Design of Reinforcement for RC Capping Beam Project Contiguous Bored Pile (Check for Lateral Loads) b BEAM INFORMATION Left 1/4 Span Middle Span Right 1/4 Span Cover c (mm) 50 50 50 Width b (mm) 1000 1000 1000 Depth h (mm) 800 800 800 h Effective Depth d (mm) 684 684 684 Spacing Between Bar (mm) 35 35 35 460 460 460 460 460 460 CHECK MOMENT Left 1/4 Span Middle Span Right 1/4 Span Remarks Maximum Moment per m run under service (KN-m/m) 34.1 34.1 34.1 Maximum Moment per beam per m under ultima(KN-m/m) 47.7 47.7 47.7 (KN-m) 47.7 47.7 47.7 Sagging Throughout 0.10 0.10 0.10 0.0029 0.0029 0.0029 0.950 0.950 0.950 650 650 650 183 183 183 0.130 0.130 0.130 889 889 889 Rebar Size For Layer 1 40 40 40 Rebar Nos. For Layer 1 10 10 10 Rebar Size For Layer 2 32 32 32 Rebar Nos. For Layer 2 18 18 18 Rebar Size For Layer 3 0 0 0 Rebar Nos. For Layer 3 0 0 0 27054 27054 27054 Reinforcement Ratio (%) 3.955 3.955 3.955 Bar Spacing 60 60 60 Rebar Nos. & Size 5T20 5T20 5T20 OK OK OK CHECK SHEAR Left 1/4 Span Middle Span Right 1/4 Span Remarks Maximum Shear per m run under service (KN/m) 170.4 170.4 170.4 Maximum Shear per beam under service (KN/m) 170.4 170.4 170.4 (KN) 238.5 238.5 238.5 v=V/(b*d) 0.349 0.349 0.349 1.020 1.020 1.020 (mm) 1.000 1.000 1.000 1.020 1.020 1.020 0.400 0.400 0.400 (mm) 1.00 1.00 1.00 Links Provided 2T10-200 2T10-200 2T10-200 Size of Links (mm) 10 10 10 Nos. Of legs 4 4 4 Link Spacing c/c (mm) 200 200 200 314 314 314 1.57 1.57 1.57 O.K. O.K. O.K. CHECK TORSION Left 1/4 Span Middle Span Right 1/4 Span Remarks MAXIMUM TORSION PER m RUN (KN-m/m) 0.00 0.00 0.00 MAXIMUM TORSION (KN-m/m) 0.00 0.00 0.00 ULTIMATE TORSION (KN-m) 0.00 0.00 0.00 HORIZONTAL DISTANCE OF LINK X1 (mm) 900.00 900.00 900.00 VERTICAL DISTANCE OF LINK Y1 (mm) 690.00 690.00 690.00 SIZE OF LINKS (mm) 10.00 10.00 10.00 157.08 157.08 157.08 460.00 460.00 460.00 (mm) N.A. N.A. N.A. PROVIDING N.A. N.A. N.A. PROVIDING Characteristics Strength of Concrete (N/mm 2 ) Characteristics Strength of Reinforcement (N/mm 2 ) Characteristics Strength of Reinforcement (N/mm 2 ) Maximum Moment per beam (Ultimate) Mult Mult/(bd 2 ) Mult/(bd 2 fcu) la = Min(0.5+sqrt(0.25-k/0.9), 0.95) Lever Arm z = la*d (mm) Asc = M/(0.87*460*z) or 0.13%*Asc (mm 2 ) 100Asc/Ac Area of Reinforcement Required Ast (mm 2 ) Area Of Reinforcement Provided Ast (mm 2 ) Maximum Shear per beam (Ultimate) Vu (N/mm 2 ) Design Concrete Stress vc (Table 3.8 of BS 8110) Distance av (Note : leave blank if n.a.) Enhanced Factor g = 2d / aV Enhanced Shear gvc Max ((v-gvc), 0.4) required by Table3.7 of BS 8110 Asv/Sv required Link area provided - Asv (mm 2 ) Asv/Sv provided AREA OF LINK - 2 LEGS Asv (mm 2 ) STRENGTH OF LINKS fyv (N/mm 2 ) LINKS SPACING Sv=0.8*X1*Y1*Asv*0.87*fyv/(T) AREA OF LONGI. BARS INSIDE PERI. OF LINK A(mm 2 )

Upload: klynchelle

Post on 17-Sep-2015

104 views

Category:

Documents


34 download

DESCRIPTION

Capping Beam.xls

TRANSCRIPT

ADesign of Reinforcement for RC Capping BeamProject : Changi Airport Line - C504Contiguous Bored Pile (Check for Lateral Loads)bBEAM INFORMATIONLeft 1/4 SpanMiddle SpanRight 1/4 SpanCover c(mm)505050Width b(mm)100010001000dDepth h(mm)800800800hEffective Depth d(mm)700700700Spacing Between Bar(mm)Characteristics Strength of Concrete fcu(N/mm2)353535Characteristics Strength of Reinforcement fy(N/mm2)460460460Characteristics Strength of Reinforcement fyv(N/mm2)460460460CHECK MOMENTLeft 1/4 SpanMiddle SpanRight 1/4 SpanRemarksMaximum Moment per m run under service(KN-m/m)34.134.134.1Maximum Moment per beam per m under ultimate(KN-m/m)47.747.747.7Maximum Moment per beam (Ultimate) Mult(KN-m)47.747.747.7Sagging ThroughoutMult/(bd2)0.100.100.10Mult/(bd2fcu)0.00280.00280.0028la = Min(0.5+sqrt(0.25-k/0.9), 0.95)0.9500.9500.950Lever Arm z = la*d(mm)665665665Asc = M/(0.87*460*z) or 0.13%*Asc(mm2)179179179100Asc/Ac0.1300.1300.130Area of Reinforcement Required Ast(mm2)910910910Rebar Size For Layer1404040Rebar Nos. For Layer1101010Rebar Size For Layer2323232Rebar Nos. For Layer2181818Rebar Size For Layer3000Rebar Nos. For Layer3000Area Of Reinforcement Provided Ast(mm2)270542705427054Reinforcement Ratio(%)3.8653.8653.865Bar Spacing606060Rebar Nos. & Size5T205T205T20OKOKOKCHECK SHEARLeft 1/4 SpanMiddle SpanRight 1/4 SpanRemarksMaximum Shear per m run under service(KN/m)170.4170.4170.4Maximum Shear per beam under service(KN/m)170.4170.4170.4Maximum Shear per beam (Ultimate) Vult(KN)238.5238.5238.5v=V/(b*d)(N/mm2)0.3410.3410.341Design Concrete Stress vc (Table 3.8 of BS 8110)1.0201.0201.020Distance av (Note : leave blank if n.a.)(mm)Enhanced Factor g = 2d / aV1.0001.0001.000Enhanced Shear gvc1.0201.0201.020Max ((v-gvc), 0.4) required by Table3.7 of BS 81100.4000.4000.400Asv/Sv required(mm)1.001.001.00Links Provided2T10-2002T10-2002T10-200Size of Links(mm)101010Nos. Of legs444Link Spacing c/c(mm)200200200Link area provided - Asv(mm2)314314314Asv/Sv provided1.571.571.57O.K.O.K.O.K.CHECK TORSIONLeft 1/4 SpanMiddle SpanRight 1/4 SpanRemarksMAXIMUM TORSION PER m RUN(KN-m/m)0.000.000.00MAXIMUM TORSION(KN-m/m)0.000.000.00ULTIMATE TORSION(KN-m)0.000.000.00HORIZONTAL DISTANCE OF LINK X1(mm)900.00900.00900.00VERTICAL DISTANCE OF LINK Y1(mm)690.00690.00690.00SIZE OF LINKS(mm)10.0010.0010.00AREA OF LINK - 2 LEGS Asv(mm2)157.08157.08157.08STRENGTH OF LINKS fyv(N/mm2)460.00460.00460.00LINKS SPACING Sv=0.8*X1*Y1*Asv*0.87*fyv/(T)(mm)N.A.N.A.N.A.PROVIDINGAREA OF LONGI. BARS INSIDE PERI. OF LINK As (mm2)(mm2)N.A.N.A.N.A.PROVIDING