CAPITOL COMPLEX MULTIPLE PROJECT UPDATE
OBJECTIVES
Overview of Scheduled Capitol Complex Projects
Review of Various Projects• Locations• Scopes of Work• Construction Sequencing & Operational Impact
Scheduled Capitol Complex Projects
FORUM BUILDINGRestroom RenovationsRoofing & Rain Leader
ReplacementAuditorium Upgrades
Site Upgrades
Scope of Work• Renovations to the existing restrooms &
adding three new at the auditorium corridor.• Redirect the existing rain leaders & abandon
the existing in place.• Install new rubber roofing. • Replace existing auditorium seating and floor
finishes.• Repair pot holes at the entrance drive to the
auditorium.• Replace the concrete ramps that access the
Ground Level.• Partial sidewalk replacement.
FINANCE BUILDINGRestroom Renovations
Roof Replacement & Repair of Rainwater Leaders
Scope of Work• Renovation the existing public
restrooms.• Line the existing rain leaders
with an epoxy reinforced resin. • Install new rubber roofing.• Sidewalk replacement.
RYAN BUILDINGRenovations to Skylights, Roof
& Windows
Scope of Work• Replace the main Skylight.• Repair roof flashings and roof
drains. • Refurbish the exterior of the
existing windows.
EAST WING of CAPITOL BUILDING
Renovations/Improvements
Scope of Work• Remove/reinstall the granite
pavers and stair treads at the Plaza.
• Demolition/removal of all existing roofing and landscaping.
• Install new roofing, plantings and irrigation.
• Repair Skylights• Refurbish lollipop light fixtures
with LED lighting.• Refurbish the existing fountains.
East Wing Sequencing
East Wing – First Sequence
East Wing – Second Sequence
East Wing FountainPart of Second & Third Sequences
East Wing –Third Sequence
East Wing – Forth Sequence
East Wing – Fifth Sequence
East Wing Landscaping Plan