Athletics Facility

Capital Projects | Active

8 The University of Alabama

Page 11: CAPITAL PROJECTS - University of Alabama...Capital Projects Summer 2017 3 Preface The University of Alabama has experienced massive growth over the past ten years. In 2007, enrollment

Project Overview:• Budget: $10,000,000• Project Start: Spring 2017• Expected Completion: Late Fall 2017• Total Square Footage: 27,036

The Adapted Athletics Facility at The University of Alabama is the first facility in the country that is dedicated to adapted athletics. The UA Adapted Athletics Program has over 30 student-athletes competing in wheelchair basketball, wheelchair tennis, para-rowing, and adapted golf. UA’s Adapted Athletics program has won 5 national championships in men’s and women’s wheelchair basketball, and 2 national championships in wheelchair tennis. Additionally, over 100 students participate in non-competitive options.

Features:• NCAA regulation game venue for

wheelchair basketball• Locker rooms• Workout/training room• Strength and conditioning room• Team meeting rooms• Study Halls

Coming Winter 2017

Overview and Details

“This kind of commitment really changes expectations of what it means to be an

athlete and what is appropriate in terms of proportional support for student-athletes with

disabilities. This facility will raise the bar nationally for all sports programs for athletes with disabilities

and especially for high performance college student-athletes with disabilities.

- Adapted Athletics Director Dr. Brent Hardin”

Project Location

ConstructionArea

ALABAMA

CRIMSON TIDE

2665

2664

1235

2667

26662669

2668

2670

63054835

4836

6208

78317832

78337834

2600

1174

3440

3441

3443

3415

34173418

3419

3420

3422

3421

3424

3423

3427

3444

3426

3429

3430

1070

K

4914

5560

I

4292B

4922

4942

5020

1254

5010

9180

4941

6299

A

H

C

D

E

G

J

5016

F

1079

2093

2247

1252 1249

1245

14011251

1250 1034

1170

4930

4260

4259

4258 4257

4256 4255

49374909

4929

4917

43854384

4383 43754376

4377

43794380

43814382

5373

5372

5370 5390

5018

5017

2261

D480

2913

4293

4931

4294

49064915

49284935

49444921

5365

7916

7004

1226

2266

2267

2265

2270

22692193

5386

5389

5024

D286

D282

D280

1160

2271

2263

22622264

7046

7205

7918

7017

7028

7902

7912

79277904

7203

7006

7158

7202

7090

7074

7054

7059

7213

7244

7298

7206

6219

6218 6085

6086

6116

6082

6369

6025

6303

63016302

6118

2933

29242908

21522064

2297

2106

20352332

1021

1022

1214

10401067

1099

1043

1108

1014

1107

10321031

1036

1003

1051

1030

10451027

1167

1013

1199

1155

103311501039

10381172

1175

1173

1072

D288

6119

5391

2602

2601

L

1233

M

78397841

4837

4838

7840

2497

5011

5133

7843D780

6080

7842

78497848

4852

3446

3446

P131

P115

P111

P129

P127

P123

P219

P209

P207

P201

P407

P409

P503

P521

P505

P501

P515

P507

P509

P511

P613 P629

P627

P623P621

P617

P603

P739

P745

P723

P121

P731

P727

P752

P713

P703

P751

D284D284

Sixth Avenue

Elm Drive

Shelby Lane

Marr's Spring Road

Colonial Drive

McCorvey Drive

Mar

gare

t D

rive

Devotie Avenue

Jefferson Avenue

Bryce Lawn Drive

Fourth

Street

Jackson Avenue

Fifth AvenueHackberry Lane

Ninth Street

Fourth Avenue

Sixth AvenueSeventh AvenueEleventh Street

Eighth Avenue

Paul Bryant Drive Twelfth

S

treet

Eighth Street

Frank Thomas Avenue

Second

Street

Fifth Avenue East

Anna Avenue

Paul Bryant

Drive

Magnolia Dr

Colonial Drive

Jack

War

ner P

arkw

ay

Second Avenue

Riverside

Drive

Campus

Drive W

est

Campus Drive East

Tenth Avenue

Capstone

Drive

Wallace Wade Avenue

University

Boulevard

Coliseum Street

University Boulevard

Stad

ium

Drive

Seventh Avenue

Fraternity Lane

McFarland Blvd

Jack Warner Parkway

Marr’s Spring

Crimson Promenade

Gene Stallings Avenue

RecreationFields

Varsity Soccer

BandPractice

Field

McCorvey

Drive

Hackberry Lane

Hackberry Lane

Old Hackberry

Lane

Palmer Lake

Facilities Management,

Library Annex, Motor Pool

& University Warehouse

0.2 miles

Mound

Rotunda

The Park atManderson

Landing

B l a c k W a r r i o r R i v e r

Johnny Stallings Dr.

Red Drew Avenue

Kilgore Lane

N

W S

E

THE UNIVERSITY OF ALABAMA

06/01/15

ConstructionArea

ConstructionArea

ConstructionArea

1

2

3

4

5

6

7

8

9

10

11

12

13

14

13

14

1

2

3

4

5

6

7

8

9

10

12

11

A B C D E F G H I J K M N O P Q R S T U V W X Y ZL

A F G H I J K N O P R S T V W X Y ZLB C D E M Q U

Capital Projects Summer 2017 9

Page 12: CAPITAL PROJECTS - University of Alabama...Capital Projects Summer 2017 3 Preface The University of Alabama has experienced massive growth over the past ten years. In 2007, enrollment

H�M� Comer Renovation

Capital Projects | Active

10 The University of Alabama

Page 13: CAPITAL PROJECTS - University of Alabama...Capital Projects Summer 2017 3 Preface The University of Alabama has experienced massive growth over the past ten years. In 2007, enrollment

Project Overview:• Budget: $24,600,000• Project Start: April 2017• Expected Completion: Fall 2018• Total Square Footage: 21,486• Complete Interior and Exterior Renovation

Named for Hugh Moss Comer, H.M. Comer was originally constructed in the 1960s. The building houses the administrative and departmental offices for the College of Engineering, a welcome center, and classrooms. It also houses the Capstone Engineering Society.

The purpose of the renovation is to update the building to match North Engineering Research Center (NERC), centralize student services for the college, and create a more open office environment.

Features:• Addition of a new west entrance• Updating the mechanical, electrical, and

plumbing systems• Center for Unique Business Enterprises• A lab incubator to showcase the latest

technology in the college

Coming Fall 2018

Overview and Details

H.M. Comer Pre-Renovation

Project Location

ConstructionArea

ALABAMA

CRIMSON TIDE

2665

2664

1235

2667

26662669

2668

2670

63054835

4836

6208

78317832

78337834

2600

1174

3440

3441

3443

3415

34173418

3419

3420

3422

3421

3424

3423

3427

3444

3426

3429

3430

1070

K

4914

5560

I

4292B

4922

4942

5020

1254

5010

9180

4941

6299

A

H

C

D

E

G

J

5016

F

1079

2093

2247

1252 1249

1245

14011251

1250 1034

1170

4930

4260

4259

4258 4257

4256 4255

49374909

4929

4917

43854384

4383 43754376

4377

43794380

43814382

5373

5372

5370 5390

5018

5017

2261

D480

2913

4293

4931

4294

49064915

49284935

49444921

5365

7916

7004

1226

2266

2267

2265

2270

22692193

5386

5389

5024

D286

D282

D280

1160

2271

2263

22622264

7046

7205

7918

7017

7028

7902

7912

79277904

7203

7006

7158

7202

7090

7074

7054

7059

7213

7244

7298

7206

6219

6218 6085

6086

6116

6082

6369

6025

6303

63016302

6118

2933

29242908

21522064

2297

2106

20352332

1021

1022

1214

10401067

1099

1043

1108

1014

1107

10321031

1036

1003

1051

1030

10451027

1167

1013

1199

1155

103311501039

10381172

1175

1173

1072

D288

6119

5391

2602

2601

L

1233

M

78397841

4837

4838

7840

2497

5011

5133

7843D780

6080

7842

78497848

4852

3446

3446

P131

P115

P111

P129

P127

P123

P219

P209

P207

P201

P407

P409

P503

P521

P505

P501

P515

P507

P509

P511

P613 P629

P627

P623P621

P617

P603

P739

P745

P723

P121

P731

P727

P752

P713

P703

P751

D284D284

Sixth Avenue

Elm Drive

Shelby Lane

Marr's Spring Road

Colonial Drive

McCorvey Drive

Mar

gare

t D

rive

Devotie Avenue

Jefferson Avenue

Bryce Lawn Drive

Fourth

Street

Jackson Avenue

Fifth AvenueHackberry Lane

Ninth Street

Fourth Avenue

Sixth AvenueSeventh AvenueEleventh Street

Eighth Avenue

Paul Bryant Drive Twelfth

S

treet

Eighth Street

Frank Thomas Avenue

Second

Street

Fifth Avenue East

Anna Avenue

Paul Bryant

Drive

Magnolia Dr

Colonial Drive

Jack

War

ner P

arkw

ay

Second Avenue

Riverside

Drive

Campus

Drive W

est

Campus Drive East

Tenth Avenue

Capstone

Drive

Wallace Wade Avenue

University

Boulevard

Coliseum Street

University Boulevard

Stad

ium

Drive

Seventh Avenue

Fraternity Lane

McFarland Blvd

Jack Warner Parkway

Marr’s Spring

Crimson Promenade

Gene Stallings Avenue

RecreationFields

Varsity Soccer

BandPractice

Field

McCorvey

Drive

Hackberry Lane

Hackberry Lane

Old Hackberry

Lane

Palmer Lake

Facilities Management,

Library Annex, Motor Pool

& University Warehouse

0.2 miles

Mound

Rotunda

The Park atManderson

Landing

B l a c k W a r r i o r R i v e r

Johnny Stallings Dr.

Red Drew Avenue

Kilgore Lane

N

W S

E

THE UNIVERSITY OF ALABAMA

06/01/15

ConstructionArea

ConstructionArea

ConstructionArea

1

2

3

4

5

6

7

8

9

10

11

12

13

14

13

14

1

2

3

4

5

6

7

8

9

10

12

11

A B C D E F G H I J K M N O P Q R S T U V W X Y ZL

A F G H I J K N O P R S T V W X Y ZLB C D E M Q U

Capital Projects Summer 2017 11

Page 14: CAPITAL PROJECTS - University of Alabama...Capital Projects Summer 2017 3 Preface The University of Alabama has experienced massive growth over the past ten years. In 2007, enrollment

Mal Moore Dining Addition

Capital Projects | Active

12 The University of Alabama

Page 15: CAPITAL PROJECTS - University of Alabama...Capital Projects Summer 2017 3 Preface The University of Alabama has experienced massive growth over the past ten years. In 2007, enrollment

Project Overview:• Budget: $15,100,00• Project Start: Summer 2017• Expected Completion: Summer 2018• Total Square Footage: 24,414• Replaces Bryant Dining

This addition to the Mal Moore Athletic Facility will be a two-story addition to the north side of the building. This dining facility will provide healthier nutritional options for the student-athletes in an effort to meet the new NCAA guidelines for post-workout nutrition.

The dining hall’s close proximity to the training facilities will have a positive effect on student-athlete performance, health and well-being.

Features:• Commercial kitchen• Storage for dry and cold goods• Seating for 440 people• Balcony for outdoor dining options• Covered area for viewing• Offices for nutritional staff• Provide healthy options for student-athletes

Coming Summer 2018

Overview and Details

ConstructionArea

ALABAMA

CRIMSON TIDE

2665

2664

1235

2667

26662669

2668

2670

63054835

4836

6208

78317832

78337834

2600

1174

3440

3441

3443

3415

34173418

3419

3420

3422

3421

3424

3423

3427

3444

3426

3429

3430

1070

K

4914

5560

I

4292B

4922

4942

5020

1254

5010

9180

4941

6299

A

H

C

D

E

G

J

5016

F

1079

2093

2247

1252 1249

1245

14011251

1250 1034

1170

4930

4260

4259

4258 4257

4256 4255

49374909

4929

4917

43854384

4383 43754376

4377

43794380

43814382

5373

5372

5370 5390

5018

5017

2261

D480

2913

4293

4931

4294

49064915

49284935

49444921

5365

7916

7004

1226

2266

2267

2265

2270

22692193

5386

5389

5024

D286

D282

D280

1160

2271

2263

22622264

7046

7205

7918

7017

7028

7902

7912

79277904

7203

7006

7158

7202

7090

7074

7054

7059

7213

7244

7298

7206

6219

6218 6085

6086

6116

6082

6369

6025

6303

63016302

6118

2933

29242908

21522064

2297

2106

20352332

1021

1022

1214

10401067

1099

1043

1108

1014

1107

10321031

1036

1003

1051

1030

10451027

1167

1013

1199

1155

103311501039

10381172

1175

1173

1072

D288

6119

5391

2602

2601

L

1233

M

78397841

4837

4838

7840

2497

5011

5133

7843D780

6080

7842

78497848

4852

3446

3446

P131

P115

P111

P129

P127

P123

P219

P209

P207

P201

P407

P409

P503

P521

P505

P501

P515

P507

P509

P511

P613 P629

P627

P623P621

P617

P603

P739

P745

P723

P121

P731

P727

P752

P713

P703

P751

D284D284

Sixth Avenue

Elm Drive

Shelby Lane

Marr's Spring Road

Colonial Drive

McCorvey Drive

Mar

gare

t D

rive

Devotie Avenue

Jefferson Avenue

Bryce Lawn Drive

Fourth

Street

Jackson Avenue

Fifth AvenueHackberry Lane

Ninth Street

Fourth Avenue

Sixth AvenueSeventh AvenueEleventh Street

Eighth Avenue

Paul Bryant Drive Twelfth

S

treet

Eighth Street

Frank Thomas Avenue

Second

Street

Fifth Avenue East

Anna Avenue

Paul Bryant

Drive

Magnolia Dr

Colonial Drive

Jack

War

ner P

arkw

ay

Second Avenue

Riverside

Drive

Campus

Drive W

est

Campus Drive East

Tenth Avenue

Capstone

Drive

Wallace Wade Avenue

University

Boulevard

Coliseum Street

University Boulevard

Stad

ium

Drive

Seventh Avenue

Fraternity Lane

McFarland Blvd

Jack Warner Parkway

Marr’s Spring

Crimson Promenade

Gene Stallings Avenue

RecreationFields

Varsity Soccer

BandPractice

Field

McCorvey

Drive

Hackberry Lane

Hackberry Lane

Old Hackberry

Lane

Palmer Lake

Facilities Management,

Library Annex, Motor Pool

& University Warehouse

0.2 miles

Mound

Rotunda

The Park atManderson

Landing

B l a c k W a r r i o r R i v e r

Johnny Stallings Dr.

Red Drew Avenue

Kilgore Lane

N

W S

E

THE UNIVERSITY OF ALABAMA

06/01/15

ConstructionArea

ConstructionArea

ConstructionArea

1

2

3

4

5

6

7

8

9

10

11

12

13

14

13

14

1

2

3

4

5

6

7

8

9

10

12

11

A B C D E F G H I J K M N O P Q R S T U V W X Y ZL

A F G H I J K N O P R S T V W X Y ZLB C D E M Q U

Project Location

Aerial View Looking Southwest

Capital Projects Summer 2017 13

Page 16: CAPITAL PROJECTS - University of Alabama...Capital Projects Summer 2017 3 Preface The University of Alabama has experienced massive growth over the past ten years. In 2007, enrollment

Frank Moody Music Building Addition and Renovation

Capital Projects | Active

Phase I New Addition

14 The University of Alabama

Page 17: CAPITAL PROJECTS - University of Alabama...Capital Projects Summer 2017 3 Preface The University of Alabama has experienced massive growth over the past ten years. In 2007, enrollment

Overview and DetailsProject Overview:• Budget: $14,200,00• Project Start: Summer 2015• Expected Completion: Spring 2018• Total Square Footage: 105,000 total

building, 25,000 addition

The Frank Moody Music Building houses The University of Alabama School of Music along with the Million Dollar Band. The facility also contains a 1,000-seat concert hall.

The purpose of the addition and renovation is to accommodate growth in the music program and to provide a practice hall for the Million Dollar Band. The Million Dollar Band puts on over 50 performances per year and practices at least five days per week. The addition and renovation will create space for the band to practice during inclement weather and hold meetings of the full band.

Features:• Two new band halls• New locker room space• Sectional practice rooms• Support space for the Million Dollar Band

Coming Spring 2018North View - Phase II Exterior Renovation

Project Location

ConstructionArea

ALABAMA

CRIMSON TIDE

2665

2664

1235

2667

26662669

2668

2670

63054835

4836

6208

78317832

78337834

2600

1174

3440

3441

3443

3415

34173418

3419

3420

3422

3421

3424

3423

3427

3444

3426

3429

3430

1070

K

4914

5560

I

4292B

4922

4942

5020

1254

5010

9180

4941

6299

A

H

C

D

E

G

J

5016

F

1079

2093

2247

1252 1249

1245

14011251

1250 1034

1170

4930

4260

4259

4258 4257

4256 4255

49374909

4929

4917

43854384

4383 43754376

4377

43794380

43814382

5373

5372

5370 5390

5018

5017

2261

D480

2913

4293

4931

4294

49064915

49284935

49444921

5365

7916

7004

1226

2266

2267

2265

2270

22692193

5386

5389

5024

D286

D282

D280

1160

2271

2263

22622264

7046

7205

7918

7017

7028

7902

7912

79277904

7203

7006

7158

7202

7090

7074

7054

7059

7213

7244

7298

7206

6219

6218 6085

6086

6116

6082

6369

6025

6303

63016302

6118

2933

29242908

21522064

2297

2106

20352332

1021

1022

1214

10401067

1099

1043

1108

1014

1107

10321031

1036

1003

1051

1030

10451027

1167

1013

1199

1155

103311501039

10381172

1175

1173

1072

D288

6119

5391

2602

2601

L

1233

M

78397841

4837

4838

7840

2497

5011

5133

7843D780

6080

7842

78497848

4852

3446

3446

P131

P115

P111

P129

P127

P123

P219

P209

P207

P201

P407

P409

P503

P521

P505

P501

P515

P507

P509

P511

P613 P629

P627

P623P621

P617

P603

P739

P745

P723

P121

P731

P727

P752

P713

P703

P751

D284D284

Sixth Avenue

Elm Drive

Shelby Lane

Marr's Spring Road

Colonial Drive

McCorvey Drive

Mar

gare

t D

rive

Devotie Avenue

Jefferson Avenue

Bryce Lawn Drive

Fourth

Street

Jackson Avenue

Fifth AvenueHackberry Lane

Ninth Street

Fourth Avenue

Sixth AvenueSeventh AvenueEleventh Street

Eighth Avenue

Paul Bryant Drive Twelfth

S

treet

Eighth Street

Frank Thomas Avenue

Second

Street

Fifth Avenue East

Anna Avenue

Paul Bryant

Drive

Magnolia Dr

Colonial Drive

Jack

War

ner P

arkw

ay

Second Avenue

Riverside

Drive

Campus

Drive W

est

Campus Drive East

Tenth Avenue

Capstone

Drive

Wallace Wade Avenue

University

Boulevard

Coliseum Street

University Boulevard

Stad

ium

Drive

Seventh Avenue

Fraternity Lane

McFarland Blvd

Jack Warner Parkway

Marr’s Spring

Crimson Promenade

Gene Stallings Avenue

RecreationFields

Varsity Soccer

BandPractice

Field

McCorvey

Drive

Hackberry Lane

Hackberry Lane

Old Hackberry

Lane

Palmer Lake

Facilities Management,

Library Annex, Motor Pool

& University Warehouse

0.2 miles

Mound

Rotunda

The Park atManderson

Landing

B l a c k W a r r i o r R i v e r

Johnny Stallings Dr.

Red Drew Avenue

Kilgore Lane

N

W S

E

THE UNIVERSITY OF ALABAMA

06/01/15

ConstructionArea

ConstructionArea

ConstructionArea

1

2

3

4

5

6

7

8

9

10

11

12

13

14

13

14

1

2

3

4

5

6

7

8

9

10

12

11

A B C D E F G H I J K M N O P Q R S T U V W X Y ZL

A F G H I J K N O P R S T V W X Y ZLB C D E M Q U

Capital Projects Summer 2017 15

Page 18: CAPITAL PROJECTS - University of Alabama...Capital Projects Summer 2017 3 Preface The University of Alabama has experienced massive growth over the past ten years. In 2007, enrollment

New Freshmen Residence Hall

Capital Projects | Active

16 The University of Alabama

Page 19: CAPITAL PROJECTS - University of Alabama...Capital Projects Summer 2017 3 Preface The University of Alabama has experienced massive growth over the past ten years. In 2007, enrollment

Project Overview:• Budget: $53,200,00• Project Start: March 2017• Expected Completion: Fall 2018• Total Square Footage: 150,516• Replaces Somerville Hall

The New Freshmen Residence Hall will replace Somerville Hall. The building will occupy the space from Ridgecrest East to McCorvey Drive.

As enrollment on campus grows, so does the need for student housing. Hence, the purpose of the project is to address the high demand for on-campus freshmen housing. The residence hall will be co-ed with men and women on separate floors controlled via access control measures.

Features:• 494 beds• Convenience store• Lounges and study areas• 500-person multipurpose community

room• Storm shelter for 1,518 people• Views of Palmer’s Lake

Coming Fall 2018

Overview and Details

Project Location

ConstructionArea

ALABAMA

CRIMSON TIDE

2665

2664

1235

2667

26662669

2668

2670

63054835

4836

6208

78317832

78337834

2600

1174

3440

3441

3443

3415

34173418

3419

3420

3422

3421

3424

3423

3427

3444

3426

3429

3430

1070

K

4914

5560

I

4292B

4922

4942

5020

1254

5010

9180

4941

6299

A

H

C

D

E

G

J

5016

F

1079

2093

2247

1252 1249

1245

14011251

1250 1034

1170

4930

4260

4259

4258 4257

4256 4255

49374909

4929

4917

43854384

4383 43754376

4377

43794380

43814382

5373

5372

5370 5390

5018

5017

2261

D480

2913

4293

4931

4294

49064915

49284935

49444921

5365

7916

7004

1226

2266

2267

2265

2270

22692193

5386

5389

5024

D286

D282

D280

1160

2271

2263

22622264

7046

7205

7918

7017

7028

7902

7912

79277904

7203

7006

7158

7202

7090

7074

7054

7059

7213

7244

7298

7206

6219

6218 6085

6086

6116

6082

6369

6025

6303

63016302

6118

2933

29242908

21522064

2297

2106

20352332

1021

1022

1214

10401067

1099

1043

1108

1014

1107

10321031

1036

1003

1051

1030

10451027

1167

1013

1199

1155

103311501039

10381172

1175

1173

1072

D288

6119

5391

2602

2601

L

1233

M

78397841

4837

4838

7840

2497

5011

5133

7843D780

6080

7842

78497848

4852

3446

3446

P131

P115

P111

P129

P127

P123

P219

P209

P207

P201

P407

P409

P503

P521

P505

P501

P515

P507

P509

P511

P613 P629

P627

P623P621

P617

P603

P739

P745

P723

P121

P731

P727

P752

P713

P703

P751

D284D284

Sixth Avenue

Elm Drive

Shelby Lane

Marr's Spring Road

Colonial Drive

McCorvey Drive

Mar

gare

t D

rive

Devotie Avenue

Jefferson Avenue

Bryce Lawn Drive

Fourth

Street

Jackson Avenue

Fifth AvenueHackberry Lane

Ninth Street

Fourth Avenue

Sixth AvenueSeventh AvenueEleventh Street

Eighth Avenue

Paul Bryant Drive Twelfth

S

treet

Eighth Street

Frank Thomas Avenue

Second

Street

Fifth Avenue East

Anna Avenue

Paul Bryant

Drive

Magnolia Dr

Colonial Drive

Jack

War

ner P

arkw

ay

Second Avenue

Riverside

Drive

Campus

Drive W

est

Campus Drive East

Tenth Avenue

Capstone

Drive

Wallace Wade Avenue

University

Boulevard

Coliseum Street

University Boulevard

Stad

ium

Drive

Seventh Avenue

Fraternity Lane

McFarland Blvd

Jack Warner Parkway

Marr’s Spring

Crimson Promenade

Gene Stallings Avenue

RecreationFields

Varsity Soccer

BandPractice

Field

McCorvey

Drive

Hackberry Lane

Hackberry Lane

Old Hackberry

Lane

Palmer Lake

Facilities Management,

Library Annex, Motor Pool

& University Warehouse

0.2 miles

Mound

Rotunda

The Park atManderson

Landing

B l a c k W a r r i o r R i v e r

Johnny Stallings Dr.

Red Drew Avenue

Kilgore Lane

N

W S

E

THE UNIVERSITY OF ALABAMA

06/01/15

ConstructionArea

ConstructionArea

ConstructionArea

1

2

3

4

5

6

7

8

9

10

11

12

13

14

13

14

1

2

3

4

5

6

7

8

9

10

12

11

A B C D E F G H I J K M N O P Q R S T U V W X Y ZL

A F G H I J K N O P R S T V W X Y ZLB C D E M Q U

Site Plan for New Freshmen Residence Hall

Capital Projects Summer 2017 17

Page 20: CAPITAL PROJECTS - University of Alabama...Capital Projects Summer 2017 3 Preface The University of Alabama has experienced massive growth over the past ten years. In 2007, enrollment

Performing Arts Academic Center

Capital Projects | Active

18 The University of Alabama

Page 21: CAPITAL PROJECTS - University of Alabama...Capital Projects Summer 2017 3 Preface The University of Alabama has experienced massive growth over the past ten years. In 2007, enrollment

Project Overview:• Budget: $60,000,000• Expected Project Start: Summer 2019• Expected Completion: 2020• Total Square Footage: 130,088• Provides a multi-functioning, state-

of-the-art venue for performances and infrastructure

The stage is set for a new home for the arts at The University of Alabama. The new Performing Arts Academic Center, which will connect to the restored Bryce Main, will be the grand centerpiece of the nucleus of campus.

The Performing Arts Academic Center will allow the Department of Theatre and Dance to combine all performance and academic functions in a single area of campus.

Features:• 350-seat drama theater• 450-seat dance theater• 250-seat studio theater• Support spaces - scenery shop, control

rooms, and rehearsal halls• Faculty offices and classrooms nearby

Coming in 2020

Overview and Details

Project Location

ConstructionArea

ALABAMA

CRIMSON TIDE

2665

2664

1235

2667

26662669

2668

2670

63054835

4836

6208

78317832

78337834

2600

1174

3440

3441

3443

3415

34173418

3419

3420

3422

3421

3424

3423

3427

3444

3426

3429

3430

1070

K

4914

5560

I

4292B

4922

4942

5020

1254

5010

9180

4941

6299

A

H

C

D

E

G

J

5016

F

1079

2093

2247

1252 1249

1245

14011251

1250 1034

1170

4930

4260

4259

4258 4257

4256 4255

49374909

4929

4917

43854384

4383 43754376

4377

43794380

43814382

5373

5372

5370 5390

5018

5017

2261

D480

2913

4293

4931

4294

49064915

49284935

49444921

5365

7916

7004

1226

2266

2267

2265

2270

22692193

5386

5389

5024

D286

D282

D280

1160

2271

2263

22622264

7046

7205

7918

7017

7028

7902

7912

79277904

7203

7006

7158

7202

7090

7074

7054

7059

7213

7244

7298

7206

6219

6218 6085

6086

6116

6082

6369

6025

6303

63016302

6118

2933

29242908

21522064

2297

2106

20352332

1021

1022

1214

10401067

1099

1043

1108

1014

1107

10321031

1036

1003

1051

1030

10451027

1167

1013

1199

1155

103311501039

10381172

1175

1173

1072

D288

6119

5391

2602

2601

L

1233

M

78397841

4837

4838

7840

2497

5011

5133

7843D780

6080

7842

78497848

4852

3446

3446

P131

P115

P111

P129

P127

P123

P219

P209

P207

P201

P407

P409

P503

P521

P505

P501

P515

P507

P509

P511

P613 P629

P627

P623P621

P617

P603

P739

P745

P723

P121

P731

P727

P752

P713

P703

P751

D284D284

Sixth Avenue

Elm Drive

Shelby Lane

Marr's Spring Road

Colonial Drive

McCorvey Drive

Mar

gare

t D

rive

Devotie Avenue

Jefferson Avenue

Bryce Lawn Drive

Fourth

Street

Jackson Avenue

Fifth AvenueHackberry Lane

Ninth Street

Fourth Avenue

Sixth AvenueSeventh AvenueEleventh Street

Eighth Avenue

Paul Bryant Drive Twelfth

S

treet

Eighth Street

Frank Thomas Avenue

Second

Street

Fifth Avenue East

Anna Avenue

Paul Bryant

Drive

Magnolia Dr

Colonial Drive

Jack

War

ner P

arkw

ay

Second Avenue

Riverside

Drive

Campus

Drive W

est

Campus Drive East

Tenth Avenue

Capstone

Drive

Wallace Wade Avenue

University

Boulevard

Coliseum Street

University Boulevard

Stad

ium

Drive

Seventh Avenue

Fraternity Lane

McFarland Blvd

Jack Warner Parkway

Marr’s Spring

Crimson Promenade

Gene Stallings Avenue

RecreationFields

Varsity Soccer

BandPractice

Field

McCorvey

Drive

Hackberry Lane

Hackberry Lane

Old Hackberry

Lane

Palmer Lake

Facilities Management,

Library Annex, Motor Pool

& University Warehouse

0.2 miles

Mound

Rotunda

The Park atManderson

Landing

B l a c k W a r r i o r R i v e r

Johnny Stallings Dr.

Red Drew Avenue

Kilgore Lane

N

W S

E

THE UNIVERSITY OF ALABAMA

06/01/15

ConstructionArea

ConstructionArea

ConstructionArea

1

2

3

4

5

6

7

8

9

10

11

12

13

14

13

14

1

2

3

4

5

6

7

8

9

10

12

11

A B C D E F G H I J K M N O P Q R S T U V W X Y ZL

A F G H I J K N O P R S T V W X Y ZLB C D E M Q U

Aerial Rendering from the North

Capital Projects Summer 2017 19

Page 22: CAPITAL PROJECTS - University of Alabama...Capital Projects Summer 2017 3 Preface The University of Alabama has experienced massive growth over the past ten years. In 2007, enrollment

Tutwiler Parking Deck

Capital Projects | Active

20 The University of Alabama

Page 23: CAPITAL PROJECTS - University of Alabama...Capital Projects Summer 2017 3 Preface The University of Alabama has experienced massive growth over the past ten years. In 2007, enrollment

Project Overview:• Budget: $26,000,000• Project Start: January 2017• Expected Completion: September 2018• Total Spaces: 1,450• Provides additional parking for campus

The Tutwiler Parking Deck will be located at the southeast corner of the Tutwiler Development directly south of Tutwiler Hall.

The addition of the parking deck will provide necessary support to the future Tutwiler Residence Hall and further development of this area of campus.

Features:• 1,450 parking spaces• 7 above-ground levels• Increase available parking in the

immediate area by ~80%• Energy efficient LED lighting• Security and access control features

Coming Fall 2018

Overview and Details

View from 12th Street looking North

Project Location

ConstructionArea

ALABAMA

CRIMSON TIDE

2665

2664

1235

2667

26662669

2668

2670

63054835

4836

6208

78317832

78337834

2600

1174

3440

3441

3443

3415

34173418

3419

3420

3422

3421

3424

3423

3427

3444

3426

3429

3430

1070

K

4914

5560

I

4292B

4922

4942

5020

1254

5010

9180

4941

6299

A

H

C

D

E

G

J

5016

F

1079

2093

2247

1252 1249

1245

14011251

1250 1034

1170

4930

4260

4259

4258 4257

4256 4255

49374909

4929

4917

43854384

4383 43754376

4377

43794380

43814382

5373

5372

5370 5390

5018

5017

2261

D480

2913

4293

4931

4294

49064915

49284935

49444921

5365

7916

7004

1226

2266

2267

2265

2270

22692193

5386

5389

5024

D286

D282

D280

1160

2271

2263

22622264

7046

7205

7918

7017

7028

7902

7912

79277904

7203

7006

7158

7202

7090

7074

7054

7059

7213

7244

7298

7206

6219

6218 6085

6086

6116

6082

6369

6025

6303

63016302

6118

2933

29242908

21522064

2297

2106

20352332

1021

1022

1214

10401067

1099

1043

1108

1014

1107

10321031

1036

1003

1051

1030

10451027

1167

1013

1199

1155

103311501039

10381172

1175

1173

1072

D288

6119

5391

2602

2601

L

1233

M

78397841

4837

4838

7840

2497

5011

5133

7843D780

6080

7842

78497848

4852

3446

3446

P131

P115

P111

P129

P127

P123

P219

P209

P207

P201

P407

P409

P503

P521

P505

P501

P515

P507

P509

P511

P613 P629

P627

P623P621

P617

P603

P739

P745

P723

P121

P731

P727

P752

P713

P703

P751

D284D284

Sixth Avenue

Elm Drive

Shelby Lane

Marr's Spring Road

Colonial Drive

McCorvey Drive

Mar

gare

t D

rive

Devotie Avenue

Jefferson Avenue

Bryce Lawn Drive

Fourth

Street

Jackson Avenue

Fifth AvenueHackberry Lane

Ninth Street

Fourth Avenue

Sixth AvenueSeventh AvenueEleventh Street

Eighth Avenue

Paul Bryant Drive Twelfth

S

treet

Eighth Street

Frank Thomas Avenue

Second

Street

Fifth Avenue East

Anna Avenue

Paul Bryant

Drive

Magnolia Dr

Colonial Drive

Jack

War

ner P

arkw

ay

Second Avenue

Riverside

Drive

Campus

Drive W

est

Campus Drive East

Tenth Avenue

Capstone

Drive

Wallace Wade Avenue

University

Boulevard

Coliseum Street

University Boulevard

Stad

ium

Drive

Seventh Avenue

Fraternity Lane

McFarland Blvd

Jack Warner Parkway

Marr’s Spring

Crimson Promenade

Gene Stallings Avenue

RecreationFields

Varsity Soccer

BandPractice

Field

McCorvey

Drive

Hackberry Lane

Hackberry Lane

Old Hackberry

Lane

Palmer Lake

Facilities Management,

Library Annex, Motor Pool

& University Warehouse

0.2 miles

Mound

Rotunda

The Park atManderson

Landing

B l a c k W a r r i o r R i v e r

Johnny Stallings Dr.

Red Drew Avenue

Kilgore Lane

N

W S

E

THE UNIVERSITY OF ALABAMA

06/01/15

ConstructionArea

ConstructionArea

ConstructionArea

1

2

3

4

5

6

7

8

9

10

11

12

13

14

13

14

1

2

3

4

5

6

7

8

9

10

12

11

A B C D E F G H I J K M N O P Q R S T U V W X Y ZL

A F G H I J K N O P R S T V W X Y ZLB C D E M Q U

Capital Projects Summer 2017 21

Page 24: CAPITAL PROJECTS - University of Alabama...Capital Projects Summer 2017 3 Preface The University of Alabama has experienced massive growth over the past ten years. In 2007, enrollment

Partlow Campus - Bryce Adult Psychiatric Hospital and Administration Buildings

22 The University of Alabama

Page 25: CAPITAL PROJECTS - University of Alabama...Capital Projects Summer 2017 3 Preface The University of Alabama has experienced massive growth over the past ten years. In 2007, enrollment

P l a n n e d Capital Projects

Capital Projects Summer 2017 23

Page 26: CAPITAL PROJECTS - University of Alabama...Capital Projects Summer 2017 3 Preface The University of Alabama has experienced massive growth over the past ten years. In 2007, enrollment

Bryce Park Food Service

Capital Projects | Planned

24 The University of Alabama

Page 27: CAPITAL PROJECTS - University of Alabama...Capital Projects Summer 2017 3 Preface The University of Alabama has experienced massive growth over the past ten years. In 2007, enrollment

Project Overview:• Budget: $7,430,000• Project Start: April 2018• Expected Completion: Fall 2018• Total Square Footage: 11,780• Dining hall for Peter Bryce campus

The Bryce Park Food Service project will be strategically located adjacent to the new North Lawn Hall classroom building. The project will provide an engaging and exciting food service venue and student-centric space for programs located on the Peter Bryce campus. The proximity of the project to Bryce Main along with the proposed University Welcome Center located therein will provide an opportunity for campus visitors to experience student life. The project proposal also provides 2,500 square feet of outdoor covered dining to accommodate 115 people.

Features:• Au Bon Pain Bakery Cafe• Dining/lounge areas to seat 240• Covered outdoor dining area overlooking

Peter Bryce Park to seat 115

Coming Fall 2018

Overview and Details

Project Location

ConstructionArea

ALABAMA

CRIMSON TIDE

2665

2664

1235

2667

26662669

2668

2670

63054835

4836

6208

78317832

78337834

2600

1174

3440

3441

3443

3415

34173418

3419

3420

3422

3421

3424

3423

3427

3444

3426

3429

3430

1070

K

4914

5560

I

4292B

4922

4942

5020

1254

5010

9180

4941

6299

A

H

C

D

E

G

J

5016

F

1079

2093

2247

1252 1249

1245

14011251

1250 1034

1170

4930

4260

4259

4258 4257

4256 4255

49374909

4929

4917

43854384

4383 43754376

4377

43794380

43814382

5373

5372

5370 5390

5018

5017

2261

D480

2913

4293

4931

4294

49064915

49284935

49444921

5365

7916

7004

1226

2266

2267

2265

2270

22692193

5386

5389

5024

D286

D282

D280

1160

2271

2263

22622264

7046

7205

7918

7017

7028

7902

7912

79277904

7203

7006

7158

7202

7090

7074

7054

7059

7213

7244

7298

7206

6219

6218 6085

6086

6116

6082

6369

6025

6303

63016302

6118

2933

29242908

21522064

2297

2106

20352332

1021

1022

1214

10401067

1099

1043

1108

1014

1107

10321031

1036

1003

1051

1030

10451027

1167

1013

1199

1155

103311501039

10381172

1175

1173

1072

D288

6119

5391

2602

2601

L

1233

M

78397841

4837

4838

7840

2497

5011

5133

7843D780

6080

7842

78497848

4852

3446

3446

P131

P115

P111

P129

P127

P123

P219

P209

P207

P201

P407

P409

P503

P521

P505

P501

P515

P507

P509

P511

P613 P629

P627

P623P621

P617

P603

P739

P745

P723

P121

P731

P727

P752

P713

P703

P751

D284D284

Sixth Avenue

Elm Drive

Shelby Lane

Marr's Spring Road

Colonial Drive

McCorvey Drive

Mar

gare

t D

rive

Devotie Avenue

Jefferson Avenue

Bryce Lawn Drive

Fourth

Street

Jackson Avenue

Fifth AvenueHackberry Lane

Ninth Street

Fourth Avenue

Sixth AvenueSeventh AvenueEleventh Street

Eighth Avenue

Paul Bryant Drive Twelfth

S

treet

Eighth Street

Frank Thomas Avenue

Second

Street

Fifth Avenue East

Anna Avenue

Paul Bryant

Drive

Magnolia Dr

Colonial Drive

Jack

War

ner P

arkw

ay

Second Avenue

Riverside

Drive

Campus

Drive W

est

Campus Drive East

Tenth Avenue

Capstone

Drive

Wallace Wade Avenue

University

Boulevard

Coliseum Street

University Boulevard

Stad

ium

Drive

Seventh Avenue

Fraternity Lane

McFarland Blvd

Jack Warner Parkway

Marr’s Spring

Crimson Promenade

Gene Stallings Avenue

RecreationFields

Varsity Soccer

BandPractice

Field

McCorvey

Drive

Hackberry Lane

Hackberry Lane

Old Hackberry

Lane

Palmer Lake

Facilities Management,

Library Annex, Motor Pool

& University Warehouse

0.2 miles

Mound

Rotunda

The Park atManderson

Landing

B l a c k W a r r i o r R i v e r

Johnny Stallings Dr.

Red Drew Avenue

Kilgore Lane

N

W S

E

THE UNIVERSITY OF ALABAMA

06/01/15

ConstructionArea

ConstructionArea

ConstructionArea

1

2

3

4

5

6

7

8

9

10

11

12

13

14

13

14

1

2

3

4

5

6

7

8

9

10

12

11

A B C D E F G H I J K M N O P Q R S T U V W X Y ZL

A F G H I J K N O P R S T V W X Y ZLB C D E M Q U

View from Peter Bryce Park Looking Northeast

Capital Projects Summer 2017 25

Page 28: CAPITAL PROJECTS - University of Alabama...Capital Projects Summer 2017 3 Preface The University of Alabama has experienced massive growth over the past ten years. In 2007, enrollment

2nd Avenue Overpass

Capital Projects | Planned

26 The University of Alabama

Page 29: CAPITAL PROJECTS - University of Alabama...Capital Projects Summer 2017 3 Preface The University of Alabama has experienced massive growth over the past ten years. In 2007, enrollment

Project Overview:• Budget: $14,700,000• Project Start: December 2018• Expected Completion: March 2020 • Purpose is to provide an overpass above

the railroad tracks in order to ease campus traffic and improve safety

The 2nd Avenue Overpass is essential to decrease campus traffic delays and improve safety conditions near campus. The overpass will provide an alternative route to ~70,000 vehicles that cross the railroad tracks each day.

Part of the Coleman Coliseum parking lot will be converted into a three-lane road. The plans include bicycle lanes, a pedestrian walkway, and safety barriers.

The design of the project intends to preserve as many parking spaces in the Coleman Coliseum parking lot as possible.

Features:• 10’ bike/pedestrian way• 4’ zone with protective barrier• Two 12’ travel lanes

Coming Spring 2020

Overview and Details

Project Location

ConstructionArea

ALABAMA

CRIMSON TIDE

2665

2664

1235

2667

26662669

2668

2670

63054835

4836

6208

78317832

78337834

2600

1174

3440

3441

3443

3415

34173418

3419

3420

3422

3421

3424

3423

3427

3444

3426

3429

3430

1070

K

4914

5560

I

4292B

4922

4942

5020

1254

5010

9180

4941

6299

A

H

C

D

E

G

J

5016

F

1079

2093

2247

1252 1249

1245

14011251

1250 1034

1170

4930

4260

4259

4258 4257

4256 4255

49374909

4929

4917

43854384

4383 43754376

4377

43794380

43814382

5373

5372

5370 5390

5018

5017

2261

D480

2913

4293

4931

4294

49064915

49284935

49444921

5365

7916

7004

1226

2266

2267

2265

2270

22692193

5386

5389

5024

D286

D282

D280

1160

2271

2263

22622264

7046

7205

7918

7017

7028

7902

7912

79277904

7203

7006

7158

7202

7090

7074

7054

7059

7213

7244

7298

7206

6219

6218 6085

6086

6116

6082

6369

6025

6303

63016302

6118

2933

29242908

21522064

2297

2106

20352332

1021

1022

1214

10401067

1099

1043

1108

1014

1107

10321031

1036

1003

1051

1030

10451027

1167

1013

1199

1155

103311501039

10381172

1175

1173

1072

D288

6119

5391

2602

2601

L

1233

M

78397841

4837

4838

7840

2497

5011

5133

7843D780

6080

7842

78497848

4852

3446

3446

P131

P115

P111

P129

P127

P123

P219

P209

P207

P201

P407

P409

P503

P521

P505

P501

P515

P507

P509

P511

P613 P629

P627

P623P621

P617

P603

P739

P745

P723

P121

P731

P727

P752

P713

P703

P751

D284D284

Sixth Avenue

Elm Drive

Shelby Lane

Marr's Spring Road

Colonial Drive

McCorvey Drive

Mar

gare

t D

rive

Devotie Avenue

Jefferson Avenue

Bryce Lawn Drive

Fourth

Street

Jackson Avenue

Fifth AvenueHackberry Lane

Ninth Street

Fourth Avenue

Sixth AvenueSeventh AvenueEleventh Street

Eighth Avenue

Paul Bryant Drive Twelfth

S

treet

Eighth Street

Frank Thomas Avenue

Second

Street

Fifth Avenue East

Anna Avenue

Paul Bryant

Drive

Magnolia Dr

Colonial Drive

Jack

War

ner P

arkw

ay

Second Avenue

Riverside

Drive

Campus

Drive W

est

Campus Drive East

Tenth Avenue

Capstone

Drive

Wallace Wade Avenue

University

Boulevard

Coliseum Street

University Boulevard

Stad

ium

Drive

Seventh Avenue

Fraternity Lane

McFarland Blvd

Jack Warner Parkway

Marr’s Spring

Crimson Promenade

Gene Stallings Avenue

RecreationFields

Varsity Soccer

BandPractice

Field

McCorvey

Drive

Hackberry Lane

Hackberry Lane

Old Hackberry

Lane

Palmer Lake

Facilities Management,

Library Annex, Motor Pool

& University Warehouse

0.2 miles

Mound

Rotunda

The Park atManderson

Landing

B l a c k W a r r i o r R i v e r

Johnny Stallings Dr.

Red Drew Avenue

Kilgore Lane

N

W S

E

THE UNIVERSITY OF ALABAMA

06/01/15

ConstructionArea

ConstructionArea

ConstructionArea

1

2

3

4

5

6

7

8

9

10

11

12

13

14

13

14

1

2

3

4

5

6

7

8

9

10

12

11

A B C D E F G H I J K M N O P Q R S T U V W X Y ZL

A F G H I J K N O P R S T V W X Y ZLB C D E M Q U

View from Top of Overpass Looking North

Capital Projects Summer 2017 27

Page 30: CAPITAL PROJECTS - University of Alabama...Capital Projects Summer 2017 3 Preface The University of Alabama has experienced massive growth over the past ten years. In 2007, enrollment

28 The University of Alabama

Page 31: CAPITAL PROJECTS - University of Alabama...Capital Projects Summer 2017 3 Preface The University of Alabama has experienced massive growth over the past ten years. In 2007, enrollment

Capital Projects Summer 2017 29

Page 32: CAPITAL PROJECTS - University of Alabama...Capital Projects Summer 2017 3 Preface The University of Alabama has experienced massive growth over the past ten years. In 2007, enrollment