capitol corridor sea level rise adaptation shirley qian, planner

6
Capitol Corridor Sea Level Rise Adaptation Shirley Qian, Planner

Upload: isaac-jackson

Post on 17-Jan-2018

229 views

Category:

Documents


0 download

DESCRIPTION

Adaptation Issues

TRANSCRIPT

Page 1: Capitol Corridor Sea Level Rise Adaptation Shirley Qian, Planner

Capitol Corridor Sea Level Rise AdaptationShirley Qian, Planner

Page 2: Capitol Corridor Sea Level Rise Adaptation Shirley Qian, Planner

About CCJPA

• Management of the Capitol Corridor intercity passenger rail service between Sacramento and San Jose

CCJPA

Union Pacific

Railroad ROW

CaltransRolling stock ownership

BARTManagement

support

AmtrakTrain and

station operator

Station property

ownership varies by city

Page 3: Capitol Corridor Sea Level Rise Adaptation Shirley Qian, Planner

Adaptation Issues

Page 4: Capitol Corridor Sea Level Rise Adaptation Shirley Qian, Planner

Adaptation Issues

Physical Assets• Flooded tracks and stations• Ballast damage and erosion• Damaged electrical and

communication lines

Service and Maintenance• Disruption to train service • Increased maintenance

costs

Page 5: Capitol Corridor Sea Level Rise Adaptation Shirley Qian, Planner

Adaptation Challenges

City of Martinez, 4 feet of inundation

Page 6: Capitol Corridor Sea Level Rise Adaptation Shirley Qian, Planner

What we need…

Work with existing partners to identify adaptation actions

Regional and local collaboration on adaptation projects Regional governance structure?

Increased awareness across all levels of government of

adaptation issues and opportunities

Identified funding sources for adaptation projects